|
Deputy Reinf. Concrete
|
4/1/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
4/4/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
4/5/2022
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
4/5/2022
|
Corrections Issued
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
4/6/2022
|
Approved
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
4/6/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
4/11/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
4/11/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
4/12/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
4/13/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
4/14/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
4/14/2022
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
4/14/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
4/15/2022
|
Approved
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
4/15/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
4/19/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
4/20/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
4/20/2022
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
4/20/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
4/21/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
4/21/2022
|
Approved
|
JOHN KITCKO
|
|
Masonry Wall/Backfill
|
4/21/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
4/22/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
4/22/2022
|
Approved
|
JOHN KITCKO
|
|
Masonry Wall/Backfill
|
4/25/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
4/26/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
4/26/2022
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
4/26/2022
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Masonry Frame
|
4/26/2022
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
4/26/2022
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Masonry Wall/Backfill
|
4/28/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Masonry Wall/Backfill
|
4/29/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
5/2/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/2/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
5/3/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/3/2022
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
5/3/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
5/3/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
5/3/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
5/4/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/4/2022
|
Approved
|
JOHN KITCKO
|
|
Masonry Wall/Backfill
|
5/4/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
5/5/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/5/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
5/6/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/6/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
5/9/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/9/2022
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
5/9/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
5/9/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
5/10/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
5/10/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/10/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
5/10/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
5/11/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
5/11/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/11/2022
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
5/11/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
5/11/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
5/11/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
5/11/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
5/12/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
5/12/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/12/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
5/13/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
5/13/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/13/2022
|
Approved
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
5/16/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
5/17/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Structural Steel Frame
|
5/17/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
5/18/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
5/18/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/18/2022
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
5/18/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
5/18/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/19/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
5/20/2022
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
5/20/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
5/20/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
5/20/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/23/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/24/2022
|
Approved
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
5/24/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/25/2022
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
5/25/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
5/25/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/26/2022
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
5/26/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
5/27/2022
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
5/27/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
5/27/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
6/2/2022
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Masonry
|
6/2/2022
|
Conditional Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
6/2/2022
|
Partial Inspection
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
6/2/2022
|
Partial Inspection
|
CAMERON CHABAN
|
|
Reinforced Masonry Frame
|
6/2/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Drilled-In Anchors
|
6/3/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
6/3/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
6/8/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
6/8/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
6/10/2022
|
No Access for Inspection
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
6/22/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
6/22/2022
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
6/22/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
6/23/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
6/23/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
6/27/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
6/27/2022
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
6/27/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
6/28/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
6/29/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
6/29/2022
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
6/29/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
6/29/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
7/1/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
7/6/2022
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
7/6/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
7/7/2022
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
7/7/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
7/7/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
7/8/2022
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
7/11/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
7/12/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
7/12/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
7/13/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Masonry Wall/Backfill
|
7/13/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Wall Anchors
|
7/13/2022
|
Off-Hour Fees Due
|
|
|
Deputy Drilled-In Anchors
|
7/14/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
7/14/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Drilled-In Anchors
|
7/15/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
7/15/2022
|
Approved
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
7/15/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
7/21/2022
|
No Access for Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
7/25/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Masonry Wall/Backfill
|
7/25/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
7/25/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
7/27/2022
|
Approved
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
7/27/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Structural Steel Frame
|
7/27/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
7/28/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
7/29/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Other (see comments)
|
8/1/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
8/1/2022
|
Approved
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
8/1/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
8/2/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Other (see comments)
|
8/4/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
8/9/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
8/9/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Other (see comments)
|
8/11/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
8/12/2022
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
8/12/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
8/12/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
8/12/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
8/15/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
8/15/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Masonry Wall/Backfill
|
8/15/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/16/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Green Building Final
|
8/16/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Green Building Rough
|
8/16/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Light Gage Steel Frame
|
8/16/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Reinforced Concrete Frame
|
8/16/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Reinforced Masonry Frame
|
8/16/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Structural Steel Frame
|
8/16/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
8/17/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Other (see comments)
|
8/18/2022
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
8/18/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
8/18/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
8/22/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
8/23/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
8/23/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
8/23/2022
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
8/23/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
8/23/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
8/24/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
8/25/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
8/25/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
8/25/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
8/26/2022
|
Approved
|
JOHN KITCKO
|
|
Masonry Wall/Backfill
|
8/26/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
8/29/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
8/30/2022
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
8/30/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
8/30/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
8/31/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
9/1/2022
|
Conditional Approval
|
JEFFREY FULTON
|
|
Masonry Wall/Backfill
|
9/1/2022
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
9/2/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
9/2/2022
|
Partial Inspection
|
ANDREW DORSO
|
|
Light Gage Steel Frame
|
9/2/2022
|
Partial Inspection
|
ANDREW DORSO
|
|
Structural Steel Frame
|
9/2/2022
|
Partial Inspection
|
ANDREW DORSO
|
|
Reinforced Concrete Frame
|
9/8/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
9/12/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
9/12/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
9/12/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
9/19/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
9/20/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
9/21/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
9/22/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
9/23/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Other (see comments)
|
9/26/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Structural Steel Frame
|
9/28/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
9/29/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
9/30/2022
|
Approved
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
9/30/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
10/11/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/11/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
10/14/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wall Anchors
|
10/18/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
10/19/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Structural Steel Frame
|
10/31/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
11/3/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
11/10/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
11/17/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
11/17/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Pre-Inspection
|
11/19/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
12/5/2022
|
Partial Approval
|
JOHN KITCKO
|
|
T-Bar Ceiling
|
12/29/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
1/6/2023
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
1/12/2023
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
1/12/2023
|
Partial Approval
|
JOHN KITCKO
|
|
Special/Order Compliance
|
1/12/2023
|
Approved
|
BRIAN KELLY
|
|
Deputy Reinf. Masonry
|
1/17/2023
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
1/18/2023
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
1/18/2023
|
Partial Approval
|
JOHN KITCKO
|
|
Masonry Wall/Backfill
|
1/18/2023
|
Approved
|
ROBERT DAVIS
|
|
Reinforced Masonry Frame
|
1/18/2023
|
Partial Approval
|
JOHN KITCKO
|
|
Special/Order Compliance
|
1/18/2023
|
Approved
|
STEVEN LEVITT
|
|
Special/Order Compliance
|
1/20/2023
|
Partial Inspection
|
JOHN KITCKO
|
|
T-Bar Ceiling
|
1/31/2023
|
Partial Inspection
|
ANDREW DORSO
|
|
Footing/Foundation/Slab
|
4/6/2023
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Green Building Rough
|
4/6/2023
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
SGSOV-Seismic Gas S/O Valve
|
4/6/2023
|
SGSOV Not Ready
|
ROBERT DAVIS
|
|
Smoke Detectors
|
4/6/2023
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Final
|
4/21/2023
|
OK for TCO
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
4/21/2023
|
Approved
|
JOHN KITCKO
|
|
Green Building Final
|
4/21/2023
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
4/21/2023
|
Approved
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
4/21/2023
|
Approved
|
JOHN KITCKO
|
|
SGSOV-Seismic Gas S/O Valve
|
4/21/2023
|
SGSOV Approved
|
JOHN KITCKO
|
|
Smoke Detectors
|
4/21/2023
|
Approved
|
JOHN KITCKO
|
|
Special/Order Compliance
|
4/21/2023
|
Partial Inspection
|
JOHN KITCKO
|
|
Final
|
6/13/2023
|
OK to Issue CofO
|
JOHN KITCKO
|