Final
|
6/9/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
6/9/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Final
|
6/9/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Rough
|
6/9/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
6/9/2022
|
Approved
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
6/9/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
6/9/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
SGSOV-Seismic Gas S/O Valve
|
6/9/2022
|
SGSOV Not Ready
|
DAVID BURKHEAD
|
|
Smoke Detectors
|
6/9/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
6/9/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
7/25/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Pre-Inspection
|
8/12/2022
|
Approved
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
9/2/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
9/3/2022
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
9/9/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
9/9/2022
|
Partial Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
9/12/2022
|
Not Ready for Inspection
|
TED RIES
|
|
Excavation/Setback/Form/Re-Bar
|
9/22/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
10/3/2022
|
Partial Approval
|
TED RIES
|
|
Excavation/Setback/Form/Re-Bar
|
10/6/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
10/20/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
10/29/2022
|
Off-Hour Fees Due
|
|
|
Excavation/Setback/Form/Re-Bar
|
10/29/2022
|
Partial Approval
|
JONATHAN QUACH
|
|
Excavation/Setback/Form/Re-Bar
|
10/31/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
11/2/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
11/3/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
11/4/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
11/8/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
11/9/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
11/10/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
11/14/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
11/17/2022
|
Partial Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
12/1/2022
|
Partial Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
12/2/2022
|
Conditional Approval
|
TED RIES
|
|
Excavation/Setback/Form/Re-Bar
|
12/13/2022
|
Partial Approval
|
TED RIES
|
|
Deputy Reinf. Masonry
|
12/16/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
12/16/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
12/21/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
12/21/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
12/22/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
12/22/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
12/23/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
12/23/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Green Building Rough
|
1/3/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
1/3/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
1/3/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
2/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/14/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Footing/Foundation/Slab
|
2/14/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
2/15/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Footing/Foundation/Slab
|
2/15/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
2/17/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
2/17/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
2/18/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
2/28/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
3/2/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
3/20/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
3/20/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Wood Frame
|
3/30/2023
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
4/5/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
4/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
4/11/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
4/14/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
4/14/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/20/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
4/27/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
4/27/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
4/27/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/25/2023
|
Partial Approval
|
RONALD JIMENEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/9/2023
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/14/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
6/14/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
6/16/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
6/16/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/22/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/29/2023
|
Conditional Approval
|
TED RIES
|
|
Pre-Inspection
|
7/18/2023
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
7/26/2023
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
7/27/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
8/10/2023
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/11/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/16/2023
|
No Access for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/22/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
8/25/2023
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
8/30/2023
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
9/8/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/18/2023
|
No Access for Inspection
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
9/19/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/27/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
9/28/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/3/2023
|
No Access for Inspection
|
GREGORY POMISH
|
|
Pre-Inspection
|
10/18/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/31/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
11/8/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
11/13/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
11/16/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Special/Order Compliance
|
11/28/2023
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/30/2023
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Wall Anchors
|
11/30/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
12/5/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
12/5/2023
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/12/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/14/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/15/2023
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
12/15/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
SGSOV-Seismic Gas S/O Valve
|
12/15/2023
|
SGSOV Not Ready
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/20/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
1/8/2024
|
No Access for Inspection
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/9/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
1/9/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
1/10/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/17/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
1/18/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
1/18/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Drywall Nailing
|
1/19/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/19/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
1/26/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Insulation
|
2/1/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
2/9/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/12/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
2/13/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
2/16/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
2/20/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
2/21/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
2/28/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/28/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
2/29/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/29/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
2/29/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
3/5/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Drywall Nailing
|
3/5/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
3/6/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Drywall Nailing
|
3/6/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/6/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
3/6/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
3/6/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
3/8/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/8/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
3/8/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
3/11/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/19/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
3/27/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/27/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
4/23/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
4/26/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
4/30/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
5/2/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
5/2/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
5/8/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
5/9/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
5/9/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
5/9/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
5/10/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
5/10/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
5/16/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
5/22/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
5/28/2024
|
Approved
|
JACOB MYERS
|
|
Special/Order Compliance
|
5/30/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
6/6/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
6/6/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
6/12/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
7/3/2024
|
Corrections Issued
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
7/3/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
9/17/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
9/26/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
12/12/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
12/19/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
1/21/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Final
|
1/21/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
1/21/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Pre-Inspection
|
1/21/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
1/21/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Masonry Frame
|
1/21/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
SGSOV-Seismic Gas S/O Valve
|
1/21/2025
|
SGSOV Not Ready
|
JEFFREY FULTON
|
|
Smoke Detectors
|
1/21/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
1/21/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Final
|
1/30/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
1/30/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Final
|
1/30/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
1/30/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
1/30/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Masonry Frame
|
1/30/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
SGSOV-Seismic Gas S/O Valve
|
1/30/2025
|
SGSOV Approved
|
JEFFREY FULTON
|
|
Smoke Detectors
|
1/30/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
1/30/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
3/3/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Final
|
3/19/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
3/26/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
4/2/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Final
|
4/3/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Final
|
4/8/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
4/8/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Final
|
4/8/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
4/8/2025
|
Approved
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
4/8/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Masonry Frame
|
4/8/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Smoke Detectors
|
4/8/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
4/8/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
4/9/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Final
|
4/14/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
4/14/2025
|
Approved
|
DAVID BURKHEAD
|
|
Green Building Final
|
4/14/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
4/14/2025
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
4/14/2025
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Smoke Detectors
|
4/14/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
4/14/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
4/16/2025
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Final
|
4/21/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Final
|
4/22/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Final
|
4/22/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
4/22/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Masonry Frame
|
4/22/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Smoke Detectors
|
4/22/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
4/22/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
4/22/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
4/23/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Final
|
5/1/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Final
|
5/2/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Smoke Detectors
|
5/2/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
5/14/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Final
|
5/16/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Final
|
6/25/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Final
|
6/25/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
6/25/2025
|
Approved
|
JEFFREY FULTON
|
|
Reinforced Masonry Frame
|
6/25/2025
|
Approved
|
JEFFREY FULTON
|
|
Smoke Detectors
|
6/25/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
6/25/2025
|
Approved
|
JEFFREY FULTON
|
|
Final
|
7/16/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Green Building Final
|
7/16/2025
|
Approved
|
DAVID BURKHEAD
|
|
Smoke Detectors
|
7/16/2025
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
12/16/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Final
|
1/16/2026
|
OK to Issue CofO
|
DAVID BURKHEAD
|