4035 N EAGLE ROCK BLVD 90065

Certificate Information: 4035 N EAGLE ROCK BLVD 90065

Application / Permit
19010-10000-05004
Plan Check / Job No.
B19LA23883
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 4-STORY SINGLE FAMILY DWELLING W/ATTACHED 2 CAR GARAGE PER SMALL LOT SUBDIVISION UNDER VTT-82132-SL (lot# 5).
Permit Issued
Issued on 12/12/2022
Issuing Office
Valley
Current Status
Issued on 12/12/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 11/8/2019 APPLICANT
Assigned to Plan Check Engineer 11/27/2019 GARO TELMI
Corrections Issued 12/6/2019 GARO TELMI
Quality Review Completed 12/9/2019 KEN GILL
Applicant returned to address corrections 1/30/2020 GARO TELMI
Applicant returned to address corrections 2/12/2020 GARO TELMI
Applicant returned to address corrections 3/12/2020 GARO TELMI
Applicant returned to address corrections 7/1/2020 GARO TELMI
Applicant returned to address corrections 9/22/2020 GARO TELMI
Green Plans Picked Up 10/2/2020 APPLICANT
Applicant returned to address corrections 10/21/2020 GARO TELMI
Plan Check Approved 1/27/2021 GARO TELMI
Building Plans Picked Up 2/8/2021 APPLICANT
Plan Check Approved 7/29/2021 GARO TELMI
Plan Check Approved 4/19/2022 GARO TELMI
Issued 12/12/2022 APPLICANT

Permit Application Clearance Information

Driveway location Cleared 1/16/2020 KEVIN ARUCAN
Hydrant and Access approval Cleared 1/16/2020 GILBERT URREA
Trees in Parkway Cleared 1/22/2020 ADRIAN SANCHEZ
Eng Process Fee Ord 176,300 Cleared 2/26/2020 ELENA LOPEZ
Address approval Cleared 4/7/2020 CELINA MORENO
Construction near power lines Cleared 5/11/2020 RIDWAN HARDY
ZA Case Cleared 7/1/2020 ANACANY HURTADO
Highway dedication Cleared 8/12/2020 CELINA MORENO
Low Impact Development Cleared 9/1/2020 ANDRES COVARRUBIAS
Permit Cleared 9/1/2020 CELINA MORENO
Roof/Waste drainage to street Cleared 9/1/2020 CELINA MORENO
"Q" conditions Cleared 9/25/2020 KENTON TRINH
Miscellaneous Cleared 9/29/2020 KENTON TRINH
Supp. Use District POD/CDO/TDO Cleared 9/29/2020 KENTON TRINH
Tract Map conditions Cleared 9/29/2020 KENTON TRINH
Green Code Cleared 10/2/2020 VIVIAN LAO
Work Adjacent to Public Way Cleared 10/7/2020 GARO TELMI
Drainage to Storm Drain Cleared 11/17/2020 SAM NAVID
Sewer availability Cleared 11/17/2020 PAMELA TENEZA
Miscellaneous Cleared 12/10/2020 LINDA MARGARET
Building over 3-story or 36-ft Cleared 1/26/2021 CALOSHA APPROVED
Grading Pre-Inspection Cleared 1/26/2021 ROBERT HUGHES

Contact Information

Architect Stone,, Tracy Anne; Lic. No.: C20219 2041 BLAKE AVENUE      LOS ANGELES, CA 90039
Contractor Joseph P Development Corporation; Lic. No.: 988764-B 4210 RIVERWALK PARKWAY #270      RIVERSIDE, CA 92505
Engineer Cefali,, David Allen; Lic. No.: S3658 4344 LAUREL CANYON BLVD_STE 3      STUDIO CITY, CA 91604
Engineer Minas,, Caro Jolfaie; Lic. No.: GE601 4742 SAN FERNANDO RD      GLENDALE, CA 91204
Engineer Sahebi,, Mo; Lic. No.: C33508 1330 OLYMPIC BL      SANTA MONICA, CA 90404
Engineer Uecke,, Steven Rex; Lic. No.: C80996 280 SHUMAN BLVD STE 270      NAPERVILLE, IL 60563
Geologist Minas,, Shant; Lic. No.: EG2607 566 RIVERDALE DRIVE      GLENDALE, CA 91204

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 12/14/2022 Approved ALIZAH MAYAGOITIA
ELECTRICAL-Rough 12/19/2022 Partial Approval ALIZAH MAYAGOITIA
Pre-Inspection 10/28/2024 Corrections Issued BRENDAN MORELLI
Special/Order Compliance 2/6/2025 Corrections Issued BRENDAN MORELLI
ELECTRICAL-Rough 4/2/2025 Not Ready for Inspection BRENDAN MORELLI
Excavation/Setback/Form/Re-Bar 4/2/2025 Not Ready for Inspection BRENDAN MORELLI
PLUMBING-Rough 4/2/2025 Not Ready for Inspection BRENDAN MORELLI
ELECTRICAL-Rough 4/4/2025 Partial Approval BRENDAN MORELLI
PLUMBING-Rough 4/4/2025 Partial Approval BRENDAN MORELLI
Footing/Foundation/Slab 4/28/2025 Partial Approval BRENDAN MORELLI
Footing/Foundation/Slab 5/5/2025 Conditional Approval BRENDAN MORELLI
Floor/Roof Diaphrgm/Shear Wall 5/20/2025 Partial Approval BRENDAN MORELLI
Drywall Nailing 5/27/2025 Not Ready for Inspection BRENDAN MORELLI
Drywall Nailing 5/29/2025 Partial Approval NICHOLAS LOPEZ
Special/Order Compliance 6/23/2025 Corrections Issued BRENDAN MORELLI
Floor/Roof Diaphrgm/Shear Wall 8/4/2025 Partial Approval NICHOLAS LOPEZ
Floor/Roof Diaphrgm/Shear Wall 8/7/2025 Partial Approval NICHOLAS LOPEZ
Drywall Nailing 8/13/2025 Partial Approval BRENDAN MORELLI
Floor/Roof Diaphrgm/Shear Wall 9/4/2025 Partial Approval BRENDAN MORELLI
Floor/Roof Diaphrgm/Shear Wall 9/15/2025 Partial Approval BRENDAN MORELLI
Floor/Roof Diaphrgm/Shear Wall 10/8/2025 Partial Approval BRENDAN MORELLI
Floor/Roof Diaphrgm/Shear Wall 10/15/2025 Partial Approval BRENDAN MORELLI
Drywall Nailing 10/17/2025 Partial Approval BRENDAN MORELLI
Floor/Roof Diaphrgm/Shear Wall 11/12/2025 Partial Approval BRENDAN MORELLI
PLUMBING-Rough 11/18/2025 Approved BRENDAN MORELLI
Special/Order Compliance 11/18/2025 Corrections Issued BRENDAN MORELLI
Floor/Roof Diaphrgm/Shear Wall 12/3/2025 Partial Approval NICHOLAS LOPEZ
ELECTRICAL-Rough 1/26/2026 Not Ready for Inspection NICHOLAS LOPEZ
ELECTRICAL-Rough 2/25/2026 Not Ready for Inspection NICHOLAS LOPEZ
Insulation 2/27/2026 Not Ready for Inspection NICHOLAS LOPEZ
Pre-Inspection 2/27/2026 Partial Inspection NICHOLAS LOPEZ
BUILDING-Rough-Frame 3/3/2026 Partial Approval NICHOLAS LOPEZ
ELECTRICAL-Rough 3/3/2026 Partial Approval NICHOLAS LOPEZ
Green Building Rough 3/3/2026 Not Ready for Inspection NICHOLAS LOPEZ
HVAC-Rough 3/3/2026 Partial Approval NICHOLAS LOPEZ
Insulation 3/3/2026 Partial Approval NICHOLAS LOPEZ
MERV13>=Rough 3/3/2026 Approved NICHOLAS LOPEZ
Verify Sprinkler Sign Off 3/3/2026 Not Ready for Inspection NICHOLAS LOPEZ
BUILDING-Rough-Frame 3/5/2026 Conditional Approval NICHOLAS LOPEZ
Floor/Roof Diaphrgm/Shear Wall 3/5/2026 Approved NICHOLAS LOPEZ
Green Building Rough 3/5/2026 Approved NICHOLAS LOPEZ
Verify Sprinkler Sign Off 3/5/2026 Not Ready for Inspection NICHOLAS LOPEZ
BUILDING-Rough-Frame 3/9/2026 Partial Approval NICHOLAS LOPEZ
Verify Sprinkler Sign Off 3/9/2026 Approved NICHOLAS LOPEZ
Insulation 3/10/2026 Not Ready for Inspection NICHOLAS LOPEZ
Insulation 3/12/2026 Partial Approval NICHOLAS LOPEZ
Interior/Exterior Lathing 3/16/2026 Partial Approval NICHOLAS LOPEZ
Drywall Nailing 4/16/2026 Partial Approval NICHOLAS LOPEZ
BUILDING-Rough-Frame 4/20/2026 Approved NICHOLAS LOPEZ
ELECTRICAL-Rough 4/20/2026 Approved NICHOLAS LOPEZ
Insulation 5/4/2026 Approved BRENDAN MORELLI
Drywall Nailing 5/6/2026 Approved BRENDAN MORELLI