5523 N SYLVIA AVE 91356

Certificate Information: 5523 N SYLVIA AVE 91356

Application / Permit
19010-20000-02421
Plan Check / Job No.
B19VN09494
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
(N) (70'-6"x 38'-0") TWO STORY SINGLE FAMILY DWELLING WITH ATT. 2-CAR GARAGE. NFPA-13D FIRE SPRINKLER THROUGHOUT. WORK PER ENGINEER.
Permit Issued
Issued on 10/10/2019
Issuing Office
Valley
Current Status
CofO Issued on 10/26/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/7/2019 APPLICANT
Green Plans Picked Up 7/12/2019 APPLICANT
Assigned to Plan Check Engineer 7/18/2019 TROY DEGUZMAN
Corrections Issued 7/25/2019 TROY DEGUZMAN
Quality Review Completed 7/26/2019 CHON CHIO KUO
Building Plans Picked Up 8/2/2019 APPLICANT
Applicant returned to address corrections 9/12/2019 TROY DEGUZMAN
Applicant returned to address corrections 10/4/2019 TROY DEGUZMAN
Plan Check Approved 10/7/2019 TROY DEGUZMAN
Issued 10/10/2019 LADBS
CofO in Progress 10/6/2022 DAVID SANDOVAL
Permit Finaled 10/26/2022 MICHAEL SMITH
CofO Issued 10/26/2022 MICHAEL SMITH
Permit Finaled 10/26/2022 MICHAEL SMITH

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 10/3/2019 JOHN LIN
Hydrant and Access approval Cleared 10/3/2019 GEORGE SUCHAND
Low Impact Development Cleared 10/3/2019 SARAH YOUSSEF
Roof/Waste drainage to street Cleared 10/3/2019 JOHN LIN
Sewer availability Cleared 10/3/2019 JOHN LIN
GPI Written Notices Cleared 10/4/2019 TROY DEGUZMAN
Grading Pre-Inspection Cleared 10/4/2019 BARTON HOLMES
Green Code Cleared 10/7/2019 PARISA ZAHABI

Contact Information

Contractor Owner-Builder       ,
Engineer Adams,, Robert Charles; Lic. No.: C21234 22129 BRYANT STREET      CANOGA PARK, CA 91304

Inspector Information

JOHN KIDWELL, (818) 774-4314 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 10/22/2019 Approved SEAN WIRCH
Pre-Inspection 5/27/2020 Not Ready for Inspection DAVID SANDOVAL
Footing/Foundation/Slab 6/22/2020 Partial Approval DONALD SUNSERI
Underground Mechanical 6/22/2020 Approved DONALD SUNSERI
Excavation/Setback/Form/Re-Bar 7/1/2020 Approved RONALD COWAN
Footing/Foundation/Slab 7/1/2020 Approved RONALD COWAN
Deputy Reinf. Concrete 7/2/2020 Approved DONALD SUNSERI
Floor/Roof Diaphrgm/Shear Wall 7/27/2020 Corrections Issued DAVID SANDOVAL
Deputy Steel/Welding 8/4/2020 Approved DAVID SANDOVAL
Floor/Roof Diaphrgm/Shear Wall 8/6/2020 Not Ready for Inspection DAVID SANDOVAL
Deputy Steel/Welding 8/11/2020 Approved DAVID SANDOVAL
Floor/Roof Diaphrgm/Shear Wall 8/13/2020 Partial Approval DAVID SANDOVAL
Floor/Roof Diaphrgm/Shear Wall 9/1/2020 Corrections Issued DAVID SANDOVAL
Floor/Roof Diaphrgm/Shear Wall 10/21/2020 Partial Approval DAVID SANDOVAL
ELECTRICAL-Rough 10/23/2020 Not Ready for Inspection DAVID SANDOVAL
Gas Test 10/23/2020 Not Ready for Inspection DAVID SANDOVAL
HVAC-Rough 10/23/2020 Not Ready for Inspection DAVID SANDOVAL
PLUMBING-Rough 10/23/2020 Not Ready for Inspection DAVID SANDOVAL
Rough-Elec/Plmb/HVAC 10/23/2020 Corrections Issued DAVID SANDOVAL
ELECTRICAL-Rough 10/30/2020 Approved DAVID SANDOVAL
Gas Test 10/30/2020 Partial Approval DAVID SANDOVAL
Green Building Rough 10/30/2020 Not Ready for Inspection DAVID SANDOVAL
HVAC-Rough 10/30/2020 Partial Inspection DAVID SANDOVAL
PLUMBING-Rough 10/30/2020 Approved DAVID SANDOVAL
Floor/Roof Diaphrgm/Shear Wall 11/4/2020 Approved DAVID SANDOVAL
BUILDING-Rough-Frame 11/18/2020 Approved DAVID SANDOVAL
Green Building Rough 11/18/2020 Approved DAVID SANDOVAL
Interior/Exterior Lathing 11/18/2020 Partial Approval DAVID SANDOVAL
MERV13>=Rough 11/18/2020 Approved DAVID SANDOVAL
Verify Sprinkler Sign Off 11/18/2020 Approved DAVID SANDOVAL
Insulation 11/20/2020 Corrections Issued DAVID SANDOVAL
Insulation 11/24/2020 Approved DAVID SANDOVAL
Drywall Nailing 12/2/2020 Approved DAVID SANDOVAL
ELECTRICAL-Final 10/29/2021 Approved DAVID SANDOVAL
Gas Test 10/29/2021 Approved DAVID SANDOVAL
Green Building Final 10/29/2021 Not Ready for Inspection DAVID SANDOVAL
HVAC-Final 10/29/2021 Corrections Issued DAVID SANDOVAL
PLUMBING-Final 10/29/2021 Approved DAVID SANDOVAL
Smoke Detectors 10/29/2021 Corrections Issued DAVID SANDOVAL
SGSOV-Seismic Gas S/O Valve 8/22/2022 SGSOV Not Ready DAVID SANDOVAL
Final 8/25/2022 Not Ready for Inspection DAVID SANDOVAL
Green Building Final 8/25/2022 Approved DAVID SANDOVAL
MERV13>=Final 8/25/2022 Not Ready for Inspection DAVID SANDOVAL
SGSOV-Seismic Gas S/O Valve 8/25/2022 SGSOV Not Ready DAVID SANDOVAL
Service/Power Release 8/25/2022 Not Ready for Inspection DAVID SANDOVAL
Smoke Detectors 8/25/2022 Not Ready for Inspection DAVID SANDOVAL
Final 10/5/2022 OK to Issue CofO DAVID SANDOVAL
HVAC-Final 10/5/2022 Approved DAVID SANDOVAL
MERV13>=Final 10/5/2022 Approved DAVID SANDOVAL
SGSOV-Seismic Gas S/O Valve 10/5/2022 SGSOV Approved DAVID SANDOVAL
Service/Power Release 10/5/2022 Approved DAVID SANDOVAL
Smoke Detectors 10/5/2022 Approved DAVID SANDOVAL