14140-14150 W RIVERSIDE DR 91423

Certificate Information: 14140-14150 W RIVERSIDE DR 91423

Application / Permit
19010-10000-05539
Plan Check / Job No.
B19LA25924
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
PROPOSE PROJECT CONSISTS OF A MIXED USE BUILDING (APARTMENT/RETAIL/RESTAURANT/OFFICE) INCLUDES 2 TOWERS, 5 STORY EACH, CONNECTED BY 2 LEVELS OF BASEMENT PARKING. 4 STORIES TYPE VA ON 1 STORY TYPE IA CONSTRUCTION. TOTAL 249 UNITS INCLUDING 25 MODERATE INCOME UNITS
Permit Issued
Issued on 6/16/2022
Issuing Office
Metro
Current Status
Issued on 6/16/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/9/2019 APPLICANT
Assigned to Plan Check Engineer 1/16/2020 VU NGUYEN
Disabled Access Plans Picked Up 2/6/2020 APPLICANT
Corrections Issued 2/20/2020 VU NGUYEN
Quality Review Completed 3/6/2020 QUAN NGHIEM
Building Plans Picked Up 3/10/2020 APPLICANT
Applicant returned to address corrections 7/30/2020 VU NGUYEN
Applicant returned to address corrections 8/4/2020 VU NGUYEN
Applicant returned to address corrections 8/13/2020 VU NGUYEN
Applicant returned to address corrections 8/18/2020 VU NGUYEN
Applicant returned to address corrections 10/1/2020 VU NGUYEN
Applicant returned to address corrections 3/3/2021 VU NGUYEN
Applicant returned to address corrections 3/5/2021 VU NGUYEN
Applicant returned to address corrections 4/27/2021 VU NGUYEN
Applicant returned to address corrections 5/24/2021 VU NGUYEN
Green Plans Picked Up 8/12/2021 APPLICANT
Plan Check Approved 6/10/2022 VU NGUYEN
Issued 6/16/2022 APPLICANT
TCO Issued (Expire Date: 11-03-2025) 5/7/2025 RICKEY JACKSON
TCO Issued (Expire Date: 01-13-2026) 7/17/2025 JEFFREY DURAN
TCO Issued (Expire Date: 07-08-2026) 1/9/2026 JEFFREY DURAN

Permit Application Clearance Information

Highway dedication Cleared 1/12/2021 LEE GUILBEAUX
Low Impact Development Cleared 1/26/2021 AMMAR ELTAWIL
Sewer availability Cleared 4/5/2021 LEE GUILBEAUX
Driveway location Cleared 6/21/2021 SHEILA AHORAIAN
Internal circulation Cleared 6/21/2021 SHEILA AHORAIAN
Address approval Cleared 7/1/2021 LEE GUILBEAUX
Green Code Cleared 7/7/2021 AARON COSTA
Trees in Parkway Cleared 10/21/2021 JOEL HERNANDEZ
Roof/Waste drainage to street Cleared 11/8/2021 CARLOS AGUILERA
DCP conditions approval Cleared 11/17/2021 LOUIE MILLER
Hydrant and Access approval Cleared 4/11/2022 KURT CORRAL
Fire Marshall Fire Life Safety Cleared 4/20/2022 WILLIAM JOHNS
Eng Process Fee Ord 176,300 Cleared 4/22/2022 LEE GUILBEAUX
Permit Cleared 4/22/2022 LEE GUILBEAUX
DAS Clearance Cleared 5/3/2022 ELIZABETH TOMS
"Q" conditions Cleared 5/20/2022 WILLIAM LAMBORN
"T" removal Cleared 5/20/2022 WILLIAM LAMBORN
CPC Cleared 5/20/2022 WILLIAM LAMBORN
Frnt yard landscape/Water mgmt Cleared 5/20/2022 WILLIAM LAMBORN
Miscellaneous Cleared 5/20/2022 WILLIAM LAMBORN
Miscellaneous Cleared 5/20/2022 WILLIAM LAMBORN
Opn space landscape/Water mgmt Cleared 5/20/2022 WILLIAM LAMBORN
Site Plan review Cleared 5/20/2022 WILLIAM LAMBORN
Supp. Use District POD/CDO/TDO Cleared 5/20/2022 WILLIAM LAMBORN
ZA Case Cleared 5/20/2022 WILLIAM LAMBORN
Building over 3-story or 36-ft Cleared 6/10/2022 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 6/10/2022 CALOSHA APPROVED

Contact Information

Architect Ball,, Larry Roy; Lic. No.: C12056 5112 TEESDALE AVE      VALLEY VILLAGE, CA 91607
Contractor Investors Management Trust Real Estate Group Inc; Lic. No.: 766199-B 15303 VENTURA BLVD   STE. 200    SHERMAN OAKS, CA 91403
Engineer Knur,, Reinard Thomas; Lic. No.: GE2755 1435 MONCADO DR      GLENDALE, CA 91207
Engineer Zangoli,, Fabio; Lic. No.: S6191 13245 FIJI WY UNIT J      MARINA DEL REY, CA 90292

Inspector Information

DEANDRE HOFFMAN, (818) 374-1182 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 6/22/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 6/23/2022 Approved JOHN KITCKO
Footing/Foundation/Slab 6/23/2022 Partial Inspection JOHN KITCKO
Deputy Reinf. Concrete 6/24/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 6/28/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 6/29/2022 Approved JOHN KITCKO
Footing/Foundation/Slab 6/30/2022 Partial Inspection JOHN KITCKO
Deputy Reinf. Concrete 7/1/2022 Approved JOHN KITCKO
Green Building Rough 7/1/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 7/1/2022 Partial Approval JOHN KITCKO
Verify Sprinkler Sign Off 7/1/2022 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Concrete 7/5/2022 Approved JOHN KITCKO
Green Building Rough 7/7/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 7/7/2022 Partial Approval JOHN KITCKO
Verify Sprinkler Sign Off 7/7/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 7/8/2022 Approved JOHN KITCKO
Footing/Foundation/Slab 7/8/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 7/11/2022 Approved JOHN KITCKO
Deputy Shotcrete 7/11/2022 Approved JOHN KITCKO
Deputy Shotcrete 7/12/2022 Approved JOHN KITCKO
Deputy Shotcrete 7/13/2022 Approved JOHN KITCKO
Green Building Rough 7/13/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 7/13/2022 Partial Inspection JOHN KITCKO
Deputy Shotcrete 7/14/2022 Approved JOHN KITCKO
Footing/Foundation/Slab 7/14/2022 Partial Approval JOHN KITCKO
Deputy Shotcrete 7/15/2022 Approved JOHN KITCKO
Deputy Shotcrete 7/15/2022 Conditional Approval JOHN KITCKO
Deputy Shotcrete 7/18/2022 Approved JOHN KITCKO
Green Building Rough 7/18/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 7/18/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 7/19/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 7/19/2022 Approved JOHN KITCKO
Deputy Shotcrete 7/19/2022 Approved JOHN KITCKO
Footing/Foundation/Slab 7/19/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 7/20/2022 Conditional Approval JOHN KITCKO
Deputy Shotcrete 7/20/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 7/21/2022 Approved JOHN KITCKO
Deputy Shotcrete 7/21/2022 Approved JOHN KITCKO
Green Building Rough 7/21/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 7/21/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 7/22/2022 Approved JOHN KITCKO
Deputy Shotcrete 7/22/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 7/26/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 7/27/2022 Approved JOHN KITCKO
Footing/Foundation/Slab 7/27/2022 No Access for Inspection JOHN KITCKO
Deputy Reinf. Concrete 7/28/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 7/29/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 7/29/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 8/2/2022 Conditional Approval JOHN KITCKO
Deputy Shotcrete 8/2/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 8/3/2022 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 8/3/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 8/4/2022 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 8/4/2022 Approved DANNY RODRIGUEZ
Deputy Shotcrete 8/4/2022 Approved DANNY RODRIGUEZ
Green Building Rough 8/4/2022 Not Ready for Inspection DANNY RODRIGUEZ
Masonry Wall/Backfill 8/4/2022 Partial Approval DANNY RODRIGUEZ
Reinforced Concrete Frame 8/4/2022 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 8/5/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/5/2022 Approved JOHN KITCKO
Deputy Shotcrete 8/5/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 8/8/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 8/8/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 8/8/2022 Conditional Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 8/8/2022 Partial Approval CAMERON CHABAN
Deputy Other (see comments) 8/9/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 8/9/2022 Approved JOHN KITCKO
Deputy Shotcrete 8/9/2022 Approved JOHN KITCKO
Green Building Rough 8/9/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 8/9/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 8/10/2022 Approved JOHN KITCKO
Deputy Shotcrete 8/10/2022 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 8/10/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 8/11/2022 Approved JOHN KITCKO
Deputy Shotcrete 8/11/2022 Approved JOHN KITCKO
Footing/Foundation/Slab 8/11/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 8/12/2022 Approved JOHN KITCKO
Deputy Shotcrete 8/12/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 8/15/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 8/17/2022 Approved JOHN KITCKO
Deputy Shotcrete 8/17/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 8/18/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/18/2022 Approved JOHN KITCKO
Deputy Shotcrete 8/18/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 8/19/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/19/2022 Approved JOHN KITCKO
Deputy Shotcrete 8/19/2022 Approved JOHN KITCKO
Footing/Foundation/Slab 8/19/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 8/22/2022 Approved JOHN KITCKO
Deputy Shotcrete 8/22/2022 Approved JOHN KITCKO
Green Building Rough 8/22/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 8/22/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 8/23/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/23/2022 Approved JOHN KITCKO
Deputy Shotcrete 8/23/2022 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 8/23/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 8/24/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/24/2022 Approved JOHN KITCKO
Deputy Shotcrete 8/24/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 8/25/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/25/2022 Approved JOHN KITCKO
Deputy Shotcrete 8/25/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 8/26/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/26/2022 Approved JOHN KITCKO
Deputy Shotcrete 8/26/2022 Approved JOHN KITCKO
Green Building Rough 8/26/2022 Partial Approval JOHN KITCKO
Reinforced Concrete Frame 8/26/2022 Not Ready for Inspection JOHN KITCKO
Deputy Other (see comments) 8/29/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 8/29/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/29/2022 Approved JOHN KITCKO
Deputy Shotcrete 8/29/2022 Approved JOHN KITCKO
Footing/Foundation/Slab 8/29/2022 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Concrete 8/30/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/30/2022 Approved JOHN KITCKO
Deputy Shotcrete 8/30/2022 Approved JOHN KITCKO
Green Building Rough 8/30/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 8/30/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 8/31/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/31/2022 Approved JOHN KITCKO
Deputy Shotcrete 8/31/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/1/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 9/1/2022 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 9/1/2022 Conditional Approval CAMERON CHABAN
Masonry Wall/Backfill 9/1/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 9/2/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 9/2/2022 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 9/2/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 9/6/2022 Approved JOHN KITCKO
Deputy Shotcrete 9/6/2022 Approved JOHN KITCKO
Green Building Rough 9/6/2022 Approved JOHN KITCKO
Reinforced Concrete Frame 9/6/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 9/7/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 9/7/2022 Approved JOHN KITCKO
Deputy Shotcrete 9/7/2022 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 9/7/2022 Partial Approval JOHN KITCKO
Deputy Other (see comments) 9/8/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 9/8/2022 Approved JOHN KITCKO
Deputy Shotcrete 9/8/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 9/9/2022 Approved JOHN KITCKO
Deputy Shotcrete 9/9/2022 Approved JOHN KITCKO
Reinforced Concrete Frame 9/9/2022 Partial Approval JOHN KITCKO
Special/Order Compliance 9/9/2022 Partial Inspection JEFFREY FULTON
Deputy Reinf. Masonry 9/12/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/13/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 9/13/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/14/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 9/14/2022 Approved JOHN KITCKO
Reinforced Masonry Frame 9/14/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 9/15/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 9/15/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/16/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 9/16/2022 Approved JOHN KITCKO
Footing/Foundation/Slab 9/20/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 9/21/2022 Conditional Approval JOHN KITCKO
Reinforced Concrete Frame 9/21/2022 Partial Inspection JOHN KITCKO
Deputy Reinf. Concrete 9/28/2022 Approved JOHN KITCKO
Footing/Foundation/Slab 9/28/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 9/29/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/30/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/4/2022 Approved JOHN KITCKO
Reinforced Concrete Frame 10/4/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 10/5/2022 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 10/5/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 10/6/2022 Approved JOHN KITCKO
Reinforced Concrete Frame 10/6/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 10/7/2022 Approved ROBERT DAVIS
Deputy Reinf. Concrete 10/11/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 10/11/2022 Approved JOHN KITCKO
Deputy Shotcrete 10/11/2022 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 10/11/2022 Partial Approval JOHN KITCKO
Reinforced Concrete Frame 10/11/2022 Partial Inspection JOHN KITCKO
Deputy Reinf. Concrete 10/12/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 10/12/2022 Approved JOHN KITCKO
Deputy Shotcrete 10/12/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/13/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 10/13/2022 Approved JOHN KITCKO
Deputy Shotcrete 10/13/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/14/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 10/14/2022 Approved JOHN KITCKO
Deputy Shotcrete 10/14/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/17/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 10/17/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/18/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 10/18/2022 Approved JOHN KITCKO
Masonry Wall/Backfill 10/18/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 10/19/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 10/19/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/20/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/21/2022 Approved JOHN KITCKO
Reinforced Concrete Frame 10/21/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 11/1/2022 Approved JOHN KITCKO
Footing/Foundation/Slab 11/1/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 11/2/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 11/3/2022 Approved JOHN KITCKO
Reinforced Concrete Frame 11/3/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 11/4/2022 Conditional Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 11/4/2022 Partial Approval JOHN KITCKO
Deputy Shotcrete 11/7/2022 Approved JOHN KITCKO
Deputy Shotcrete 11/8/2022 Approved JOHN KITCKO
Deputy Shotcrete 11/9/2022 Approved JOHN KITCKO
Reinforced Concrete Frame 11/9/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 11/10/2022 Approved JOHN KITCKO
Deputy Shotcrete 11/10/2022 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 11/10/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 11/14/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 11/15/2022 Approved JOHN KITCKO
Masonry Wall/Backfill 11/15/2022 Corrections Issued JOHN KITCKO
Reinforced Concrete Frame 11/15/2022 Corrections Issued JOHN KITCKO
Deputy Reinf. Concrete 11/16/2022 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 11/16/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 11/17/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 11/18/2022 Approved JOHN KITCKO
Reinforced Concrete Frame 11/18/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 11/21/2022 Conditional Approval JEFFREY DURAN
Piling/Pier/Caisson 11/21/2022 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 11/22/2022 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 11/22/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 11/23/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 11/23/2022 Approved JOHN KITCKO
Deputy Shotcrete 11/23/2022 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 11/23/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 11/28/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 11/28/2022 Conditional Approval JOHN KITCKO
Deputy Shotcrete 11/28/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 11/29/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 11/29/2022 Approved JOHN KITCKO
Deputy Shotcrete 11/29/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 11/30/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 11/30/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/1/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 12/1/2022 Approved JOHN KITCKO
Masonry Wall/Backfill 12/1/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 12/2/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 12/2/2022 Approved JOHN KITCKO
Footing/Foundation/Slab 12/2/2022 Partial Approval JOHN KITCKO
Masonry Wall/Backfill 12/7/2022 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 12/13/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/14/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/15/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/16/2022 Approved JOHN KITCKO
Reinforced Concrete Frame 12/16/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 12/20/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/21/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/22/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/23/2022 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 12/27/2022 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/28/2022 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 12/28/2022 Partial Approval JOHN KITCKO
Reinforced Concrete Frame 12/28/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 12/29/2022 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 12/29/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 12/30/2022 Approved JOHN KITCKO
Special/Order Compliance 12/30/2022 Conditional Approval DEANDRE HOFFMAN
Structural Steel Frame 12/30/2022 Partial Inspection JOHN KITCKO
Deputy Shotcrete 1/3/2023 Approved JOHN KITCKO
Reinforced Concrete Frame 1/3/2023 Not Ready for Inspection JOHN KITCKO
Special/Order Compliance 1/3/2023 Approved BRIAN KELLY
Deputy Reinf. Concrete 1/4/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 1/4/2023 Approved JOHN KITCKO
Deputy Reinf. Concrete 1/5/2023 Approved JOHN KITCKO
Reinforced Concrete Frame 1/5/2023 Partial Approval JOHN KITCKO
Special/Order Compliance 1/5/2023 Approved BRIAN KELLY
Deputy Reinf. Concrete 1/6/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 1/6/2023 Approved JOHN KITCKO
Footing/Foundation/Slab 1/6/2023 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 1/11/2023 Approved JOHN KITCKO
Deputy Reinf. Concrete 1/12/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 1/12/2023 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 1/12/2023 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Concrete 1/13/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 1/13/2023 Approved JOHN KITCKO
Masonry Wall/Backfill 1/13/2023 Partial Approval JOHN KITCKO
Reinforced Concrete Frame 1/13/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 1/17/2023 Approved JOHN KITCKO
Deputy Reinf. Concrete 1/18/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 1/18/2023 Approved JOHN KITCKO
Reinforced Concrete Frame 1/18/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 1/19/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 1/19/2023 Approved JOHN KITCKO
Footing/Foundation/Slab 1/19/2023 Partial Approval JOHN KITCKO
Special/Order Compliance 1/19/2023 Partial Approval STEVEN LEVITT
Deputy Reinf. Concrete 1/20/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 1/20/2023 Approved JOHN KITCKO
Reinforced Concrete Frame 1/20/2023 Not Ready for Inspection JOHN KITCKO
Special/Order Compliance 1/20/2023 Not Ready for Inspection STEVEN LEVITT
Deputy Reinf. Masonry 1/23/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 1/24/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 1/24/2023 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 1/24/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 1/25/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 1/25/2023 Approved JOHN KITCKO
Reinforced Concrete Frame 1/25/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 1/26/2023 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 1/26/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 1/27/2023 Approved JOHN KITCKO
Deputy Reinf. Concrete 1/30/2023 Approved JOHN KITCKO
Reinforced Concrete Frame 1/30/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 1/31/2023 Approved JOHN KITCKO
Deputy Reinf. Concrete 2/1/2023 Approved JOHN KITCKO
Deputy Reinf. Concrete 2/2/2023 Approved JOHN KITCKO
Deputy Reinf. Concrete 2/3/2023 Approved JOHN KITCKO
Masonry Wall/Backfill 2/3/2023 Partial Inspection JOHN KITCKO
Deputy Shotcrete 2/6/2023 Approved JOHN KITCKO
Deputy Shotcrete 2/7/2023 Approved JOHN KITCKO
Reinforced Concrete Frame 2/7/2023 Partial Approval JOHN KITCKO
Deputy Shotcrete 2/8/2023 Approved JOHN KITCKO
Deputy Steel/Welding 2/8/2023 Approved JOHN KITCKO
Deputy Shotcrete 2/9/2023 Approved JOHN KITCKO
Deputy Shotcrete 2/9/2023 Conditional Approval DANIEL VARNUM
Deputy Steel/Welding 2/9/2023 Conditional Approval DANIEL VARNUM
Drywall Nailing 2/9/2023 Partial Approval DANIEL VARNUM
Light Gage Steel Frame 2/9/2023 Partial Approval DANIEL VARNUM
Deputy Shotcrete 2/10/2023 Approved JOHN KITCKO
Deputy Steel/Welding 2/10/2023 Approved JOHN KITCKO
Masonry Wall/Backfill 2/10/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 2/13/2023 Approved JOHN KITCKO
Reinforced Concrete Frame 2/13/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 2/14/2023 Approved JOHN KITCKO
Deputy Reinf. Concrete 2/15/2023 Approved JOHN KITCKO
Deputy Reinf. Concrete 2/16/2023 Approved JOHN KITCKO
Deputy Reinf. Concrete 2/17/2023 Approved JOHN KITCKO
Deputy Reinf. Concrete 2/21/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 2/21/2023 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Concrete 2/22/2023 Conditional Approval BRIAN KELLY
Deputy Wood Construction 2/22/2023 Conditional Approval BRIAN KELLY
Floor/Roof Diaphrgm/Shear Wall 2/22/2023 Partial Inspection BRIAN KELLY
Deputy Reinf. Concrete 2/23/2023 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 2/23/2023 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/24/2023 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 2/24/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/27/2023 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 2/28/2023 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 3/1/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/2/2023 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/3/2023 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 3/3/2023 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 3/3/2023 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/6/2023 Approved JOHN KITCKO
Deputy Reinf. Concrete 3/7/2023 Approved JOHN KITCKO
Deputy Reinf. Concrete 3/8/2023 Approved JOHN KITCKO
Deputy Reinf. Concrete 3/9/2023 Approved JOHN KITCKO
Deputy Reinf. Concrete 3/10/2023 Approved JOHN KITCKO
Deputy Shotcrete 3/14/2023 Approved JOHN KITCKO
Deputy Shotcrete 3/15/2023 Approved JOHN KITCKO
Footing/Foundation/Slab 3/15/2023 Partial Approval JOHN KITCKO
Special/Order Compliance 3/15/2023 Partial Inspection STEVEN LEVITT
Deputy Shotcrete 3/16/2023 Approved JOHN KITCKO
Deputy Shotcrete 3/17/2023 Approved JOHN KITCKO
Deputy Wood Construction 3/20/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 3/20/2023 Partial Approval JOHN KITCKO
Deputy Wood Construction 3/21/2023 Approved JOHN KITCKO
Deputy Wood Construction 3/22/2023 Approved JOHN KITCKO
Deputy Wood Construction 3/23/2023 Approved JOHN KITCKO
Deputy Wood Construction 3/24/2023 Approved JOHN KITCKO
Deputy Reinf. Concrete 3/29/2023 Approved JOHN KITCKO
Footing/Foundation/Slab 3/29/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 3/30/2023 Approved JOHN KITCKO
Deputy Reinf. Concrete 3/31/2023 Approved JOHN KITCKO
Deputy Reinf. Concrete 4/4/2023 Conditional Approval JOHN KITCKO
Deputy Wood Construction 4/6/2023 Conditional Approval JOHN KITCKO
Deputy Wood Construction 4/7/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 4/10/2023 Approved JOHN KITCKO
Deputy Wood Construction 4/10/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 4/10/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 4/11/2023 Approved JOHN KITCKO
Deputy Steel/Welding 4/11/2023 Approved JOHN KITCKO
Deputy Wood Construction 4/11/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 4/12/2023 Conditional Approval JOHN KITCKO
Deputy Steel/Welding 4/12/2023 Conditional Approval JOHN KITCKO
Deputy Wood Construction 4/12/2023 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 4/13/2023 Approved JOHN KITCKO
Deputy Steel/Welding 4/13/2023 Approved JOHN KITCKO
Deputy Wood Construction 4/13/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 4/13/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 4/14/2023 Approved JOHN KITCKO
Deputy Steel/Welding 4/14/2023 Approved JOHN KITCKO
Deputy Wood Construction 4/14/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 4/14/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 4/17/2023 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/18/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 4/19/2023 Conditional Approval JOHN KITCKO
Deputy Wood Construction 4/19/2023 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 4/20/2023 Approved JOHN KITCKO
Deputy Wood Construction 4/20/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 4/20/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 4/21/2023 Approved JOHN KITCKO
Deputy Wood Construction 4/21/2023 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 4/21/2023 Not Ready for Inspection JOHN KITCKO
Masonry Wall/Backfill 4/21/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 4/24/2023 Approved JOHN KITCKO
Deputy Wood Construction 4/24/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 4/25/2023 Approved JOHN KITCKO
Deputy Wood Construction 4/25/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 4/26/2023 Conditional Approval JOHN KITCKO
Deputy Wood Construction 4/26/2023 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 4/27/2023 Approved JOHN KITCKO
Deputy Wood Construction 4/27/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 4/27/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 4/28/2023 Approved JOHN KITCKO
Deputy Wood Construction 4/28/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 4/28/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 5/1/2023 Approved JOHN KITCKO
Deputy Wood Construction 5/1/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 5/2/2023 Approved JOHN KITCKO
Deputy Wood Construction 5/2/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 5/2/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 5/3/2023 Approved JOHN KITCKO
Deputy Wood Construction 5/3/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 5/4/2023 Approved JOHN KITCKO
Deputy Wood Construction 5/4/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 5/5/2023 Conditional Approval JOHN KITCKO
Deputy Wood Construction 5/5/2023 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 5/8/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 5/9/2023 Approved JOHN KITCKO
Deputy Wood Construction 5/9/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 5/9/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 5/10/2023 Approved JOHN KITCKO
Deputy Wood Construction 5/10/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 5/10/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 5/11/2023 Approved JOHN KITCKO
Deputy Wood Construction 5/11/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 5/12/2023 Approved JOHN KITCKO
Deputy Wood Construction 5/12/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 5/15/2023 Approved JOHN KITCKO
Deputy Wood Construction 5/15/2023 Conditional Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 5/15/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 5/16/2023 Approved JOHN KITCKO
Deputy Wood Construction 5/16/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 5/16/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 5/17/2023 Approved JOHN KITCKO
Deputy Wood Construction 5/17/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 5/18/2023 Approved JOHN KITCKO
Deputy Wood Construction 5/18/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 5/19/2023 Approved JOHN KITCKO
Deputy Wood Construction 5/19/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 5/19/2023 Partial Inspection JOHN KITCKO
Deputy Reinf. Masonry 5/22/2023 Approved JOHN KITCKO
Deputy Wood Construction 5/22/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 5/22/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 5/23/2023 Approved JOHN KITCKO
Deputy Wood Construction 5/23/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 5/23/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 5/24/2023 Approved JOHN KITCKO
Deputy Wood Construction 5/24/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 5/25/2023 Approved JOHN KITCKO
Deputy Wood Construction 5/25/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 5/25/2023 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Masonry 5/26/2023 Approved JOHN KITCKO
Deputy Wood Construction 5/26/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 5/30/2023 Approved JOHN KITCKO
Deputy Wood Construction 5/30/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 5/31/2023 Approved JOHN KITCKO
Deputy Wood Construction 5/31/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 5/31/2023 Partial Approval JOHN KITCKO
Wood Frame 5/31/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 6/1/2023 Approved JOHN KITCKO
Deputy Wood Construction 6/1/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 6/1/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 6/2/2023 Approved JOHN KITCKO
Deputy Wood Construction 6/2/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 6/2/2023 Partial Inspection JOHN KITCKO
Special/Order Compliance 6/2/2023 Partial Inspection JEFFREY FULTON
Deputy Reinf. Masonry 6/5/2023 Approved JOHN KITCKO
Deputy Wood Construction 6/5/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 6/5/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 6/6/2023 Conditional Approval JOHN KITCKO
Deputy Wood Construction 6/6/2023 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 6/7/2023 Approved JOHN KITCKO
Deputy Wood Construction 6/7/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 6/7/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 6/8/2023 Conditional Approval JOHN KITCKO
Deputy Wood Construction 6/8/2023 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 6/9/2023 Approved JOHN KITCKO
Deputy Wood Construction 6/9/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 6/12/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 6/12/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 6/13/2023 Approved JOHN KITCKO
Deputy Wood Construction 6/13/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 6/14/2023 Approved JOHN KITCKO
Deputy Wood Construction 6/14/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 6/14/2023 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Masonry 6/15/2023 Approved JOHN KITCKO
Deputy Wood Construction 6/15/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 6/15/2023 Partial Inspection JOHN KITCKO
Deputy Reinf. Masonry 6/16/2023 Approved JOHN KITCKO
Deputy Wood Construction 6/16/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 6/16/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 6/20/2023 Approved JOHN KITCKO
Deputy Wood Construction 6/20/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 6/21/2023 Approved JOHN KITCKO
Deputy Wood Construction 6/21/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 6/21/2023 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Masonry 6/22/2023 Approved JOHN KITCKO
Deputy Wood Construction 6/22/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 6/22/2023 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Masonry 6/23/2023 Approved JOHN KITCKO
Deputy Wood Construction 6/23/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 6/26/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 6/27/2023 Approved JOHN KITCKO
Deputy Wood Construction 6/27/2023 Approved JOHN KITCKO
Wood Frame 6/27/2023 Corrections Issued JOHN KITCKO
Deputy Reinf. Masonry 6/28/2023 Approved JOHN KITCKO
Deputy Wood Construction 6/28/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 6/29/2023 Approved JOHN KITCKO
Deputy Wood Construction 6/29/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 6/29/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 6/30/2023 Approved JOHN KITCKO
Deputy Wood Construction 6/30/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 7/3/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 7/5/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 7/6/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 7/7/2023 Approved ROBERT DAVIS
Deputy Wood Construction 7/11/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 7/12/2023 Approved JOHN KITCKO
Deputy Wood Construction 7/12/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 7/12/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 7/13/2023 Approved JOHN KITCKO
Deputy Wood Construction 7/13/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 7/13/2023 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 7/13/2023 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Masonry 7/14/2023 Approved JOHN KITCKO
Deputy Wood Construction 7/14/2023 Approved JOHN KITCKO
Wood Frame 7/14/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 7/17/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 7/17/2023 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Masonry 7/18/2023 Approved JOHN KITCKO
Deputy Wood Construction 7/18/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 7/18/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 7/19/2023 Approved JOHN KITCKO
Deputy Wood Construction 7/19/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 7/20/2023 Approved JOHN KITCKO
Deputy Wood Construction 7/20/2023 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 7/21/2023 Approved JOHN KITCKO
Deputy Wood Construction 7/21/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 7/24/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 7/25/2023 Approved JOHN KITCKO
Insulation 7/25/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 7/26/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 7/27/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 7/28/2023 Approved JOHN KITCKO
Deputy Wood Construction 7/31/2023 Conditional Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 7/31/2023 Partial Approval ANDREW DORSO
Insulation 7/31/2023 Partial Inspection ANDREW DORSO
Deputy Wood Construction 8/1/2023 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 8/2/2023 Conditional Approval ANDREW DORSO
Deputy Wood Construction 8/2/2023 Partial Approval ANDREW DORSO
Floor/Roof Diaphrgm/Shear Wall 8/2/2023 Partial Inspection ANDREW DORSO
Insulation 8/2/2023 Partial Inspection ANDREW DORSO
Deputy Reinf. Masonry 8/3/2023 Conditional Approval KENNETH ROBERTS
Deputy Wood Construction 8/3/2023 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 8/4/2023 Conditional Approval ANDREW DORSO
Deputy Wood Construction 8/4/2023 Conditional Approval ANDREW DORSO
Floor/Roof Diaphrgm/Shear Wall 8/4/2023 Not Ready for Inspection ANDREW DORSO
Deputy Reinf. Masonry 8/7/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/8/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/9/2023 Approved JOHN KITCKO
Drywall Nailing 8/9/2023 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Masonry 8/10/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/11/2023 Approved JOHN KITCKO
Deputy Wood Construction 8/11/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 8/11/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 8/14/2023 Approved JOHN KITCKO
Deputy Wood Construction 8/14/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 8/14/2023 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 8/15/2023 Approved JOHN KITCKO
Deputy Wood Construction 8/15/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 8/15/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 8/16/2023 Approved JOHN KITCKO
Deputy Wood Construction 8/16/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/17/2023 Approved JOHN KITCKO
Deputy Wood Construction 8/17/2023 Approved JOHN KITCKO
Drywall Nailing 8/17/2023 Not Ready for Inspection JOHN KITCKO
Insulation 8/17/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 8/18/2023 Approved JOHN KITCKO
Deputy Wood Construction 8/18/2023 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 8/21/2023 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 8/22/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/23/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/24/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/25/2023 Approved JOHN KITCKO
Deputy Wood Construction 8/25/2023 Approved JOHN KITCKO
Wood Frame 8/25/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 8/28/2023 Approved JOHN KITCKO
Deputy Wood Construction 8/28/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/29/2023 Approved JOHN KITCKO
Deputy Wood Construction 8/29/2023 Approved JOHN KITCKO
Wood Frame 8/29/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 8/30/2023 Approved JOHN KITCKO
Deputy Wood Construction 8/30/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/31/2023 Conditional Approval JEFFREY FULTON
Deputy Wood Construction 8/31/2023 Conditional Approval JEFFREY FULTON
Deputy Reinf. Masonry 9/1/2023 Approved JOHN KITCKO
Deputy Wood Construction 9/1/2023 Approved JOHN KITCKO
Wood Frame 9/1/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 9/5/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 9/6/2023 Approved JOHN KITCKO
Drywall Nailing 9/6/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 9/7/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 9/8/2023 Approved JOHN KITCKO
Deputy Wood Construction 9/8/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 9/8/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 9/11/2023 Approved JOHN KITCKO
Deputy Wood Construction 9/11/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 9/12/2023 Approved JOHN KITCKO
Deputy Wood Construction 9/12/2023 Approved JOHN KITCKO
Masonry Wall/Backfill 9/12/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 9/13/2023 Approved JOHN KITCKO
Deputy Wood Construction 9/13/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 9/13/2023 Partial Inspection JOHN KITCKO
Deputy Reinf. Masonry 9/14/2023 Approved JOHN KITCKO
Deputy Wood Construction 9/14/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 9/15/2023 Approved JOHN KITCKO
Deputy Wood Construction 9/15/2023 Approved JOHN KITCKO
Drywall Nailing 9/15/2023 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 9/15/2023 Partial Approval JOHN KITCKO
Deputy Wood Construction 9/27/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 9/27/2023 Partial Approval JOHN KITCKO
Light Gage Steel Frame 9/27/2023 Partial Approval JOHN KITCKO
Deputy Wood Construction 9/28/2023 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 9/28/2023 Partial Inspection JOHN KITCKO
Deputy Wood Construction 9/29/2023 Approved JOHN KITCKO
Wood Frame 10/11/2023 Partial Approval JOHN KITCKO
Insulation 10/30/2023 Partial Approval JOHN KITCKO
Insulation 10/31/2023 Not Ready for Inspection JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 11/3/2023 Partial Approval JOHN KITCKO
Wood Frame 11/8/2023 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 11/14/2023 Partial Approval JOHN KITCKO
Insulation 11/22/2023 Partial Approval JEFFREY DURAN
Insulation 12/1/2023 Partial Approval JOHN KITCKO
Drywall Nailing 12/6/2023 Partial Approval JOHN KITCKO
Insulation 12/6/2023 Partial Approval JOHN KITCKO
Insulation 12/11/2023 Partial Approval JOHN KITCKO
Insulation 12/12/2023 Partial Approval JOHN KITCKO
Insulation 12/13/2023 Partial Approval JOHN KITCKO
Insulation 12/14/2023 Partial Approval JOHN KITCKO
Insulation 12/15/2023 Partial Approval JOHN KITCKO
Deputy Steel/Welding 12/18/2023 Approved JOHN KITCKO
Deputy Steel/Welding 12/19/2023 Approved JOHN KITCKO
Deputy Steel/Welding 12/20/2023 Approved JOHN KITCKO
Deputy Steel/Welding 12/21/2023 Approved JOHN KITCKO
Deputy Steel/Welding 12/22/2023 Approved JOHN KITCKO
Drywall Nailing 1/4/2024 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 1/9/2024 Approved JOHN KITCKO
Deputy Reinf. Masonry 1/10/2024 Approved JOHN KITCKO
Insulation 1/10/2024 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 1/11/2024 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 1/12/2024 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 1/16/2024 Approved JOHN KITCKO
Deputy Reinf. Masonry 1/17/2024 Approved JOHN KITCKO
Drywall Nailing 1/17/2024 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 1/19/2024 Approved JOHN KITCKO
Wood Frame 1/19/2024 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 1/22/2024 Approved JOHN KITCKO
Deputy Reinf. Masonry 1/23/2024 Approved JOHN KITCKO
Deputy Reinf. Masonry 1/24/2024 Approved JOHN KITCKO
Wood Frame 1/25/2024 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 1/26/2024 Approved JOHN KITCKO
Deputy Reinf. Masonry 1/29/2024 Approved JOHN KITCKO
Deputy Reinf. Masonry 1/30/2024 Approved JOHN KITCKO
Drywall Nailing 1/30/2024 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 1/31/2024 Approved JOHN KITCKO
Deputy Wood Construction 2/6/2024 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 2/6/2024 Partial Approval JOHN KITCKO
Deputy Wood Construction 2/7/2024 Conditional Approval JOHN KITCKO
Insulation 2/7/2024 Partial Approval JOHN KITCKO
Deputy Wood Construction 2/8/2024 Approved JOHN KITCKO
Deputy Wood Construction 2/9/2024 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 2/12/2024 Partial Approval JOHN KITCKO
Insulation 2/22/2024 Partial Approval JOHN KITCKO
Insulation 2/27/2024 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 3/1/2024 Partial Approval JOHN KITCKO
Drywall Nailing 3/6/2024 Partial Approval JOHN KITCKO
Interior/Exterior Lathing 3/6/2024 Partial Approval JOHN KITCKO
Drywall Nailing 3/7/2024 Partial Approval JOHN KITCKO
Interior/Exterior Lathing 3/7/2024 Partial Approval JOHN KITCKO
Insulation 3/13/2024 Partial Approval JOHN KITCKO
Insulation 3/14/2024 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 3/15/2024 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 3/20/2024 Not Ready for Inspection JEFFREY DURAN
Insulation 3/20/2024 Not Ready for Inspection JEFFREY DURAN
Interior/Exterior Lathing 3/20/2024 Not Ready for Inspection JEFFREY DURAN
Drywall Nailing 3/21/2024 Partial Approval JOHN KITCKO
Insulation 3/21/2024 Partial Approval JOHN KITCKO
Interior/Exterior Lathing 3/21/2024 Partial Approval JOHN KITCKO
Drywall Nailing 3/22/2024 Partial Approval JOHN KITCKO
Drywall Nailing 3/28/2024 Partial Approval JOHN KITCKO
Insulation 4/1/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/3/2024 Approved JOHN KITCKO
Footing/Foundation/Slab 4/3/2024 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Concrete 4/4/2024 Approved JOHN KITCKO
Drywall Nailing 4/4/2024 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 4/4/2024 Partial Approval JOHN KITCKO
Insulation 4/4/2024 Partial Approval JOHN KITCKO
Insulation 4/5/2024 Partial Approval JOHN KITCKO
Insulation 4/10/2024 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 4/11/2024 Approved JOHN KITCKO
Drywall Nailing 4/11/2024 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 4/11/2024 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 4/12/2024 Approved JOHN KITCKO
Deputy Shotcrete 4/15/2024 Approved JOHN KITCKO
Deputy Shotcrete 4/16/2024 Approved JOHN KITCKO
Deputy Shotcrete 4/17/2024 Approved JOHN KITCKO
Deputy Reinf. Concrete 4/18/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 4/18/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 4/19/2024 Approved JOHN KITCKO
Drywall Nailing 4/19/2024 Partial Approval JOHN KITCKO
Insulation 4/19/2024 Partial Approval JOHN KITCKO
Reinforced Concrete Frame 4/19/2024 Partial Approval JOHN KITCKO
Deputy Shotcrete 4/22/2024 Approved JOHN KITCKO
Insulation 4/22/2024 Partial Approval JOHN KITCKO
Deputy Shotcrete 4/23/2024 Approved JOHN KITCKO
Deputy Shotcrete 4/24/2024 Approved JOHN KITCKO
Deputy Reinf. Concrete 4/25/2024 Approved JOHN KITCKO
Deputy Shotcrete 4/25/2024 Approved JOHN KITCKO
Reinforced Concrete Frame 4/25/2024 Partial Approval JOHN KITCKO
Drywall Nailing 4/30/2024 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 5/13/2024 Approved JOHN KITCKO
Footing/Foundation/Slab 5/13/2024 Partial Approval JOHN KITCKO
Insulation 5/13/2024 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 5/15/2024 Approved JOHN KITCKO
Reinforced Concrete Frame 5/16/2024 Partial Approval JOHN KITCKO
Drywall Nailing 5/22/2024 Partial Approval JOHN KITCKO
Drywall Nailing 5/28/2024 Partial Approval JOHN KITCKO
Drywall Nailing 5/29/2024 Not Ready for Inspection JOHN KITCKO
Insulation 5/29/2024 Partial Approval JOHN KITCKO
Footing/Foundation/Slab 6/4/2024 Partial Approval JOHN KITCKO
Footing/Foundation/Slab 6/10/2024 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 6/18/2024 Partial Approval JOHN KITCKO
Drywall Nailing 6/21/2024 Partial Approval GREGORY POMISH
Deputy Reinf. Masonry 7/3/2024 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 7/8/2024 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 7/9/2024 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 7/10/2024 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 7/11/2024 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 7/12/2024 Approved JOHN KITCKO
Masonry Wall/Backfill 7/12/2024 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 7/19/2024 Approved JOHN KITCKO
Footing/Foundation/Slab 7/19/2024 Partial Approval JOHN KITCKO
Footing/Foundation/Slab 7/23/2024 Partial Approval JOHN KITCKO
Deputy Shotcrete 7/31/2024 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 8/7/2024 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 8/8/2024 Conditional Approval JEFFREY DURAN
Insulation 8/15/2024 Partial Inspection JOHN KITCKO
Drywall Nailing 8/20/2024 Partial Approval JOHN KITCKO
Insulation 8/20/2024 Partial Approval JOHN KITCKO
Drywall Nailing 8/23/2024 Partial Approval JOHN KITCKO
Insulation 8/23/2024 Partial Approval JOHN KITCKO
Drywall Nailing 9/4/2024 Partial Approval JOHN KITCKO
Drywall Nailing 9/20/2024 Partial Approval JOHN KITCKO
Drywall Nailing 9/26/2024 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 11/4/2024 Conditional Approval JOHN KITCKO
Wood Frame 11/19/2024 Partial Inspection JOHN KITCKO
Drywall Nailing 12/10/2024 Partial Approval JOHN KITCKO
Insulation 1/3/2025 Partial Approval JOHN KITCKO
Drywall Nailing 1/16/2025 Partial Approval JOHN KITCKO
Drywall Nailing 2/4/2025 Partial Approval JOHN KITCKO
Drywall Nailing 2/12/2025 Partial Approval JOHN KITCKO
Drywall Nailing 2/20/2025 Partial Approval JOHN KITCKO
Final 3/5/2025 Partial Inspection JOHN KITCKO
Footing/Foundation/Slab 3/5/2025 Approved JOHN KITCKO
Green Building Final 3/5/2025 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 3/5/2025 Approved JOHN KITCKO
SGSOV-Seismic Gas S/O Valve 3/5/2025 SGSOV Not Ready JOHN KITCKO
Smoke Detectors 3/5/2025 Not Ready for Inspection JOHN KITCKO
Structural Steel Frame 3/5/2025 Approved JOHN KITCKO
Wood Frame 3/5/2025 Approved JOHN KITCKO
Final 3/12/2025 Partial Inspection JOHN KITCKO
Green Building Final 3/12/2025 Approved JOHN KITCKO
SGSOV-Seismic Gas S/O Valve 3/12/2025 SGSOV Not Ready JOHN KITCKO
Smoke Detectors 3/12/2025 Partial Approval JOHN KITCKO
Drywall Nailing 3/14/2025 Partial Inspection JOHN KITCKO
Final 5/2/2025 Partial Inspection JOHN KITCKO
SGSOV-Seismic Gas S/O Valve 5/2/2025 SGSOV Approved JOHN KITCKO
Smoke Detectors 5/2/2025 Approved JOHN KITCKO
Final 6/17/2025 Partial Inspection JOHN KITCKO
Special/Order Compliance 12/16/2025 Partial Approval SCOTT SOBEL
Special/Order Compliance 12/16/2025 Partial Inspection JOHN KITCKO
Special/Order Compliance 1/5/2026 Partial Inspection JOHN KITCKO