Work Description
(N) IRREGULAR SHAPED 24'-8" X 26'-2" THREE STORY SINGLE FAMILY DWELLING OVER BASEMENT TYPE VB ALL WORK PER ENGINEERING NFPA 13D FIRE SPRINKLER SYSTEM REQUIRED
Permit Issued
Issued on 4/19/2023
Issuing Office
Metro
Current Status
Issued on 4/19/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/20/2019 APPLICANT
Green Plans Picked Up 1/29/2020 APPLICANT
Assigned to Plan Check Engineer 1/30/2020 SEWADA ZADOORIAN MILAGARDI
Corrections Issued 2/10/2020 SEWADA ZADOORIAN MILAGARDI
Quality Review Completed 2/12/2020 OMID HEDAYAT
Building Plans Picked Up 2/21/2020 APPLICANT
Applicant returned to address corrections 5/20/2021 SEWADA ZADOORIAN MILAGARDI
Applicant returned to address corrections 11/10/2021 SEWADA ZADOORIAN MILAGARDI
Applicant returned to address corrections 11/16/2021 SEWADA ZADOORIAN MILAGARDI
Applicant returned to address corrections 8/10/2022 SEWADA ZADOORIAN MILAGARDI
Plan Check Approved 2/14/2023 SEWADA ZADOORAN MILAGARDI
Issued 4/19/2023 APPLICANT

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 5/4/2021 JEANIE LAM
BHO/Hillside ordinance Cleared 5/4/2021 JEANIE LAM
BHO/Hillside ordinance Cleared 5/4/2021 JEANIE LAM
BHO/Hillside ordinance Cleared 5/4/2021 JEANIE LAM
Eng Process Fee Ord 176,300 Cleared 6/11/2021 STEVE MELGAR
Sewer availability Cleared 6/11/2021 STEVE MELGAR
Permit Cleared 6/15/2021 STEVE MELGAR
Distance to fire station Cleared 6/27/2021 ROBERT DUFF
Hydrant and Access approval Cleared 6/27/2021 ROBERT DUFF
BHO/Hillside ordinance Cleared 7/20/2021 CELINA MORENO
Trees in Parkway Cleared 2/2/2022 ADALBERTO VERA
Low Impact Development Cleared 2/23/2022 LONDY ALVARADO
Roof/Waste drainage to street Cleared 7/13/2022 STEVE MELGAR
Miscellaneous Cleared 7/27/2022 ALBERT TAM
Building over 3-story or 36-ft Cleared 8/5/2022 CALOSHA APPROVED
GPI Written Notices Cleared 8/5/2022 SEWADA ZADOORAN MILAGARDI
Grading Pre-Inspection Cleared 8/5/2022 SEWADA ZADOORAN MILAGARDI
Green Code Cleared 8/5/2022 SEWADA ZADOORAN MILAGARDI
Miscellaneous Cleared 9/23/2022 KENTON TRINH
Specific Plan Cleared 9/23/2022 KENTON TRINH
ZA Case Cleared 9/23/2022 KENTON TRINH
ZI Cleared 9/23/2022 KENTON TRINH
Work Adjacent to Public Way Cleared 2/4/2023 LARRY LEE

Contact Information

Contractor Build Zone Corp; Lic. No.: 1098273-B 3925 GUARDIA AVENUE      LOS ANGELES, CA
Engineer Phillips,, Craig Richard; Lic. No.: C69673 2123 VESTAL AVE      LOS ANGELES, CA 90026

Inspector Information

OSVALDO PARAMO, (213) 202-9854 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/16/2023 Partial Inspection OSVALDO PARAMO
Piling/Pier/Caisson 7/11/2023 Not Ready for Inspection OSVALDO PARAMO
Pre-Inspection 7/11/2023 Partial Inspection OSVALDO PARAMO
Piling/Pier/Caisson 7/17/2023 Partial Inspection OSVALDO PARAMO
Piling/Pier/Caisson 7/18/2023 Partial Approval OSVALDO PARAMO
Piling/Pier/Caisson 8/1/2023 Partial Approval DONALD CRICHLOW
Piling/Pier/Caisson 8/15/2023 Partial Approval OSVALDO PARAMO
Deputy Reinf. Concrete 8/17/2023 Conditional Approval OSVALDO PARAMO
Piling/Pier/Caisson 9/5/2023 Partial Inspection OSVALDO PARAMO
Piling/Pier/Caisson 9/8/2023 Partial Approval OSVALDO PARAMO
Piling/Pier/Caisson 9/12/2023 Partial Approval OSVALDO PARAMO
Piling/Pier/Caisson 9/15/2023 Not Ready for Inspection OSVALDO PARAMO
Deputy Reinf. Concrete 9/21/2023 Approved OSVALDO PARAMO
Piling/Pier/Caisson 9/21/2023 Partial Approval OSVALDO PARAMO
Deputy Reinf. Concrete 9/22/2023 Conditional Approval OSVALDO PARAMO
Piling/Pier/Caisson 9/27/2023 Not Ready for Inspection OSVALDO PARAMO
Piling/Pier/Caisson 9/29/2023 Partial Approval OSVALDO PARAMO
Footing/Foundation/Slab 10/3/2023 Not Ready for Inspection OSVALDO PARAMO
Piling/Pier/Caisson 10/3/2023 Partial Inspection OSVALDO PARAMO
Piling/Pier/Caisson 10/5/2023 Corrections Issued OSVALDO PARAMO
Piling/Pier/Caisson 10/6/2023 Partial Approval OSVALDO PARAMO
Deputy Reinf. Concrete 10/10/2023 Conditional Approval JOSH MEISTER
Piling/Pier/Caisson 10/13/2023 Not Ready for Inspection OSVALDO PARAMO
Piling/Pier/Caisson 10/23/2023 Not Ready for Inspection OSVALDO PARAMO
Piling/Pier/Caisson 11/1/2023 Partial Approval OSVALDO PARAMO
Deputy Other (see comments) 11/2/2023 Conditional Approval OSVALDO PARAMO
Piling/Pier/Caisson 11/6/2023 Partial Approval ALIZAH MAYAGOITIA
Deputy Reinf. Concrete 11/13/2023 Conditional Approval OSVALDO PARAMO
Piling/Pier/Caisson 12/27/2023 Not Ready for Inspection ALIZAH MAYAGOITIA
Deputy Reinf. Concrete 12/28/2023 Partial Approval SCOTT FINNILA
Piling/Pier/Caisson 12/29/2023 Conditional Approval HAMIK HARTOUNIAN
Piling/Pier/Caisson 1/5/2024 Partial Approval OSVALDO PARAMO
Piling/Pier/Caisson 3/11/2024 Not Ready for Inspection OSVALDO PARAMO
Piling/Pier/Caisson 3/14/2024 Not Ready for Inspection OSVALDO PARAMO
Piling/Pier/Caisson 3/27/2024 Partial Approval OSVALDO PARAMO
Piling/Pier/Caisson 3/28/2024 Partial Approval OSVALDO PARAMO
Underground Mechanical 4/1/2024 Partial Approval OSVALDO PARAMO
Footing/Foundation/Slab 4/26/2024 Partial Approval OSVALDO PARAMO
Deputy Reinf. Concrete 4/29/2024 Conditional Approval OSVALDO PARAMO
Excavation/Setback/Form/Re-Bar 5/20/2024 Partial Approval OSVALDO PARAMO
Deputy Reinf. Concrete 6/20/2024 Conditional Approval OSVALDO PARAMO
Footing/Foundation/Slab 8/5/2024 Partial Approval ALIZAH MAYAGOITIA
Excavation/Setback/Form/Re-Bar 10/15/2024 Partial Approval OSVALDO PARAMO
Deputy Reinf. Concrete 10/22/2024 Conditional Approval OSVALDO PARAMO
Excavation/Setback/Form/Re-Bar 10/31/2024 Partial Inspection WILLIAM SIERRA
Footing/Foundation/Slab 12/6/2024 Partial Approval ALIZAH MAYAGOITIA
Deputy Reinf. Concrete 12/9/2024 Conditional Approval OSVALDO PARAMO
Wood Frame 3/12/2025 Partial Approval ALIZAH MAYAGOITIA
Deputy Drilled-In Anchors 3/14/2025 Conditional Approval ALIZAH MAYAGOITIA
Deputy Wood Construction 3/25/2025 Conditional Approval ALIZAH MAYAGOITIA
Wood Frame 3/26/2025 Corrections Issued ALIZAH MAYAGOITIA
Deputy Steel/Welding 4/4/2025 Conditional Approval LILIANA PORTILLO
PLUMBING-Rough 5/21/2025 Partial Approval ALIZAH MAYAGOITIA
PLUMBING-Rough 10/3/2025 Approved ALIZAH MAYAGOITIA
ELECTRICAL-Rough 2/27/2026 Approved ALIZAH MAYAGOITIA
HVAC-Rough 2/27/2026 Partial Approval ALIZAH MAYAGOITIA
PLUMBING-Rough 2/27/2026 Approved ALIZAH MAYAGOITIA
BUILDING-Rough-Frame 3/20/2026 Approved ALIZAH MAYAGOITIA
Green Building Rough 3/20/2026 Not Ready for Inspection ALIZAH MAYAGOITIA
Verify Sprinkler Sign Off 3/20/2026 Approved ALIZAH MAYAGOITIA
HVAC-Rough 3/23/2026 Approved ALIZAH MAYAGOITIA
Insulation 3/31/2026 Not Ready for Inspection ALIZAH MAYAGOITIA
Insulation 4/13/2026 Approved ALIZAH MAYAGOITIA
Interior/Exterior Lathing 4/13/2026 Partial Approval ALIZAH MAYAGOITIA
Interior/Exterior Lathing 4/16/2026 Approved ALIZAH MAYAGOITIA
Shower Pan 4/17/2026 Approved ALIZAH MAYAGOITIA
Drywall Nailing 6/2/2026 Approved OSVALDO PARAMO
Green Building Rough 6/2/2026 Approved OSVALDO PARAMO