Excavation/Setback/Form/Re-Bar
|
1/19/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
1/19/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/20/2021
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
2/12/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
2/25/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
2/25/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
2/25/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
3/2/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
3/2/2021
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
3/2/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/3/2021
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
3/8/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
3/8/2021
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
3/11/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
3/12/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
3/12/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
3/12/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
3/12/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/15/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
3/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
3/18/2021
|
Not Ready for Inspection
|
LANNY MERRICK
|
|
Reinforced Masonry Frame
|
3/30/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
3/30/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
4/9/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
4/9/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/12/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
4/13/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
4/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
4/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
4/21/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
4/21/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
4/21/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
4/22/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
4/23/2021
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Reinforced Masonry Frame
|
4/23/2021
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Verify Sprinkler Sign Off
|
4/23/2021
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Masonry Wall/Backfill
|
4/24/2021
|
Off-Hour Fees Due
|
|
|
Masonry Wall/Backfill
|
4/24/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
4/28/2021
|
Approved
|
JOEY BUCHANAN
|
|
Excavation/Setback/Form/Re-Bar
|
4/28/2021
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
4/29/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
4/29/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/30/2021
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
5/7/2021
|
Partial Approval
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
5/10/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
5/10/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
5/10/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
5/11/2021
|
Conditional Approval
|
LEOPOLDO MENDOZA
|
|
Deputy Reinf. Masonry
|
5/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
5/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
5/14/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
5/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
6/4/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
6/4/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
6/4/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/12/2021
|
Conditional Approval
|
DAVID TSAU
|
|
Deputy Reinf. Concrete
|
7/29/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
8/13/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/13/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/20/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/20/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/25/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/25/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/25/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/26/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/30/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
9/20/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
9/24/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
9/27/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/27/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/28/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/1/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
10/21/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
10/22/2021
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
10/26/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/27/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/28/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/29/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/2/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/3/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/4/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/5/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/10/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/12/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/16/2021
|
Conditional Approval
|
TED RIES
|
|
Wood Frame
|
11/17/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Steel/Welding
|
11/18/2021
|
Conditional Approval
|
TED RIES
|
|
Deputy Steel/Welding
|
11/19/2021
|
Conditional Approval
|
TED RIES
|
|
Deputy Steel/Welding
|
11/23/2021
|
Conditional Approval
|
TED RIES
|
|
Deputy Steel/Welding
|
11/24/2021
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
11/29/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/30/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/1/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/2/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/3/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/8/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/9/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/10/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/20/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/21/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/22/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/23/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
1/4/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/4/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
1/4/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
1/4/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/5/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/7/2022
|
Approved
|
TED RIES
|
|
Deputy Steel/Welding
|
1/10/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/11/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/12/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/14/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
1/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
1/26/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
1/27/2022
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/27/2022
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
2/4/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
2/10/2022
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
2/11/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
2/14/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
2/15/2022
|
Partial Approval
|
JAMES POWERS
|
|
Pre-Inspection
|
1/20/2023
|
Partial Approval
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
2/17/2023
|
Partial Approval
|
JAMES POWERS
|
|
Pre-Inspection
|
4/6/2023
|
Partial Approval
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
4/26/2023
|
Partial Inspection
|
JAMES POWERS
|
|
Wood Frame
|
5/9/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
5/15/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Pre-Inspection
|
6/1/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/9/2023
|
Partial Approval
|
JAMES POWERS
|
|
Pre-Inspection
|
6/12/2023
|
Corrections Issued
|
LARRY ARNICK
|
|
Drywall Nailing
|
7/13/2023
|
Corrections Issued
|
LARRY ARNICK
|
|
Drywall Nailing
|
7/19/2023
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
7/21/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/26/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/18/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
9/25/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/27/2023
|
Partial Approval
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
9/27/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/27/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
10/2/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
10/2/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
10/3/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
10/6/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
10/10/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/20/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wall Anchors
|
10/26/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/1/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
11/8/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/4/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
4/16/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
4/18/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
4/24/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
5/2/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
6/20/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
7/5/2024
|
Partial Approval
|
JAMES POWERS
|
|
Final
|
11/8/2024
|
OK for TCO
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
11/8/2024
|
Approved
|
JAMES POWERS
|
|
Green Building Final
|
11/8/2024
|
Approved
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
11/8/2024
|
Approved
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
11/8/2024
|
Approved
|
JAMES POWERS
|
|
SGSOV-Seismic Gas S/O Valve
|
11/8/2024
|
SGSOV No Gas
|
JAMES POWERS
|
|
Smoke Detectors
|
11/8/2024
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
11/8/2024
|
Approved
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
11/26/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/26/2024
|
Partial Approval
|
JAMES POWERS
|
|
Final
|
11/26/2024
|
OK to Issue CofO
|
JAMES POWERS
|