131 W AVENUE 34 90031

Certificate Information: 131 W AVENUE 34 90031

Application / Permit
19010-10000-05418
Plan Check / Job No.
B19LA25535
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
NEW MIXED USE 315-UNIT (66 VLI UNITS) TYPE V-A APARTMENT AND RETAIL OVER 2-LEVEL TYPE I-A SUBTERRANEAN PARKING.
Permit Issued
Issued on 10/14/2022
Issuing Office
Metro
Current Status
Issued on 10/14/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/17/2019 APPLICANT
Assigned to Plan Check Engineer 1/2/2020 KEVIN MORALES
Corrections Issued 1/14/2020 KEVIN MORALES
Quality Review Completed 1/16/2020 TIEN JEN WANG
Building Plans Picked Up 1/28/2020 APPLICANT
Disabled Access Plans Picked Up 2/14/2020 APPLICANT
Green Plans Picked Up 11/9/2020 APPLICANT
Plan Check Approved 10/14/2022 KEVIN MORALES
Issued 10/14/2022 APPLICANT
TCO Issued (Expire Date: 12-09-2025) 6/12/2025 ADAM BURGESS
TCO Issued (Expire Date: 02-23-2026) 8/27/2025 ERNESTO CORRAL
TCO Issued (Expire Date: 06-07-2026) 12/9/2025 RAFAEL ESPINOZA
TCO Issued (Expire Date: 06-13-2026) 12/15/2025 RAFAEL ESPINOZA

Permit Application Clearance Information

Green Code Cleared 11/5/2020 DONALD CRICHLOW
Address approval Cleared 11/18/2020 THOMAS LANG
Miscellaneous Cleared 2/2/2021 SAM NAVID
Miscellaneous Cleared 2/2/2021 SAM NAVID
Eng Process Fee Ord 176,300 Cleared 4/6/2021 ELAINE LEI
Driveway location Cleared 6/8/2021 COLLINS ALLAN
Highway dedication Cleared 7/26/2021 RENZ SORIANO
Low Impact Development Cleared 8/5/2021 IDA MEISAMI-FARD
Hydrant and Access approval Cleared 8/19/2021 ROBERT DUFF
Construction within easement Cleared 1/19/2022 WALTER RAMIREZ
DCP conditions approval Cleared 3/3/2022 MICHAEL ZIRBES
Density Bonus 12.22.A.31 Cleared 3/3/2022 MICHAEL ZIRBES
Metro Rail approval Cleared 8/15/2022 KEVIN MORALES
Trees in Parkway Cleared 8/31/2022 ADALBERTO VERA
Sewer availability Cleared 9/1/2022 ABEL CASILLAS
Fire Marshall Fire Life Safety Cleared 9/29/2022 ANDREW KO
Permit Cleared 10/3/2022 BIJAN ZADEH
Roof/Waste drainage to street Cleared 10/3/2022 BIJAN ZADEH
Encroachment in public way Cleared 10/4/2022 JEREMY CHOK
Building over 3-story or 36-ft Cleared 10/6/2022 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 10/6/2022 CALOSHA APPROVED
"D" conditions Cleared 10/12/2022 LOUIS ORTEGA
"Q" conditions Cleared 10/12/2022 LOUIS ORTEGA
"T" removal Cleared 10/12/2022 LOUIS ORTEGA
Frnt yard landscape/Water mgmt Cleared 10/12/2022 LOUIS ORTEGA
Miscellaneous Cleared 10/12/2022 LOUIS ORTEGA
Opn space landscape/Water mgmt Cleared 10/12/2022 LOUIS ORTEGA
Prkng lot landscape/Water mgmt Cleared 10/12/2022 LOUIS ORTEGA
Site Plan review Cleared 10/12/2022 LOUIS ORTEGA
ZA Case Cleared 10/12/2022 LOUIS ORTEGA
ZA Case Cleared 10/12/2022 LOUIS ORTEGA
ZA Case Cleared 10/12/2022 LOUIS ORTEGA
ZA Case Cleared 10/12/2022 LOUIS ORTEGA
ZA Case Cleared 10/12/2022 LOUIS ORTEGA
ZA Case Cleared 10/12/2022 LOUIS ORTEGA
ZA Case Cleared 10/12/2022 LOUIS ORTEGA
DAS Clearance Cleared 10/13/2022 KEVIN MORALES
Hold Cleared 10/14/2022 EUGENE BARBEAU
Specific Plan Cleared 10/14/2022 NOAH MCCOY

Contact Information

Architect Bornstein,, Lise Michelle; Lic. No.: C30835 3573 HAYDEN AVENUE      CULVER CITY, CA 90232
Contractor Bernards Builders Inc; Lic. No.: 977134-B 555 FIRST ST      SAN FERNANDO, CA 91340
Engineer Adams,, Jelisa; Lic. No.: GE3092 26632 EL TOBOSO      MISSION VIEJO, CA 92691
Engineer Mahjoub,, Nina Azadeh; Lic. No.: C78947 21400 BURBANK BLVD 114      WOODLAND HILLS, CA 91367

Inspector Information

RONALD JIMENEZ, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
LARRY ARNICK, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
JOEY BUCHANAN, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
ERNESTO CORRAL, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
RAFAEL ESPINOZA, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 11/15/2022 Partial Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 11/17/2022 Not Ready for Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 11/18/2022 Partial Approval RAFAEL ESPINOZA
Special/Order Compliance 12/22/2022 Partial Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 12/27/2022 Partial Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 12/27/2022 Partial Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 1/26/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/27/2023 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 1/27/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/31/2023 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 2/2/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 2/3/2023 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 2/6/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/7/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/7/2023 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 2/7/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 2/8/2023 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 2/8/2023 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 2/8/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/9/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/9/2023 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 2/9/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 2/10/2023 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 2/14/2023 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 2/14/2023 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 2/15/2023 Partial Approval RAFAEL ESPINOZA
Deputy Other (see comments) 2/16/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/16/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/16/2023 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 2/16/2023 Partial Approval RAFAEL ESPINOZA
Deputy Other (see comments) 2/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 2/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Other (see comments) 2/21/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/21/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/21/2023 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 2/21/2023 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 2/21/2023 Partial Approval RAFAEL ESPINOZA
Deputy Other (see comments) 2/22/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/22/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 2/22/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Other (see comments) 2/23/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/23/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 2/23/2023 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 2/28/2023 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/8/2023 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 3/8/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Other (see comments) 3/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 3/17/2023 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 3/17/2023 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 4/3/2023 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 4/4/2023 Partial Approval RAFAEL ESPINOZA
Deputy Other (see comments) 4/7/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/7/2023 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 4/7/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Other (see comments) 4/12/2023 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 4/12/2023 Partial Approval RAFAEL ESPINOZA
Deputy Other (see comments) 4/13/2023 No Access for Inspection LARRY ARNICK
Deputy Reinf. Concrete 4/13/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 4/13/2023 Partial Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 4/14/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 4/24/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 4/24/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 4/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 4/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 4/27/2023 Conditional Approval LARRY ARNICK
Deputy Shotcrete 4/27/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 4/27/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 4/28/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 4/28/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/1/2023 Conditional Approval LARRY ARNICK
Deputy Shotcrete 5/1/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 5/1/2023 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 5/1/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 5/2/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 5/2/2023 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 5/3/2023 Partial Approval LARRY ARNICK
Deputy Other (see comments) 5/4/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/4/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 5/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 5/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/11/2023 Approved LARRY ARNICK
Deputy Shotcrete 5/11/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 5/11/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 5/12/2023 Conditional Approval LARRY ARNICK
Deputy Shotcrete 5/12/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 5/12/2023 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 5/12/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 5/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/17/2023 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 5/17/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 5/18/2023 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 5/22/2023 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 5/23/2023 Conditional Approval LARRY ARNICK
Deputy Shotcrete 5/23/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 5/23/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 5/24/2023 Conditional Approval LARRY ARNICK
Deputy Shotcrete 5/24/2023 Conditional Approval LARRY ARNICK
Green Building Rough 5/24/2023 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 5/24/2023 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 5/24/2023 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 5/25/2023 Conditional Approval LARRY ARNICK
Deputy Shotcrete 5/25/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 5/25/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 5/30/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 5/30/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/31/2023 Conditional Approval LARRY ARNICK
Deputy Shotcrete 5/31/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 5/31/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 6/1/2023 Conditional Approval LARRY ARNICK
Deputy Shotcrete 6/1/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 6/1/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 6/2/2023 Conditional Approval LARRY ARNICK
Deputy Shotcrete 6/2/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 6/2/2023 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 6/5/2023 Conditional Approval LARRY ARNICK
Deputy Shotcrete 6/5/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 6/5/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 6/7/2023 Partial Approval LARRY ARNICK
Deputy Shotcrete 6/7/2023 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 6/7/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 6/8/2023 Conditional Approval LARRY ARNICK
Deputy Shotcrete 6/8/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 6/8/2023 Partial Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 6/9/2023 Partial Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 6/12/2023 Partial Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 6/13/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 6/14/2023 Conditional Approval LARRY ARNICK
Deputy Shotcrete 6/14/2023 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 6/14/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 6/20/2023 Conditional Approval LARRY ARNICK
Deputy Shotcrete 6/20/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 6/20/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 6/21/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 6/21/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 6/22/2023 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 6/22/2023 Conditional Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 6/22/2023 Partial Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 6/29/2023 Partial Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 6/30/2023 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 6/30/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 7/3/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/6/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 7/6/2023 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 7/6/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/10/2023 Conditional Approval LARRY ARNICK
Deputy Shotcrete 7/10/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 7/10/2023 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 7/17/2023 Partial Approval LARRY ARNICK
Green Building Rough 7/17/2023 Conditional Approval DARRYL ARNOLD
Reinforced Concrete Frame 7/17/2023 Conditional Approval DARRYL ARNOLD
Verify Sprinkler Sign Off 7/17/2023 Conditional Approval DARRYL ARNOLD
Footing/Foundation/Slab 7/24/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 7/25/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 7/25/2023 Partial Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 8/3/2023 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 8/3/2023 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 8/4/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/7/2023 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/7/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/8/2023 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/8/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 8/8/2023 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 8/8/2023 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 8/9/2023 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/9/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/10/2023 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/10/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 8/10/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 8/11/2023 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/11/2023 Conditional Approval LARRY ARNICK
Insulation 8/15/2023 Not Ready for Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 8/16/2023 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 8/16/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 8/17/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 8/22/2023 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 8/22/2023 Not Ready for Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 8/23/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 8/24/2023 Conditional Approval LARRY ARNICK
Light Gage Steel Frame 8/25/2023 Partial Approval LARRY ARNICK
Piling/Pier/Caisson 8/25/2023 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 8/29/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/30/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/31/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/1/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/5/2023 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/5/2023 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 9/5/2023 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 9/6/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/7/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 9/7/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 9/8/2023 Conditional Approval LARRY ARNICK
Green Building Rough 9/12/2023 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 9/12/2023 Not Ready for Inspection LARRY ARNICK
Wood Frame 9/12/2023 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 9/14/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 9/15/2023 Conditional Approval LARRY ARNICK
Masonry Wall/Backfill 9/19/2023 Partial Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 9/21/2023 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 9/21/2023 Not Ready for Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 9/22/2023 Partial Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 9/26/2023 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 9/27/2023 Corrections Issued LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 9/29/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/2/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/2/2023 Conditional Approval LARRY ARNICK
Deputy Wood Construction 10/2/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/3/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/3/2023 Conditional Approval LARRY ARNICK
Deputy Wood Construction 10/3/2023 Conditional Approval LARRY ARNICK
Masonry Wall/Backfill 10/3/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 10/4/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/4/2023 Conditional Approval LARRY ARNICK
Deputy Wood Construction 10/4/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/5/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/5/2023 Conditional Approval LARRY ARNICK
Deputy Wood Construction 10/5/2023 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 10/5/2023 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 10/6/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/6/2023 Conditional Approval LARRY ARNICK
Deputy Wood Construction 10/6/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 10/6/2023 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/10/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/10/2023 Conditional Approval LARRY ARNICK
Deputy Wood Construction 10/10/2023 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/11/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/11/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/11/2023 Conditional Approval LARRY ARNICK
Deputy Wood Construction 10/11/2023 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/12/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/12/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/12/2023 Conditional Approval LARRY ARNICK
Deputy Wood Construction 10/12/2023 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 10/12/2023 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/13/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/13/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/13/2023 Conditional Approval LARRY ARNICK
Deputy Wood Construction 10/13/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/16/2023 Conditional Approval RICARDO ROBLES
Excavation/Setback/Form/Re-Bar 10/16/2023 Not Ready for Inspection RICARDO ROBLES
Footing/Foundation/Slab 10/16/2023 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/17/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/17/2023 Conditional Approval LARRY ARNICK
Deputy Wood Construction 10/17/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 10/17/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 10/18/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 10/18/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Wood Construction 10/18/2023 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 10/18/2023 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 10/18/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/19/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 10/19/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Wood Construction 10/19/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/20/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/20/2023 Conditional Approval LARRY ARNICK
Deputy Wood Construction 10/20/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/23/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/25/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/27/2023 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 10/27/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 11/2/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 11/3/2023 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 11/6/2023 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 11/7/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 11/7/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/8/2023 Conditional Approval LARRY ARNICK
Deputy Wood Construction 11/8/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 11/8/2023 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 11/8/2023 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 11/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 11/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/13/2023 Conditional Approval LARRY ARNICK
Deputy Wood Construction 11/13/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 11/13/2023 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 11/13/2023 Partial Approval LARRY ARNICK
Green Building Rough 11/13/2023 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 11/13/2023 Not Ready for Inspection LARRY ARNICK
T-Bar Ceiling 11/13/2023 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 11/13/2023 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 11/14/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/16/2023 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 11/16/2023 Partial Approval LARRY ARNICK
Deputy Wood Construction 11/21/2023 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 11/21/2023 Partial Approval LARRY ARNICK
Deputy Wood Construction 11/27/2023 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 11/27/2023 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 11/29/2023 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 11/29/2023 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 12/5/2023 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 12/7/2023 Partial Approval LARRY ARNICK
Deputy Wood Construction 12/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 12/12/2023 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 12/12/2023 Partial Approval LARRY ARNICK
Deputy Wood Construction 12/14/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 12/14/2023 Partial Approval LARRY ARNICK
Deputy Wood Construction 12/15/2023 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 12/18/2023 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 12/27/2023 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 1/4/2024 Partial Approval LARRY ARNICK
Green Building Rough 1/8/2024 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 1/8/2024 Not Ready for Inspection LARRY ARNICK
Wood Frame 1/8/2024 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 1/10/2024 Conditional Approval LARRY ARNICK
Deputy Wood Construction 1/10/2024 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 1/10/2024 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 1/11/2024 Conditional Approval LARRY ARNICK
Deputy Wood Construction 1/11/2024 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 1/11/2024 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 1/11/2024 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 1/12/2024 Conditional Approval RAFAEL ESPINOZA
Deputy Wood Construction 1/12/2024 Conditional Approval RAFAEL ESPINOZA
Insulation 1/12/2024 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 1/16/2024 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 1/16/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 1/17/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 1/18/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 1/19/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 1/23/2024 Partial Approval LARRY ARNICK
Drywall Nailing 1/25/2024 Partial Approval JACOB MYERS
Floor/Roof Diaphrgm/Shear Wall 1/26/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 1/29/2024 Partial Approval JACOB MYERS
Floor/Roof Diaphrgm/Shear Wall 1/30/2024 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 1/31/2024 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 1/31/2024 Conditional Approval LARRY ARNICK
Deputy Wood Construction 1/31/2024 Conditional Approval LARRY ARNICK
Insulation 1/31/2024 Not Ready for Inspection LARRY ARNICK
Wood Frame 1/31/2024 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 2/1/2024 Conditional Approval LARRY ARNICK
Deputy Wood Construction 2/1/2024 Conditional Approval LARRY ARNICK
Insulation 2/1/2024 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 2/2/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 2/2/2024 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 2/6/2024 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 2/7/2024 Partial Approval LARRY ARNICK
Deputy Wood Construction 2/8/2024 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 2/8/2024 Partial Approval LARRY ARNICK
Deputy Wood Construction 2/9/2024 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 2/9/2024 Partial Approval LARRY ARNICK
Drywall Nailing 2/12/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 2/13/2024 Partial Approval LARRY ARNICK
Insulation 2/14/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 2/15/2024 Partial Approval LARRY ARNICK
Drywall Nailing 2/20/2024 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 2/22/2024 Partial Approval JACOB MYERS
Deputy Wood Construction 2/23/2024 Partial Approval JACOB MYERS
Drywall Nailing 2/23/2024 Partial Approval JACOB MYERS
Deputy Wood Construction 2/26/2024 Conditional Approval LARRY ARNICK
Drywall Nailing 2/26/2024 Partial Approval LARRY ARNICK
Green Building Rough 2/26/2024 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 2/26/2024 Not Ready for Inspection LARRY ARNICK
Wood Frame 2/26/2024 Not Ready for Inspection LARRY ARNICK
Deputy Wood Construction 2/27/2024 Conditional Approval LARRY ARNICK
Drywall Nailing 2/27/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 2/28/2024 Not Ready for Inspection LARRY ARNICK
Deputy Wood Construction 2/29/2024 Conditional Approval LARRY ARNICK
Drywall Nailing 2/29/2024 Not Ready for Inspection LARRY ARNICK
Green Building Rough 2/29/2024 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 2/29/2024 Not Ready for Inspection LARRY ARNICK
Wood Frame 2/29/2024 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 3/1/2024 Conditional Approval LARRY ARNICK
Deputy Wood Construction 3/1/2024 Conditional Approval LARRY ARNICK
Drywall Nailing 3/1/2024 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 3/4/2024 Conditional Approval LARRY ARNICK
Deputy Wood Construction 3/4/2024 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 3/4/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 3/7/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 3/8/2024 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 3/11/2024 Partial Approval LARRY ARNICK
Drywall Nailing 3/12/2024 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 3/13/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 3/15/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 3/19/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 3/20/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 3/21/2024 Partial Approval LARRY ARNICK
Drywall Nailing 3/27/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 3/28/2024 Partial Approval LARRY ARNICK
Drywall Nailing 3/29/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 4/2/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 4/4/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 4/5/2024 Not Ready for Inspection LARRY ARNICK
Green Building Rough 4/11/2024 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 4/11/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 4/11/2024 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 4/15/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 4/16/2024 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 4/18/2024 Partial Approval LARRY ARNICK
Drywall Nailing 4/19/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 4/22/2024 Partial Approval LARRY ARNICK
Insulation 4/23/2024 Partial Approval LARRY ARNICK
Insulation 4/25/2024 Corrections Issued LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 4/26/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 4/29/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 4/29/2024 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 4/29/2024 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 5/2/2024 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 5/3/2024 Partial Inspection JEFFREY FULTON
Insulation 5/6/2024 Partial Approval LUIS CCAMACHO
Interior/Exterior Lathing 5/6/2024 Not Ready for Inspection LUIS CCAMACHO
Drywall Nailing 5/8/2024 Not Ready for Inspection JEFFREY FULTON
Insulation 5/8/2024 Not Ready for Inspection JEFFREY FULTON
Interior/Exterior Lathing 5/8/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 5/10/2024 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 5/10/2024 Partial Inspection JEFFREY FULTON
Insulation 5/15/2024 Partial Approval LARRY ARNICK
Insulation 5/17/2024 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 5/17/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 5/20/2024 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 5/21/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 5/21/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 5/22/2024 Partial Approval LARRY ARNICK
Drywall Nailing 5/23/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 5/24/2024 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 5/28/2024 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 5/28/2024 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 5/28/2024 Conditional Approval RAFAEL ESPINOZA
Insulation 5/28/2024 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/29/2024 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 5/29/2024 Conditional Approval LARRY ARNICK
Deputy Shotcrete 5/29/2024 Conditional Approval LARRY ARNICK
Interior/Exterior Lathing 5/29/2024 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 5/31/2024 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 5/31/2024 Conditional Approval LARRY ARNICK
Deputy Shotcrete 5/31/2024 Conditional Approval LARRY ARNICK
Interior/Exterior Lathing 5/31/2024 Not Ready for Inspection LARRY ARNICK
Masonry Wall/Backfill 5/31/2024 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 6/3/2024 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 6/3/2024 Conditional Approval LARRY ARNICK
Deputy Shotcrete 6/3/2024 Conditional Approval LARRY ARNICK
Drywall Nailing 6/3/2024 Partial Approval LARRY ARNICK
Insulation 6/3/2024 Partial Approval LARRY ARNICK
Drywall Nailing 6/4/2024 Partial Approval LARRY ARNICK
Insulation 6/4/2024 Partial Approval LARRY ARNICK
Drywall Nailing 6/6/2024 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 6/6/2024 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 6/7/2024 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 6/10/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 6/11/2024 Partial Approval LARRY ARNICK
Drywall Nailing 6/12/2024 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 6/13/2024 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 6/14/2024 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 6/17/2024 Partial Approval LARRY ARNICK
Drywall Nailing 6/25/2024 Not Ready for Inspection LARRY ARNICK
Insulation 6/25/2024 Partial Approval LARRY ARNICK
Drywall Nailing 6/26/2024 Partial Approval LARRY ARNICK
Masonry Wall/Backfill 7/1/2024 Partial Approval LARRY ARNICK
Insulation 7/2/2024 Not Ready for Inspection JEFFREY FULTON
Interior/Exterior Lathing 7/8/2024 Partial Approval LARRY ARNICK
Green Building Rough 7/9/2024 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 7/9/2024 Not Ready for Inspection LARRY ARNICK
Wood Frame 7/9/2024 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 7/11/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 7/12/2024 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 7/12/2024 Partial Approval LARRY ARNICK
Insulation 7/15/2024 Partial Approval LARRY ARNICK
Insulation 7/17/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 7/19/2024 Partial Approval LARRY ARNICK
Drywall Nailing 7/22/2024 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 7/23/2024 Partial Approval LARRY ARNICK
Smoke Detectors 7/24/2024 Not Ready for Inspection LARRY ARNICK
Insulation 7/26/2024 Partial Approval LARRY ARNICK
Insulation 7/30/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 7/31/2024 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 8/2/2024 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 8/5/2024 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 8/6/2024 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 8/8/2024 Partial Approval LARRY ARNICK
Masonry Wall/Backfill 8/8/2024 Partial Approval LARRY ARNICK
Insulation 8/16/2024 Not Ready for Inspection LARRY ARNICK
Insulation 8/19/2024 Partial Approval LARRY ARNICK
Drywall Nailing 8/22/2024 Partial Approval LARRY ARNICK
Insulation 8/23/2024 Partial Approval LARRY ARNICK
Masonry Wall/Backfill 8/23/2024 Partial Approval LARRY ARNICK
Drywall Nailing 8/26/2024 Partial Approval LARRY ARNICK
Insulation 8/27/2024 Partial Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 8/28/2024 Partial Approval LARRY ARNICK
Insulation 8/28/2024 Partial Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 8/30/2024 Partial Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 9/3/2024 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 9/3/2024 Partial Approval LARRY ARNICK
Final 9/5/2024 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 9/5/2024 Partial Approval LARRY ARNICK
Green Building Final 9/5/2024 Not Ready for Inspection LARRY ARNICK
Green Building Rough 9/5/2024 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 9/5/2024 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 9/5/2024 Not Ready for Inspection LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 9/5/2024 SGSOV Not Ready LARRY ARNICK
Smoke Detectors 9/5/2024 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 9/5/2024 Not Ready for Inspection LARRY ARNICK
Wood Frame 9/5/2024 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 9/9/2024 Not Ready for Inspection LARRY ARNICK
Insulation 9/9/2024 Partial Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 9/10/2024 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 9/12/2024 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 9/12/2024 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 9/16/2024 Not Ready for Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 9/17/2024 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 9/19/2024 Partial Approval RAMAZANALI ALMASI
Excavation/Setback/Form/Re-Bar 9/20/2024 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 9/24/2024 Not Ready for Inspection RAMAZANALI ALMASI
Interior/Exterior Lathing 9/25/2024 Partial Approval LARRY ARNICK
Drywall Nailing 9/26/2024 Not Ready for Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 10/2/2024 Partial Approval LARRY ARNICK
Green Building Rough 10/17/2024 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 10/17/2024 Not Ready for Inspection LARRY ARNICK
Wood Frame 10/17/2024 Not Ready for Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 10/18/2024 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 11/4/2024 Partial Approval LARRY ARNICK
Drywall Nailing 11/14/2024 Partial Approval LARRY ARNICK
Light Gage Steel Frame 12/6/2024 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 2/26/2025 Approved LARRY ARNICK
Pre-Inspection 3/27/2025 Approved RONALD JIMENEZ
T-Bar Ceiling 3/28/2025 Not Ready for Inspection LARRY ARNICK
T-Bar Ceiling 4/16/2025 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 4/29/2025 Partial Inspection JEFFREY FULTON
Final 5/12/2025 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 5/12/2025 Approved LARRY ARNICK
Green Building Final 5/12/2025 Not Ready for Inspection LARRY ARNICK
Green Building Rough 5/12/2025 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 5/12/2025 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 5/12/2025 Partial Approval LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 5/12/2025 SGSOV Not Ready LARRY ARNICK
Smoke Detectors 5/12/2025 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 5/12/2025 Not Ready for Inspection LARRY ARNICK
Wood Frame 5/12/2025 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 5/13/2025 Partial Approval LARRY ARNICK
T-Bar Ceiling 5/13/2025 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 5/14/2025 Partial Approval LARRY ARNICK
Pre-Inspection 5/15/2025 Partial Approval LARRY ARNICK
Pre-Inspection 5/20/2025 Partial Approval LARRY ARNICK
Pre-Inspection 5/21/2025 Partial Inspection LARRY ARNICK
Pre-Inspection 5/22/2025 Partial Inspection LARRY ARNICK
Pre-Inspection 5/27/2025 Partial Approval LARRY ARNICK
Pre-Inspection 5/29/2025 Conditional Approval LARRY ARNICK
Pre-Inspection 5/30/2025 Not Ready for Inspection LARRY ARNICK
Final 6/3/2025 OK for TCO LARRY ARNICK
Green Building Final 6/3/2025 Approved LARRY ARNICK
Green Building Rough 6/3/2025 Approved LARRY ARNICK
Reinforced Concrete Frame 6/3/2025 Approved LARRY ARNICK
Reinforced Masonry Frame 6/3/2025 Approved LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 6/3/2025 SGSOV Approved LARRY ARNICK
Smoke Detectors 6/3/2025 Approved LARRY ARNICK
Verify Sprinkler Sign Off 6/3/2025 Approved LARRY ARNICK
Wood Frame 6/3/2025 Approved LARRY ARNICK
Final 7/10/2025 Partial Approval LARRY ARNICK
Pre-Inspection 7/11/2025 Partial Approval LARRY ARNICK
Pre-Inspection 7/14/2025 Partial Approval LARRY ARNICK
Pre-Inspection 7/15/2025 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 7/23/2025 Corrections Issued LARRY ARNICK
Pre-Inspection 7/30/2025 Partial Inspection LARRY ARNICK
Pre-Inspection 8/1/2025 Partial Approval LARRY ARNICK
Pre-Inspection 8/6/2025 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 8/7/2025 Partial Approval LARRY ARNICK
Pre-Inspection 8/8/2025 Partial Approval LARRY ARNICK
Final 8/11/2025 Partial Approval LARRY ARNICK
Pre-Inspection 8/12/2025 Approved LARRY ARNICK
Special/Order Compliance 1/30/2026 No Access for Inspection LARRY ARNICK
Special/Order Compliance 5/19/2026 Approved RONALD JIMENEZ
Special/Order Compliance 5/27/2026 Approved RONALD JIMENEZ
Final 6/3/2026 Conditional Approval RONALD JIMENEZ