Pre-Inspection
|
6/15/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/2/2022
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
9/2/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/6/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/9/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
9/21/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Footing/Foundation/Slab
|
9/22/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy EIFS
|
9/28/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/28/2022
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
9/28/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
9/28/2022
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/28/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/3/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Footing/Foundation/Slab
|
10/8/2022
|
Off-Hour Fees Due
|
|
|
Special/Order Compliance
|
10/8/2022
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
10/12/2022
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
10/12/2022
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
10/12/2022
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
10/13/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Footing/Foundation/Slab
|
10/13/2022
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
10/14/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Special/Order Compliance
|
10/20/2022
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
10/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
10/24/2022
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
10/27/2022
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/27/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/31/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/2/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
11/7/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
11/9/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
11/9/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
11/9/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
11/10/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/14/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
11/15/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
11/18/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
2/9/2023
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
2/9/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
3/7/2023
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/7/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
3/16/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Green Building Rough
|
3/17/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/17/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
3/17/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/6/2023
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
4/6/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
4/6/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
4/6/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
4/7/2023
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
4/7/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/11/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
4/14/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Green Building Rough
|
4/18/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
4/18/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
4/18/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
4/26/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
4/27/2023
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
4/27/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
4/27/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
4/27/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Shotcrete
|
4/28/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
5/1/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
5/1/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
5/2/2023
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
5/2/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
5/3/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
5/4/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
5/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Green Building Rough
|
5/8/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
5/8/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
5/8/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
5/16/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Green Building Rough
|
5/17/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
5/17/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
5/17/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/25/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
6/2/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Green Building Rough
|
6/12/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
6/12/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
6/12/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
6/14/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
6/14/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
6/14/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
6/27/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
6/27/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
6/27/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/28/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
7/12/2023
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
7/12/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
7/12/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
7/12/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
7/13/2023
|
No Access for Inspection
|
EDWIN GREGORYONA
|
|
Deputy Reinf. Concrete
|
7/18/2023
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Insulation
|
7/18/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Special/Order Compliance
|
7/18/2023
|
Partial Inspection
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
7/21/2023
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
8/1/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/1/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/1/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
8/7/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/14/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/18/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
8/28/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
8/28/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
8/28/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
8/28/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
8/30/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/31/2023
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/31/2023
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
9/1/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
9/1/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/1/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/5/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
9/27/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/27/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/28/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/2/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Wood Construction
|
10/3/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
10/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/11/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/23/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Wood Construction
|
10/25/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/25/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Wood Construction
|
11/6/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/6/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/7/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
11/9/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
11/9/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
11/13/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/13/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
11/17/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/20/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
11/20/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
11/20/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
11/20/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
11/20/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/27/2023
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
11/27/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
11/27/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Wood Construction
|
11/28/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
11/29/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
12/14/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/2/2024
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
1/2/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
1/2/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Wood Construction
|
1/8/2024
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/8/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/11/2024
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
1/11/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
1/11/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
1/17/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
1/22/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/22/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
1/22/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
1/22/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
1/22/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/25/2024
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
1/25/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
1/30/2024
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
1/30/2024
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
1/30/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
1/30/2024
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
2/1/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
2/6/2024
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
2/6/2024
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
2/8/2024
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
2/22/2024
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
2/22/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
3/21/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
4/1/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
4/11/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
4/16/2024
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
4/22/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
4/30/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
5/3/2024
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
5/3/2024
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
5/9/2024
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
5/13/2024
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
5/24/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
6/11/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
7/25/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
8/15/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
8/21/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
9/3/2024
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
9/23/2024
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
9/23/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
9/30/2024
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
9/30/2024
|
Partial Approval
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
9/30/2024
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
10/7/2024
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
10/7/2024
|
Partial Approval
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
10/7/2024
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
10/16/2024
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
10/16/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
11/4/2024
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
11/4/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
11/7/2024
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
11/15/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
11/20/2024
|
Partial Approval
|
LARRY ARNICK
|
|
T-Bar Ceiling
|
11/20/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
11/21/2024
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
11/21/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
11/27/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
12/6/2024
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
12/6/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
12/10/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
12/10/2024
|
Partial Approval
|
LARRY ARNICK
|
|
T-Bar Ceiling
|
1/6/2025
|
Approved
|
JAMES POWERS
|
|
Final
|
1/29/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
1/29/2025
|
Approved
|
JAMES POWERS
|
|
Green Building Final
|
1/29/2025
|
Approved
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
1/29/2025
|
Partial Approval
|
JAMES POWERS
|
|
SGSOV-Seismic Gas S/O Valve
|
1/29/2025
|
SGSOV Approved
|
JAMES POWERS
|
|
Smoke Detectors
|
1/29/2025
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
1/29/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
1/29/2025
|
Partial Approval
|
JAMES POWERS
|
|
Final
|
3/24/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/24/2025
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
3/24/2025
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
3/24/2025
|
Partial Approval
|
JAMES POWERS
|
|
Final
|
4/10/2025
|
OK for TCO
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
4/10/2025
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
4/10/2025
|
Approved
|
JAMES POWERS
|
|
Wood Frame
|
4/10/2025
|
Approved
|
JAMES POWERS
|
|
Final
|
4/21/2025
|
OK for TCO
|
JAMES POWERS
|
|
Final
|
5/5/2025
|
OK for TCO
|
JAMES POWERS
|
|
Special/Order Compliance
|
10/7/2025
|
Partial Approval
|
JAMES POWERS
|
|
Special/Order Compliance
|
3/10/2026
|
Approved
|
JAMES POWERS
|
|
T-Bar Ceiling
|
4/21/2026
|
Not Ready for Inspection
|
JAMES POWERS
|