Footing/Foundation/Slab
|
1/20/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/24/2022
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
1/25/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
1/25/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
1/25/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/26/2022
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
1/26/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/27/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/1/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/2/2022
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
2/2/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/3/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Seismic Resistance
|
2/8/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/9/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/16/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
2/16/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/23/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/24/2022
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
2/24/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/7/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/7/2022
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
3/24/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/31/2022
|
Conditional Approval
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
3/31/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/7/2022
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
4/7/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
4/7/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/12/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/9/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/17/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
5/17/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/19/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/23/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/1/2022
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
6/1/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
6/1/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
6/1/2022
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
6/1/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/2/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
6/2/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/3/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/10/2022
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
6/10/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
6/10/2022
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
6/10/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Pre-Stress Concrete
|
6/22/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/22/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
6/22/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/24/2022
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
6/25/2022
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
6/27/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/14/2022
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
7/14/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
7/14/2022
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
7/14/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/15/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/29/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Green Building Rough
|
7/30/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
7/30/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
7/30/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
8/2/2022
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
8/2/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/2/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/2/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/5/2022
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
8/5/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/5/2022
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/5/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
9/30/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/30/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
9/30/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
10/11/2022
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
10/11/2022
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
10/11/2022
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
11/14/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/14/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
11/14/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
11/14/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
11/15/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
11/15/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
11/18/2022
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
11/18/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
11/18/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Wood Construction
|
11/30/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
12/19/2022
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/20/2022
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
12/20/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Wood Construction
|
12/27/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
1/17/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Insulation
|
2/6/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/3/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
3/3/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Wood Construction
|
3/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/13/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
3/13/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/22/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
3/22/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
3/28/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
3/28/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
4/5/2023
|
Partial Approval
|
JAMES POWERS
|
|
Special/Order Compliance
|
4/5/2023
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
4/5/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
4/5/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
4/25/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
4/25/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
5/22/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
5/22/2023
|
Corrections Issued
|
LARRY ARNICK
|
|
Insulation
|
5/26/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
5/26/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
6/2/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
6/2/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
6/9/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
6/9/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
6/16/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
6/16/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
6/16/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
6/22/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
6/22/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
6/26/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
6/26/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
7/11/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
7/11/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
7/19/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
7/19/2023
|
Partial Approval
|
JAMES POWERS
|
|
Structural Steel Frame
|
8/3/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/4/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
8/7/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
8/7/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/9/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
8/9/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
8/11/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Wood Construction
|
8/15/2023
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/21/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/25/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/29/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
9/6/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
9/14/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/21/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
9/21/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
9/27/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
11/14/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
12/7/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
12/13/2023
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
12/18/2023
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
12/20/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/21/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
12/28/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
1/8/2024
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
1/8/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/10/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
1/12/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
1/12/2024
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
1/19/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
1/29/2024
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
1/29/2024
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
2/1/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
2/8/2024
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
2/20/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/14/2024
|
Partial Approval
|
JAMES POWERS
|
|
Special/Order Compliance
|
3/19/2024
|
Approved
|
ERNESTO CORRAL
|
|
Special/Order Compliance
|
4/2/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Special/Order Compliance
|
7/11/2024
|
Partial Approval
|
JAMES POWERS
|
|
Smoke Detectors
|
10/9/2024
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
10/9/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Pre-Inspection
|
3/17/2025
|
Partial Approval
|
JAMES POWERS
|
|
SGSOV-Seismic Gas S/O Valve
|
3/17/2025
|
SGSOV Approved
|
JAMES POWERS
|
|
Drywall Nailing
|
3/24/2025
|
Approved
|
JAMES POWERS
|
|
Final
|
3/24/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
3/24/2025
|
Approved
|
JAMES POWERS
|
|
Green Building Final
|
3/24/2025
|
Approved
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/24/2025
|
Approved
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
3/24/2025
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
3/24/2025
|
Approved
|
JAMES POWERS
|
|
Wood Frame
|
3/24/2025
|
Approved
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
3/26/2025
|
Partial Approval
|
JAMES POWERS
|
|
Pre-Inspection
|
3/26/2025
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Final
|
3/28/2025
|
OK for TCO
|
JAMES POWERS
|
|
Special/Order Compliance
|
1/13/2026
|
Partial Approval
|
JAMES POWERS
|