|
Footing/Foundation/Slab
|
5/28/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
6/2/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
6/3/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
6/3/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
6/3/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
6/4/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
6/4/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
6/7/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
6/7/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
6/7/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
6/8/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
6/8/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
6/9/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
6/9/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
6/9/2021
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
6/10/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
6/11/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
6/16/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
6/18/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
6/21/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
6/22/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
6/23/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
6/23/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
6/24/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
6/24/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
6/25/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
6/28/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
6/28/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
6/29/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
6/29/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
6/30/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
6/30/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
6/30/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
6/30/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
7/1/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
7/1/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
7/1/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
7/2/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
7/2/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
7/2/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
7/8/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
7/9/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
7/12/2021
|
Partial Approval
|
JONATHAN QUACH
|
|
Excavation/Setback/Form/Re-Bar
|
7/13/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Masonry Wall/Backfill
|
7/15/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
7/16/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
7/22/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
7/23/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
8/2/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
8/3/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
8/4/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
8/6/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
8/9/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
8/12/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
8/13/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
8/16/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
8/17/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
8/18/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
8/19/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
8/20/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
8/27/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
8/31/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
9/3/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
9/3/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
9/10/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
9/13/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
9/14/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
9/15/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
9/16/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
9/17/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
9/27/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
10/4/2021
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
10/5/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
10/11/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
10/12/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Footing/Foundation/Slab
|
10/12/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Reinf. Concrete
|
10/13/2021
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Excavation/Setback/Form/Re-Bar
|
10/14/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
10/15/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
10/18/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
10/19/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
10/20/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
10/21/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
10/22/2021
|
Not Ready for Inspection
|
MARK FERRARI
|
|
Excavation/Setback/Form/Re-Bar
|
10/26/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
11/1/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
11/3/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
11/9/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
11/19/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
11/24/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
12/1/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
12/6/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
12/7/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
12/7/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
1/13/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/14/2022
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
1/18/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/19/2022
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/21/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
1/25/2022
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
1/26/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
2/4/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
2/9/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/11/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
2/14/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
2/14/2022
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
2/16/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/18/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
2/18/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/22/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
2/23/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
2/24/2022
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
2/25/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
3/1/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
3/2/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
3/2/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/4/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
3/7/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
3/8/2022
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
3/11/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
3/11/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
3/11/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
3/14/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
3/14/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/14/2022
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
3/15/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
3/15/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
3/15/2022
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
3/16/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
3/16/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
3/16/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
3/17/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
3/17/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Insulation
|
3/17/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
3/21/2022
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
3/23/2022
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/24/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
3/29/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/31/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
4/5/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/11/2022
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
4/14/2022
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/21/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wall Anchors
|
4/25/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Wall Anchors
|
4/26/2022
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
4/29/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
5/5/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
5/5/2022
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/10/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
5/18/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
5/24/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
6/3/2022
|
Conditional Approval
|
TED RIES
|
|
Insulation
|
6/9/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
6/15/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
6/21/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
7/13/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
7/14/2022
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
7/15/2022
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
7/18/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/19/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
7/20/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
7/22/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
7/22/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
7/25/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/25/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
7/26/2022
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
7/29/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
8/3/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
8/3/2022
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
8/5/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
8/5/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
8/8/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
8/9/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/11/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
8/16/2022
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
8/17/2022
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/17/2022
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
8/17/2022
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
8/24/2022
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
8/29/2022
|
Partial Approval
|
TED RIES
|
|
Insulation
|
8/30/2022
|
Partial Approval
|
TED RIES
|
|
Light Gage Steel Frame
|
8/30/2022
|
Partial Approval
|
TED RIES
|
|
Insulation
|
8/31/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
8/31/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
9/1/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
9/7/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
9/9/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
9/9/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
9/12/2022
|
Not Ready for Inspection
|
TED RIES
|
|
Interior/Exterior Lathing
|
9/15/2022
|
Partial Approval
|
TED RIES
|
|
Light Gage Steel Frame
|
9/19/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
9/21/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
9/26/2022
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
9/29/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
10/4/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
10/5/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
10/13/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
10/20/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
11/14/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
11/17/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
11/18/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
11/18/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
11/22/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
11/29/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
12/2/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
12/7/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
12/14/2022
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
12/19/2022
|
No Access for Inspection
|
TED RIES
|
|
Light Gage Steel Frame
|
1/18/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
1/24/2023
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
2/2/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
2/2/2023
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
2/8/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
2/13/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Footing/Foundation/Slab
|
2/15/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Final
|
2/15/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Rough
|
2/15/2023
|
Approved
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
2/15/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
2/15/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
2/15/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
SGSOV-Seismic Gas S/O Valve
|
2/15/2023
|
SGSOV Not Ready
|
DAVID BURKHEAD
|
|
Smoke Detectors
|
2/15/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
2/15/2023
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
2/23/2023
|
Partial Approval
|
RONALD JIMENEZ
|
|
Excavation/Setback/Form/Re-Bar
|
2/23/2023
|
Partial Approval
|
RONALD JIMENEZ
|
|
Light Gage Steel Frame
|
2/24/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
3/9/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
3/16/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wall Anchors
|
3/28/2023
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
3/31/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
4/4/2023
|
No Access for Inspection
|
RAFAEL CORTES
|
|
Drywall Nailing
|
4/6/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
4/6/2023
|
Approved
|
DAVID BURKHEAD
|
|
Final
|
12/7/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
12/7/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Final
|
12/7/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
12/7/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
12/7/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
SGSOV-Seismic Gas S/O Valve
|
12/7/2023
|
SGSOV Not Ready
|
DAVID BURKHEAD
|
|
Smoke Detectors
|
12/7/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
12/7/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
12/8/2023
|
Approved
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
12/11/2023
|
Approved
|
DAVID BURKHEAD
|
|
Final
|
12/13/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
12/13/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Final
|
12/13/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
12/13/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
12/13/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
SGSOV-Seismic Gas S/O Valve
|
12/13/2023
|
SGSOV Not Ready
|
DAVID BURKHEAD
|
|
Smoke Detectors
|
12/13/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
12/13/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Final
|
12/18/2023
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
12/18/2023
|
Approved
|
DAVID BURKHEAD
|
|
Green Building Final
|
12/18/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
12/18/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
12/18/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
SGSOV-Seismic Gas S/O Valve
|
12/18/2023
|
SGSOV Approved
|
DAVID BURKHEAD
|
|
Smoke Detectors
|
12/18/2023
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
12/18/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
12/20/2023
|
No Access for Inspection
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
12/22/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Final
|
2/16/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Green Building Final
|
2/16/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
2/16/2024
|
Approved
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
2/16/2024
|
Approved
|
DAVID BURKHEAD
|
|
Smoke Detectors
|
2/16/2024
|
Approved
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
2/16/2024
|
Approved
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
2/20/2024
|
Approved
|
DAVID BURKHEAD
|
|
Verify Rec and Parks Fee Memo
|
2/20/2024
|
Approved
|
DAVID BURKHEAD
|
|
Final
|
2/29/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Final
|
2/29/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
8/13/2024
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
2/4/2025
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
8/5/2025
|
Approved
|
DAVID BURKHEAD
|
|
Final
|
12/8/2025
|
OK to Issue CofO
|
DAVID BURKHEAD
|
|
Green Building Final
|
12/8/2025
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
1/27/2026
|
Approved
|
DAVID BURKHEAD
|