7050 W HAWTHORN AVE 90028

Certificate Information: 7050 W HAWTHORN AVE 90028

Application / Permit
19010-10000-06393
Plan Check / Job No.
B19LA27496
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 7-STORY, 60-UNIT APT BUILDING, (5-STORIES TYPE 111-A ,APT, OVER 2-STORY TYPE 1-A APARTMENT & PARKING GARAGE OVER ONE LEVEL TYPE 1-A SUBTERRANEAN PARKING GARAGE). ( 7 Very Low Income, 3 Low Income, and 2 Moderate income.)
Permit Issued
Issued on 1/25/2023
Issuing Office
Metro
Current Status
CofO Corrected on 11/3/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/30/2019 APPLICANT
Assigned to Plan Check Engineer 2/27/2020 GARO TELMI
Corrections Issued 3/9/2020 GARO TELMI
Quality Review Completed 3/11/2020 KEN GILL
Applicant returned to address corrections 12/30/2020 GARO TELMI
Applicant returned to address corrections 7/13/2021 GARO TELMI
Applicant returned to address corrections 7/29/2021 GARO TELMI
Disabled Access Plans Picked Up 9/14/2021 APPLICANT
Applicant returned to address corrections 10/1/2021 GARO TELMI
Applicant returned to address corrections 11/16/2022 GARO TELMI
Applicant returned to address corrections 1/9/2023 GARO TELMI
Plan Check Approved 1/19/2023 GARO TELMI
Issued 1/25/2023 APPLICANT
Green Plans Picked Up 6/9/2023 APPLICANT
CofO in Progress 10/2/2025 EDWIN GREGORYONA
CofO Issued-Status Void 10/2/2025 ERNESTO CORRAL
Permit Finaled-Status Void 10/2/2025 ERNESTO CORRAL
Re-Activate Permit 11/3/2025 ADAM BURGESS
Permit Finaled 11/3/2025 ADAM BURGESS
CofO Corrected 11/3/2025 ADAM BURGESS
Permit Finaled 11/3/2025 ADAM BURGESS

Permit Application Clearance Information

Construction near power lines Cleared 7/25/2020 RIDWAN HARDY
DAS Clearance Cleared 12/17/2020 GARO TELMI
Address approval Cleared 7/30/2021 WALLIE JONG
Highway dedication Cleared 7/30/2021 WALLIE JONG
Permit Cleared 7/30/2021 WALLIE JONG
Building over 3-story or 36-ft Cleared 8/9/2021 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 8/9/2021 CALOSHA APPROVED
Eng Process Fee Ord 176,300 Cleared 8/17/2021 WALLIE JONG
Sewer availability Cleared 1/26/2022 WALLIE JONG
Green Code Cleared 2/22/2022 GARO TELMI
Work Adjacent to Public Way Cleared 3/2/2022 ARMEN SARKISIAN
Density Bonus 12.22.A.25 Cleared 3/16/2022 MARITESS GO
Driveway location Cleared 4/13/2022 PETE EYRE
Internal circulation Cleared 4/13/2022 PETE EYRE
Historic Resource Verification Cleared 5/2/2022 MAX LODER
Hydrant and Access approval Cleared 5/12/2022 RUEL COLE
Frnt yard landscape/Water mgmt Cleared 5/16/2022 KENTON TRINH
Opn space landscape/Water mgmt Cleared 5/16/2022 KENTON TRINH
Site Plan review Cleared 5/16/2022 KENTON TRINH
Redevelopment Project Area Cleared 5/19/2022 SUSAN WONG
Low Impact Development Cleared 7/15/2022 ANDRES COVARRUBIAS
Roof/Waste drainage to street Cleared 8/16/2022 ABEL CASILLAS
Fire Marshall Fire Life Safety Cleared 10/19/2022 VIDAL GARCIA
Trees in Parkway Cleared 11/8/2022 ADALBERTO VERA

Contact Information

Architect Uriu,, Giovanni; Lic. No.: C7487 830 SO GLENDALE AVENUE      GLENDALE, CA 91205
Contractor Focus Builders Inc; Lic. No.: 990023-B 3375 LIVONIA AVE      LOS ANGELES, CA 90034
Engineer Bowers,, Erik George; Lic. No.: L8571 7745 JELLICO AVENUE      NORTHRIDGE, CA 91325
Engineer Downey,, Henry Ross; Lic. No.: C30372 7463 VARNA AVE      NORTH HOLLYWOOD, CA 916054011
Engineer Karns,, Jesse; Lic. No.: S4321 24161 ADONIS      MISSION VIEJO, CA 92691
Engineer Mahmoudkhani,, Behnam; Lic. No.: C88488 120 W WILSON AVE 1550      GLENDALE, CA 91203

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 3/8/2023 Not Ready for Inspection EDWIN GREGORYONA
Pre-Inspection 3/8/2023 Approved EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 3/9/2023 Partial Approval GREGORY POMISH
Footing/Foundation/Slab 3/9/2023 Partial Approval GREGORY POMISH
Footing/Foundation/Slab 3/13/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 3/17/2023 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 3/17/2023 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 3/28/2023 Partial Approval TED RIES
Footing/Foundation/Slab 4/6/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/10/2023 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 4/10/2023 Partial Approval TED RIES
Verify Sprinkler Sign Off 4/10/2023 Not Ready for Inspection TED RIES
Deputy Other (see comments) 4/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 4/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 4/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 4/11/2023 Conditional Approval TED RIES
Deputy Shotcrete 4/13/2023 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 4/13/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/14/2023 Conditional Approval TED RIES
Deputy Shotcrete 4/14/2023 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 4/14/2023 Partial Approval TED RIES
Deputy Reinf. Concrete 4/24/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 4/24/2023 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 4/24/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 5/3/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/19/2023 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 5/22/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 5/25/2023 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 5/25/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 5/25/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/30/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 6/2/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 6/2/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/5/2023 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 6/6/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 6/6/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 6/6/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 6/7/2023 Conditional Approval MICHAEL ROSENBERG
Masonry Wall/Backfill 6/16/2023 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 6/28/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 7/5/2023 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 7/5/2023 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 7/6/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 7/14/2023 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 7/14/2023 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 7/21/2023 Partial Approval TED RIES
Deputy Reinf. Concrete 8/8/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/14/2023 Approved TIMOTHY POWELL
Footing/Foundation/Slab 8/14/2023 Not Ready for Inspection TIMOTHY POWELL
Deputy Reinf. Concrete 8/15/2023 Conditional Approval GREGORY POMISH
Green Building Rough 8/15/2023 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 8/15/2023 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 8/15/2023 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 8/16/2023 Conditional Approval DAVID BURKHEAD
Piling/Pier/Caisson 8/16/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 8/21/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 8/22/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 8/25/2023 Partial Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 9/6/2023 Not Ready for Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 9/13/2023 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 9/19/2023 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 10/4/2023 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 10/10/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 10/11/2023 Partial Approval LARRY ARNICK
Drywall Nailing 10/27/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 10/27/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 11/2/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 11/16/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 11/22/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/29/2023 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 12/15/2023 Partial Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 12/19/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 1/11/2024 Partial Approval EDWIN GREGORYONA
Insulation 1/12/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 1/26/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 1/26/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 1/30/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 2/13/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/16/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 3/7/2024 Partial Inspection EDWIN GREGORYONA
Wood Frame 3/8/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 4/3/2024 Partial Approval DAVID BURKHEAD
Drywall Nailing 4/5/2024 Partial Approval EDWIN GREGORYONA
Insulation 4/10/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 4/15/2024 Partial Approval EDWIN GREGORYONA
Insulation 4/19/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 4/25/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 4/30/2024 Partial Approval DAVID BURKHEAD
Wood Frame 5/2/2024 Partial Approval DAVID BURKHEAD
Insulation 5/7/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 5/7/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 5/7/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/9/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/16/2024 Partial Approval EDWIN GREGORYONA
Insulation 5/16/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 5/16/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 5/21/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/23/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/29/2024 Partial Approval EDWIN GREGORYONA
Insulation 5/29/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 6/3/2024 Partial Inspection JEFFREY FULTON
Wood Frame 6/5/2024 Partial Approval MARTIN TAVITIAN
Drywall Nailing 6/6/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 6/6/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 6/10/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 6/11/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 6/12/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 6/25/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 6/25/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 7/5/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 7/9/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 7/11/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 7/23/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 8/2/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 8/15/2024 Partial Approval EDWIN GREGORYONA
Pre-Inspection 10/18/2024 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 12/13/2024 Partial Approval DAVID BURKHEAD
Drywall Nailing 1/10/2025 Partial Approval DAVID BURKHEAD
Drywall Nailing 2/19/2025 Partial Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 5/27/2025 Partial Approval ALFREDO LOPEZ
Final 8/8/2025 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 8/8/2025 Approved DAVID BURKHEAD
Green Building Final 8/8/2025 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 8/8/2025 Approved DAVID BURKHEAD
Reinforced Concrete Frame 8/8/2025 Conditional Approval DAVID BURKHEAD
Reinforced Masonry Frame 8/8/2025 Conditional Approval DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 8/8/2025 SGSOV Approved DAVID BURKHEAD
Smoke Detectors 8/8/2025 Partial Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 8/8/2025 Partial Inspection DAVID BURKHEAD
Final 8/18/2025 Partial Inspection EDWIN GREGORYONA
Green Building Final 8/18/2025 Partial Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 8/18/2025 Approved EDWIN GREGORYONA
Reinforced Masonry Frame 8/18/2025 Approved EDWIN GREGORYONA
Smoke Detectors 8/18/2025 Partial Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 8/18/2025 Approved EDWIN GREGORYONA
Final 8/28/2025 Partial Inspection DAVID BURKHEAD
Green Building Final 8/28/2025 Not Ready for Inspection DAVID BURKHEAD
Smoke Detectors 8/28/2025 Approved DAVID BURKHEAD
Final 9/8/2025 OK to Issue CofO EDWIN GREGORYONA
Green Building Final 9/8/2025 Approved EDWIN GREGORYONA