Piling/Pier/Caisson
|
4/8/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Pre-Inspection
|
4/8/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
4/9/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
4/12/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
4/13/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
4/13/2021
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
4/13/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
4/13/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
4/14/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
4/14/2021
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
4/14/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
4/14/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
4/15/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
4/15/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
4/15/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
4/16/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
4/16/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
4/16/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
4/19/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
4/19/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
4/19/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
4/20/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
4/20/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
4/20/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
4/21/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
4/21/2021
|
Approved
|
ROBERT DAVIS
|
|
Grading Pre-Inspection
|
4/21/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
4/21/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
4/22/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
4/22/2021
|
Approved
|
ROBERT DAVIS
|
|
Grading Pre-Inspection
|
4/22/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
4/22/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
4/23/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
4/23/2021
|
Approved
|
ROBERT DAVIS
|
|
Grading Pre-Inspection
|
4/23/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
4/23/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
4/26/2021
|
Approved
|
JOHN KITCKO
|
|
Grading Pre-Inspection
|
4/26/2021
|
Partial Inspection
|
JOHN KITCKO
|
|
Piling/Pier/Caisson
|
4/26/2021
|
Partial Inspection
|
JOHN KITCKO
|
|
Deputy Grading
|
4/27/2021
|
Approved
|
JOHN KITCKO
|
|
Grading Pre-Inspection
|
4/27/2021
|
Partial Inspection
|
JOHN KITCKO
|
|
Piling/Pier/Caisson
|
4/27/2021
|
Partial Inspection
|
JOHN KITCKO
|
|
Deputy Grading
|
4/28/2021
|
Approved
|
JOHN KITCKO
|
|
Grading Pre-Inspection
|
4/28/2021
|
Partial Inspection
|
JOHN KITCKO
|
|
Piling/Pier/Caisson
|
4/28/2021
|
Partial Inspection
|
JOHN KITCKO
|
|
Deputy Grading
|
4/29/2021
|
Approved
|
JOHN KITCKO
|
|
Piling/Pier/Caisson
|
4/29/2021
|
Partial Inspection
|
JOHN KITCKO
|
|
Deputy Grading
|
5/3/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/3/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/3/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/4/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/4/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
5/5/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/5/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/5/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
5/6/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/6/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/6/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
5/7/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/7/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/7/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
5/10/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/10/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/10/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
5/11/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/11/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/11/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
5/12/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/12/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/12/2021
|
Partial Inspection
|
ROBERT DAVIS
|
|
Deputy Grading
|
5/13/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/13/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/13/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
5/14/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/14/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/14/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
5/17/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/17/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/17/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
5/18/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/18/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/18/2021
|
Partial Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/19/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/19/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/20/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/20/2021
|
Partial Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/21/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/21/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/24/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/25/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/26/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/26/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Grading
|
5/27/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/27/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/27/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Grading
|
5/28/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/28/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/28/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
6/1/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/1/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
6/1/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
6/2/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/2/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
6/2/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
6/3/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/3/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
6/3/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/4/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
6/4/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/7/2021
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Piling/Pier/Caisson
|
6/7/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Reinf. Concrete
|
6/8/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/9/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
6/9/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
6/10/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/10/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
6/10/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
6/11/2021
|
No Access for Inspection
|
JOE VELASQUEZ
|
|
Deputy Reinf. Concrete
|
6/11/2021
|
No Access for Inspection
|
JOE VELASQUEZ
|
|
Piling/Pier/Caisson
|
6/11/2021
|
Not Ready for Inspection
|
JOE VELASQUEZ
|
|
Deputy Grading
|
6/14/2021
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
6/14/2021
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Steel/Welding
|
6/14/2021
|
Conditional Approval
|
DANIEL VARNUM
|
|
Piling/Pier/Caisson
|
6/14/2021
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Deputy Grading
|
6/15/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/15/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
6/15/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
6/15/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Grading
|
6/16/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/16/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
6/16/2021
|
Approved
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
6/16/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/17/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
6/17/2021
|
Approved
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
6/17/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/18/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
6/18/2021
|
Approved
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
6/18/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/21/2021
|
Approved
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
6/21/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/22/2021
|
Approved
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
6/22/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/23/2021
|
Approved
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
6/23/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/24/2021
|
Approved
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
6/24/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/25/2021
|
Approved
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
6/25/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/28/2021
|
Approved
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
6/28/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/29/2021
|
Approved
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
6/29/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/30/2021
|
Approved
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
6/30/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/1/2021
|
Approved
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
7/1/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/2/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/6/2021
|
Approved
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
7/6/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/7/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
7/7/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/8/2021
|
Approved
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
7/8/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/9/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
7/9/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/12/2021
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
7/12/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
7/12/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/13/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
7/13/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/14/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
7/14/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/15/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/16/2021
|
Approved
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
7/19/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
7/19/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
7/20/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
7/21/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
7/21/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
7/22/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
7/23/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/26/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
7/26/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/27/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
7/27/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/28/2021
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
7/28/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/29/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/30/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/2/2021
|
Conditional Approval
|
DANIEL VARNUM
|
|
Piling/Pier/Caisson
|
8/2/2021
|
No Access for Inspection
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
8/3/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
8/4/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
8/5/2021
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
8/6/2021
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
8/9/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/10/2021
|
Approved
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
8/10/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/11/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/12/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/13/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/16/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
8/17/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/18/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
8/19/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
8/20/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
8/23/2021
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/23/2021
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/24/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
8/25/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
8/26/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
8/27/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
8/31/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/1/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/2/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/3/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/7/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/8/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/9/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/10/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/13/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/15/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/16/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/17/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/20/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/21/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/22/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/23/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/24/2021
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/27/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/28/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/29/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/30/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
10/1/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
10/12/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
10/13/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
10/14/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
10/15/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
10/18/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
10/19/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
10/20/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
10/21/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
10/22/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
10/25/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
10/26/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
10/27/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
10/28/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
10/29/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
11/1/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
11/1/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
11/2/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
11/2/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
11/3/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
11/3/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
11/4/2021
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
11/4/2021
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
11/15/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
11/15/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
11/16/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
11/16/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
11/17/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
11/17/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
11/18/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
11/18/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
11/19/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
11/19/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
11/23/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
11/23/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
11/24/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
11/24/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
11/29/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
11/29/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
12/1/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/1/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
12/6/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/6/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
12/7/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/7/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
12/8/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/8/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
12/9/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/9/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
12/10/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/10/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
12/14/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/14/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
12/15/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/15/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
12/16/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/16/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
12/17/2021
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/17/2021
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
12/20/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/20/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
12/21/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/21/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
12/22/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/22/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
12/23/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/23/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
12/27/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/27/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
1/10/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
1/10/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
1/11/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
1/11/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
1/12/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
1/12/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
1/13/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
1/13/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
1/14/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
1/14/2022
|
Approved
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
9/13/2022
|
Approved
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
9/14/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
9/15/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Final
|
7/10/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
7/10/2023
|
Partial Approval
|
JOHN KITCKO
|
|
Smoke Detectors
|
7/10/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Final
|
7/13/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Final
|
7/13/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Smoke Detectors
|
7/13/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
8/10/2023
|
Partial Approval
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
8/11/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|