1500 S HI POINT ST 90035

Certificate Information: 1500 S HI POINT ST 90035

Application / Permit
19010-10000-06486
Plan Check / Job No.
B19LA27563
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 5 STORY 58 UNIT APARTMENT BUILDING - ( 4 LEVELS OF RESIDENTIAL TYPE III - A ,OVER GROUND LEVEL TYPE I-A PARKING GARAGE & REC.ROOM & GYM & LOBBY & ONE RESIDENTIAL UNIT & OVER ONE LEVEL TYPE I -A SUBTERRANEAN PARKING GARAGE).   (TOC-TIER#3 PROJECT WITH 6 UNITS SET ASIDE FOR Extremely Low Income units. )
Permit Issued
Issued on 11/3/2022
Issuing Office
West Los Angeles
Current Status
Issued on 11/3/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/31/2019 APPLICANT
Assigned to Plan Check Engineer 2/7/2020 DEAN LEE
Corrections Issued 2/13/2020 DEAN LEE
Quality Review Completed 2/21/2020 BILL STUTSMAN
Applicant returned to address corrections 12/3/2020 DEAN LEE
Applicant returned to address corrections 4/5/2021 GARO TELMI
Applicant returned to address corrections 8/6/2021 GARO TELMI
Applicant returned to address corrections 9/30/2021 GARO TELMI
Applicant returned to address corrections 10/18/2021 GARO TELMI
Applicant returned to address corrections 7/1/2022 GARO TELMI
Plan Check Approved 8/8/2022 GARO TELMI
Issued 11/3/2022 APPLICANT
Building Plans Picked Up 11/4/2022 APPLICANT

Permit Application Clearance Information

Address approval Cleared 12/22/2020 THOMAS LANG
Eng Process Fee Ord 176,300 Cleared 12/31/2020 THOMAS LANG
Driveway location Cleared 2/2/2021 KEVIN ARUCAN
Highway dedication Cleared 2/2/2021 THOMAS LANG
Internal circulation Cleared 2/2/2021 KEVIN ARUCAN
Bicycle Parking Cleared 4/8/2021 KEVIN ARUCAN
Encroachment in public way Cleared 4/9/2021 ELAINE LEI
Green Code Cleared 6/14/2021 AARON COSTA
Sewer availability Cleared 6/24/2021 THOMAS LANG
Hydrant and Access approval Cleared 7/14/2021 MATTHEW CRAIG
Construction near power lines Cleared 10/13/2021 WALTER RAMIREZ
Construction within easement Cleared 10/13/2021 WALTER RAMIREZ
Work Adjacent to Public Way Cleared 11/8/2021 BOK GOH
Trees in Parkway Cleared 11/17/2021 ADALBERTO VERA
Fire Marshall Fire Life Safety Cleared 12/14/2021 MENOA AGHAJANI
Low Impact Development Cleared 12/15/2021 ANDRES COVARRUBIAS
ZA Case Cleared 4/21/2022 RUBEN VASQUEZ
DCP conditions approval Cleared 5/18/2022 NICHOLAS KAWAZOE
Density Bonus 12.22.A.31 Cleared 5/18/2022 NICHOLAS KAWAZOE
"Q" conditions Cleared 5/27/2022 RUBEN VASQUEZ
Opn space landscape/Water mgmt Cleared 5/27/2022 RUBEN VASQUEZ
ZA Case Cleared 5/27/2022 RUBEN VASQUEZ
ZA Case Cleared 5/27/2022 RUBEN VASQUEZ
ZA Case Cleared 5/27/2022 RUBEN VASQUEZ
ZA Case Cleared 5/27/2022 RUBEN VASQUEZ
Roof/Waste drainage to street Cleared 5/31/2022 ABEL CASILLAS
DAS Clearance Cleared 6/3/2022 DEAN LEE
Permit Cleared 6/6/2022 ABEL CASILLAS
Building over 3-story or 36-ft Cleared 7/1/2022 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 7/1/2022 CALOSHA APPROVED

Contact Information

Architect Friedman,, John Benjamin; Lic. No.: C9167 23427 BLYTHE STREET      WEST HILLS, CA 91304
Contractor Owner-Builder       ,
Engineer Cefali,, David Allen; Lic. No.: S3658 4344 LAUREL CANYON BLVD_STE 3      STUDIO CITY, CA 91604
Engineer De, Leon, Cynthia Aguilar; Lic. No.: C31604 8061 SAN MATEO CIR      BUENA PARK, CA 90620
Engineer Obando,, Gaspar Eduardo; Lic. No.: C71382 3101 OCEAN PARK BLVD   STE 100, PMB 122    SANTA MONICA, CA 90405
Engineer Smith,, Melvin Bruce; Lic. No.: GE2673 2165 N MARVEL AVE      SIMI VALLEY, CA 93065
Engineer Soliman,, John; Lic. No.: C80833 13785 PELICAN DR      RANCHO CUCAMONGA, CA 91739

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 4/7/2023 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 4/7/2023 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Subgrade 4/7/2023 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 4/21/2023 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 4/21/2023 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Subgrade 4/21/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 4/28/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 5/5/2023 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 5/5/2023 Not Ready for Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 5/9/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 5/10/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 5/12/2023 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 6/1/2023 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 6/1/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 6/1/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 6/1/2023 Not Ready for Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 6/14/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 8/15/2023 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Barrier 8/15/2023 Approved RAFAEL ESPINOZA
METHANE-Subgrade 8/15/2023 Approved RAFAEL ESPINOZA
Footing/Foundation/Slab 8/17/2023 Partial Approval JEROME BLACKWOOD
Deputy Reinf. Concrete 9/15/2023 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/25/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/26/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 9/29/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/5/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/1/2023 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 11/1/2023 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 11/3/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/6/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/6/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/7/2023 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 11/7/2023 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 1/18/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/24/2024 Conditional Approval MICHAEL ROSENBERG
Drywall Nailing 2/15/2024 Partial Inspection EDWIN GREGORYONA
Drywall Nailing 2/20/2024 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 2/23/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/23/2024 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 3/1/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/1/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 3/8/2024 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 3/11/2024 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 3/15/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 3/15/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/20/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/26/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/27/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 3/27/2024 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 3/27/2024 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 3/28/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 3/28/2024 Approved EDWIN GREGORYONA
Reinforced Concrete Frame 3/28/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 3/28/2024 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 3/29/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/29/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 4/2/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 4/2/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/9/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/9/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 4/9/2024 Partial Approval EDWIN GREGORYONA
Structural Steel Frame 4/9/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/9/2024 Partial Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 4/23/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/23/2024 Partial Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 4/23/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/23/2024 Partial Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/29/2024 Partial Approval EDWIN GREGORYONA
Insulation 4/29/2024 Partial Inspection EDWIN GREGORYONA
Drywall Nailing 4/30/2024 Not Ready for Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/30/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 4/30/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/30/2024 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/30/2024 Partial Inspection EDWIN GREGORYONA
Drywall Nailing 5/2/2024 Partial Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 5/2/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 5/2/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 5/24/2024 Partial Approval EDWIN GREGORYONA
Insulation 5/24/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 5/31/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 6/11/2024 Not Ready for Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 6/12/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 6/18/2024 Partial Approval EDWIN GREGORYONA
Wall Anchors 6/18/2024 Not Ready for Inspection EDWIN GREGORYONA
Insulation 6/21/2024 Approved MARTIN TAVITIAN
Wall Anchors 6/25/2024 Approved EDWIN GREGORYONA
Wood Frame 6/25/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 6/28/2024 Not Ready for Inspection JACOB MYERS
Deputy Wood Construction 7/1/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 7/1/2024 Partial Approval EDWIN GREGORYONA
Insulation 7/1/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 7/3/2024 Partial Approval EDWIN GREGORYONA
Insulation 7/3/2024 Partial Approval EDWIN GREGORYONA
Insulation 7/10/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 7/15/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 7/23/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 7/30/2024 Not Ready for Inspection EDWIN GREGORYONA
Light Gage Steel Frame 7/30/2024 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 8/2/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 8/13/2024 Partial Approval EDWIN GREGORYONA
Insulation 8/13/2024 Partial Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 8/30/2024 Partial Approval MARTIN TAVITIAN
Light Gage Steel Frame 9/4/2024 Partial Approval EDWIN GREGORYONA
Special/Order Compliance 9/4/2024 Not Ready for Inspection EDWIN GREGORYONA
Insulation 9/18/2024 No Access for Inspection ALFREDO LOPEZ
Insulation 9/25/2024 Partial Approval MARTIN TAVITIAN
Drywall Nailing 9/26/2024 Partial Approval LARRY ARNICK
Wood Frame 9/26/2024 Partial Approval LARRY ARNICK
Pre-Inspection 9/27/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 10/2/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 10/15/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 10/15/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 10/21/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 10/21/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 10/30/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 10/30/2024 Partial Approval EDWIN GREGORYONA
Pre-Inspection 11/4/2024 Approved EDWIN GREGORYONA
Drywall Nailing 11/12/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/14/2024 Not Ready for Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 11/14/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 12/5/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 12/13/2024 Partial Approval MARTIN TAVITIAN
Drywall Nailing 1/3/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 1/9/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 1/9/2025 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 1/22/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 8/6/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 8/14/2025 Partial Approval EDWIN GREGORYONA
Pre-Inspection 9/23/2025 Approved EDWIN GREGORYONA
Pre-Inspection 11/13/2025 Approved EDWIN GREGORYONA
Drywall Nailing 12/9/2025 Partial Approval EDWIN GREGORYONA
Pre-Inspection 2/23/2026 Approved MARTIN TAVITIAN
Pre-Inspection 4/24/2026 Partial Inspection CHRISTOPHER BLACKWOOD
Final 5/19/2026 Not Ready for Inspection MARTIN TAVITIAN
Footing/Foundation/Slab 5/19/2026 Approved MARTIN TAVITIAN
Green Building Final 5/19/2026 Not Ready for Inspection MARTIN TAVITIAN
Green Building Rough 5/19/2026 Not Ready for Inspection MARTIN TAVITIAN
Reinforced Concrete Frame 5/19/2026 Partial Approval MARTIN TAVITIAN
Reinforced Masonry Frame 5/19/2026 Partial Approval MARTIN TAVITIAN
SGSOV-Seismic Gas S/O Valve 5/19/2026 SGSOV Not Ready MARTIN TAVITIAN
Smoke Detectors 5/19/2026 Not Ready for Inspection MARTIN TAVITIAN
Verify Sprinkler Sign Off 5/19/2026 Approved MARTIN TAVITIAN
Final 6/4/2026 Conditional Approval MARTIN TAVITIAN
Green Building Final 6/4/2026 Approved MARTIN TAVITIAN
Green Building Rough 6/4/2026 Approved MARTIN TAVITIAN
Reinforced Concrete Frame 6/4/2026 Approved MARTIN TAVITIAN
Reinforced Masonry Frame 6/4/2026 Approved MARTIN TAVITIAN
SGSOV-Seismic Gas S/O Valve 6/4/2026 SGSOV Approved MARTIN TAVITIAN
Smoke Detectors 6/4/2026 Approved MARTIN TAVITIAN