335 W 48TH ST 90037

Certificate Information: 335 W 48TH ST 90037

Application / Permit
19010-20000-02540
Plan Check / Job No.
B19VN09861
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
NEW 30'-0" x 27'-0" IRREGULAR SHAPED DETACHED TWO CAR GARAGE WITH 30'-0" x 30'-4" IRREGULAR SHAPED (N) ACCESSORY DWELLING UNIT PER AB 494 AND SB 229 ON SECOND FLOOR.
Permit Issued
Issued on 8/12/2019
Issuing Office
Valley
Current Status
CofO Issued on 8/20/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/13/2019 APPLICANT
Green Plans Picked Up 6/26/2019 APPLICANT
Assigned to Plan Check Engineer 7/3/2019 SARKIS HARABEDIAN
Corrections Issued 7/8/2019 SARKIS HARABEDIAN
Quality Review Completed 7/8/2019 ABDUL CHEGENI
Building Plans Picked Up 7/9/2019 APPLICANT
Applicant returned to address corrections 7/24/2019 SARKIS HARABEDIAN
Plan Check Approved 8/9/2019 SARKIS HARABEDIAN
Issued 8/12/2019 LADBS
CofO in Progress 8/16/2022 JOAQUIN GREENOUGH
Permit Finaled 8/20/2022 DEROLD HAUFF
CofO Issued 8/20/2022 DEROLD HAUFF
Permit Finaled 8/20/2022 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 7/9/2019 SAFA JAVANMARDI
Eng Process Fee Ord 176,300 Cleared 7/9/2019 SAFA JAVANMARDI
Permit Cleared 7/9/2019 SAFA JAVANMARDI
Trees in Parkway Cleared 7/12/2019 HECTOR BANUELOS
Low Impact Development Cleared 7/26/2019 JORGE MEJIA LEMUS
Roof/Waste drainage to street Cleared 7/26/2019 ELAINE LEI
Green Code Cleared 7/29/2019 DAVID MATSON
ZI Cleared 8/2/2019 NOAH MCCOY
Sewer availability Cleared 8/8/2019 GUILLERMO PETRA
Hydrant and Access approval Cleared 8/9/2019 GEORGE SUCHAND

Contact Information

Contractor Owner-Builder       ,
Engineer Hedjran,, Nader; Lic. No.: C68179 1311 VISTA COLINA DR      SAN MARCOS, CA 92078

Inspector Information

ALEJANDRO DE ARTOLA, (213) 202-3128 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 9/3/2019 Corrections Issued JOSEPH MCGARRY
BUILDING-Rough-Frame 4/9/2020 Not Ready for Inspection FREDDIE RIVERA
ELECTRICAL-Rough 4/9/2020 Approved FREDDIE RIVERA
Green Building Rough 4/9/2020 Not Ready for Inspection FREDDIE RIVERA
HVAC-Rough 4/9/2020 Not Ready for Inspection FREDDIE RIVERA
MERV13>=Rough 4/9/2020 Not Ready for Inspection FREDDIE RIVERA
PLUMBING-Rough 4/9/2020 Not Ready for Inspection FREDDIE RIVERA
Verify Sprinkler Sign Off 4/9/2020 Not Ready for Inspection FREDDIE RIVERA
BUILDING-Rough-Frame 4/16/2020 Corrections Issued ALEJANDRO DE ARTOLA
Floor/Roof Diaphrgm/Shear Wall 4/16/2020 Partial Approval ALEJANDRO DE ARTOLA
Green Building Rough 4/16/2020 Partial Approval ALEJANDRO DE ARTOLA
MERV13>=Rough 4/16/2020 Partial Approval ALEJANDRO DE ARTOLA
PLUMBING-Rough 4/16/2020 Partial Approval ALEJANDRO DE ARTOLA
Verify Sprinkler Sign Off 4/16/2020 Not Ready for Inspection ALEJANDRO DE ARTOLA
BUILDING-Rough-Frame 4/27/2020 Not Ready for Inspection ENRIQUE MIRELES
Footing/Foundation/Slab 4/27/2020 Not Ready for Inspection ENRIQUE MIRELES
Green Building Rough 4/27/2020 Corrections Issued ENRIQUE MIRELES
MERV13>=Rough 4/27/2020 Not Ready for Inspection ENRIQUE MIRELES
Verify Sprinkler Sign Off 4/27/2020 Not Ready for Inspection ENRIQUE MIRELES
PLUMBING-Rough 4/29/2020 Corrections Issued ALEJANDRO DE ARTOLA
PLUMBING-Rough 5/4/2020 Partial Approval FREDDIE RIVERA
PLUMBING-Rough 5/6/2020 Not Ready for Inspection ROBERT MCDOWELL
BUILDING-Rough-Frame 5/14/2020 Not Ready for Inspection ROBERT MCDOWELL
Green Building Rough 5/14/2020 Not Ready for Inspection ROBERT MCDOWELL
MERV13>=Rough 5/14/2020 Approved ROBERT MCDOWELL
Verify Sprinkler Sign Off 5/14/2020 Not Ready for Inspection ROBERT MCDOWELL
Footing/Foundation/Slab 5/26/2020 Partial Approval CHRISTOPHER DELLEFIELD
Insulation 5/26/2020 Approved CHRISTOPHER DELLEFIELD
Interior/Exterior Lathing 5/26/2020 Conditional Approval CHRISTOPHER DELLEFIELD
Drywall Nailing 6/10/2020 Approved SABAS ALONSO
Green Building Rough 6/10/2020 Approved SABAS ALONSO
Interior/Exterior Lathing 6/10/2020 Approved SABAS ALONSO
BUILDING-Rough-Frame 8/7/2020 Conditional Approval ROBERT MCDOWELL
ELECTRICAL-Final 8/7/2020 Approved ROBERT MCDOWELL
Final 8/7/2020 Corrections Issued ROBERT MCDOWELL
Footing/Foundation/Slab 8/7/2020 Approved ROBERT MCDOWELL
Green Building Final 8/7/2020 Approved ROBERT MCDOWELL
Green Building Rough 8/7/2020 Approved ROBERT MCDOWELL
HVAC-Final 8/7/2020 Approved ROBERT MCDOWELL
MERV13>=Final 8/7/2020 Approved ROBERT MCDOWELL
PLUMBING-Final 8/7/2020 Approved ROBERT MCDOWELL
SGSOV-Seismic Gas S/O Valve 8/7/2020 SGSOV Not Ready ROBERT MCDOWELL
Service/Power Release 8/7/2020 Approved ROBERT MCDOWELL
Smoke Detectors 8/7/2020 Approved ROBERT MCDOWELL
Verify Sprinkler Sign Off 8/7/2020 Partial Inspection ROBERT MCDOWELL
Service/Power Release 11/9/2020 Not Ready for Inspection DAVID FEILER
Pre-Inspection 5/12/2021 Approved HORACE FULTZ
BUILDING-Rough-Frame 2/1/2022 Not Ready for Inspection JOAQUIN GREENOUGH
Final 2/1/2022 Corrections Issued JOAQUIN GREENOUGH
SGSOV-Seismic Gas S/O Valve 2/1/2022 SGSOV Not Ready JOAQUIN GREENOUGH
Verify Sprinkler Sign Off 2/1/2022 Corrections Issued JOAQUIN GREENOUGH
BUILDING-Rough-Frame 4/6/2022 Not Ready for Inspection JOAQUIN GREENOUGH
Final 4/6/2022 Corrections Issued JOAQUIN GREENOUGH
SGSOV-Seismic Gas S/O Valve 4/6/2022 SGSOV Not Ready JOAQUIN GREENOUGH
Verify Sprinkler Sign Off 4/6/2022 Not Ready for Inspection JOAQUIN GREENOUGH
BUILDING-Rough-Frame 4/14/2022 Not Ready for Inspection JOAQUIN GREENOUGH
Final 4/14/2022 Corrections Issued JOAQUIN GREENOUGH
SGSOV-Seismic Gas S/O Valve 4/14/2022 SGSOV Not Ready JOAQUIN GREENOUGH
Verify Sprinkler Sign Off 4/14/2022 Not Ready for Inspection JOAQUIN GREENOUGH
SGSOV-Seismic Gas S/O Valve 4/22/2022 SGSOV Not Ready JOAQUIN GREENOUGH
BUILDING-Rough-Frame 5/10/2022 Approved JOAQUIN GREENOUGH
Final 5/10/2022 Corrections Issued JOAQUIN GREENOUGH
SGSOV-Seismic Gas S/O Valve 5/10/2022 SGSOV Approved JOAQUIN GREENOUGH
Verify Sprinkler Sign Off 5/10/2022 Approved JOAQUIN GREENOUGH
Final 6/28/2022 Not Ready for Inspection JOAQUIN GREENOUGH
Final 8/2/2022 OK to Issue CofO JOAQUIN GREENOUGH
Service/Power Release 8/2/2022 Approved JOAQUIN GREENOUGH