10810 W VANOWEN ST 91605

Certificate Information: 10810 W VANOWEN ST 91605

Application / Permit
19010-10000-05953
Plan Check / Job No.
B19LA27029
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(22) Storage Building for Household Goods
Work Description
NEW THREE-STORY, 42,360 SF SELF-STORAGE BUILDING PER CAC-2018-6902-2C-CU-2AA-SPR
Permit Issued
Issued on 2/28/2022
Issuing Office
Metro
Current Status
CofO Issued on 6/28/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/23/2019 APPLICANT
Assigned to Plan Check Engineer 1/16/2020 SERGIO GUTIERREZ
Corrections Issued 1/23/2020 SERGIO GUTIERREZ
Disabled Access Plans Picked Up 1/27/2020 APPLICANT
Quality Review Completed 2/7/2020 KESETE HAREGOT
Applicant returned to address corrections 10/30/2020 SERGIO GUTIERREZ
Applicant returned to address corrections 6/17/2021 SERGIO GUTIERREZ
Green Plans Picked Up 11/4/2021 APPLICANT
Plan Check Approved 2/8/2022 SERGIO GUTIERREZ
Issued 2/28/2022 APPLICANT
Building Plans Picked Up 3/1/2022 APPLICANT
TCO Issued (Expire Date: 10-18-2023) 4/21/2023 RICKEY JACKSON
CofO in Progress 6/13/2023 JOHN KITCKO
CofO Issued 6/28/2023 RICKEY JACKSON
Permit Finaled 6/28/2023 RICKEY JACKSON

Permit Application Clearance Information

Construction near power lines Cleared 3/27/2020 RIDWAN HARDY
Internal circulation Cleared 4/2/2020 SHEILA AHORAIAN
Address approval Cleared 5/5/2020 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 5/5/2020 LEE GUILBEAUX
Work Adjacent to Public Way Cleared 5/5/2020 LEE GUILBEAUX
Hydrant and Access approval Cleared 9/4/2020 GILBERT URREA
Green Code Cleared 6/10/2021 AARON COSTA
Permit Cleared 9/16/2021 CARLOS AGUILERA
Low Impact Development Cleared 9/24/2021 AMMAR ELTAWIL
Stormwater Pollution Mitigatn Cleared 9/24/2021 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 9/27/2021 CARLOS AGUILERA
DAS Clearance Cleared 10/29/2021 SERGIO GUTIERREZ
Disturb/Remove Protected Trees Cleared 11/10/2021 JOEL HERNANDEZ
Trees in Parkway Cleared 11/10/2021 JOEL HERNANDEZ
Sewer availability Cleared 12/7/2021 LEE GUILBEAUX
"T" removal Cleared 1/10/2022 JASON CHAN
"Q" conditions Cleared 1/18/2022 JASON CHAN
CPC Cleared 1/18/2022 JASON CHAN
Frnt yard landscape/Water mgmt Cleared 1/18/2022 JASON CHAN
Tract Map conditions Cleared 1/18/2022 JASON CHAN
Building over 3-story or 36-ft Cleared 2/8/2022 CALOSHA APPROVED

Contact Information

Architect Vakili,, Shabnam; Lic. No.: C26298 KSP STUDIO   23 ORCHARD STE 200    LAKE FOREST, CA 92630
Contractor Vcc Llc; Lic. No.: 970830-B P O BOX 555      LITTLE ROCK, AR 72203
Engineer Lappert,, Jake Warren; Lic. No.: L9303 160 S OLD SPRINGS RD STE 210      ANAHEIM, CA 92808
Engineer Mckee,, Christopher Shannon; Lic. No.: C74414 160 S OLD SPRINGS RD STE 210      ANAHEIM, CA 92808
Engineer Shakerin,, Kayvon; Lic. No.: C46202 23 ORCHARD ROAD      LAKE FOREST, CA 92630

Inspector Information

DEANDRE HOFFMAN, (818) 374-1182 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 4/1/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 4/4/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 4/5/2022 Approved JOHN KITCKO
Footing/Foundation/Slab 4/5/2022 Corrections Issued JOHN KITCKO
Deputy Reinf. Concrete 4/6/2022 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 4/6/2022 Partial Approval JOHN KITCKO
Deputy Drilled-In Anchors 4/11/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 4/11/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 4/12/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 4/13/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 4/14/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 4/14/2022 Approved JOHN KITCKO
Footing/Foundation/Slab 4/14/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 4/15/2022 Approved JOHN KITCKO
Reinforced Masonry Frame 4/15/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 4/19/2022 Approved JOHN KITCKO
Deputy Drilled-In Anchors 4/20/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 4/20/2022 Approved JOHN KITCKO
Footing/Foundation/Slab 4/20/2022 Partial Inspection JOHN KITCKO
Deputy Drilled-In Anchors 4/21/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 4/21/2022 Approved JOHN KITCKO
Masonry Wall/Backfill 4/21/2022 Partial Approval JOHN KITCKO
Deputy Drilled-In Anchors 4/22/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 4/22/2022 Approved JOHN KITCKO
Masonry Wall/Backfill 4/25/2022 Not Ready for Inspection JOHN KITCKO
Deputy Drilled-In Anchors 4/26/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 4/26/2022 Approved JOHN KITCKO
Green Building Rough 4/26/2022 Not Ready for Inspection JEFFREY DURAN
Reinforced Masonry Frame 4/26/2022 Partial Approval JEFFREY DURAN
Verify Sprinkler Sign Off 4/26/2022 Not Ready for Inspection JEFFREY DURAN
Masonry Wall/Backfill 4/28/2022 Partial Approval JOHN KITCKO
Masonry Wall/Backfill 4/29/2022 Partial Approval JOHN KITCKO
Deputy Drilled-In Anchors 5/2/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 5/2/2022 Approved JOHN KITCKO
Deputy Drilled-In Anchors 5/3/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 5/3/2022 Approved JOHN KITCKO
Green Building Rough 5/3/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Masonry Frame 5/3/2022 Partial Approval JOHN KITCKO
Verify Sprinkler Sign Off 5/3/2022 Approved JOHN KITCKO
Deputy Drilled-In Anchors 5/4/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 5/4/2022 Approved JOHN KITCKO
Masonry Wall/Backfill 5/4/2022 Partial Approval JOHN KITCKO
Deputy Drilled-In Anchors 5/5/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 5/5/2022 Conditional Approval JOHN KITCKO
Deputy Drilled-In Anchors 5/6/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 5/6/2022 Approved JOHN KITCKO
Deputy Drilled-In Anchors 5/9/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 5/9/2022 Approved JOHN KITCKO
Green Building Rough 5/9/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Masonry Frame 5/9/2022 Partial Approval JOHN KITCKO
Deputy Drilled-In Anchors 5/10/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 5/10/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 5/10/2022 Approved JOHN KITCKO
Deputy Steel/Welding 5/10/2022 Approved JOHN KITCKO
Deputy Drilled-In Anchors 5/11/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 5/11/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 5/11/2022 Approved JOHN KITCKO
Footing/Foundation/Slab 5/11/2022 Partial Approval JOHN KITCKO
Green Building Rough 5/11/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 5/11/2022 Partial Approval JOHN KITCKO
Reinforced Masonry Frame 5/11/2022 Partial Approval JOHN KITCKO
Deputy Drilled-In Anchors 5/12/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 5/12/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 5/12/2022 Approved JOHN KITCKO
Deputy Drilled-In Anchors 5/13/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 5/13/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 5/13/2022 Approved JOHN KITCKO
Reinforced Concrete Frame 5/16/2022 Partial Approval JOHN KITCKO
Footing/Foundation/Slab 5/17/2022 Partial Approval JOHN KITCKO
Structural Steel Frame 5/17/2022 Approved JOHN KITCKO
Deputy Drilled-In Anchors 5/18/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 5/18/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 5/18/2022 Approved JOHN KITCKO
Green Building Rough 5/18/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Masonry Frame 5/18/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 5/19/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 5/20/2022 Approved JOHN KITCKO
Green Building Rough 5/20/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 5/20/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Masonry Frame 5/20/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 5/23/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 5/24/2022 Approved JOHN KITCKO
Reinforced Concrete Frame 5/24/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 5/25/2022 Approved JOHN KITCKO
Green Building Rough 5/25/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Masonry Frame 5/25/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 5/26/2022 Approved JOHN KITCKO
Footing/Foundation/Slab 5/26/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 5/27/2022 Approved JOHN KITCKO
Green Building Rough 5/27/2022 Partial Approval JOHN KITCKO
Reinforced Masonry Frame 5/27/2022 Partial Approval JOHN KITCKO
Deputy Drilled-In Anchors 6/2/2022 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 6/2/2022 Conditional Approval ROBERT DAVIS
Green Building Rough 6/2/2022 Partial Inspection CAMERON CHABAN
Masonry Wall/Backfill 6/2/2022 Partial Inspection CAMERON CHABAN
Reinforced Masonry Frame 6/2/2022 Conditional Approval CAMERON CHABAN
Deputy Drilled-In Anchors 6/3/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 6/3/2022 Conditional Approval CAMERON CHABAN
Green Building Rough 6/8/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Masonry Frame 6/8/2022 Partial Inspection JOHN KITCKO
Footing/Foundation/Slab 6/10/2022 No Access for Inspection JOHN KITCKO
Deputy Drilled-In Anchors 6/22/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 6/22/2022 Approved JOHN KITCKO
Footing/Foundation/Slab 6/22/2022 Partial Approval JOHN KITCKO
Deputy Drilled-In Anchors 6/23/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 6/23/2022 Approved JOHN KITCKO
Deputy Drilled-In Anchors 6/27/2022 Approved JOHN KITCKO
Deputy Steel/Welding 6/27/2022 Approved JOHN KITCKO
Footing/Foundation/Slab 6/27/2022 Partial Approval JOHN KITCKO
Deputy Drilled-In Anchors 6/28/2022 Approved JOHN KITCKO
Deputy Drilled-In Anchors 6/29/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 6/29/2022 Approved JOHN KITCKO
Green Building Rough 6/29/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Masonry Frame 6/29/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 7/1/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 7/6/2022 Approved JOHN KITCKO
Footing/Foundation/Slab 7/6/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 7/7/2022 Approved JOHN KITCKO
Green Building Rough 7/7/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Masonry Frame 7/7/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 7/8/2022 Approved JOHN KITCKO
Green Building Rough 7/11/2022 Not Ready for Inspection JOHN KITCKO
Green Building Rough 7/12/2022 Partial Approval JOHN KITCKO
Reinforced Masonry Frame 7/12/2022 Partial Approval JOHN KITCKO
Green Building Rough 7/13/2022 Partial Inspection JOHN KITCKO
Masonry Wall/Backfill 7/13/2022 Partial Inspection JOHN KITCKO
Wall Anchors 7/13/2022 Off-Hour Fees Due
Deputy Drilled-In Anchors 7/14/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 7/14/2022 Conditional Approval JOHN KITCKO
Deputy Drilled-In Anchors 7/15/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 7/15/2022 Approved JOHN KITCKO
Reinforced Masonry Frame 7/15/2022 Partial Approval JOHN KITCKO
Light Gage Steel Frame 7/21/2022 No Access for Inspection JOHN KITCKO
Green Building Rough 7/25/2022 Not Ready for Inspection JOHN KITCKO
Masonry Wall/Backfill 7/25/2022 Partial Inspection JOHN KITCKO
Reinforced Masonry Frame 7/25/2022 Partial Approval JOHN KITCKO
Deputy Steel/Welding 7/27/2022 Approved JOHN KITCKO
Light Gage Steel Frame 7/27/2022 Partial Approval JOHN KITCKO
Structural Steel Frame 7/27/2022 Partial Approval JOHN KITCKO
Deputy Steel/Welding 7/28/2022 Conditional Approval JOHN KITCKO
Deputy Steel/Welding 7/29/2022 Conditional Approval JOHN KITCKO
Deputy Other (see comments) 8/1/2022 Approved JOHN KITCKO
Deputy Steel/Welding 8/1/2022 Approved JOHN KITCKO
Reinforced Concrete Frame 8/1/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 8/2/2022 Approved JOHN KITCKO
Deputy Other (see comments) 8/4/2022 Conditional Approval JEFFREY DURAN
Green Building Rough 8/9/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Masonry Frame 8/9/2022 Partial Approval JOHN KITCKO
Deputy Other (see comments) 8/11/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/12/2022 Approved JOHN KITCKO
Footing/Foundation/Slab 8/12/2022 Partial Approval JOHN KITCKO
Green Building Rough 8/12/2022 Partial Approval JOHN KITCKO
Reinforced Masonry Frame 8/12/2022 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 8/15/2022 Not Ready for Inspection JOHN KITCKO
Insulation 8/15/2022 Not Ready for Inspection JOHN KITCKO
Masonry Wall/Backfill 8/15/2022 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 8/16/2022 Partial Inspection SORIN CIRSTOIU
Green Building Final 8/16/2022 Partial Inspection SORIN CIRSTOIU
Green Building Rough 8/16/2022 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 8/16/2022 Partial Approval SORIN CIRSTOIU
Reinforced Concrete Frame 8/16/2022 Partial Inspection SORIN CIRSTOIU
Reinforced Masonry Frame 8/16/2022 Partial Inspection SORIN CIRSTOIU
Structural Steel Frame 8/16/2022 Partial Inspection SORIN CIRSTOIU
Deputy Reinf. Concrete 8/17/2022 Approved JOHN KITCKO
Deputy Other (see comments) 8/18/2022 Approved JOHN KITCKO
Green Building Rough 8/18/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Masonry Frame 8/18/2022 Partial Approval JOHN KITCKO
Deputy Steel/Welding 8/22/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 8/23/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/23/2022 Approved JOHN KITCKO
Deputy Steel/Welding 8/23/2022 Approved JOHN KITCKO
Green Building Rough 8/23/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Masonry Frame 8/23/2022 Partial Approval JOHN KITCKO
Deputy Steel/Welding 8/24/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 8/25/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/25/2022 Approved JOHN KITCKO
Deputy Steel/Welding 8/25/2022 Approved JOHN KITCKO
Deputy Steel/Welding 8/26/2022 Approved JOHN KITCKO
Masonry Wall/Backfill 8/26/2022 Partial Approval JOHN KITCKO
Deputy Steel/Welding 8/29/2022 Approved JOHN KITCKO
Deputy Steel/Welding 8/30/2022 Approved JOHN KITCKO
Green Building Rough 8/30/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Masonry Frame 8/30/2022 Partial Approval JOHN KITCKO
Deputy Steel/Welding 8/31/2022 Approved JOHN KITCKO
Deputy Steel/Welding 9/1/2022 Conditional Approval JEFFREY FULTON
Masonry Wall/Backfill 9/1/2022 Partial Inspection JEFFREY FULTON
Deputy Steel/Welding 9/2/2022 Conditional Approval CAMERON CHABAN
Drywall Nailing 9/2/2022 Partial Inspection ANDREW DORSO
Light Gage Steel Frame 9/2/2022 Partial Inspection ANDREW DORSO
Structural Steel Frame 9/2/2022 Partial Inspection ANDREW DORSO
Reinforced Concrete Frame 9/8/2022 Not Ready for Inspection JOHN KITCKO
Green Building Rough 9/12/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 9/12/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Masonry Frame 9/12/2022 Partial Approval JOHN KITCKO
Deputy Steel/Welding 9/19/2022 Conditional Approval JOHN KITCKO
Deputy Steel/Welding 9/20/2022 Conditional Approval JOHN KITCKO
Deputy Steel/Welding 9/21/2022 Approved JOHN KITCKO
Deputy Steel/Welding 9/22/2022 Conditional Approval JOHN KITCKO
Deputy Steel/Welding 9/23/2022 Approved JOHN KITCKO
Deputy Other (see comments) 9/26/2022 Conditional Approval JOHN KITCKO
Structural Steel Frame 9/28/2022 Partial Inspection JOHN KITCKO
Deputy Steel/Welding 9/29/2022 Approved JOHN KITCKO
Deputy Steel/Welding 9/30/2022 Approved JOHN KITCKO
Light Gage Steel Frame 9/30/2022 Approved JOHN KITCKO
Deputy Steel/Welding 10/11/2022 Conditional Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 10/11/2022 Partial Approval JOHN KITCKO
Light Gage Steel Frame 10/14/2022 Not Ready for Inspection JOHN KITCKO
Wall Anchors 10/18/2022 Partial Approval JOHN KITCKO
Insulation 10/19/2022 Partial Approval JOHN KITCKO
Structural Steel Frame 10/31/2022 Partial Approval JOHN KITCKO
Drywall Nailing 11/3/2022 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 11/10/2022 Partial Approval JOHN KITCKO
Footing/Foundation/Slab 11/17/2022 Not Ready for Inspection JOHN KITCKO
Special/Order Compliance 11/17/2022 Partial Approval JOHN KITCKO
Pre-Inspection 11/19/2022 Partial Approval JOHN KITCKO
Footing/Foundation/Slab 12/5/2022 Partial Approval JOHN KITCKO
T-Bar Ceiling 12/29/2022 Not Ready for Inspection JOHN KITCKO
Deputy Steel/Welding 1/6/2023 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 1/12/2023 Approved JOHN KITCKO
Footing/Foundation/Slab 1/12/2023 Partial Approval JOHN KITCKO
Special/Order Compliance 1/12/2023 Approved BRIAN KELLY
Deputy Reinf. Masonry 1/17/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 1/18/2023 Approved JOHN KITCKO
Green Building Rough 1/18/2023 Partial Approval JOHN KITCKO
Masonry Wall/Backfill 1/18/2023 Approved ROBERT DAVIS
Reinforced Masonry Frame 1/18/2023 Partial Approval JOHN KITCKO
Special/Order Compliance 1/18/2023 Approved STEVEN LEVITT
Special/Order Compliance 1/20/2023 Partial Inspection JOHN KITCKO
T-Bar Ceiling 1/31/2023 Partial Inspection ANDREW DORSO
Footing/Foundation/Slab 4/6/2023 Not Ready for Inspection ROBERT DAVIS
Green Building Rough 4/6/2023 Not Ready for Inspection ROBERT DAVIS
SGSOV-Seismic Gas S/O Valve 4/6/2023 SGSOV Not Ready ROBERT DAVIS
Smoke Detectors 4/6/2023 Not Ready for Inspection ROBERT DAVIS
Final 4/21/2023 OK for TCO JOHN KITCKO
Footing/Foundation/Slab 4/21/2023 Approved JOHN KITCKO
Green Building Final 4/21/2023 Approved JOHN KITCKO
Green Building Rough 4/21/2023 Approved JOHN KITCKO
Reinforced Masonry Frame 4/21/2023 Approved JOHN KITCKO
SGSOV-Seismic Gas S/O Valve 4/21/2023 SGSOV Approved JOHN KITCKO
Smoke Detectors 4/21/2023 Approved JOHN KITCKO
Special/Order Compliance 4/21/2023 Partial Inspection JOHN KITCKO
Final 6/13/2023 OK to Issue CofO JOHN KITCKO