444 W UNIVERSAL HOLLYWOOD DR 91608

Certificate Information: 444 W UNIVERSAL HOLLYWOOD DR 91608

Application / Permit
19010-10001-02251
Plan Check / Job No.
B21LA02460
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(13) Office
Work Description
Early Start - Foundation Only permit - scopes: Excavation work under building footprint, foundation system - piles, pile caps, mat footings and spread footings, Elevator and sump pits slabs and retaining wall below grade level, structural retaining walls at or below grade level, vertical columns from foundation to underside of the lowest floor slab.
Permit Issued
Issued on 4/7/2021
Issuing Office
Metro
Current Status
Permit Finaled on 3/18/2024

Permit Application Status History

Plan Check Approved 3/18/2021 SUEN LIEU
Issued 4/7/2021 APPLICANT
Building Plans Picked Up 4/8/2021 APPLICANT
Permit Finaled 3/18/2024 JOHN KITCKO

Permit Application Clearance Information

Green Code Cleared 2/16/2021 SUEN LIEU
Work Adjacent to Public Way Cleared 2/16/2021 CHIU TAM
Fire Marshall Fire Life Safety Cleared 2/19/2021 DOMINIQUE MEDINA
DAS Clearance Cleared 2/22/2021 SUEN LIEU
Low Impact Development Cleared 2/22/2021 AMMAR ELTAWIL
Stormwater Pollution Mitigatn Cleared 2/22/2021 AMMAR ELTAWIL
Address approval Cleared 2/23/2021 LEE GUILBEAUX
Permit Cleared 2/23/2021 LEE GUILBEAUX
Roof/Waste drainage to street Cleared 2/23/2021 LEE GUILBEAUX
Sewer availability Cleared 2/23/2021 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 2/24/2021 LEE GUILBEAUX
Hydrant and Access approval Cleared 3/3/2021 ROBERT DUFF
"Q" conditions Cleared 3/5/2021 DANALYNN DOMINGUEZ
CPC Cleared 3/5/2021 DANALYNN DOMINGUEZ
Site Plan review Cleared 3/5/2021 DANALYNN DOMINGUEZ
Tract Map conditions Cleared 3/5/2021 DANALYNN DOMINGUEZ
ZA Case Cleared 3/5/2021 DANALYNN DOMINGUEZ
ZA Case Cleared 3/5/2021 DANALYNN DOMINGUEZ
ZA Case Cleared 3/5/2021 DANALYNN DOMINGUEZ
ZI Cleared 3/5/2021 DANALYNN DOMINGUEZ
Disturb/Remove Protected Trees Cleared 3/10/2021 ADRIAN SANCHEZ
Building over 3-story or 36-ft Cleared 3/18/2021 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 3/18/2021 CALOSHA APPROVED

Contact Information

Contractor Hathaway Dinwiddie Construction Company; Lic. No.: 729664-B 275 BATTERY STREET SUITE 300      SAN FRANCISCO, CA 941113330
Engineer Mitchell,, Robert; Lic. No.: GE3011 2306 NE 199TH ST      SHORELINE, WA 98177
Engineer Volnyy,, Vladimir A; Lic. No.: S4817 11342 PALA MESA DR      NORTHRIDGE, CA 91326
Geologist Francuch,, Dean Gregory; Lic. No.: GEO5789 9316 SOPHIA AVENUE      NORTH HILLS, CA 91343

Inspector Information

DEANDRE HOFFMAN, (818) 374-1182 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Piling/Pier/Caisson 4/8/2021 Partial Approval ROBERT DAVIS
Pre-Inspection 4/8/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 4/9/2021 Not Ready for Inspection ROBERT DAVIS
Piling/Pier/Caisson 4/12/2021 Partial Approval ROBERT DAVIS
Deputy Grading 4/13/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 4/13/2021 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/13/2021 Partial Approval ROBERT DAVIS
Piling/Pier/Caisson 4/13/2021 Partial Approval ROBERT DAVIS
Deputy Grading 4/14/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 4/14/2021 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/14/2021 Partial Approval ROBERT DAVIS
Piling/Pier/Caisson 4/14/2021 Partial Approval ROBERT DAVIS
Deputy Grading 4/15/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 4/15/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 4/15/2021 Partial Approval ROBERT DAVIS
Deputy Grading 4/16/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 4/16/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 4/16/2021 Partial Approval ROBERT DAVIS
Deputy Grading 4/19/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 4/19/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 4/19/2021 Partial Approval ROBERT DAVIS
Deputy Grading 4/20/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 4/20/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 4/20/2021 Partial Approval ROBERT DAVIS
Deputy Grading 4/21/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 4/21/2021 Approved ROBERT DAVIS
Grading Pre-Inspection 4/21/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 4/21/2021 Partial Approval ROBERT DAVIS
Deputy Grading 4/22/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 4/22/2021 Approved ROBERT DAVIS
Grading Pre-Inspection 4/22/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 4/22/2021 Partial Approval ROBERT DAVIS
Deputy Grading 4/23/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 4/23/2021 Approved ROBERT DAVIS
Grading Pre-Inspection 4/23/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 4/23/2021 Partial Approval ROBERT DAVIS
Deputy Grading 4/26/2021 Approved JOHN KITCKO
Grading Pre-Inspection 4/26/2021 Partial Inspection JOHN KITCKO
Piling/Pier/Caisson 4/26/2021 Partial Inspection JOHN KITCKO
Deputy Grading 4/27/2021 Approved JOHN KITCKO
Grading Pre-Inspection 4/27/2021 Partial Inspection JOHN KITCKO
Piling/Pier/Caisson 4/27/2021 Partial Inspection JOHN KITCKO
Deputy Grading 4/28/2021 Approved JOHN KITCKO
Grading Pre-Inspection 4/28/2021 Partial Inspection JOHN KITCKO
Piling/Pier/Caisson 4/28/2021 Partial Inspection JOHN KITCKO
Deputy Grading 4/29/2021 Approved JOHN KITCKO
Piling/Pier/Caisson 4/29/2021 Partial Inspection JOHN KITCKO
Deputy Grading 5/3/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 5/3/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 5/3/2021 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/4/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 5/4/2021 Partial Approval ROBERT DAVIS
Deputy Grading 5/5/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 5/5/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 5/5/2021 Partial Approval ROBERT DAVIS
Deputy Grading 5/6/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 5/6/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 5/6/2021 Partial Approval ROBERT DAVIS
Deputy Grading 5/7/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 5/7/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 5/7/2021 Partial Approval ROBERT DAVIS
Deputy Grading 5/10/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 5/10/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 5/10/2021 Partial Approval ROBERT DAVIS
Deputy Grading 5/11/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 5/11/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 5/11/2021 Partial Approval ROBERT DAVIS
Deputy Grading 5/12/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 5/12/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 5/12/2021 Partial Inspection ROBERT DAVIS
Deputy Grading 5/13/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 5/13/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 5/13/2021 Partial Approval ROBERT DAVIS
Deputy Grading 5/14/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 5/14/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 5/14/2021 Partial Approval ROBERT DAVIS
Deputy Grading 5/17/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 5/17/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 5/17/2021 Partial Approval ROBERT DAVIS
Deputy Grading 5/18/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 5/18/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 5/18/2021 Partial Inspection ROBERT DAVIS
Deputy Reinf. Concrete 5/19/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 5/19/2021 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/20/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 5/20/2021 Partial Inspection ROBERT DAVIS
Deputy Reinf. Concrete 5/21/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 5/21/2021 Not Ready for Inspection ROBERT DAVIS
Piling/Pier/Caisson 5/24/2021 Not Ready for Inspection ROBERT DAVIS
Piling/Pier/Caisson 5/25/2021 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 5/26/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 5/26/2021 Not Ready for Inspection ROBERT DAVIS
Deputy Grading 5/27/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 5/27/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 5/27/2021 Not Ready for Inspection ROBERT DAVIS
Deputy Grading 5/28/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 5/28/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 5/28/2021 Partial Approval ROBERT DAVIS
Deputy Grading 6/1/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 6/1/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 6/1/2021 Partial Approval ROBERT DAVIS
Deputy Grading 6/2/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 6/2/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 6/2/2021 Partial Approval ROBERT DAVIS
Deputy Grading 6/3/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 6/3/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 6/3/2021 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/4/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 6/4/2021 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/7/2021 Conditional Approval RUSSELL BONVOULOIR
Piling/Pier/Caisson 6/7/2021 Partial Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 6/8/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 6/9/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 6/9/2021 Partial Approval ROBERT DAVIS
Deputy Grading 6/10/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 6/10/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 6/10/2021 Partial Approval ROBERT DAVIS
Deputy Grading 6/11/2021 No Access for Inspection JOE VELASQUEZ
Deputy Reinf. Concrete 6/11/2021 No Access for Inspection JOE VELASQUEZ
Piling/Pier/Caisson 6/11/2021 Not Ready for Inspection JOE VELASQUEZ
Deputy Grading 6/14/2021 Conditional Approval DANIEL VARNUM
Deputy Reinf. Concrete 6/14/2021 Conditional Approval DANIEL VARNUM
Deputy Steel/Welding 6/14/2021 Conditional Approval DANIEL VARNUM
Piling/Pier/Caisson 6/14/2021 Not Ready for Inspection DANIEL VARNUM
Deputy Grading 6/15/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 6/15/2021 Approved ROBERT DAVIS
Deputy Steel/Welding 6/15/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 6/15/2021 Partial Approval ROBERT DAVIS
Deputy Grading 6/16/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 6/16/2021 Approved ROBERT DAVIS
Deputy Steel/Welding 6/16/2021 Approved ROBERT DAVIS
Footing/Foundation/Slab 6/16/2021 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 6/17/2021 Approved ROBERT DAVIS
Deputy Steel/Welding 6/17/2021 Approved ROBERT DAVIS
Footing/Foundation/Slab 6/17/2021 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/18/2021 Approved ROBERT DAVIS
Deputy Steel/Welding 6/18/2021 Approved ROBERT DAVIS
Footing/Foundation/Slab 6/18/2021 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 6/21/2021 Approved ROBERT DAVIS
Footing/Foundation/Slab 6/21/2021 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 6/22/2021 Approved ROBERT DAVIS
Footing/Foundation/Slab 6/22/2021 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/23/2021 Approved ROBERT DAVIS
Footing/Foundation/Slab 6/23/2021 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 6/24/2021 Approved ROBERT DAVIS
Footing/Foundation/Slab 6/24/2021 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/25/2021 Approved ROBERT DAVIS
Footing/Foundation/Slab 6/25/2021 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 6/28/2021 Approved ROBERT DAVIS
Footing/Foundation/Slab 6/28/2021 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 6/29/2021 Approved ROBERT DAVIS
Footing/Foundation/Slab 6/29/2021 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 6/30/2021 Approved ROBERT DAVIS
Footing/Foundation/Slab 6/30/2021 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/1/2021 Approved ROBERT DAVIS
Footing/Foundation/Slab 7/1/2021 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 7/2/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 7/6/2021 Approved ROBERT DAVIS
Footing/Foundation/Slab 7/6/2021 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 7/7/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 7/7/2021 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 7/8/2021 Approved ROBERT DAVIS
Footing/Foundation/Slab 7/8/2021 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 7/9/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 7/9/2021 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 7/12/2021 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/12/2021 Not Ready for Inspection ROBERT DAVIS
Piling/Pier/Caisson 7/12/2021 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 7/13/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 7/13/2021 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 7/14/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 7/14/2021 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 7/15/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 7/16/2021 Approved ROBERT DAVIS
Footing/Foundation/Slab 7/19/2021 Not Ready for Inspection ROBERT DAVIS
Piling/Pier/Caisson 7/19/2021 Not Ready for Inspection ROBERT DAVIS
Footing/Foundation/Slab 7/20/2021 Partial Approval ROBERT DAVIS
Footing/Foundation/Slab 7/21/2021 Not Ready for Inspection ROBERT DAVIS
Piling/Pier/Caisson 7/21/2021 Partial Approval ROBERT DAVIS
Piling/Pier/Caisson 7/22/2021 Partial Approval ROBERT DAVIS
Piling/Pier/Caisson 7/23/2021 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/26/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 7/26/2021 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/27/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 7/27/2021 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/28/2021 Approved ROBERT DAVIS
Piling/Pier/Caisson 7/28/2021 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/29/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 7/30/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 8/2/2021 Conditional Approval DANIEL VARNUM
Piling/Pier/Caisson 8/2/2021 No Access for Inspection DANIEL VARNUM
Deputy Reinf. Concrete 8/3/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 8/4/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 8/5/2021 Conditional Approval DANIEL VARNUM
Deputy Reinf. Concrete 8/6/2021 Conditional Approval DANIEL VARNUM
Deputy Reinf. Concrete 8/9/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 8/10/2021 Approved ROBERT DAVIS
Footing/Foundation/Slab 8/10/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 8/11/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 8/12/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 8/13/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 8/16/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 8/17/2021 Approved ROBERT DAVIS
Deputy Reinf. Concrete 8/18/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 8/19/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 8/20/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 8/23/2021 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/23/2021 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/24/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 8/25/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 8/26/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 8/27/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 8/31/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/1/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/2/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/3/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/7/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/8/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/9/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/10/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/13/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/15/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/16/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/17/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/20/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/21/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/22/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/23/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/24/2021 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 9/27/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/28/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/29/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/30/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/1/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/12/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/13/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/14/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/15/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/18/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/19/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/20/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/21/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/22/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/25/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/26/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/27/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/28/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/29/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 11/1/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 11/1/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 11/2/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 11/2/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 11/3/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 11/3/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 11/4/2021 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 11/4/2021 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 11/15/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 11/15/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 11/16/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 11/16/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 11/17/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 11/17/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 11/18/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 11/18/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 11/19/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 11/19/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 11/23/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 11/23/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 11/24/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 11/24/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 11/29/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 11/29/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 12/1/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/1/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 12/6/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/6/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 12/7/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/7/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 12/8/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/8/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 12/9/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/9/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 12/10/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/10/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 12/14/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/14/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 12/15/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/15/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 12/16/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/16/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 12/17/2021 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 12/17/2021 Conditional Approval JOHN KITCKO
Deputy Drilled-In Anchors 12/20/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/20/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 12/21/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/21/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 12/22/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/22/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 12/23/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/23/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 12/27/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/27/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 1/10/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 1/10/2022 Approved JOHN KITCKO
Deputy Drilled-In Anchors 1/11/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 1/11/2022 Approved JOHN KITCKO
Deputy Drilled-In Anchors 1/12/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 1/12/2022 Approved JOHN KITCKO
Deputy Drilled-In Anchors 1/13/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 1/13/2022 Approved JOHN KITCKO
Deputy Drilled-In Anchors 1/14/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 1/14/2022 Approved JOHN KITCKO
Reinforced Concrete Frame 9/13/2022 Approved JOHN KITCKO
Reinforced Concrete Frame 9/14/2022 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 9/15/2022 Partial Approval JOHN KITCKO
Green Building Final 7/10/2023 Not Ready for Inspection JOHN KITCKO
Interior/Exterior Lathing 7/10/2023 Partial Approval JOHN KITCKO
Smoke Detectors 7/10/2023 Not Ready for Inspection JOHN KITCKO
Final 7/13/2023 Not Ready for Inspection JOHN KITCKO
Green Building Final 7/13/2023 Not Ready for Inspection JOHN KITCKO
Smoke Detectors 7/13/2023 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 8/10/2023 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 8/11/2023 Not Ready for Inspection JOHN KITCKO