1260 S FIGUEROA ST 90015

Certificate Information: 1260 S FIGUEROA ST 90015

Application / Permit
19010-10003-01188
Plan Check / Job No.
B19LA15795
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(11) Hotel
Work Description
`PROPOSED EARLY START (FOUNDATION ONLY PERMIT) FOR A 38 STORY HOTEL, RETAIL/AMENITY SPACE WITH REQUIRED PARKING GARAGE. THIS PERMIT IS TO CONSTRUCT TO THE AT GRADE SLAB.
Permit Issued
Issued on 4/21/2020
Issuing Office
Metro
Current Status
Permit Finaled on 9/30/2022

Permit Application Status History

Plan Check Approved 2/28/2020 JOHN VASQUEZ
Issued 4/21/2020 LADBS
Permit Finaled 9/30/2022 RAFAEL ESPINOZA

Permit Application Clearance Information

Address approval Cleared 8/1/2019 JEANIE LAM
Bicycle Parking Cleared 8/1/2019 JEANIE LAM
Encroachment in public way Cleared 8/1/2019 JEANIE LAM
Highway dedication Cleared 8/1/2019 JEANIE LAM
Permit Cleared 8/1/2019 JEANIE LAM
Sewer availability Cleared 8/1/2019 JEANIE LAM
Watercourse Cleared 8/1/2019 JEANIE LAM
City owned building/parcel Cleared 8/12/2019 HAROOT AVANESIAN
Low Impact Development Cleared 8/12/2019 JORGE MEJIA LEMUS
Roof/Waste drainage to street Cleared 8/12/2019 ERIK BEASLEY
Stormwater Pollution Mitigatn Cleared 8/12/2019 JORGE MEJIA LEMUS
Driveway location Cleared 8/14/2019 EDUARDO HERMOSO
Eng Process Fee Ord 176,300 Cleared 8/14/2019 JAMES MORALEZ
Trees in Parkway Cleared 8/19/2019 ADRIAN SANCHEZ
Abandoned oil well Cleared 8/20/2019 GEORGE SUCHAND
Abandoned oil well approval Cleared 8/20/2019 GEORGE SUCHAND
DAS Clearance Cleared 8/20/2019 JOHN VASQUEZ
Hydrant and Access approval Cleared 8/20/2019 GEORGE SUCHAND
Project located in CRA area Cleared 8/23/2019 JIM URQUHART
Food Service Establishment Cleared 8/26/2019 KENNETH BROWNE
Green Code Cleared 8/30/2019 JOHN VASQUEZ
Fire Marshall Fire Life Safety Cleared 2/4/2020 DOMINIQUE MEDINA
Building over 3-story or 36-ft Cleared 2/28/2020 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 2/28/2020 CALOSHA APPROVED
Miscellaneous Cleared 2/28/2020 ERIN STRELICH
Miscellaneous Cleared 2/28/2020 ERIN STRELICH
Miscellaneous Cleared 2/28/2020 ERIN STRELICH
Miscellaneous Cleared 2/28/2020 ERIN STRELICH
ZA Case Cleared 2/28/2020 ERIN STRELICH
ZI Cleared 2/28/2020 ERIN STRELICH
Work Adjacent to Public Way Cleared 3/2/2020 BOK GOH
"D" conditions Cleared 3/12/2020 ERIN STRELICH
"Q" conditions Cleared 3/12/2020 ERIN STRELICH
CPC Cleared 3/12/2020 ERIN STRELICH
CPC Cleared 3/12/2020 ERIN STRELICH
Site Plan review Cleared 3/12/2020 ERIN STRELICH
Tract Map conditions Cleared 3/13/2020 ERIN STRELICH
"T" removal Cleared 4/17/2020 ERIN STRELICH

Contact Information

Architect Wicksman,, Warwick Ian; Lic. No.: C23350 22844 DOLOROSA ST      WOODLAND HILLS, CA 91367
Contractor Suffolk Construction Company Inc; Lic. No.: 751099-B 525 MARKET ST STE 2850      SAN FRANCISCO, CA 94105
Engineer Islam,, Mohammed Saiful; Lic. No.: S4083 155 N LAKE AVE SUITE 600      PASADENA, CA 91101

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 5/5/2020 Not Ready for Inspection JAMES POWERS
Pre-Inspection 5/5/2020 Approved JAMES POWERS
Deputy Reinf. Concrete 5/6/2020 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 5/8/2020 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 5/11/2020 Partial Approval LANNY MERRICK
Excavation/Setback/Form/Re-Bar 5/14/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 5/18/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 5/18/2020 Partial Approval NICK DANERI
Reinforced Concrete Frame 5/18/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 5/19/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/20/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 5/21/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 5/22/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 5/27/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 5/28/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 5/29/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/1/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/2/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 6/2/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 6/3/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/4/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/5/2020 Conditional Approval NICK DANERI
Footing/Foundation/Slab 6/9/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 6/10/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/11/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 6/11/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 6/12/2020 Conditional Approval NICK DANERI
Footing/Foundation/Slab 6/13/2020 Off-Hour Fees Due
Footing/Foundation/Slab 6/13/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 6/15/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/16/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/17/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/18/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/19/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/22/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/23/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 6/23/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 6/23/2020 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 6/24/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 6/24/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 6/24/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 6/25/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 6/25/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/26/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 6/26/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 6/26/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 6/29/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 6/29/2020 Conditional Approval NICK DANERI
Footing/Foundation/Slab 6/29/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 6/30/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 6/30/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 6/30/2020 Not Ready for Inspection NICK DANERI
Footing/Foundation/Slab 6/30/2020 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 7/1/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 7/1/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 7/1/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 7/2/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 7/2/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 7/2/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 7/6/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 7/6/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 7/8/2020 Not Ready for Inspection NICK DANERI
Excavation/Setback/Form/Re-Bar 7/9/2020 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 7/10/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 7/10/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/13/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 7/13/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/14/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 7/14/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/15/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 7/15/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 7/15/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 7/16/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 7/16/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/17/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 7/17/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/20/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 7/20/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 7/23/2020 Not Ready for Inspection NICK DANERI
Excavation/Setback/Form/Re-Bar 7/24/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 7/28/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/29/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 7/29/2020 Partial Inspection NICK DANERI
Deputy Reinf. Concrete 7/30/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 7/30/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 7/31/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 7/31/2020 Not Ready for Inspection NICK DANERI
Excavation/Setback/Form/Re-Bar 8/1/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/3/2020 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 8/4/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/4/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 8/4/2020 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 8/5/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/5/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 8/5/2020 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 8/6/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/6/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 8/6/2020 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 8/7/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/7/2020 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 8/10/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/10/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 8/10/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 8/11/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/12/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/17/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 8/18/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 8/19/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 8/19/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 8/20/2020 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 8/26/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/26/2020 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 8/27/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/27/2020 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 8/28/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/28/2020 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 8/31/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/31/2020 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 9/10/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/10/2020 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 9/11/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/11/2020 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 10/6/2020 Off-Hour Fees Due
Structural Steel Frame 10/6/2020 Off-Hour Fees Due
Floor/Roof Diaphrgm/Shear Wall 1/6/2021 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 5/5/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 5/12/2021 Conditional Approval NICK DANERI
Final 9/30/2022 Permit Finaled RAFAEL ESPINOZA
SUSMP-Std. Urban Storm Water 9/30/2022 Approved RAFAEL ESPINOZA
Smoke Detectors 9/30/2022 Approved RAFAEL ESPINOZA