Deputy Reinf. Concrete
|
2/22/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Footing/Foundation/Slab
|
2/22/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
3/10/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
3/10/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
3/22/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Footing/Foundation/Slab
|
3/22/2022
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Footing/Foundation/Slab
|
3/23/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Other (see comments)
|
3/24/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
3/24/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/30/2022
|
Conditional Approval
|
KENNETH ROBERTS
|
|
Deputy Shotcrete
|
3/30/2022
|
Conditional Approval
|
KENNETH ROBERTS
|
|
Reinforced Masonry Frame
|
3/30/2022
|
Partial Approval
|
KENNETH ROBERTS
|
|
Deputy Reinf. Masonry
|
3/31/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Shotcrete
|
3/31/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
4/1/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Shotcrete
|
4/1/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
4/1/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
4/4/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
4/4/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Shotcrete
|
4/4/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
4/5/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
4/5/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Shotcrete
|
4/5/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
4/6/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
4/14/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
4/15/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
4/18/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
4/19/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
4/20/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
4/20/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
4/21/2022
|
Conditional Approval
|
KENNETH ROBERTS
|
|
Deputy Pre-Stress Concrete
|
4/22/2022
|
Conditional Approval
|
KENNETH ROBERTS
|
|
Deputy Pre-Stress Concrete
|
4/25/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
4/26/2022
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
4/27/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
4/28/2022
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Reinf. Masonry
|
4/28/2022
|
Conditional Approval
|
JEFFREY FULTON
|
|
Masonry Wall/Backfill
|
4/28/2022
|
Partial Inspection
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
4/28/2022
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Pre-Stress Concrete
|
4/29/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
4/29/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/2/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
5/2/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/3/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
5/3/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
5/3/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
5/3/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/4/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
5/4/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/6/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
5/6/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
5/6/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/9/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
5/9/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
5/9/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
5/10/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/11/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
5/11/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/12/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
5/12/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
5/13/2022
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Masonry
|
5/13/2022
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Pre-Stress Concrete
|
5/16/2022
|
Conditional Approval
|
ANDREW DORSO
|
|
Deputy Reinf. Masonry
|
5/16/2022
|
Conditional Approval
|
ANDREW DORSO
|
|
Deputy Reinf. Concrete
|
5/17/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
5/17/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
5/18/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/25/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/26/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
5/26/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/27/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/31/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
5/31/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
6/1/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
6/2/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
6/3/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
6/3/2022
|
Partial Inspection
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
6/6/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
6/6/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
6/10/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
6/10/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
6/10/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
6/14/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
6/14/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
6/15/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
6/15/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
6/16/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
6/16/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Shotcrete
|
6/16/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
6/16/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
6/17/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
6/17/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
6/21/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
6/23/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
6/23/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
6/24/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
6/28/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
6/28/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
6/29/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
6/30/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
7/1/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
7/5/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
7/6/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
7/7/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
7/7/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
7/8/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
7/11/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
7/12/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Shotcrete
|
7/12/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
7/12/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
7/13/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
7/13/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
7/13/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
7/14/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
7/15/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Footing/Foundation/Slab
|
7/15/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Drilled-In Anchors
|
7/18/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
7/18/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
7/19/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
7/19/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
7/20/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
7/20/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
7/21/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
7/21/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
7/21/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
7/21/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
7/22/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
7/22/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
7/25/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
7/25/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Shotcrete
|
7/25/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
7/26/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
7/27/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
7/27/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
7/28/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
7/29/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
8/1/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
8/2/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
8/3/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Masonry Frame
|
8/3/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
8/4/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
8/5/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Masonry Frame
|
8/5/2022
|
Partial Inspection
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
8/8/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
8/8/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
8/9/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
8/9/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
8/10/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
8/10/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
8/11/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
8/11/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
8/12/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
8/12/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
8/12/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
8/15/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
8/15/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
8/15/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Pre-Stress Concrete
|
8/16/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
8/16/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
8/16/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Reinforced Masonry Frame
|
8/16/2022
|
Partial Approval
|
BRUCE CAMPBELL
|
|
Deputy Pre-Stress Concrete
|
8/17/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
8/17/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
8/17/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
8/18/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
8/18/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
8/19/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
8/19/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Footing/Foundation/Slab
|
8/19/2022
|
Partial Inspection
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
8/22/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
8/22/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
8/23/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
8/23/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
8/24/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
8/24/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
8/25/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
8/25/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
8/26/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
8/26/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
8/26/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
8/26/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
8/29/2022
|
Partial Approval
|
ANDREW DORSO
|
|
Deputy Reinf. Masonry
|
8/29/2022
|
Conditional Approval
|
ANDREW DORSO
|
|
Deputy Pre-Stress Concrete
|
8/30/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
8/30/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
8/31/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
8/31/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
9/1/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
9/1/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
9/2/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
9/6/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
9/7/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
9/8/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
9/8/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
9/12/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
9/13/2022
|
Conditional Approval
|
ANDREW DORSO
|
|
Deputy Reinf. Masonry
|
9/14/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
9/15/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
9/16/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
9/19/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
9/19/2022
|
Approved
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
9/20/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
9/21/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
9/22/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
9/23/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
9/26/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
9/27/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
9/28/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
9/28/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
9/29/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
9/30/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
10/4/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
10/5/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
10/6/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
10/7/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
10/12/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
10/12/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
10/13/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
10/14/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
10/20/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
10/21/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
11/9/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
11/10/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
11/14/2022
|
Conditional Approval
|
ANDREW DORSO
|
|
Deputy Reinf. Masonry
|
11/15/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
11/16/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
11/17/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
11/18/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Shotcrete
|
11/23/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
11/23/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
11/29/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
12/1/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
12/2/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
12/5/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
12/6/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
12/7/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
12/8/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
12/9/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
12/12/2022
|
Conditional Approval
|
KENNETH ROBERTS
|
|
Masonry Wall/Backfill
|
12/12/2022
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Masonry
|
12/13/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
12/14/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
12/15/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
12/16/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
12/19/2022
|
Approved
|
JOHN KITCKO
|
|
Masonry Wall/Backfill
|
12/19/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
12/20/2022
|
Approved
|
KENNETH ROBERTS
|
|
Masonry Wall/Backfill
|
12/20/2022
|
Partial Approval
|
KENNETH ROBERTS
|
|
Deputy Reinf. Masonry
|
12/21/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
12/22/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
12/22/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
12/23/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
12/23/2022
|
Partial Inspection
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
12/27/2022
|
Conditional Approval
|
ANDREW DORSO
|
|
Deputy Reinf. Masonry
|
12/28/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
12/29/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
12/30/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
2/2/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
2/6/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Special/Order Compliance
|
2/6/2023
|
Conditional Approval
|
STEVEN LEVITT
|
|
Deputy Reinf. Masonry
|
2/7/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Special/Order Compliance
|
2/7/2023
|
Conditional Approval
|
STEVEN LEVITT
|
|
Deputy Reinf. Masonry
|
2/8/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Special/Order Compliance
|
2/8/2023
|
Conditional Approval
|
STEVEN LEVITT
|
|
Deputy Reinf. Masonry
|
2/9/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
2/10/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Special/Order Compliance
|
2/10/2023
|
Conditional Approval
|
STEVEN LEVITT
|
|
Deputy Reinf. Masonry
|
2/13/2023
|
Conditional Approval
|
ANDREW DORSO
|
|
Special/Order Compliance
|
2/13/2023
|
Conditional Approval
|
STEVEN LEVITT
|
|
Deputy Reinf. Masonry
|
2/14/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Masonry Wall/Backfill
|
2/14/2023
|
Partial Inspection
|
ANDREW DORSO
|
|
Special/Order Compliance
|
2/14/2023
|
Partial Approval
|
STEVEN LEVITT
|
|
Deputy Reinf. Masonry
|
2/15/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Footing/Foundation/Slab
|
2/15/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
2/16/2023
|
Conditional Approval
|
DANIEL VARNUM
|
|
Masonry Wall/Backfill
|
2/16/2023
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Masonry
|
2/17/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Special/Order Compliance
|
2/17/2023
|
Conditional Approval
|
STEVEN LEVITT
|
|
Deputy Reinf. Masonry
|
2/21/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
2/22/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
2/23/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
2/24/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
2/27/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
2/28/2023
|
Approved
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Masonry
|
3/1/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/2/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/3/2023
|
Conditional Approval
|
ANDREW DORSO
|
|
Deputy Reinf. Masonry
|
3/6/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
3/6/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/7/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/8/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
3/8/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/9/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Fireproofing
|
3/10/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/10/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
3/14/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Fireproofing
|
3/15/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Fireproofing
|
3/17/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
3/20/2023
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Fireproofing
|
3/21/2023
|
Conditional Approval
|
STEVEN LEVITT
|
|
Deputy Reinf. Concrete
|
4/5/2023
|
Conditional Approval
|
STEVEN LEVITT
|
|
Deputy Reinf. Concrete
|
4/6/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
4/11/2023
|
Conditional Approval
|
STEVEN LEVITT
|
|
Deputy Steel/Welding
|
4/12/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
4/13/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
4/14/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
9/23/2024
|
Conditional Approval
|
CAMERON CHABAN
|