21010 W ERWIN ST 91367

Certificate Information: 21010 W ERWIN ST 91367

Application / Permit
19010-10000-05839
Plan Check / Job No.
B19LA26783
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(16) Retail
Work Description
PROPOSED 7-STORY MIXED USE BLDG. WITH COMMERCIAL USES BLDG. WITH SUBTERRANEAN PARKING PER DIR 2017-4722-SPP.
Permit Issued
Issued on 7/21/2022
Issuing Office
Metro
Current Status
CofO Issued on 12/18/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/19/2019 APPLICANT
Disabled Access Plans Picked Up 1/31/2020 APPLICANT
Green Plans Picked Up 1/31/2020 APPLICANT
Assigned to Plan Check Engineer 2/6/2020 LAWRENCE QUIRANTE
Corrections Issued 3/3/2020 LAWRENCE QUIRANTE
Quality Review Completed 3/6/2020 ALLEN MANALANSAN
Building Plans Picked Up 3/9/2020 APPLICANT
Applicant returned to address corrections 6/24/2021 LAWRENCE QUIRANTE
Applicant returned to address corrections 6/28/2021 LAWRENCE QUIRANTE
Applicant returned to address corrections 6/30/2021 LAWRENCE QUIRANTE
Applicant returned to address corrections 7/6/2021 LAWRENCE QUIRANTE
Applicant returned to address corrections 7/12/2021 LAWRENCE QUIRANTE
Applicant returned to address corrections 7/16/2021 LAWRENCE QUIRANTE
Applicant returned to address corrections 7/20/2021 LAWRENCE QUIRANTE
Applicant returned to address corrections 7/22/2021 LAWRENCE QUIRANTE
Applicant returned to address corrections 7/26/2021 LAWRENCE QUIRANTE
Applicant returned to address corrections 7/28/2021 LAWRENCE QUIRANTE
Applicant returned to address corrections 7/30/2021 LAWRENCE QUIRANTE
Applicant returned to address corrections 8/3/2021 LAWRENCE QUIRANTE
Applicant returned to address corrections 8/5/2021 LAWRENCE QUIRANTE
Applicant returned to address corrections 8/9/2021 LAWRENCE QUIRANTE
Applicant returned to address corrections 8/10/2021 LAWRENCE QUIRANTE
Applicant returned to address corrections 8/11/2021 LAWRENCE QUIRANTE
Applicant returned to address corrections 9/7/2021 LAWRENCE QUIRANTE
Applicant returned to address corrections 10/25/2021 LAWRENCE QUIRANTE
Plan Check Approved 7/20/2022 LAWRENCE QUIRANTE
Issued 7/21/2022 APPLICANT
TCO Issued (Expire Date: 11-25-2025) 5/29/2025 RICKEY JACKSON
TCO Issued (Expire Date: 05-25-2026) 11/26/2025 RICKEY JACKSON
Permit Finaled 12/18/2025 RICKEY JACKSON
CofO Issued 12/18/2025 RICKEY JACKSON
Permit Finaled 12/18/2025 RICKEY JACKSON

Permit Application Clearance Information

Internal circulation Cleared 4/1/2020 SHEILA AHORAIAN
Eng Process Fee Ord 176,300 Cleared 4/9/2020 GABRIEL ROBLES
Highway dedication Cleared 4/9/2020 GABRIEL ROBLES
Address approval Cleared 4/17/2020 HOWARD COOPER
Building over 3-story or 36-ft Cleared 7/2/2020 CALOSHA APPROVED
Work Adjacent to Public Way Cleared 10/13/2021 LEE GUILBEAUX
Low Impact Development Cleared 4/15/2022 JORGE MEJIA LEMUS
Miscellaneous Cleared 5/3/2022 MIGUEL GAMBOA
Opn space landscape/Water mgmt Cleared 5/3/2022 MIGUEL GAMBOA
Site Plan review Cleared 5/3/2022 MIGUEL GAMBOA
Disturb/Remove Protected Trees Cleared 5/4/2022 JOEL HERNANDEZ
Trees in Parkway Cleared 5/4/2022 ADALBERTO VERA
Roof/Waste drainage to street Cleared 5/13/2022 CARLOS AGUILERA
Hydrant and Access approval Cleared 5/23/2022 MATTHEW CRAIG
Sewer availability Cleared 5/24/2022 CARLOS AGUILERA
Miscellaneous Cleared 6/13/2022 MIGUEL GAMBOA
Specific Plan Cleared 6/13/2022 MIGUEL GAMBOA
Green Code Cleared 6/22/2022 LAWRENCE QUIRANTE
Permit Cleared 6/28/2022 LEE GUILBEAUX
DAS Clearance Cleared 7/18/2022 WAI LAU
Fire Marshall Fire Life Safety Cleared 7/18/2022 ANDREW KO

Contact Information

Architect Garrison,, John Clark; Lic. No.: C16833 3100 BRISTOL STREET SUITE 400      COSTA MESA, CA 92626
Contractor California Home Builders; Lic. No.: 700451-B 21510 ROSCOE BLVD      CANOGA PARK, CA 91304
Contractor Owner-Builder       ,
Engineer Labib,, Youhanna T; Lic. No.: S4549 319 MAIN STREET      EL SEGUNDO, CA 90245
Engineer Varela,, Gregorio; Lic. No.: C81201 1108 S ADAMS ST      GLENDALE, CA 91205

Inspector Information

ROBERT DAVIS, (818) 374-1125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 7/22/2022 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 7/22/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 7/25/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 7/26/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 7/28/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 8/1/2022 Conditional Approval JOHN KITCKO
Green Building Rough 8/1/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 8/1/2022 Partial Inspection JOHN KITCKO
Special/Order Compliance 8/1/2022 Partial Inspection JOHN KITCKO
Verify Sprinkler Sign Off 8/1/2022 Approved JOHN KITCKO
Deputy Shotcrete 8/2/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 8/3/2022 Conditional Approval CAMERON CHABAN
Green Building Rough 8/3/2022 Partial Inspection CAMERON CHABAN
Reinforced Concrete Frame 8/3/2022 Partial Approval CAMERON CHABAN
Deputy Shotcrete 8/4/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 8/5/2022 Conditional Approval DANIEL VARNUM
Deputy Reinf. Concrete 8/8/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 8/8/2022 Conditional Approval CAMERON CHABAN
Green Building Rough 8/8/2022 Not Ready for Inspection CAMERON CHABAN
Reinforced Concrete Frame 8/8/2022 Partial Approval CAMERON CHABAN
Deputy Shotcrete 8/9/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 8/10/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 8/10/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 8/11/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 8/12/2022 Conditional Approval CAMERON CHABAN
Structural Steel Frame 8/12/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/15/2022 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 8/16/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 8/16/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 8/17/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 8/18/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 8/19/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/19/2022 Conditional Approval CAMERON CHABAN
Masonry Wall/Backfill 8/19/2022 Partial Approval CAMERON CHABAN
Piling/Pier/Caisson 8/19/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 8/22/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/22/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 8/22/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 8/23/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/23/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 8/23/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 8/24/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/24/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 8/24/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 8/25/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/25/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 8/25/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 8/26/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/26/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 8/26/2022 Conditional Approval CAMERON CHABAN
Structural Steel Frame 8/26/2022 Partial Approval CAMERON CHABAN
Deputy Other (see comments) 8/29/2022 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/29/2022 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 8/30/2022 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 8/30/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 9/2/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 9/2/2022 Conditional Approval CAMERON CHABAN
Structural Steel Frame 9/2/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 9/6/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 9/6/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 9/7/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 9/7/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 9/8/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 9/8/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 9/8/2022 Conditional Approval CAMERON CHABAN
Structural Steel Frame 9/8/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 9/9/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 9/9/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 9/9/2022 Conditional Approval CAMERON CHABAN
Green Building Rough 9/9/2022 Not Ready for Inspection CAMERON CHABAN
Deputy Reinf. Concrete 9/12/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 9/12/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 9/13/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/14/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 9/14/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 9/15/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 9/15/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 9/16/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/19/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 9/19/2022 Conditional Approval CAMERON CHABAN
Structural Steel Frame 9/19/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 9/20/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/21/2022 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 9/21/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/22/2022 Conditional Approval CAMERON CHABAN
Structural Steel Frame 9/22/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 9/23/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 9/26/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 9/26/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 9/27/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 9/27/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 9/28/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 9/28/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 9/29/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 9/29/2022 Conditional Approval CAMERON CHABAN
Green Building Rough 9/29/2022 Partial Inspection CAMERON CHABAN
Reinforced Concrete Frame 9/29/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 9/30/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 9/30/2022 Conditional Approval CAMERON CHABAN
Piling/Pier/Caisson 9/30/2022 Partial Inspection CAMERON CHABAN
Deputy Reinf. Concrete 10/3/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 10/4/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 10/5/2022 Conditional Approval CAMERON CHABAN
Structural Steel Frame 10/5/2022 Not Ready for Inspection CAMERON CHABAN
Deputy Reinf. Concrete 10/6/2022 Conditional Approval CAMERON CHABAN
Green Building Rough 10/6/2022 Not Ready for Inspection CAMERON CHABAN
Reinforced Concrete Frame 10/6/2022 Partial Approval CAMERON CHABAN
Structural Steel Frame 10/6/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 10/11/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 10/11/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 10/12/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 10/12/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 10/13/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 10/13/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 10/14/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 10/14/2022 Conditional Approval CAMERON CHABAN
Structural Steel Frame 10/14/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 10/17/2022 Conditional Approval JOHN KITCKO
Deputy Other (see comments) 10/18/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 10/18/2022 Conditional Approval CAMERON CHABAN
Green Building Rough 10/18/2022 Not Ready for Inspection CAMERON CHABAN
Reinforced Concrete Frame 10/18/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 10/19/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 10/19/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 10/20/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 10/20/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 10/21/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 10/21/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 10/24/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 10/24/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 10/25/2022 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 10/25/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 10/26/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 10/26/2022 Conditional Approval CAMERON CHABAN
Piling/Pier/Caisson 10/26/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 10/27/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 10/28/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 10/31/2022 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 10/31/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 11/1/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 11/1/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 11/2/2022 Conditional Approval JOHN KITCKO
Deputy Shotcrete 11/2/2022 Conditional Approval JOHN KITCKO
Structural Steel Frame 11/2/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 11/3/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 11/3/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 11/4/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 11/7/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 11/8/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 11/9/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 11/10/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 11/15/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 11/16/2022 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 11/16/2022 Partial Approval CAMERON CHABAN
Structural Steel Frame 11/16/2022 Partial Inspection CAMERON CHABAN
Deputy Reinf. Concrete 11/17/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 11/18/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 11/21/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 11/21/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 11/22/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 11/23/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 11/28/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 11/29/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 11/29/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 11/30/2022 Conditional Approval CAMERON CHABAN
Green Building Rough 11/30/2022 Not Ready for Inspection CAMERON CHABAN
Reinforced Concrete Frame 11/30/2022 Partial Inspection CAMERON CHABAN
Deputy Reinf. Concrete 12/1/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/2/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 12/2/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 12/5/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/6/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 12/6/2022 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 12/6/2022 Partial Inspection CAMERON CHABAN
Deputy Reinf. Concrete 12/7/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 12/7/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/8/2022 Conditional Approval CAMERON CHABAN
Structural Steel Frame 12/8/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/9/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 12/9/2022 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 12/9/2022 Partial Inspection CAMERON CHABAN
Deputy Reinf. Concrete 12/12/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 12/12/2022 Conditional Approval CAMERON CHABAN
Green Building Rough 12/12/2022 Not Ready for Inspection DANIEL VARNUM
Reinforced Concrete Frame 12/12/2022 Partial Approval DANIEL VARNUM
Structural Steel Frame 12/12/2022 Not Ready for Inspection DANIEL VARNUM
Deputy Reinf. Concrete 12/13/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/14/2022 Conditional Approval CAMERON CHABAN
Deputy Other (see comments) 12/15/2022 Conditional Approval CAMERON CHABAN
Structural Steel Frame 12/15/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/16/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 12/16/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/19/2022 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 12/19/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 12/20/2022 Conditional Approval DANIEL VARNUM
Deputy Shotcrete 12/20/2022 Conditional Approval DANIEL VARNUM
Deputy Reinf. Concrete 12/21/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 12/21/2022 Conditional Approval CAMERON CHABAN
Structural Steel Frame 12/21/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/22/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 12/22/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/23/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 12/23/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/27/2022 Conditional Approval ANDREW DORSO
Deputy Shotcrete 12/27/2022 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 12/28/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 12/28/2022 Conditional Approval ANDREW DORSO
Deputy Shotcrete 12/28/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/29/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/30/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 12/30/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 1/3/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 1/3/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 1/4/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 1/4/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 1/5/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 1/5/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 1/6/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 1/6/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 1/9/2023 Conditional Approval ROBERT DAVIS
Reinforced Concrete Frame 1/9/2023 Conditional Approval ROBERT DAVIS
Special/Order Compliance 1/9/2023 Approved BRIAN KELLY
Deputy Reinf. Concrete 1/10/2023 Conditional Approval DANIEL VARNUM
Structural Steel Frame 1/10/2023 No Access for Inspection DANIEL VARNUM
Deputy Reinf. Concrete 1/11/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 1/12/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 1/13/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 1/13/2023 Conditional Approval CAMERON CHABAN
Structural Steel Frame 1/13/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 1/17/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 1/17/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 1/18/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 1/18/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 1/19/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 1/19/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 1/20/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 1/23/2023 Conditional Approval CAMERON CHABAN
Structural Steel Frame 1/23/2023 Partial Approval CAMERON CHABAN
Deputy Shotcrete 1/24/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 1/25/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 1/26/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 1/26/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 1/27/2023 Conditional Approval CAMERON CHABAN
Special/Order Compliance 1/27/2023 Partial Inspection DEANDRE HOFFMAN
Structural Steel Frame 1/27/2023 Conditional Approval CAMERON CHABAN
Structural Steel Frame 1/30/2023 Partial Inspection JEFFREY FULTON
Deputy Reinf. Concrete 1/31/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/1/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 2/1/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/2/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 2/2/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/3/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 2/3/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/6/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 2/6/2023 Conditional Approval CAMERON CHABAN
Special/Order Compliance 2/6/2023 Conditional Approval STEVEN LEVITT
Deputy Reinf. Concrete 2/7/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 2/7/2023 Conditional Approval CAMERON CHABAN
Special/Order Compliance 2/7/2023 Conditional Approval STEVEN LEVITT
Deputy Reinf. Concrete 2/8/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 2/8/2023 Conditional Approval CAMERON CHABAN
Special/Order Compliance 2/8/2023 Conditional Approval STEVEN LEVITT
Deputy Reinf. Concrete 2/9/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 2/9/2023 Conditional Approval CAMERON CHABAN
Structural Steel Frame 2/9/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/10/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 2/10/2023 Conditional Approval CAMERON CHABAN
Masonry Wall/Backfill 2/10/2023 Partial Approval CAMERON CHABAN
Special/Order Compliance 2/10/2023 Partial Approval STEVEN LEVITT
Deputy Reinf. Concrete 2/13/2023 Conditional Approval DANIEL VARNUM
Deputy Reinf. Masonry 2/13/2023 Conditional Approval DANIEL VARNUM
Deputy Reinf. Concrete 2/14/2023 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 2/14/2023 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 2/15/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 2/15/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/16/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 2/16/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/17/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 2/17/2023 Conditional Approval CAMERON CHABAN
Special/Order Compliance 2/17/2023 Conditional Approval STEVEN LEVITT
Deputy Reinf. Concrete 2/21/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 2/21/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 2/21/2023 Conditional Approval CAMERON CHABAN
Structural Steel Frame 2/21/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/22/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 2/22/2023 Conditional Approval CAMERON CHABAN
Structural Steel Frame 2/22/2023 Partial Inspection CAMERON CHABAN
Deputy Reinf. Concrete 2/23/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 2/23/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 2/23/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/24/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 2/24/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 2/24/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/27/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 2/28/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 3/1/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 3/2/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 3/2/2023 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 3/2/2023 Partial Approval CAMERON CHABAN
Masonry Wall/Backfill 3/2/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 3/3/2023 Conditional Approval JEFFREY FULTON
Deputy Reinf. Masonry 3/3/2023 Conditional Approval JEFFREY FULTON
Structural Steel Frame 3/3/2023 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 3/6/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 3/6/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 3/6/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 3/7/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 3/7/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 3/7/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 3/8/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 3/8/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 3/9/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 3/9/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 3/10/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 3/10/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 3/13/2023 Conditional Approval DEANDRE HOFFMAN
Deputy Reinf. Masonry 3/13/2023 Conditional Approval DEANDRE HOFFMAN
Deputy Reinf. Concrete 3/14/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 3/14/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 3/15/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 3/15/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 3/16/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 3/16/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 3/17/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 3/17/2023 Conditional Approval CAMERON CHABAN
Masonry Wall/Backfill 3/17/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 3/20/2023 Conditional Approval JEFFREY FULTON
Deputy Reinf. Masonry 3/20/2023 Conditional Approval JEFFREY FULTON
Deputy Reinf. Masonry 3/21/2023 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/22/2023 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 3/22/2023 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 3/23/2023 Conditional Approval JEFFREY FULTON
Deputy Reinf. Masonry 3/23/2023 Conditional Approval JEFFREY FULTON
Footing/Foundation/Slab 3/23/2023 Partial Inspection JEFFREY FULTON
Deputy Reinf. Concrete 3/24/2023 Conditional Approval DANIEL VARNUM
Wood Frame 3/24/2023 Partial Approval DANIEL VARNUM
Deputy Reinf. Masonry 3/28/2023 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 3/29/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 3/29/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 3/30/2023 Conditional Approval DEANDRE HOFFMAN
Deputy Reinf. Masonry 3/30/2023 Conditional Approval DEANDRE HOFFMAN
Deputy Reinf. Concrete 3/31/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 3/31/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/3/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 4/3/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/4/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 4/4/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/5/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 4/5/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/6/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 4/6/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 4/6/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/7/2023 Conditional Approval ANDREW DORSO
Deputy Reinf. Masonry 4/7/2023 Conditional Approval ANDREW DORSO
Deputy Wood Construction 4/7/2023 Conditional Approval ANDREW DORSO
Floor/Roof Diaphrgm/Shear Wall 4/7/2023 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 4/10/2023 Conditional Approval KENNETH ROBERTS
Deputy Reinf. Masonry 4/10/2023 Conditional Approval KENNETH ROBERTS
Deputy Wood Construction 4/10/2023 Conditional Approval RICKEY JACKSON
Deputy Reinf. Concrete 4/11/2023 Conditional Approval JEFFREY FULTON
Deputy Reinf. Masonry 4/11/2023 Conditional Approval JEFFREY FULTON
Deputy Wood Construction 4/11/2023 Conditional Approval JEFFREY FULTON
Green Building Rough 4/11/2023 Not Ready for Inspection JEFFREY FULTON
Masonry Wall/Backfill 4/11/2023 Partial Inspection JEFFREY FULTON
Reinforced Masonry Frame 4/11/2023 Partial Inspection JEFFREY FULTON
Deputy Reinf. Concrete 4/12/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 4/12/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 4/12/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 4/12/2023 Partial Approval CAMERON CHABAN
Special/Order Compliance 4/12/2023 Partial Approval STEVEN LEVITT
Deputy Wood Construction 4/13/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/14/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 4/14/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 4/14/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/17/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 4/17/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/18/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 4/18/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/19/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 4/19/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/20/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 4/20/2023 Conditional Approval CAMERON CHABAN
Green Building Rough 4/20/2023 Partial Inspection CAMERON CHABAN
Reinforced Concrete Frame 4/20/2023 Partial Approval CAMERON CHABAN
Structural Steel Frame 4/20/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/21/2023 Conditional Approval JEFFREY FULTON
Deputy Reinf. Masonry 4/21/2023 Conditional Approval JEFFREY FULTON
Deputy Wood Construction 4/21/2023 Conditional Approval JEFFREY FULTON
Wood Frame 4/21/2023 Partial Inspection JEFFREY FULTON
Deputy Reinf. Concrete 4/24/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 4/24/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 4/24/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/25/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 4/25/2023 Conditional Approval CAMERON CHABAN
Deputy Steel/Welding 4/25/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 4/25/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/26/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 4/26/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 4/26/2023 Conditional Approval CAMERON CHABAN
Structural Steel Frame 4/26/2023 Partial Inspection CAMERON CHABAN
Deputy Reinf. Concrete 4/27/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 4/27/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 4/27/2023 Conditional Approval CAMERON CHABAN
Structural Steel Frame 4/27/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 4/28/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 4/28/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 4/28/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 4/28/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 5/1/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 5/1/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 5/2/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 5/2/2023 Conditional Approval CAMERON CHABAN
Special/Order Compliance 5/2/2023 Partial Inspection CAMERON CHABAN
Deputy Reinf. Masonry 5/3/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 5/3/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 5/3/2023 Partial Approval CAMERON CHABAN
Masonry Wall/Backfill 5/3/2023 Partial Inspection CAMERON CHABAN
Deputy Reinf. Masonry 5/4/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 5/4/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 5/5/2023 Conditional Approval JEFFREY DURAN
Deputy Wood Construction 5/5/2023 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 5/8/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 5/9/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 5/9/2023 Conditional Approval CAMERON CHABAN
Masonry Wall/Backfill 5/9/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 5/10/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 5/10/2023 Order to Comply Issued CAMERON CHABAN
Deputy Reinf. Masonry 5/11/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 5/11/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 5/11/2023 Partial Approval CAMERON CHABAN
Special/Order Compliance 5/11/2023 Partial Approval STEVEN LEVITT
Deputy Reinf. Masonry 5/12/2023 Conditional Approval CAMERON CHABAN
Deputy Drilled-In Anchors 5/15/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 5/15/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 5/16/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 5/16/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 5/16/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 5/17/2023 Conditional Approval CAMERON CHABAN
Deputy Steel/Welding 5/17/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 5/17/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 5/17/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 5/18/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 5/18/2023 Conditional Approval CAMERON CHABAN
Deputy Steel/Welding 5/18/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 5/18/2023 Conditional Approval CAMERON CHABAN
Green Building Rough 5/18/2023 Not Ready for Inspection CAMERON CHABAN
Reinforced Concrete Frame 5/18/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 5/19/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 5/19/2023 Conditional Approval CAMERON CHABAN
Deputy Steel/Welding 5/19/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 5/19/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 5/22/2023 Conditional Approval JEFFREY FULTON
Deputy Wood Construction 5/22/2023 Conditional Approval JEFFREY FULTON
Deputy Reinf. Masonry 5/23/2023 Conditional Approval JEFFREY FULTON
Deputy Wood Construction 5/23/2023 Conditional Approval JEFFREY FULTON
Structural Steel Frame 5/23/2023 Partial Inspection JEFFREY FULTON
Deputy Reinf. Masonry 5/24/2023 Conditional Approval JEFFREY FULTON
Deputy Wood Construction 5/24/2023 Conditional Approval JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 5/24/2023 Partial Inspection JEFFREY FULTON
Deputy Reinf. Masonry 5/25/2023 Conditional Approval JEFFREY FULTON
Deputy Wood Construction 5/25/2023 Conditional Approval JEFFREY FULTON
Deputy Reinf. Masonry 5/26/2023 Conditional Approval JEFFREY DURAN
Deputy Wood Construction 5/26/2023 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 5/30/2023 Conditional Approval BRIAN KELLY
Insulation 5/30/2023 Partial Approval BRIAN KELLY
Structural Steel Frame 5/30/2023 Not Ready for Inspection BRIAN KELLY
Deputy Reinf. Masonry 5/31/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 5/31/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 5/31/2023 Partial Approval CAMERON CHABAN
Green Building Rough 5/31/2023 Not Ready for Inspection CAMERON CHABAN
Deputy Reinf. Concrete 6/1/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 6/1/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 6/1/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 6/2/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 6/2/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 6/5/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 6/5/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 6/6/2023 Conditional Approval JOHN KITCKO
Deputy Wood Construction 6/6/2023 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 6/7/2023 Conditional Approval JEFFREY DURAN
Deputy Wood Construction 6/7/2023 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 6/8/2023 Approved DANNY RODRIGUEZ
Deputy Wood Construction 6/8/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 6/9/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 6/9/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 6/9/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 6/12/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 6/13/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 6/13/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 6/13/2023 Conditional Approval CAMERON CHABAN
Green Building Rough 6/13/2023 Not Ready for Inspection CAMERON CHABAN
Reinforced Concrete Frame 6/13/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 6/14/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 6/14/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 6/14/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 6/15/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 6/15/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 6/16/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 6/16/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 6/20/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 6/21/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 6/21/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 6/21/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 6/22/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 6/22/2023 Conditional Approval CAMERON CHABAN
Light Gage Steel Frame 6/22/2023 Partial Inspection CAMERON CHABAN
Deputy Pre-Stress Concrete 6/23/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 6/23/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 6/23/2023 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 6/23/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 6/23/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 6/23/2023 Partial Inspection CAMERON CHABAN
Deputy Reinf. Masonry 6/26/2023 Conditional Approval JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 6/26/2023 Partial Inspection JEFFREY FULTON
Deputy Reinf. Masonry 6/27/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 6/27/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 6/27/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 6/28/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 6/28/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 6/29/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 6/29/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 6/30/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 6/30/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 6/30/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 7/3/2023 Conditional Approval JEFFREY FULTON
Deputy Reinf. Masonry 7/5/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 7/6/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 7/6/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 7/6/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 7/7/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 7/7/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 7/7/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 7/10/2023 Conditional Approval BRIAN KELLY
Deputy Reinf. Masonry 7/11/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 7/11/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 7/12/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 7/12/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 7/13/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 7/13/2023 Conditional Approval CAMERON CHABAN
Wood Frame 7/13/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 7/14/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 7/14/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 7/17/2023 Conditional Approval CAMERON CHABAN
Insulation 7/17/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 7/18/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 7/18/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 7/18/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 7/19/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 7/19/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 7/20/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 7/20/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 7/21/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 7/21/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 7/24/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 7/24/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 7/24/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 7/25/2023 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 7/26/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 7/27/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 7/27/2023 Partial Inspection CAMERON CHABAN
Deputy Reinf. Masonry 7/28/2023 Conditional Approval JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 7/28/2023 Partial Inspection JEFFREY FULTON
Insulation 7/31/2023 Partial Inspection JEFFREY FULTON
Deputy Reinf. Masonry 8/1/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 8/1/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/2/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 8/2/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 8/3/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/3/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 8/3/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 8/3/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/4/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 8/4/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/7/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/8/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 8/8/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/9/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 8/9/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/10/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/11/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 8/14/2023 Partial Inspection JEFFREY FULTON
Deputy Reinf. Masonry 8/15/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 8/15/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/16/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 8/16/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/17/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/18/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 8/18/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 8/21/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/21/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/22/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 8/22/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/23/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 8/23/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 8/23/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/24/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 8/24/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 8/24/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/25/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 8/25/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 8/28/2023 Conditional Approval JEFFREY FULTON
Insulation 8/28/2023 Partial Inspection JEFFREY FULTON
Deputy Reinf. Masonry 8/29/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 8/29/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/30/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 8/30/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/31/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 8/31/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 9/1/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 9/1/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 9/1/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 9/5/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 9/5/2023 Partial Approval CAMERON CHABAN
Masonry Wall/Backfill 9/5/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 9/6/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 9/6/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 9/7/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 9/7/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 9/8/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 9/8/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 9/11/2023 Partial Approval MARTIN TAVITIAN
Deputy Wood Construction 9/11/2023 Partial Approval MARTIN TAVITIAN
Insulation 9/11/2023 Partial Approval KENNETH ROBERTS
Deputy Reinf. Masonry 9/12/2023 Conditional Approval DEANDRE HOFFMAN
Deputy Wood Construction 9/12/2023 Conditional Approval DEANDRE HOFFMAN
Floor/Roof Diaphrgm/Shear Wall 9/12/2023 Partial Inspection DEANDRE HOFFMAN
Deputy Reinf. Masonry 9/13/2023 Conditional Approval JEFFREY DURAN
Deputy Wood Construction 9/13/2023 Conditional Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 9/13/2023 Not Ready for Inspection DEANDRE HOFFMAN
Deputy Reinf. Masonry 9/14/2023 Conditional Approval DEANDRE HOFFMAN
Deputy Wood Construction 9/14/2023 Conditional Approval DEANDRE HOFFMAN
Floor/Roof Diaphrgm/Shear Wall 9/14/2023 Partial Inspection DEANDRE HOFFMAN
Deputy Reinf. Masonry 9/15/2023 Conditional Approval STEVEN LEVITT
Deputy Wood Construction 9/15/2023 Conditional Approval STEVEN LEVITT
Drywall Nailing 9/15/2023 Partial Approval STEVEN LEVITT
Insulation 9/15/2023 Partial Approval STEVEN LEVITT
Deputy Reinf. Masonry 9/18/2023 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 9/19/2023 Conditional Approval PAUL DAVIDSON
Drywall Nailing 9/19/2023 Partial Approval PAUL DAVIDSON
Insulation 9/19/2023 Partial Approval PAUL DAVIDSON
Deputy Reinf. Masonry 9/20/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 9/21/2023 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 9/22/2023 Conditional Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 9/22/2023 Conditional Approval STEVEN LEVITT
Insulation 9/22/2023 Partial Approval STEVEN LEVITT
Floor/Roof Diaphrgm/Shear Wall 9/26/2023 Partial Approval CAMERON CHABAN
Deputy Wood Construction 9/27/2023 Conditional Approval CAMERON CHABAN
Drywall Nailing 9/27/2023 Partial Approval CAMERON CHABAN
Insulation 9/27/2023 Partial Approval CAMERON CHABAN
Deputy Wood Construction 9/28/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 9/28/2023 Partial Approval JOHN KITCKO
Deputy Wood Construction 9/29/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 10/4/2023 Partial Approval CAMERON CHABAN
Insulation 10/4/2023 Partial Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 10/5/2023 Partial Approval CAMERON CHABAN
Insulation 10/5/2023 Partial Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 10/6/2023 Partial Approval CAMERON CHABAN
Insulation 10/6/2023 Partial Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 10/11/2023 Partial Approval CAMERON CHABAN
Insulation 10/11/2023 Partial Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 10/12/2023 Partial Approval CAMERON CHABAN
Insulation 10/12/2023 Partial Approval CAMERON CHABAN
Drywall Nailing 10/13/2023 Partial Inspection JEFFREY FULTON
Insulation 10/13/2023 Not Ready for Inspection JEFFREY FULTON
Deputy Wood Construction 10/17/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 10/17/2023 Partial Approval CAMERON CHABAN
Insulation 10/17/2023 Partial Approval CAMERON CHABAN
Deputy Wood Construction 10/18/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 10/18/2023 Partial Approval JOHN KITCKO
Insulation 10/18/2023 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Masonry 10/19/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 10/19/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 10/19/2023 Partial Approval CAMERON CHABAN
Insulation 10/19/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 10/20/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 10/20/2023 Conditional Approval CAMERON CHABAN
Drywall Nailing 10/20/2023 Partial Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 10/20/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 10/23/2023 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/24/2023 Conditional Approval CAMERON CHABAN
Insulation 10/24/2023 Not Ready for Inspection CAMERON CHABAN
Interior/Exterior Lathing 10/24/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 10/25/2023 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 10/25/2023 Partial Approval CAMERON CHABAN
Insulation 10/25/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 10/26/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 10/27/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 11/1/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 11/2/2023 Conditional Approval CAMERON CHABAN
Deputy Drilled-In Anchors 11/3/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 11/3/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 11/3/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 11/6/2023 Conditional Approval JEFFREY FULTON
Interior/Exterior Lathing 11/6/2023 Partial Inspection JEFFREY FULTON
Deputy Reinf. Masonry 11/7/2023 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 11/8/2023 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 11/9/2023 Not Ready for Inspection CAMERON CHABAN
Insulation 11/9/2023 Partial Approval CAMERON CHABAN
Deputy Reinf. Masonry 11/15/2023 Conditional Approval CAMERON CHABAN
Insulation 11/16/2023 Partial Approval CAMERON CHABAN
Interior/Exterior Lathing 11/17/2023 Partial Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 12/6/2023 Partial Approval CAMERON CHABAN
Insulation 12/12/2023 Partial Approval DEANDRE HOFFMAN
Wood Frame 12/14/2023 Partial Approval BRIAN KELLY
Wood Frame 12/20/2023 Partial Approval CAMERON CHABAN
Interior/Exterior Lathing 1/8/2024 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 1/9/2024 Partial Inspection JEFFREY FULTON
Pre-Inspection 1/9/2024 Partial Inspection MELVIN GIRTON
Insulation 1/11/2024 Not Ready for Inspection JEFFREY FULTON
Special/Order Compliance 1/12/2024 Partial Inspection MELVIN GIRTON
Wood Frame 1/12/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 1/16/2024 Partial Inspection JEFFREY FULTON
Wood Frame 1/16/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 1/17/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 1/18/2024 Partial Approval BRIAN KELLY
Wood Frame 1/18/2024 Partial Approval BRIAN KELLY
Drywall Nailing 1/22/2024 Partial Inspection JEFFREY FULTON
Insulation 1/22/2024 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 1/23/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 1/25/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 1/30/2024 Partial Inspection JEFFREY FULTON
Insulation 1/30/2024 Corrections Issued JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 1/31/2024 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 2/1/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 2/2/2024 Partial Inspection JEFFREY FULTON
Insulation 2/2/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 2/6/2024 Not Ready for Inspection JEFFREY FULTON
Insulation 2/6/2024 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 2/9/2024 Corrections Issued JEFFREY FULTON
Insulation 2/9/2024 Not Ready for Inspection JEFFREY FULTON
Interior/Exterior Lathing 2/12/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 2/14/2024 Not Ready for Inspection JEFFREY FULTON
Insulation 2/14/2024 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 2/20/2024 Partial Inspection JEFFREY FULTON
Insulation 2/20/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 2/21/2024 Not Ready for Inspection JEFFREY FULTON
Insulation 2/21/2024 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 2/23/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 2/27/2024 Partial Approval JOHN KITCKO
Interior/Exterior Lathing 2/28/2024 Partial Approval GREGORY POMISH
Insulation 3/1/2024 Partial Approval ROBERT DAVIS
Insulation 3/4/2024 Partial Approval ROBERT DAVIS
Drywall Nailing 3/6/2024 Partial Approval ROBERT DAVIS
Insulation 3/6/2024 Partial Approval ROBERT DAVIS
Drywall Nailing 3/7/2024 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 3/11/2024 Corrections Issued ROBERT DAVIS
Drywall Nailing 3/13/2024 Partial Approval ROBERT DAVIS
Insulation 3/13/2024 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 3/14/2024 Not Ready for Inspection ROBERT DAVIS
Wood Frame 3/14/2024 Partial Approval ROBERT DAVIS
Drywall Nailing 3/15/2024 Not Ready for Inspection ROBERT DAVIS
Insulation 3/15/2024 Not Ready for Inspection ROBERT DAVIS
Insulation 3/18/2024 Partial Approval ROBERT DAVIS
Drywall Nailing 3/20/2024 Partial Approval ROBERT DAVIS
Wood Frame 3/26/2024 Partial Approval ROBERT DAVIS
Drywall Nailing 3/27/2024 Not Ready for Inspection ROBERT DAVIS
Wood Frame 3/27/2024 Partial Approval ROBERT DAVIS
Drywall Nailing 3/29/2024 Partial Approval ROBERT DAVIS
Insulation 3/29/2024 Partial Approval ROBERT DAVIS
Insulation 4/1/2024 Partial Approval ROBERT DAVIS
Insulation 4/2/2024 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 4/2/2024 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 4/3/2024 Partial Approval GREGORY POMISH
Wood Frame 4/3/2024 Partial Approval GREGORY POMISH
Wood Frame 4/4/2024 Partial Approval BRIAN KELLY
Insulation 4/8/2024 Not Ready for Inspection ROBERT DAVIS
Insulation 4/10/2024 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 4/10/2024 Partial Approval ROBERT DAVIS
Drywall Nailing 4/16/2024 Partial Approval ROBERT DAVIS
Insulation 4/16/2024 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 4/23/2024 Partial Approval ROBERT DAVIS
Wood Frame 4/23/2024 Partial Approval ROBERT DAVIS
Wood Frame 4/24/2024 Partial Approval ROBERT DAVIS
Insulation 4/29/2024 Partial Approval ROBERT DAVIS
Wood Frame 4/29/2024 Not Ready for Inspection ROBERT DAVIS
Insulation 4/30/2024 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 4/30/2024 Partial Approval ROBERT DAVIS
Insulation 5/1/2024 Not Ready for Inspection ROBERT DAVIS
Wood Frame 5/1/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 5/2/2024 Approved ROBERT DAVIS
Light Gage Steel Frame 5/2/2024 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 5/2/2024 Conditional Approval ROBERT DAVIS
Insulation 5/3/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 5/6/2024 Conditional Approval ROBERT DAVIS
Interior/Exterior Lathing 5/6/2024 Partial Approval ROBERT DAVIS
Wood Frame 5/6/2024 Not Ready for Inspection ROBERT DAVIS
Insulation 5/7/2024 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 5/7/2024 Partial Approval ROBERT DAVIS
Drywall Nailing 5/10/2024 Not Ready for Inspection ROBERT DAVIS
Insulation 5/10/2024 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 5/13/2024 Partial Approval ROBERT DAVIS
Insulation 5/13/2024 Partial Approval ROBERT DAVIS
Insulation 5/15/2024 Not Ready for Inspection ROBERT DAVIS
Wood Frame 5/15/2024 Partial Approval ROBERT DAVIS
Wood Frame 5/17/2024 Partial Approval ROBERT DAVIS
Insulation 5/20/2024 Not Ready for Inspection ROBERT DAVIS
Wood Frame 5/20/2024 Partial Approval ROBERT DAVIS
Insulation 5/21/2024 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 5/21/2024 Partial Approval ROBERT DAVIS
Wood Frame 5/21/2024 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 5/22/2024 Partial Approval ROBERT DAVIS
Drywall Nailing 5/23/2024 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 5/30/2024 Partial Approval ROBERT DAVIS
Drywall Nailing 6/5/2024 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 6/7/2024 Partial Approval ROBERT DAVIS
Drywall Nailing 6/10/2024 Partial Approval ROBERT DAVIS
Wood Frame 6/11/2024 Partial Approval ROBERT DAVIS
Insulation 6/14/2024 Not Ready for Inspection ROBERT DAVIS
Wood Frame 6/14/2024 Partial Approval ROBERT DAVIS
Drywall Nailing 6/18/2024 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 6/18/2024 Partial Approval ROBERT DAVIS
Drywall Nailing 6/20/2024 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 6/20/2024 Partial Approval ROBERT DAVIS
Drywall Nailing 6/21/2024 Not Ready for Inspection ROBERT DAVIS
Insulation 6/21/2024 Partial Approval ROBERT DAVIS
Insulation 6/24/2024 Partial Approval GREGORY POMISH
Masonry Wall/Backfill 6/24/2024 Partial Approval GREGORY POMISH
Wood Frame 6/24/2024 Partial Inspection GREGORY POMISH
Drywall Nailing 6/25/2024 Partial Approval GREGORY POMISH
Insulation 6/25/2024 Partial Approval GREGORY POMISH
Wood Frame 6/25/2024 Partial Approval GREGORY POMISH
Insulation 6/26/2024 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 6/26/2024 Partial Approval ROBERT DAVIS
Drywall Nailing 6/28/2024 Partial Approval ROBERT DAVIS
Green Building Rough 6/28/2024 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 7/2/2024 Partial Approval ROBERT DAVIS
Drywall Nailing 7/3/2024 Partial Approval ROBERT DAVIS
Insulation 7/8/2024 Partial Approval ROBERT DAVIS
Wood Frame 7/8/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/12/2024 Conditional Approval ROBERT DAVIS
Drywall Nailing 7/15/2024 Partial Inspection ROBERT DAVIS
Masonry Wall/Backfill 7/16/2024 Partial Approval ROBERT DAVIS
Special/Order Compliance 7/16/2024 Corrections Issued ROBERT DAVIS
Drywall Nailing 7/18/2024 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/22/2024 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 7/23/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/24/2024 Conditional Approval ROBERT DAVIS
Drywall Nailing 7/25/2024 Partial Approval ROBERT DAVIS
Reinforced Concrete Frame 7/25/2024 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 7/26/2024 Not Ready for Inspection ROBERT DAVIS
Special/Order Compliance 7/26/2024 Partial Inspection ROBERT DAVIS
Reinforced Concrete Frame 7/30/2024 Partial Approval ROBERT DAVIS
Insulation 8/1/2024 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 8/1/2024 Not Ready for Inspection ROBERT DAVIS
Insulation 8/2/2024 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 8/2/2024 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 8/2/2024 Partial Approval ROBERT DAVIS
Insulation 8/5/2024 Not Ready for Inspection ROBERT DAVIS
Reinforced Concrete Frame 8/5/2024 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 8/7/2024 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 8/8/2024 Partial Approval ROBERT DAVIS
Drywall Nailing 8/9/2024 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 8/14/2024 Partial Approval GREGORY POMISH
Insulation 8/19/2024 Partial Approval ROBERT DAVIS
Drywall Nailing 8/21/2024 Partial Approval ROBERT DAVIS
Green Building Rough 8/21/2024 Approved ROBERT DAVIS
Reinforced Masonry Frame 8/21/2024 Partial Approval ROBERT DAVIS
Drywall Nailing 8/23/2024 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 8/27/2024 Partial Approval ROBERT DAVIS
Insulation 9/18/2024 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 9/18/2024 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 9/20/2024 Not Ready for Inspection ROBERT DAVIS
Wood Frame 9/20/2024 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 9/24/2024 Not Ready for Inspection ROBERT DAVIS
Masonry Wall/Backfill 9/24/2024 Partial Approval ROBERT DAVIS
Wood Frame 9/24/2024 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 9/26/2024 Conditional Approval ROBERT DAVIS
Insulation 9/30/2024 Partial Approval ROBERT DAVIS
Drywall Nailing 10/7/2024 Partial Approval ROBERT DAVIS
Drywall Nailing 10/9/2024 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 10/9/2024 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 10/15/2024 Partial Approval ROBERT DAVIS
Special/Order Compliance 10/30/2024 Partial Inspection ROBERT DAVIS
Special/Order Compliance 11/6/2024 Partial Inspection ROBERT DAVIS
Special/Order Compliance 12/18/2024 Not Ready for Inspection JACOB MYERS
Final 12/23/2024 Corrections Issued ROBERT DAVIS
Footing/Foundation/Slab 12/23/2024 Approved ROBERT DAVIS
Green Building Final 12/23/2024 Approved ROBERT DAVIS
Reinforced Concrete Frame 12/23/2024 Approved ROBERT DAVIS
Reinforced Masonry Frame 12/23/2024 Approved ROBERT DAVIS
SGSOV-Seismic Gas S/O Valve 12/23/2024 SGSOV Not Ready ROBERT DAVIS
Smoke Detectors 12/23/2024 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 1/7/2025 Approved ROBERT DAVIS
Drywall Nailing 1/10/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 1/14/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 1/17/2025 Partial Approval ROBERT DAVIS
Special/Order Compliance 1/22/2025 Partial Inspection ROBERT DAVIS
Pre-Inspection 1/29/2025 Partial Inspection BRIAN KELLY
Special/Order Compliance 1/29/2025 Corrections Issued ROBERT DAVIS
Special/Order Compliance 1/31/2025 Corrections Issued ROBERT DAVIS
Special/Order Compliance 2/19/2025 Partial Inspection ROBERT DAVIS
Special/Order Compliance 3/18/2025 Partial Inspection ROBERT DAVIS
Special/Order Compliance 3/24/2025 Partial Approval ROBERT DAVIS
Special/Order Compliance 3/27/2025 Partial Inspection ROBERT DAVIS
Special/Order Compliance 3/28/2025 Partial Inspection ROBERT DAVIS
Special/Order Compliance 4/15/2025 Partial Inspection ROBERT DAVIS
Special/Order Compliance 6/6/2025 Partial Inspection ROBERT DAVIS
Order to Comply 7/8/2025 Not Required ROBERT DAVIS
Special/Order Compliance 7/8/2025 Partial Approval ROBERT DAVIS
Special/Order Compliance 7/10/2025 Partial Inspection ROBERT DAVIS
Special/Order Compliance 10/28/2025 Partial Inspection GREGORY POMISH
Final 11/24/2025 OK for TCO ROBERT DAVIS
SGSOV-Seismic Gas S/O Valve 11/24/2025 SGSOV Approved ROBERT DAVIS
Smoke Detectors 11/24/2025 Approved ROBERT DAVIS