5144 S CRENSHAW BLVD 90043

Certificate Information: 5144 S CRENSHAW BLVD 90043

Application / Permit
19010-10000-05381
Plan Check / Job No.
B19LA25414
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 5 STORY 78 UNIT MIXED USE APARTMENT BUILDING ; (4) STORY TYPE V-A OVER 1 STORY TYPE 1-A RETAIL & PARKING & OVER 1 LEVEL SUBTERRANEAN PARKING GARAGE (8 AFFORDABLE UNITS PER TOC TIER 3).
Permit Issued
Issued on 6/7/2022
Issuing Office
Metro
Current Status
Issued on 6/7/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/2/2019 APPLICANT
Assigned to Plan Check Engineer 12/12/2019 GARO TELMI
Green Plans Picked Up 12/12/2019 APPLICANT
Corrections Issued 12/27/2019 GARO TELMI
Quality Review Completed 1/2/2020 KEN GILL
Disabled Access Plans Picked Up 1/7/2020 APPLICANT
Applicant returned to address corrections 9/17/2020 GARO TELMI
Applicant returned to address corrections 9/29/2020 GARO TELMI
Applicant returned to address corrections 11/5/2020 GARO TELMI
Applicant returned to address corrections 6/24/2021 GARO TELMI
Applicant returned to address corrections 7/8/2021 GARO TELMI
Applicant returned to address corrections 7/15/2021 GARO TELMI
Applicant returned to address corrections 10/14/2021 GARO TELMI
Applicant returned to address corrections 3/4/2022 GARO TELMI
Plan Check Approved 3/16/2022 GARO TELMI
Building Plans Picked Up 5/17/2022 APPLICANT
Issued 6/7/2022 APPLICANT
TCO Issued (Expire Date: 11-02-2025) 5/6/2025 ERNESTO CORRAL
TCO Issued (Expire Date: 04-05-2026) 10/7/2025 ERNESTO CORRAL
TCO Issued (Expire Date: 10-06-2026) 4/9/2026 RAFAEL ESPINOZA

Permit Application Clearance Information

Bicycle Parking Cleared 1/13/2020 CELINA MORENO
Trees in Parkway Cleared 1/15/2020 ADRIAN SANCHEZ
Eng Process Fee Ord 176,300 Cleared 1/16/2020 ELAINE LEI
Address approval Cleared 1/30/2020 EMIL KYUPELYAN
Sewer availability Cleared 2/11/2020 JEANETTE VONG
DAS Clearance Cleared 3/27/2020 WAI LAU
Low Impact Development Cleared 11/19/2020 ROBIN YAMADA
DCP conditions approval Cleared 4/27/2021 NICHOLAS KAWAZOE
Density Bonus 12.22.A.31 Cleared 4/27/2021 NICHOLAS KAWAZOE
Construction near power lines Cleared 6/15/2021 WALTER RAMIREZ
Roof/Waste drainage to street Cleared 6/23/2021 WALLIE JONG
Highway dedication Cleared 7/8/2021 CECILIO NAVARRO
Permit Cleared 7/8/2021 CECILIO NAVARRO
Metro Rail approval Cleared 10/7/2021 GARO TELMI
Hydrant and Access approval Cleared 10/13/2021 ROBERT DUFF
Fire Marshall Fire Life Safety Cleared 12/14/2021 OSCAR SALGADO JR
Miscellaneous Cleared 12/20/2021 JEANETTE VONG
Green Code Cleared 12/24/2021 KHEDER ALRAZAA
Driveway location Cleared 12/29/2021 EDUARDO HERMOSO
Internal circulation Cleared 12/29/2021 EDUARDO HERMOSO
Specific Plan Cleared 1/11/2022 EDUARDO HERMOSO
CPC Cleared 1/13/2022 RUBEN VASQUEZ
Encroachment in public way Cleared 1/18/2022 JEREMY CHOK
Work Adjacent to Public Way Cleared 1/25/2022 BOK GOH
"D" conditions Cleared 2/17/2022 RUBEN VASQUEZ
Miscellaneous Cleared 2/17/2022 RUBEN VASQUEZ
Opn space landscape/Water mgmt Cleared 2/17/2022 RUBEN VASQUEZ
Site Plan review Cleared 2/17/2022 RUBEN VASQUEZ
Specific Plan Cleared 2/17/2022 RUBEN VASQUEZ
Historic Resource Verification Cleared 2/23/2022 SUSAN WONG
Redevelopment Project Area Cleared 2/23/2022 SUSAN WONG
Building over 3-story or 36-ft Cleared 3/16/2022 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 3/16/2022 CALOSHA APPROVED

Contact Information

Architect Kaliski,, John Ethan; Lic. No.: C17945 3780 WILSHIRE BLVD SUITE 300      LOS ANGELES, CA 90010
Contractor Mohrsaz Mike; Lic. No.: 910443-B 5080 AVENIDA HACIENDA      TARZANA, CA 91356
Engineer Davis,, Danny Thomas; Lic. No.: L7586 1197 E LOS ANGELES AVE   #322    SIMI VALLEY, CA 93065
Engineer Dermendjian,, Raffi Hrag; Lic. No.: C88261 9325 SHOSHONE AVENUE      NORTHRIDGE, CA 91325
Engineer Koma,, Shahram Javadi; Lic. No.: C69497 23241 VENTURA BLVD 300      WOODLAND HILLS, CA 91364
Engineer White,, William Michael; Lic. No.: C62111 19619 MATHILDE LN      SAUGUS, CA 91350

Inspector Information

ALFREDO LOPEZ, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI
JAMES POWERS, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/15/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/2/2022 Partial Approval JAMES POWERS
Footing/Foundation/Slab 9/2/2022 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 9/6/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/21/2022 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 9/22/2022 Partial Approval JAMES POWERS
Deputy EIFS 9/28/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/28/2022 Partial Approval JAMES POWERS
Green Building Rough 9/28/2022 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 9/28/2022 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 9/28/2022 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 10/3/2022 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 10/8/2022 Off-Hour Fees Due
Special/Order Compliance 10/8/2022 Partial Approval JAMES POWERS
Green Building Rough 10/12/2022 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 10/12/2022 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 10/12/2022 Not Ready for Inspection GREGORY POMISH
Deputy Shotcrete 10/13/2022 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 10/13/2022 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 10/14/2022 Conditional Approval MICHAEL ROSENBERG
Special/Order Compliance 10/20/2022 Not Ready for Inspection GREGORY POMISH
Deputy Shotcrete 10/21/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 10/24/2022 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 10/27/2022 Partial Approval JAMES POWERS
Footing/Foundation/Slab 10/27/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/31/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/7/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/9/2022 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 11/9/2022 Partial Approval JAMES POWERS
Reinforced Concrete Frame 11/9/2022 Not Ready for Inspection JAMES POWERS
Excavation/Setback/Form/Re-Bar 11/10/2022 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 11/14/2022 Partial Approval JAMES POWERS
Deputy Shotcrete 11/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/18/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/9/2023 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 2/9/2023 Partial Approval JAMES POWERS
Deputy Shotcrete 3/7/2023 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/7/2023 Partial Approval JAMES POWERS
Deputy Shotcrete 3/16/2023 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 3/17/2023 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 3/17/2023 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 3/17/2023 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 4/6/2023 Partial Approval JAMES POWERS
Green Building Rough 4/6/2023 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 4/6/2023 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 4/6/2023 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 4/7/2023 Partial Approval JAMES POWERS
Reinforced Concrete Frame 4/7/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 4/14/2023 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 4/18/2023 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 4/18/2023 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 4/18/2023 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 4/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 4/27/2023 Partial Approval JAMES POWERS
Green Building Rough 4/27/2023 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 4/27/2023 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 4/27/2023 Not Ready for Inspection JAMES POWERS
Deputy Shotcrete 4/28/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 5/1/2023 Partial Approval JAMES POWERS
Deputy Shotcrete 5/1/2023 Partial Approval JAMES POWERS
Deputy Shotcrete 5/2/2023 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 5/2/2023 Partial Approval JAMES POWERS
Deputy Shotcrete 5/3/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 5/4/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/8/2023 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 5/8/2023 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 5/8/2023 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 5/8/2023 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 5/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 5/16/2023 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 5/17/2023 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 5/17/2023 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 5/17/2023 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 5/25/2023 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/2/2023 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 6/12/2023 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 6/12/2023 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 6/12/2023 Not Ready for Inspection LARRY ARNICK
Green Building Rough 6/14/2023 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 6/14/2023 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 6/14/2023 Not Ready for Inspection LARRY ARNICK
Green Building Rough 6/27/2023 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 6/27/2023 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 6/27/2023 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 6/28/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 7/12/2023 Partial Approval JAMES POWERS
Green Building Rough 7/12/2023 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 7/12/2023 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 7/12/2023 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 7/13/2023 No Access for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 7/18/2023 Partial Approval MARTIN TAVITIAN
Insulation 7/18/2023 Not Ready for Inspection JAMES POWERS
Special/Order Compliance 7/18/2023 Partial Inspection KATY RAMIREZ
Deputy Reinf. Concrete 7/21/2023 Partial Approval JAMES POWERS
Green Building Rough 8/1/2023 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 8/1/2023 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 8/1/2023 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 8/7/2023 Not Ready for Inspection JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 8/14/2023 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 8/18/2023 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/28/2023 Conditional Approval LARRY ARNICK
Green Building Rough 8/28/2023 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 8/28/2023 Conditional Approval LARRY ARNICK
Verify Sprinkler Sign Off 8/28/2023 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 8/30/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/31/2023 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/31/2023 Partial Approval JAMES POWERS
Green Building Rough 9/1/2023 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 9/1/2023 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 9/1/2023 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 9/5/2023 Partial Approval JAMES POWERS
Deputy Wood Construction 9/27/2023 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 9/27/2023 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 9/28/2023 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 10/2/2023 Partial Approval LARRY ARNICK
Deputy Wood Construction 10/3/2023 Partial Approval JAMES POWERS
Deputy Wood Construction 10/10/2023 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 10/11/2023 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 10/23/2023 Partial Approval LARRY ARNICK
Deputy Wood Construction 10/25/2023 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 10/25/2023 Partial Approval LARRY ARNICK
Deputy Wood Construction 11/6/2023 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 11/6/2023 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 11/7/2023 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 11/9/2023 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 11/9/2023 Partial Approval GREGORY POMISH
Deputy Wood Construction 11/13/2023 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 11/13/2023 Partial Approval JAMES POWERS
Deputy Wood Construction 11/17/2023 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 11/20/2023 Partial Approval LARRY ARNICK
Green Building Rough 11/20/2023 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 11/20/2023 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 11/20/2023 Not Ready for Inspection LARRY ARNICK
Wood Frame 11/20/2023 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 11/27/2023 Partial Approval JAMES POWERS
Green Building Rough 11/27/2023 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 11/27/2023 Not Ready for Inspection JAMES POWERS
Deputy Wood Construction 11/28/2023 Partial Approval JAMES POWERS
Insulation 11/29/2023 Partial Approval JAMES POWERS
Insulation 12/14/2023 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 1/2/2024 Partial Approval JAMES POWERS
Green Building Rough 1/2/2024 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 1/2/2024 Not Ready for Inspection JAMES POWERS
Deputy Wood Construction 1/8/2024 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 1/8/2024 Not Ready for Inspection JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 1/11/2024 Partial Approval JAMES POWERS
Green Building Rough 1/11/2024 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 1/11/2024 Not Ready for Inspection JAMES POWERS
Insulation 1/17/2024 Partial Approval JAMES POWERS
Deputy Wood Construction 1/22/2024 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 1/22/2024 Not Ready for Inspection LARRY ARNICK
Green Building Rough 1/22/2024 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 1/22/2024 Not Ready for Inspection LARRY ARNICK
Wood Frame 1/22/2024 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 1/25/2024 Partial Approval JAMES POWERS
Green Building Rough 1/25/2024 Partial Approval JAMES POWERS
Deputy Wood Construction 1/30/2024 Partial Approval JAMES POWERS
Green Building Rough 1/30/2024 Approved JAMES POWERS
Verify Sprinkler Sign Off 1/30/2024 Not Ready for Inspection JAMES POWERS
Wood Frame 1/30/2024 Partial Approval JAMES POWERS
Insulation 2/1/2024 Partial Approval GREGORY POMISH
Drywall Nailing 2/6/2024 Partial Approval JAMES POWERS
Insulation 2/6/2024 Partial Approval JAMES POWERS
Insulation 2/8/2024 Partial Approval JAMES POWERS
Insulation 2/22/2024 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 2/22/2024 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 3/21/2024 Partial Approval JAMES POWERS
Drywall Nailing 4/1/2024 Partial Approval LARRY ARNICK
Drywall Nailing 4/11/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/16/2024 Partial Approval JAMES POWERS
Interior/Exterior Lathing 4/22/2024 Partial Approval LARRY ARNICK
Light Gage Steel Frame 4/30/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/3/2024 Partial Approval JAMES POWERS
Interior/Exterior Lathing 5/3/2024 Partial Approval JAMES POWERS
Light Gage Steel Frame 5/9/2024 Partial Approval JAMES POWERS
Interior/Exterior Lathing 5/13/2024 Partial Approval JAMES POWERS
Light Gage Steel Frame 5/24/2024 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 6/11/2024 Partial Approval JAMES POWERS
Drywall Nailing 7/25/2024 Partial Approval JAMES POWERS
Deputy Wood Construction 8/15/2024 Partial Approval JAMES POWERS
Drywall Nailing 8/21/2024 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 9/3/2024 Partial Approval JAMES POWERS
Footing/Foundation/Slab 9/23/2024 Partial Approval JAMES POWERS
Light Gage Steel Frame 9/23/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/30/2024 Partial Approval JAMES POWERS
Light Gage Steel Frame 9/30/2024 Partial Approval JAMES POWERS
Masonry Wall/Backfill 9/30/2024 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 10/7/2024 Partial Approval JAMES POWERS
Insulation 10/7/2024 Partial Approval JAMES POWERS
Masonry Wall/Backfill 10/7/2024 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/16/2024 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 10/16/2024 Not Ready for Inspection JAMES POWERS
Excavation/Setback/Form/Re-Bar 11/4/2024 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 11/4/2024 Not Ready for Inspection JAMES POWERS
Reinforced Masonry Frame 11/7/2024 Partial Approval JAMES POWERS
Footing/Foundation/Slab 11/15/2024 Partial Approval LARRY ARNICK
Drywall Nailing 11/20/2024 Partial Approval LARRY ARNICK
T-Bar Ceiling 11/20/2024 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 11/21/2024 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 11/21/2024 Not Ready for Inspection JAMES POWERS
Masonry Wall/Backfill 11/27/2024 Partial Approval JAMES POWERS
Drywall Nailing 12/6/2024 Partial Approval JAMES POWERS
Footing/Foundation/Slab 12/6/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/10/2024 Conditional Approval LARRY ARNICK
Drywall Nailing 12/10/2024 Partial Approval LARRY ARNICK
T-Bar Ceiling 1/6/2025 Approved JAMES POWERS
Final 1/29/2025 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 1/29/2025 Approved JAMES POWERS
Green Building Final 1/29/2025 Approved JAMES POWERS
Reinforced Concrete Frame 1/29/2025 Partial Approval JAMES POWERS
SGSOV-Seismic Gas S/O Valve 1/29/2025 SGSOV Approved JAMES POWERS
Smoke Detectors 1/29/2025 Approved JAMES POWERS
Verify Sprinkler Sign Off 1/29/2025 Not Ready for Inspection JAMES POWERS
Wood Frame 1/29/2025 Partial Approval JAMES POWERS
Final 3/24/2025 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 3/24/2025 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 3/24/2025 Partial Approval JAMES POWERS
Wood Frame 3/24/2025 Partial Approval JAMES POWERS
Final 4/10/2025 OK for TCO JAMES POWERS
Reinforced Concrete Frame 4/10/2025 Approved JAMES POWERS
Verify Sprinkler Sign Off 4/10/2025 Approved JAMES POWERS
Wood Frame 4/10/2025 Approved JAMES POWERS
Final 4/21/2025 OK for TCO JAMES POWERS
Final 5/5/2025 OK for TCO JAMES POWERS
Special/Order Compliance 10/7/2025 Partial Approval JAMES POWERS
Special/Order Compliance 3/10/2026 Approved JAMES POWERS
T-Bar Ceiling 4/21/2026 Not Ready for Inspection JAMES POWERS