233-233 1/2 N WELCOME ST 90026

Certificate Information: 233-233 1/2 N WELCOME ST 90026

Application / Permit
19010-20000-01914
Plan Check / Job No.
B19VN07485
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
NEW IRREGULAR SHAPE 48' X 32' NFPA13-D SPRINKLER TROUGHOUT 3-STORY DUPLEX (front building)
Permit Issued
Issued on 9/20/2019
Issuing Office
Metro
Current Status
CofO Issued on 4/1/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/7/2019 APPLICANT
Assigned to Plan Check Engineer 5/23/2019 ALDOUS CHIC
Corrections Issued 5/28/2019 ALDOUS CHIC
Quality Review Completed 5/29/2019 ABDUL CHEGENI
Building Plans Picked Up 5/29/2019 APPLICANT
Green Plans Picked Up 5/29/2019 APPLICANT
Applicant returned to address corrections 8/7/2019 ALDOUS CHIC
Plan Check Approved 8/20/2019 ALDOUS CHIC
Issued 9/20/2019 LADBS
CofO in Progress 3/9/2022 THOMAS LOGRASSO
Permit Finaled 4/1/2022 DEROLD HAUFF
CofO Issued 4/1/2022 DEROLD HAUFF
Permit Finaled 4/1/2022 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 5/30/2019 ELENA LOPEZ
Eng Process Fee Ord 176,300 Cleared 5/30/2019 ELENA LOPEZ
Grading Pre-Inspection Cleared 5/30/2019 PATRICK MISCHLICH
Highway dedication Cleared 5/30/2019 ELENA LOPEZ
Sewer availability Cleared 5/30/2019 ELENA LOPEZ
Green Code Cleared 7/25/2019 PARISA ZAHABI
Frnt yard landscape/Water mgmt Cleared 7/26/2019 RICHARD REASER
Abandoned oil well Cleared 7/31/2019 GEORGE SUCHAND
Hydrant and Access approval Cleared 7/31/2019 GEORGE SUCHAND
Low Impact Development Cleared 7/31/2019 ORVAL HERNANDEZ-MARCI
Roof/Waste drainage to street Cleared 7/31/2019 KARAN PATEL
Trees in Parkway Cleared 8/2/2019 JOHN KIM
Miscellaneous Cleared 8/5/2019 RICHARD REASER
GPI Written Notices Cleared 8/19/2019 ALDOUS CHIC

Contact Information

Contractor Golden Point Construction; Lic. No.: 965193-B 731 EAST 75TH STREET      LOS ANGELES, CA 90001
Engineer Dorta,, Michael Rohrs; Lic. No.: C72538 26851 GRAYSLAKE ROAD      RANCHO PALOS VERDES, CA 90275

Inspector Information

HAMIK HARTOUNIAN, (213) 202-3275 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 1/27/2020 Not Ready for Inspection AJA COLLAY
Footing/Foundation/Slab 1/27/2020 Not Ready for Inspection AJA COLLAY
METHANE-Barrier 1/27/2020 Not Ready for Inspection AJA COLLAY
METHANE-Subgrade 1/27/2020 Not Ready for Inspection AJA COLLAY
Excavation/Setback/Form/Re-Bar 1/30/2020 Corrections Issued AJA COLLAY
Excavation/Setback/Form/Re-Bar 2/3/2020 Approved AJA COLLAY
Underground Mechanical 2/27/2020 Partial Approval HORACE FULTZ
Floor/Roof Diaphrgm/Shear Wall 3/3/2020 Partial Approval AJA COLLAY
ELECTRICAL-Rough 7/8/2020 Not Ready for Inspection ENRIQUE MIRELES
Floor/Roof Diaphrgm/Shear Wall 7/8/2020 Corrections Issued ENRIQUE MIRELES
HVAC-Rough 7/8/2020 Not Ready for Inspection ENRIQUE MIRELES
Floor/Roof Diaphrgm/Shear Wall 7/14/2020 Not Ready for Inspection KATHRYN BUTTERWORTH
HVAC-Rough 7/14/2020 Corrections Issued KATHRYN BUTTERWORTH
Deputy Wood Construction 7/21/2020 Conditional Approval CHRISTOPHER DELLEFIELD
ELECTRICAL-Rough 8/18/2020 Not Ready for Inspection JOSEPH MCGARRY
Floor/Roof Diaphrgm/Shear Wall 8/18/2020 Conditional Approval JOSEPH MCGARRY
Green Building Rough 8/18/2020 Not Ready for Inspection JOSEPH MCGARRY
HVAC-Rough 8/18/2020 Not Ready for Inspection JOSEPH MCGARRY
METHANE-Rough 8/18/2020 Not Ready for Inspection JOSEPH MCGARRY
PLUMBING-Rough 8/18/2020 Partial Approval JOSEPH MCGARRY
Verify Sprinkler Sign Off 8/18/2020 Approved JOSEPH MCGARRY
BUILDING-Rough-Frame 8/27/2020 Corrections Issued STUART CHAPMAN
ELECTRICAL-Rough 8/27/2020 Corrections Issued STUART CHAPMAN
Green Building Rough 8/27/2020 Corrections Issued STUART CHAPMAN
HVAC-Rough 8/27/2020 Not Ready for Inspection STUART CHAPMAN
METHANE-Rough 8/27/2020 Approved STUART CHAPMAN
PLUMBING-Rough 8/27/2020 Corrections Issued STUART CHAPMAN
HVAC-Rough 9/22/2020 Not Ready for Inspection RUBEN SALAS
Interior/Exterior Lathing 9/22/2020 Not Ready for Inspection RUBEN SALAS
BUILDING-Rough-Frame 9/28/2020 Not Ready for Inspection KATHRYN BUTTERWORTH
ELECTRICAL-Final 9/28/2020 Not Ready for Inspection KATHRYN BUTTERWORTH
ELECTRICAL-Rough 9/28/2020 Partial Approval KATHRYN BUTTERWORTH
Green Building Rough 9/28/2020 Not Ready for Inspection KATHRYN BUTTERWORTH
PLUMBING-Final 9/28/2020 Not Ready for Inspection KATHRYN BUTTERWORTH
PLUMBING-Rough 9/28/2020 Approved KATHRYN BUTTERWORTH
BUILDING-Rough-Frame 10/13/2020 Corrections Issued OSVALDO PARAMO
HVAC-Rough 10/13/2020 Approved OSVALDO PARAMO
BUILDING-Rough-Frame 10/23/2020 Partial Approval DAVID CHAN
Interior/Exterior Lathing 10/23/2020 Approved DAVID CHAN
BUILDING-Rough-Frame 11/2/2020 Corrections Issued SCOTT FINNILA
Green Building Rough 11/2/2020 Corrections Issued SCOTT FINNILA
Insulation 11/9/2020 Not Ready for Inspection HAMIK HARTOUNIAN
BUILDING-Rough-Frame 11/14/2020 Not Ready for Inspection DAVID CHAN
ELECTRICAL-Rough 11/14/2020 Approved DAVID CHAN
Green Building Rough 11/14/2020 Approved DAVID CHAN
Insulation 11/14/2020 Approved DAVID CHAN
Drywall Nailing 11/25/2020 Approved ROBERT VORHIS
Green Building Rough 11/25/2020 Approved ROBERT VORHIS
Shower Pan 3/5/2021 Approved OSVALDO PARAMO
BUILDING-Rough-Frame 7/13/2021 Not Ready for Inspection KATHRYN BUTTERWORTH
Final 7/13/2021 Not Ready for Inspection KATHRYN BUTTERWORTH
Footing/Foundation/Slab 7/13/2021 Not Ready for Inspection KATHRYN BUTTERWORTH
Green Building Final 7/13/2021 Not Ready for Inspection KATHRYN BUTTERWORTH
METHANE-Barrier 7/13/2021 Not Ready for Inspection KATHRYN BUTTERWORTH
METHANE-Subgrade 7/13/2021 Not Ready for Inspection KATHRYN BUTTERWORTH
SGSOV-Seismic Gas S/O Valve 7/13/2021 SGSOV Not Ready KATHRYN BUTTERWORTH
Service/Power Release 7/13/2021 Not Ready for Inspection KATHRYN BUTTERWORTH
Smoke Detectors 7/13/2021 Not Ready for Inspection KATHRYN BUTTERWORTH
BUILDING-Rough-Frame 8/13/2021 Approved OSVALDO PARAMO
Final 8/13/2021 Not Ready for Inspection OSVALDO PARAMO
Footing/Foundation/Slab 8/13/2021 Approved OSVALDO PARAMO
Green Building Final 8/13/2021 Not Ready for Inspection OSVALDO PARAMO
SGSOV-Seismic Gas S/O Valve 8/13/2021 SGSOV Not Ready OSVALDO PARAMO
Smoke Detectors 8/13/2021 Not Ready for Inspection OSVALDO PARAMO
Final 8/25/2021 Corrections Issued KATHRYN BUTTERWORTH
Green Building Final 8/25/2021 Not Ready for Inspection KATHRYN BUTTERWORTH
SGSOV-Seismic Gas S/O Valve 8/25/2021 SGSOV Approved KATHRYN BUTTERWORTH
Service/Power Release 8/25/2021 Not Ready for Inspection KATHRYN BUTTERWORTH
Smoke Detectors 8/25/2021 Approved KATHRYN BUTTERWORTH
ELECTRICAL-Final 9/10/2021 Corrections Issued STUART CHAPMAN
Final 9/10/2021 Not Ready for Inspection STUART CHAPMAN
Green Building Final 9/10/2021 Corrections Issued STUART CHAPMAN
HVAC-Final 9/10/2021 Corrections Issued STUART CHAPMAN
PLUMBING-Final 9/10/2021 Corrections Issued STUART CHAPMAN
Service/Power Release 9/10/2021 Not Ready for Inspection STUART CHAPMAN
Final 9/17/2021 Not Ready for Inspection THOMAS LOGRASSO
Green Building Final 9/17/2021 Not Ready for Inspection THOMAS LOGRASSO
Service/Power Release 9/17/2021 Not Ready for Inspection THOMAS LOGRASSO
Final 9/28/2021 Corrections Issued OSVALDO PARAMO
Final 9/30/2021 Conditional Approval OSVALDO PARAMO
Green Building Final 9/30/2021 Approved OSVALDO PARAMO
Service/Power Release 9/30/2021 Approved OSVALDO PARAMO
Final 3/9/2022 OK to Issue CofO THOMAS LOGRASSO