3016 N NORTH MAIN ST 90031
Certificate Information: 3016 N NORTH MAIN ST 90031
- Application / Permit
- 19010-10004-06106
- Plan Check / Job No.
- B23LA11393
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Commercial
- Primary Use
- (5) Apartment
- Work Description
- *eplan* Supplemental to permit number 19010-10000-06106, : To change the number of required parking to zero per AB 2097. - Enclose the loading space and change it to commercial use. -Change store front door from a store front slider to a flash panel hollow metal door and frame, infill opening with a rated framed wall and exterior cement plaster finish; - Remove roll-up doors at Loading Area and infill opening with framed wall and provide cement stucco finish; - Replace the storefront and glazing at NE corner; provide flush panel hollow door and frame. In fill opening with framed wall, provide exterior cement plaster finish.; - Remove glazing from arched openings; provide rectangular glazing units and infill arched openings with framed construction. Provide exterior cement plaster finish; - Add a U-shaped framed perforated guardrail. Provide two 7 tall, perforated metal panels at elevator lobby opening at 5th floor.; Add hose bibs at exterior building faade at level the podium. ** Core and Shell only. TI will be under seprate permits **
- Permit Issued
- Issued on 5/10/2024
- Issuing Office
- Current Status
- Permit Finaled on 11/14/2024
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Submitted | 6/27/2023 | APPLICANT |
| Assigned to Plan Check Engineer | 6/29/2023 | JOHNNY WU |
| Corrections Issued | 7/27/2023 | KESETE HAREGOT |
| Quality Review Completed | 8/1/2023 | RODOLFO ARIAS |
| Applicant returned to address corrections | 9/15/2023 | JOHNNY WU |
| Applicant returned to address corrections | 12/8/2023 | JOHNNY WU |
| Applicant returned to address corrections | 12/15/2023 | JOHNNY WU |
| Applicant returned to address corrections | 2/26/2024 | JOHNNY WU |
| Applicant returned to address corrections | 2/28/2024 | JOHNNY WU |
| Applicant returned to address corrections | 3/6/2024 | JOHNNY WU |
| Applicant returned to address corrections | 4/22/2024 | JOHNNY WU |
| Applicant returned to address corrections | 5/6/2024 | JOHNNY WU |
| Applicant returned to address corrections | 5/8/2024 | JOHNNY WU |
| Plan Check Approved | 5/8/2024 | JOHNNY WU |
| Issued | 5/10/2024 | APPLICANT |
| Permit Finaled | 11/14/2024 | RAFAEL ESPINOZA |
Permit Application Clearance Information
| DAS Clearance | Cleared | 4/3/2024 | Rodolfo Arias |
| ZA Case | Cleared | 4/8/2024 | MATHEW QUAN |
| ZA Case | Cleared | 4/8/2024 | MATHEW QUAN |
| ZA Case | Cleared | 4/8/2024 | MATHEW QUAN |
| CPC | Cleared | 5/3/2024 | MATHEW QUAN |
| Miscellaneous | Cleared | 5/3/2024 | MATHEW QUAN |
Contact Information
| Architect | Suarez,, Hugo; Lic. No.: NA10561 | , |
| Contractor | Walton Construction Inc; Lic. No.: 1034491-B | 358 E FOOTHILL BLVD STE 100 SAN DIMAS, CA 91773 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| Final | 11/14/2024 | Permit Finaled | RAFAEL ESPINOZA |
| Reinforced Concrete Frame | 11/14/2024 | Approved | RAFAEL ESPINOZA |
| Reinforced Masonry Frame | 11/14/2024 | Approved | RAFAEL ESPINOZA |
| Wood Frame | 11/14/2024 | Approved | RAFAEL ESPINOZA |