Pre-Inspection
|
1/3/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
2/3/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
2/4/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
2/10/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
2/11/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
3/1/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/18/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/22/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/24/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
3/24/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Barrier
|
3/24/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Subgrade
|
3/24/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/25/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
4/6/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/7/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/7/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/8/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
4/8/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/8/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/11/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/12/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/13/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/14/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
4/14/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/14/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/15/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/15/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/15/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/18/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/18/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/19/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/19/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/20/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/20/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/21/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/21/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/22/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
4/22/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/22/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
4/22/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/25/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/25/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/26/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/26/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Other (see comments)
|
4/27/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/27/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/28/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/29/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/29/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/2/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Methane Barrier
|
5/27/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
METHANE-Subgrade
|
6/8/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Methane Barrier
|
6/15/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Methane Barrier
|
6/16/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Methane Barrier
|
6/17/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
6/21/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/22/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/23/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/24/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Pre-Inspection
|
6/25/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Other (see comments)
|
6/28/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
7/7/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
METHANE-Rough
|
7/8/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/8/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
7/8/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/20/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
7/21/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
7/22/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
7/26/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
7/27/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
7/29/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
7/29/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/29/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
7/29/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/2/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
8/3/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
8/4/2022
|
Conditional Approval
|
TED RIES
|
|
METHANE-Rough
|
8/4/2022
|
Partial Inspection
|
TED RIES
|
|
Reinforced Concrete Frame
|
8/4/2022
|
Partial Approval
|
TED RIES
|
|
Verify Sprinkler Sign Off
|
8/4/2022
|
Not Ready for Inspection
|
TED RIES
|
|
Deputy Reinf. Concrete
|
8/5/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Other (see comments)
|
8/9/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
8/9/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
8/10/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
8/11/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
8/12/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
8/15/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
8/15/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
8/15/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
8/15/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
8/16/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
8/17/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
8/18/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
8/19/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
8/22/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Shotcrete
|
8/23/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
METHANE-Rough
|
8/23/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
8/23/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
8/23/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
8/24/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
8/26/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
METHANE-Rough
|
8/26/2022
|
Off-Hour Fees Due
|
|
|
Reinforced Concrete Frame
|
8/26/2022
|
Off-Hour Fees Due
|
|
|
Reinforced Concrete Frame
|
8/26/2022
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
8/26/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
8/26/2022
|
Off-Hour Fees Due
|
|
|
Deputy Shotcrete
|
8/29/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Shotcrete
|
8/31/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
9/29/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
10/3/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
10/13/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
10/14/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Structural Steel Frame
|
10/14/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Other (see comments)
|
10/28/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/18/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Other (see comments)
|
11/21/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
11/21/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/22/2022
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Other (see comments)
|
12/2/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
12/2/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
12/9/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/12/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
12/16/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/16/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
12/23/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
1/13/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/13/2023
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/17/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
1/17/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
1/17/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/1/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/17/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/22/2023
|
Partial Approval
|
JAIME RIOS
|
|
Deputy Wood Construction
|
3/7/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/8/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
4/10/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
4/10/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
4/10/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
4/19/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
4/21/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
4/27/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
4/27/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/28/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
5/2/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
5/2/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
5/9/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
5/10/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
5/12/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/12/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
5/15/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/16/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
5/16/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
5/17/2023
|
Corrections Issued
|
LARRY ARNICK
|
|
Insulation
|
5/19/2023
|
Corrections Issued
|
LARRY ARNICK
|
|
METHANE-Rough
|
5/19/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
5/19/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
5/19/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
5/22/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
5/22/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
5/23/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
5/26/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Wood Construction
|
5/30/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Insulation
|
5/30/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
5/31/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
6/1/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
6/1/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
6/1/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
6/2/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/2/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/6/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
6/7/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/8/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
6/8/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
6/12/2023
|
Approved
|
RAFAEL ESPINOZA
|
|
Insulation
|
6/13/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
6/15/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
6/20/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
6/21/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
6/22/2023
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Drywall Nailing
|
6/23/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
6/23/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
6/27/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
6/28/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
7/6/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
7/6/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
7/6/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
7/10/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
7/10/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
7/13/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
7/14/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
7/17/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
7/25/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
7/26/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
8/2/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
8/8/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
8/18/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
8/24/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
8/30/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
8/31/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
9/1/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
9/5/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
9/6/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
9/7/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
9/7/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
9/13/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
9/14/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
9/14/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
9/14/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
9/15/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
9/18/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
9/20/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
9/21/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
9/21/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
9/26/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
9/27/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
9/29/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
10/2/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
10/4/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
10/5/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
10/5/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
10/6/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
10/10/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
10/11/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
10/11/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
10/12/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
10/12/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
10/12/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
10/13/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
10/18/2023
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Reinforced Masonry Frame
|
10/19/2023
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Masonry
|
10/20/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Interior/Exterior Lathing
|
10/23/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
10/24/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
10/26/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
10/26/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
10/26/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
10/30/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
10/30/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
10/31/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Interior/Exterior Lathing
|
11/1/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
11/2/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
11/2/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
11/13/2023
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Interior/Exterior Lathing
|
11/21/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
11/22/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
12/4/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
12/4/2023
|
Approved
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
12/5/2023
|
Partial Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
12/28/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
1/2/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
1/17/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
1/17/2024
|
Partial Approval
|
RONALD JIMENEZ
|
|
Light Gage Steel Frame
|
1/17/2024
|
Partial Approval
|
RONALD JIMENEZ
|
|
Verify Sprinkler Sign Off
|
1/22/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
1/22/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
1/25/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Wood Frame
|
1/25/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
1/30/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Steel/Welding
|
1/31/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Interior/Exterior Lathing
|
2/12/2024
|
Approved
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
2/12/2024
|
Approved
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
3/18/2024
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/9/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
4/9/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Final
|
4/15/2024
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
4/15/2024
|
Approved
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
4/15/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Barrier
|
4/15/2024
|
Approved
|
RAFAEL ESPINOZA
|
|
METHANE-Subgrade
|
4/15/2024
|
Approved
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/15/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
SGSOV-Seismic Gas S/O Valve
|
4/15/2024
|
SGSOV Not Ready
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
4/15/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
4/15/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
4/15/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Final
|
4/29/2024
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
5/10/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
5/10/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
5/28/2024
|
Approved
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
6/4/2024
|
Approved
|
RAFAEL ESPINOZA
|
|
Final
|
6/28/2024
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
6/28/2024
|
Approved
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
6/28/2024
|
Approved
|
RAFAEL ESPINOZA
|
|
SGSOV-Seismic Gas S/O Valve
|
6/28/2024
|
SGSOV Approved
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
6/28/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
6/28/2024
|
Approved
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
6/28/2024
|
Approved
|
RAFAEL ESPINOZA
|
|
Final
|
9/25/2024
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Smoke Detectors
|
9/25/2024
|
Partial Approval
|
RAFAEL CORTES
|
|
Special/Order Compliance
|
12/3/2024
|
Approved
|
RAFAEL CORTES
|
|
Final
|
12/20/2024
|
OK to Issue CofO
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
12/20/2024
|
Approved
|
RAFAEL ESPINOZA
|