248-248 1/2 N DILLON ST 90026

Certificate Information: 248-248 1/2 N DILLON ST 90026

Application / Permit
19010-10000-05404
Plan Check / Job No.
B19LA25488
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
(N) 3 STORY DUPLEX WITH GARAGE BELOW (REAR OF LOT)
Permit Issued
Issued on 12/24/2020
Issuing Office
Current Status
CofO Issued on 6/1/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/3/2019 APPLICANT
Assigned to Plan Check Engineer 12/12/2019 LAMAR DAVIS
Green Plans Picked Up 12/12/2019 APPLICANT
Corrections Issued 12/16/2019 LAMAR DAVIS
Quality Review Completed 12/27/2019 HERNAN ARREOLA
Building Plans Picked Up 2/14/2020 APPLICANT
Applicant returned to address corrections 4/6/2020 LAMAR DAVIS
Plan Check Approved 11/24/2020 LAMAR DAVIS
Issued 12/24/2020 APPLICANT
CofO in Progress 4/27/2022 FREDDIE RIVERA
Permit Finaled 6/1/2022 RONALD MYRICK
Permit Finaled 6/1/2022 RONALD MYRICK
CofO Issued 6/1/2022 RONALD MYRICK

Permit Application Clearance Information

Green Code Cleared 3/4/2020 KHEDER ALRAZAA
Address approval Cleared 3/13/2020 THOMAS LANG
Hydrant and Access approval Cleared 3/13/2020 JOHN CONNEALLY
Sewer availability Cleared 3/13/2020 THOMAS LANG
Frnt yard landscape/Water mgmt Cleared 4/30/2020 ANACANY HURTADO
Low Impact Development Cleared 5/12/2020 MARTIN FRAGOSO
Eng Process Fee Ord 176,300 Cleared 6/22/2020 THOMAS LANG
Roof/Waste drainage to street Cleared 6/22/2020 THOMAS LANG
Trees in Parkway Cleared 9/1/2020 JOHN KIM
GPI Written Notices Cleared 11/4/2020 ROBERT HUGHES
Grading Pre-Inspection Cleared 11/4/2020 ROBERT HUGHES
Miscellaneous Cleared 11/24/2020 LAMAR DAVIS

Contact Information

Contractor Golden Point Construction; Lic. No.: 965193-B 731 EAST 75TH STREET      LOS ANGELES, CA 90001
Engineer Espino,, Manuel A; Lic. No.: C55526 12109 WOODRUFF AVE      DOWNEY, CA 90241
Engineer Zhong,, Raymond Meng; Lic. No.: M27635 2416 W VALLEY BLVD      ALHAMBRA, CA 91803
Geologist Minas,, Shant; Lic. No.: GEO8859 566 RIVERDALE DRIVE      GLENDALE, CA 91204

Inspector Information

FREDDIE RIVERA, (213) 202-3437 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 1/26/2021 Not Ready for Inspection ROBERT VORHIS
METHANE-Subgrade 1/26/2021 Not Ready for Inspection ROBERT VORHIS
Underground Mechanical 1/26/2021 Not Ready for Inspection ROBERT VORHIS
Excavation/Setback/Form/Re-Bar 2/3/2021 Partial Approval ROBERT VORHIS
METHANE-Subgrade 2/3/2021 Partial Approval ROBERT VORHIS
PLUMBING-Rough 2/3/2021 Partial Approval ROBERT VORHIS
Footing/Foundation/Slab 2/9/2021 Approved ROBERT VORHIS
METHANE-Barrier 2/9/2021 Approved ROBERT VORHIS
METHANE-Subgrade 2/9/2021 Approved ROBERT VORHIS
Floor/Roof Diaphrgm/Shear Wall 6/1/2021 Corrections Issued ROBERT VORHIS
Floor/Roof Diaphrgm/Shear Wall 6/16/2021 Not Ready for Inspection ROBERT VORHIS
Floor/Roof Diaphrgm/Shear Wall 6/22/2021 Not Ready for Inspection ROBERT VORHIS
ELECTRICAL-Rough 6/24/2021 Approved ROBERT VORHIS
HVAC-Rough 6/24/2021 Not Ready for Inspection ROBERT VORHIS
PLUMBING-Rough 6/24/2021 Not Ready for Inspection ROBERT VORHIS
HVAC-Rough 7/2/2021 Approved ROBERT VORHIS
PLUMBING-Rough 7/2/2021 Approved ROBERT VORHIS
BUILDING-Rough-Frame 7/8/2021 Not Ready for Inspection KATHRYN BUTTERWORTH
Green Building Rough 7/8/2021 Not Ready for Inspection KATHRYN BUTTERWORTH
MERV13>=Rough 7/8/2021 Not Ready for Inspection KATHRYN BUTTERWORTH
METHANE-Rough 7/8/2021 Not Ready for Inspection KATHRYN BUTTERWORTH
Verify Sprinkler Sign Off 7/8/2021 Not Ready for Inspection KATHRYN BUTTERWORTH
Floor/Roof Diaphrgm/Shear Wall 7/14/2021 Approved ROBERT VORHIS
Green Building Rough 7/14/2021 Not Ready for Inspection ROBERT VORHIS
MERV13>=Rough 7/14/2021 Approved ROBERT VORHIS
METHANE-Rough 7/14/2021 Not Ready for Inspection ROBERT VORHIS
Verify Sprinkler Sign Off 7/14/2021 Approved ROBERT VORHIS
BUILDING-Rough-Frame 7/19/2021 Not Ready for Inspection ROBERT VORHIS
Green Building Rough 7/19/2021 Not Ready for Inspection ROBERT VORHIS
METHANE-Rough 7/19/2021 Approved ROBERT VORHIS
Interior/Exterior Lathing 8/5/2021 Corrections Issued OSVALDO PARAMO
Interior/Exterior Lathing 8/6/2021 Partial Approval OSVALDO PARAMO
BUILDING-Rough-Frame 8/12/2021 Corrections Issued JOSEPH MCGARRY
Green Building Rough 8/12/2021 Not Ready for Inspection JOSEPH MCGARRY
BUILDING-Rough-Frame 8/16/2021 Corrections Issued JOAQUIN GREENOUGH
Green Building Rough 8/16/2021 Approved JOAQUIN GREENOUGH
BUILDING-Rough-Frame 9/1/2021 Approved ROBERT VORHIS
Insulation 9/13/2021 No Access for Inspection JESUS PINEDA
Insulation 9/16/2021 Not Ready for Inspection KATHRYN BUTTERWORTH
Interior/Exterior Lathing 9/16/2021 Corrections Issued KATHRYN BUTTERWORTH
Insulation 10/1/2021 Corrections Issued ASHLEY THOMPSON
Insulation 10/5/2021 Corrections Issued ADAM ESCOTO
Drywall Nailing 10/6/2021 Not Ready for Inspection ROBERT VORHIS
Insulation 10/13/2021 Approved ROBERT VORHIS
Drywall Nailing 10/15/2021 Approved ROBERT VORHIS
ELECTRICAL-Final 3/17/2022 Corrections Issued FREDDIE RIVERA
HVAC-Final 3/17/2022 Not Ready for Inspection FREDDIE RIVERA
PLUMBING-Final 3/17/2022 Not Ready for Inspection FREDDIE RIVERA
ELECTRICAL-Final 3/23/2022 Not Ready for Inspection STUART CHAPMAN
Final 3/23/2022 Corrections Issued STUART CHAPMAN
Gas Test 3/23/2022 Approved STUART CHAPMAN
HVAC-Final 3/23/2022 Not Ready for Inspection STUART CHAPMAN
PLUMBING-Final 3/23/2022 Not Ready for Inspection STUART CHAPMAN
ELECTRICAL-Final 3/29/2022 Approved FREDDIE RIVERA
ELECTRICAL-Rough 3/29/2022 Approved FREDDIE RIVERA
Green Building Final 3/29/2022 Not Ready for Inspection FREDDIE RIVERA
HVAC-Rough 3/29/2022 Approved FREDDIE RIVERA
PLUMBING-Final 3/29/2022 Approved FREDDIE RIVERA
Final 3/31/2022 Not Ready for Inspection FREDDIE RIVERA
MERV13>=Final 3/31/2022 Not Ready for Inspection FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 3/31/2022 SGSOV Not Ready FREDDIE RIVERA
Service/Power Release 3/31/2022 Partial Inspection FREDDIE RIVERA
Smoke Detectors 3/31/2022 Partial Inspection FREDDIE RIVERA
Final 4/8/2022 Not Ready for Inspection FREDDIE RIVERA
Green Building Final 4/8/2022 Partial Inspection FREDDIE RIVERA
MERV13>=Final 4/8/2022 Partial Inspection FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 4/8/2022 SGSOV Not Ready FREDDIE RIVERA
Service/Power Release 4/8/2022 Partial Inspection FREDDIE RIVERA
Smoke Detectors 4/8/2022 Partial Inspection FREDDIE RIVERA
Final 4/19/2022 Conditional Approval FREDDIE RIVERA
Green Building Final 4/19/2022 Approved FREDDIE RIVERA
MERV13>=Final 4/19/2022 Approved FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 4/19/2022 SGSOV Approved FREDDIE RIVERA
Service/Power Release 4/19/2022 Approved FREDDIE RIVERA
Smoke Detectors 4/19/2022 Approved FREDDIE RIVERA