Footing/Foundation/Slab
|
8/16/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/23/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
9/23/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
9/23/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/26/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
9/29/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
9/30/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
10/3/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
10/13/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
10/13/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
10/14/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
10/18/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
10/18/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
10/18/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
10/19/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
10/28/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
10/31/2022
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
11/2/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
11/2/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
11/3/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
1/27/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
1/27/2023
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
1/30/2023
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Excavation/Setback/Form/Re-Bar
|
1/30/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
1/30/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
2/1/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
2/7/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
2/7/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
2/8/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
2/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Masonry Wall/Backfill
|
4/10/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
4/12/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
4/14/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
4/18/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
4/18/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
4/18/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
4/18/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
4/26/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
5/1/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
5/2/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
5/2/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
5/3/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
5/18/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
5/19/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
5/19/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
5/25/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
5/26/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
5/30/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
6/1/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
6/2/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
6/2/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
6/6/2023
|
Corrections Issued
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
6/8/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
6/9/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
6/9/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
6/13/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Shotcrete
|
6/13/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
6/13/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
6/14/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
6/16/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
6/16/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
6/21/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
6/21/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
6/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
6/29/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
9/25/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
9/26/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/27/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
9/27/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
9/28/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
10/18/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
10/19/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
10/20/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
10/23/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
10/25/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
10/26/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
10/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
10/31/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
10/31/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
11/1/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
11/1/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
11/2/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
11/2/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
11/2/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
11/2/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
11/3/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
11/13/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
11/13/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
11/14/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
11/16/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
11/17/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
11/20/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
11/21/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
11/30/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
11/30/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
12/4/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
12/11/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
12/11/2023
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
12/12/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
12/15/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
12/18/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
12/19/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Masonry Wall/Backfill
|
12/19/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
12/26/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
12/29/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
1/2/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
1/5/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
1/5/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
1/8/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
1/8/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
1/9/2024
|
No Access for Inspection
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
1/16/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
1/16/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
1/19/2024
|
Partial Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
1/22/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
1/23/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
1/25/2024
|
Conditional Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
1/25/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
1/29/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
1/29/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
2/13/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/15/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
2/23/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
2/26/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
3/4/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
3/4/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
3/13/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Green Building Rough
|
3/21/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
3/21/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
3/21/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/22/2024
|
Approved
|
LARRY ARNICK
|
|
Deputy Wood Construction
|
4/2/2024
|
No Access for Inspection
|
LARRY ARNICK
|
|
Deputy Wood Construction
|
4/3/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
4/3/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
4/3/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
4/3/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/4/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
4/8/2024
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Verify Sprinkler Sign Off
|
4/8/2024
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Wood Frame
|
4/8/2024
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/11/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/11/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
4/11/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
4/11/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/19/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
4/19/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
4/19/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
4/19/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
4/29/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
4/29/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Masonry
|
5/22/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
5/24/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
7/1/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
7/1/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
7/1/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
7/1/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
7/3/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
7/9/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
7/12/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
7/15/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
7/15/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
7/18/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
7/19/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/22/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
7/25/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Wood Construction
|
7/25/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
7/25/2024
|
Partial Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
7/25/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
T-Bar Ceiling
|
7/25/2024
|
Partial Inspection
|
LARRY ARNICK
|
|
Deputy Wood Construction
|
7/30/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
7/30/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
7/30/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
8/7/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
8/7/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
8/7/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/9/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
8/9/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
8/9/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
8/16/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
8/16/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
8/16/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
8/21/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
8/21/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
8/21/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/23/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
8/23/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
8/23/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
8/27/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
8/27/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
8/27/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
8/28/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Insulation
|
8/28/2024
|
Corrections Issued
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
8/30/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Insulation
|
8/30/2024
|
Corrections Issued
|
LARRY ARNICK
|
|
Deputy Drilled-In Anchors
|
9/4/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
9/4/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
9/4/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
9/4/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
9/4/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
9/4/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Drilled-In Anchors
|
9/5/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
9/5/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
9/5/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
T-Bar Ceiling
|
9/5/2024
|
Corrections Issued
|
LARRY ARNICK
|
|
Deputy Drilled-In Anchors
|
9/10/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
9/10/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
9/10/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
9/10/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
9/10/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
9/10/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
9/20/2024
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Green Building Rough
|
9/20/2024
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Verify Sprinkler Sign Off
|
9/20/2024
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Wood Frame
|
9/20/2024
|
Partial Inspection
|
RONALD JIMENEZ
|
|
Insulation
|
9/24/2024
|
Partial Approval
|
RONALD JIMENEZ
|
|
Green Building Rough
|
9/25/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
9/25/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
9/25/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
9/27/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
10/18/2024
|
Corrections Issued
|
LARRY ARNICK
|
|
Insulation
|
10/30/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
10/31/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
11/4/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
11/4/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
11/4/2024
|
Corrections Issued
|
LARRY ARNICK
|
|
Insulation
|
11/13/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
11/14/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
11/27/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
12/4/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
12/4/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
12/4/2024
|
Corrections Issued
|
LARRY ARNICK
|
|
Drywall Nailing
|
12/5/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
12/5/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Wood Frame
|
12/9/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
12/12/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
12/12/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
12/13/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
12/19/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
12/19/2024
|
Approved
|
LARRY ARNICK
|
|
Drywall Nailing
|
1/7/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
1/7/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
1/29/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
3/5/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Wood Frame
|
3/5/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
3/11/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
5/15/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
5/15/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
5/15/2025
|
Approved
|
LARRY ARNICK
|
|
Green Building Final
|
5/15/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
5/15/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
5/15/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
SGSOV-Seismic Gas S/O Valve
|
5/15/2025
|
SGSOV Not Ready
|
LARRY ARNICK
|
|
Smoke Detectors
|
5/15/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
5/15/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
5/15/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/22/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
5/22/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
5/29/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
7/7/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
7/7/2025
|
Partial Inspection
|
LARRY ARNICK
|
|
Special/Order Compliance
|
7/15/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
7/31/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
7/31/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Final
|
7/31/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
7/31/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
7/31/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
SGSOV-Seismic Gas S/O Valve
|
7/31/2025
|
SGSOV Not Ready
|
LARRY ARNICK
|
|
Smoke Detectors
|
7/31/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
7/31/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
7/31/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
T-Bar Ceiling
|
8/19/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
8/23/2025
|
Pending Review
|
|
|
Final
|
8/23/2025
|
Pending Review
|
|
|
Green Building Final
|
8/23/2025
|
Pending Review
|
|
|
Reinforced Concrete Frame
|
8/23/2025
|
Pending Review
|
|
|
Reinforced Masonry Frame
|
8/23/2025
|
Pending Review
|
|
|
SGSOV-Seismic Gas S/O Valve
|
8/23/2025
|
Pending Review
|
|
|
Smoke Detectors
|
8/23/2025
|
Pending Review
|
|
|
Verify Sprinkler Sign Off
|
8/23/2025
|
Pending Review
|
|
|
Drywall Nailing
|
9/10/2025
|
Approved
|
LARRY ARNICK
|
|
Final
|
9/10/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Final
|
9/10/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
9/10/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
9/10/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
SGSOV-Seismic Gas S/O Valve
|
9/10/2025
|
SGSOV Not Ready
|
LARRY ARNICK
|
|
Smoke Detectors
|
9/10/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
9/10/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
9/10/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
10/9/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Final
|
10/9/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
10/9/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
10/9/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
SGSOV-Seismic Gas S/O Valve
|
10/9/2025
|
SGSOV Not Ready
|
LARRY ARNICK
|
|
Smoke Detectors
|
10/9/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
10/9/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Pre-Inspection
|
10/14/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Final
|
10/15/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Final
|
10/15/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
10/15/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
10/15/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
SGSOV-Seismic Gas S/O Valve
|
10/15/2025
|
SGSOV Not Ready
|
LARRY ARNICK
|
|
Smoke Detectors
|
10/15/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
10/15/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
10/21/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Final
|
10/21/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
10/21/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Masonry Frame
|
10/21/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
SGSOV-Seismic Gas S/O Valve
|
10/21/2025
|
SGSOV Not Ready
|
JEFFREY FULTON
|
|
Smoke Detectors
|
10/21/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
10/21/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Final
|
10/27/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Final
|
10/27/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
10/27/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
10/27/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
SGSOV-Seismic Gas S/O Valve
|
10/27/2025
|
SGSOV Not Ready
|
LARRY ARNICK
|
|
Smoke Detectors
|
10/27/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
10/27/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
10/29/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Final
|
10/29/2025
|
Approved
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
10/29/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
10/29/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
SGSOV-Seismic Gas S/O Valve
|
10/29/2025
|
SGSOV Approved
|
LARRY ARNICK
|
|
Smoke Detectors
|
10/29/2025
|
Approved
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
10/29/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
10/31/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
10/31/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
10/31/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
10/31/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
11/4/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
11/4/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
11/4/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
11/4/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
11/5/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
11/5/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
11/5/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
11/5/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
11/7/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
11/7/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
11/7/2025
|
Not Ready for Inspection
|
SCOTT SOBEL
|
|
Verify Sprinkler Sign Off
|
11/7/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
11/12/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
11/12/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Masonry Frame
|
11/12/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
11/12/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Final
|
11/18/2025
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Reinforced Concrete Frame
|
11/18/2025
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Reinforced Masonry Frame
|
11/18/2025
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Verify Sprinkler Sign Off
|
11/18/2025
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
11/19/2025
|
Partial Inspection
|
LARRY ARNICK
|
|
Final
|
11/21/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
11/21/2025
|
Approved
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
11/21/2025
|
Approved
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
11/21/2025
|
Approved
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
11/21/2025
|
Approved
|
LARRY ARNICK
|
|
Pre-Inspection
|
11/24/2025
|
No Access for Inspection
|
JEFFREY FULTON
|
|
T-Bar Ceiling
|
11/25/2025
|
Approved
|
LARRY ARNICK
|
|
Final
|
12/4/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
T-Bar Ceiling
|
12/5/2025
|
Approved
|
LARRY ARNICK
|
|
Final
|
12/8/2025
|
Partial Inspection
|
LARRY ARNICK
|
|
Final
|
12/12/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
1/5/2026
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
1/5/2026
|
Approved
|
LARRY ARNICK
|
|
Wood Frame
|
2/2/2026
|
No Access for Inspection
|
LARRY ARNICK
|
|
Final
|
3/4/2026
|
Partial Inspection
|
RONALD JIMENEZ
|
|
Wood Frame
|
3/4/2026
|
Approved
|
RONALD JIMENEZ
|
|
Final
|
4/20/2026
|
Partial Approval
|
RONALD JIMENEZ
|
|
Special/Order Compliance
|
5/19/2026
|
Approved
|
RONALD JIMENEZ
|