8377 W BLACKBURN AVE 1-28 90048

Certificate Information: 8377 W BLACKBURN AVE 1-28 90048

Application / Permit
19010-10000-05756
Plan Check / Job No.
B19LA26618
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 4-STORY TYPE V-A CONSTRUCTION WITH 28-UNIT OF RESIDENTIAL OVER 2 LEVELS OF SUBTERRANIEAN PARKING .THIS IS 100% PRIVATELY FUNDED PROJECT WITH THE MARKET RATE AND NO TOC,NO HOUSING DENSITY APPLY.
Permit Issued
Issued on 4/7/2022
Issuing Office
Metro
Current Status
CofO Corrected on 3/3/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/19/2019 APPLICANT
Disabled Access Plans Picked Up 1/31/2020 APPLICANT
Assigned to Plan Check Engineer 2/6/2020 ZAW HAN
Corrections Issued 2/20/2020 ZAW HAN
Quality Review Completed 3/12/2020 HERNAN ARREOLA
Green Plans Picked Up 9/3/2020 APPLICANT
Applicant returned to address corrections 10/21/2020 ZAW HAN
Applicant returned to address corrections 10/22/2020 ZAW HAN
Applicant returned to address corrections 10/29/2020 ZAW HAN
Applicant returned to address corrections 12/1/2020 ZAW HAN
Plan Check Approved 1/18/2022 ZAW HAN
Issued 4/7/2022 APPLICANT
Building Plans Picked Up 4/7/2022 APPLICANT
TCO Issued (Expire Date: 07-01-2025) 1/2/2025 ADAM BURGESS
CofO in Progress 5/5/2025 EDWIN GREGORYONA
CofO in Progress 5/8/2025 EDWIN GREGORYONA
CofO Issued-Status Void 6/23/2025 ADAM BURGESS
Permit Finaled-Status Void 6/23/2025 ADAM BURGESS
Re-Activate Permit 11/6/2025 ADAM BURGESS
Permit Finaled 3/3/2026 ADAM BURGESS
CofO Corrected 3/3/2026 ADAM BURGESS
Permit Finaled 3/3/2026 ADAM BURGESS

Permit Application Clearance Information

Address approval Cleared 4/2/2020 EMIL KYUPELYAN
Address approval Cleared 4/2/2020 EMIL KYUPELYAN
Permit Cleared 4/2/2020 EMIL KYUPELYAN
CPC Cleared 7/23/2020 MARITZA PRZEKOP
Frnt yard landscape/Water mgmt Cleared 7/23/2020 MARITZA PRZEKOP
Miscellaneous Cleared 7/23/2020 MARITZA PRZEKOP
Miscellaneous Cleared 7/23/2020 MARITZA PRZEKOP
Miscellaneous Cleared 7/23/2020 MARITZA PRZEKOP
Miscellaneous Cleared 7/23/2020 MARITZA PRZEKOP
Opn space landscape/Water mgmt Cleared 7/23/2020 MARITZA PRZEKOP
Prkng lot landscape/Water mgmt Cleared 7/23/2020 MARITZA PRZEKOP
Eng Process Fee Ord 176,300 Cleared 8/28/2020 ELAINE LEI
Hydrant and Access approval Cleared 9/1/2020 MATTHEW CRAIG
Tenant Habitability Plan Cleared 4/29/2021 PHILLIP MUNGUIA
Highway dedication Cleared 8/9/2021 STEVE MELGAR
Public Housing Cleared 10/5/2021 JOEL LAUNCHBAUGH
Low Impact Development Cleared 10/20/2021 MARTIN FRAGOSO
Roof/Waste drainage to street Cleared 11/4/2021 CINDY QI
Building over 3-story or 36-ft Cleared 11/9/2021 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 11/9/2021 CALOSHA APPROVED
Green Code Cleared 11/9/2021 ZAW HAN
Sewer availability Cleared 11/15/2021 JEANIE LAM
Fire Marshall Fire Life Safety Cleared 11/16/2021 VIDAL GARCIA
Work Adjacent to Public Way Cleared 12/10/2021 JOSE RODRIGUEZ
DAS Clearance Cleared 12/20/2021 SHINE LIN

Contact Information

Architect Fischer,, James Robert; Lic. No.: C32908 17904 HARTLAND STREET      RESEDA, CA 91335
Contractor Sma Builders Inc; Lic. No.: 457725-B 16134 LEADWELL ST      VAN NUYS, CA 91406
Engineer Ghanim,, Husam; Lic. No.: S5689 1594 CASITAS AVENUE      PASADENA, CA 91103
Engineer Jones,, Christopher Michael; Lic. No.: L8193 16457 GLEDHILL ST      NORTH HILLS, CA 91343
Geologist Emerson,, Kyle Douglas; Lic. No.: EG1271 35529 OLEANDER AVENUE      YUCAIPA, CA 923999632

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 4/8/2022 Approved EDWIN GREGORYONA
Deputy Steel/Welding 4/13/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/14/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/15/2022 Partial Approval EDWIN GREGORYONA
Piling/Pier/Caisson 4/15/2022 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 4/18/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/18/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/20/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/22/2022 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 4/22/2022 Partial Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 4/29/2022 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 5/18/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/17/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/20/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/20/2022 Partial Approval EDWIN GREGORYONA
Special/Order Compliance 7/20/2022 Approved EDWIN GREGORYONA
Deputy Reinf. Concrete 7/21/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 7/21/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/22/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 7/22/2022 Conditional Approval WINSTON DUNNING
Excavation/Setback/Form/Re-Bar 8/4/2022 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 8/23/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/16/2022 Conditional Approval MICHAEL ROSENBERG
Special/Order Compliance 9/19/2022 Approved EDWIN GREGORYONA
Green Building Rough 9/22/2022 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 9/22/2022 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 9/22/2022 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 9/22/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 9/27/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/3/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 10/3/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 10/4/2022 Partial Approval EDWIN GREGORYONA
Green Building Rough 10/6/2022 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 10/6/2022 Partial Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 10/6/2022 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 10/6/2022 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 10/12/2022 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/13/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 10/14/2022 Partial Approval EDWIN GREGORYONA
Green Building Rough 10/14/2022 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 10/14/2022 Partial Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 10/14/2022 Partial Approval EDWIN GREGORYONA
Reinforced Masonry Frame 10/14/2022 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 10/14/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Shotcrete 10/17/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/25/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 10/25/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/26/2022 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 10/26/2022 Partial Approval EDWIN GREGORYONA
Green Building Rough 10/26/2022 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 10/26/2022 Partial Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 10/26/2022 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 10/26/2022 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 10/31/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 11/3/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/4/2022 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 11/17/2022 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 11/17/2022 Partial Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 11/17/2022 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 11/17/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 11/22/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/22/2022 Partial Approval EDWIN GREGORYONA
Green Building Rough 11/30/2022 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 11/30/2022 Partial Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 11/30/2022 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 11/30/2022 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 12/1/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 12/6/2022 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 12/9/2022 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 12/9/2022 Approved EDWIN GREGORYONA
Masonry Wall/Backfill 12/9/2022 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 12/9/2022 Partial Approval EDWIN GREGORYONA
Reinforced Masonry Frame 12/9/2022 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 12/9/2022 Not Ready for Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 12/14/2022 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 12/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 12/21/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 12/27/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Masonry 12/28/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/8/2023 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 2/21/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 2/21/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 2/21/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 3/7/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/7/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/23/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 3/24/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/6/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/7/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/10/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/10/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 4/10/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/10/2023 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/10/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Steel/Welding 4/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 4/12/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/13/2023 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/14/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/14/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 4/14/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/14/2023 Partial Approval EDWIN GREGORYONA
Reinforced Masonry Frame 4/14/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/17/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/26/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/26/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/26/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 4/26/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/26/2023 Not Ready for Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 5/1/2023 Partial Approval LARRY ARNICK
Deputy Steel/Welding 5/2/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 5/2/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/3/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 5/3/2023 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 5/4/2023 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 5/5/2023 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 5/11/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/12/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 5/12/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 5/12/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 5/12/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Wood Construction 5/17/2023 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 5/17/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/18/2023 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 5/18/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/18/2023 Partial Inspection EDWIN GREGORYONA
Green Building Rough 5/18/2023 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 5/18/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Steel/Welding 5/22/2023 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 5/22/2023 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 5/22/2023 Partial Approval EDWIN GREGORYONA
Reinforced Masonry Frame 5/22/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 5/24/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/7/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 6/9/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 6/9/2023 Partial Approval EDWIN GREGORYONA
Grading Pre-Inspection 6/9/2023 Approved EDWIN GREGORYONA
Drywall Nailing 6/12/2023 Partial Inspection EDWIN GREGORYONA
Deputy Steel/Welding 6/14/2023 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 6/27/2023 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 6/27/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/3/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 7/3/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 7/6/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/10/2023 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 7/10/2023 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 7/10/2023 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 7/11/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/25/2023 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 8/2/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 8/2/2023 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 9/14/2023 Conditional Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 9/14/2023 Not Ready for Inspection GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 9/19/2023 Not Ready for Inspection LARRY ARNICK
Deputy Wood Construction 9/20/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 9/21/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 9/28/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Wood Construction 9/29/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 9/29/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 9/29/2023 Partial Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 9/29/2023 Approved EDWIN GREGORYONA
Deputy Wood Construction 10/10/2023 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 10/13/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 10/13/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 10/18/2023 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 10/27/2023 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 10/27/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 10/27/2023 Partial Inspection EDWIN GREGORYONA
Deputy Wood Construction 11/6/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 11/6/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/7/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 12/6/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/2/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/21/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 2/27/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 3/1/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/8/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 3/8/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 3/14/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/23/2024 Partial Approval DAVID BURKHEAD
Drywall Nailing 3/26/2024 Not Ready for Inspection RAMAZANALI ALMASI
Drywall Nailing 4/2/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 4/19/2024 Not Ready for Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 4/29/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 5/6/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 5/6/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/10/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 5/21/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 5/24/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 6/14/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 6/14/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 7/17/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 8/7/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 9/9/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 9/9/2024 Not Ready for Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 9/10/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 9/23/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 10/1/2024 Partial Approval EDWIN GREGORYONA
Pre-Inspection 11/26/2024 Not Ready for Inspection JEFFREY FULTON
Insulation 12/4/2024 Approved EDWIN GREGORYONA
Final 12/30/2024 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 12/30/2024 Approved EDWIN GREGORYONA
Green Building Final 12/30/2024 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 12/30/2024 Approved EDWIN GREGORYONA
METHANE-Barrier 12/30/2024 Approved EDWIN GREGORYONA
METHANE-Subgrade 12/30/2024 Approved EDWIN GREGORYONA
Reinforced Concrete Frame 12/30/2024 Approved EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 12/30/2024 SGSOV Not Ready EDWIN GREGORYONA
Smoke Detectors 12/30/2024 Approved EDWIN GREGORYONA
Wood Frame 12/30/2024 Approved EDWIN GREGORYONA
Special/Order Compliance 12/31/2024 Approved EDWIN GREGORYONA
Final 4/22/2025 OK to Issue CofO EDWIN GREGORYONA
Green Building Final 4/22/2025 Approved EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 4/22/2025 SGSOV Approved EDWIN GREGORYONA
Special/Order Compliance 6/4/2025 Approved EDWIN GREGORYONA