2405 S HAUSER BLVD 90016

Certificate Information: 2405 S HAUSER BLVD 90016

Application / Permit
19010-10000-04872
Plan Check / Job No.
B19LA23354
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 235' X 97' 4-STORY (TOC) TYPE 3A 30-UNIT APARTMENT OVER 1 LEVEL OF TYPE 1 SUBTERRANEAN PARKING GARAGE WITH 3 UNITS SET ASIDE FOR EXTREMELY LOW INCOME. NFPA 13 SPRINKLERS THROUGHOUT
Permit Issued
Issued on 1/19/2021
Issuing Office
Metro
Current Status
CofO Issued on 10/20/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/5/2019 APPLICANT
Assigned to Plan Check Engineer 11/9/2019 MICHAEL PEREZ
Corrections Issued 11/20/2019 MICHAEL PEREZ
Quality Review Completed 12/11/2019 QUAN NGHIEM
Applicant returned to address corrections 6/5/2020 MICHAEL PEREZ
Plan Check Approved 1/7/2021 MICHAEL PEREZ
Issued 1/19/2021 APPLICANT
Building Plans Picked Up 1/19/2021 APPLICANT
TCO Issued (Expire Date: 10-31-2023) 5/4/2023 TED RIES
CofO in Progress 10/20/2023 EDWIN GREGORYONA
CofO Issued 10/20/2023 ERNESTO CORRAL
Permit Finaled 10/20/2023 ERNESTO CORRAL

Permit Application Clearance Information

CPC Cleared 3/31/2020 DENZEL HENDERSON
Miscellaneous Cleared 3/31/2020 DENZEL HENDERSON
Miscellaneous Cleared 3/31/2020 DENZEL HENDERSON
Prkng lot landscape/Water mgmt Cleared 3/31/2020 DENZEL HENDERSON
CPC Cleared 4/9/2020 DENZEL HENDERSON
Internal circulation Cleared 4/9/2020 TAIMOUR TANAVOLI
Eng Process Fee Ord 176,300 Cleared 4/16/2020 CECILIO NAVARRO
Address approval Cleared 4/17/2020 CECILIO NAVARRO
Hydrant and Access approval Cleared 4/24/2020 GEORGE SUCHAND
Opn space landscape/Water mgmt Cleared 5/6/2020 DENZEL HENDERSON
Building over 3-story or 36-ft Cleared 6/12/2020 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 6/12/2020 CALOSHA APPROVED
Trees in Parkway Cleared 6/25/2020 JOHN KIM
Highway dedication Cleared 7/1/2020 CELINA MORENO
Construction near power lines Cleared 7/9/2020 RIDWAN HARDY
Construction within easement Cleared 7/9/2020 RIDWAN HARDY
Encroachment in public way Cleared 7/22/2020 ELAINE LEI
Bicycle Parking Cleared 7/31/2020 ELAINE LEI
Permit Cleared 8/11/2020 CELINA MORENO
Sewer availability Cleared 8/21/2020 CECILIO NAVARRO
Work Adjacent to Public Way Cleared 8/25/2020 ROSA SILVA
Low Impact Development Cleared 9/4/2020 JORGE MEJIA LEMUS
Roof/Waste drainage to street Cleared 9/4/2020 CELINA MORENO
Density Bonus 12.22.A.31 Cleared 9/15/2020 LOUIE MILLER
DAS Clearance Cleared 10/21/2020 MICHAEL PEREZ
Green Code Cleared 11/5/2020 MICHAEL PEREZ
Fire Marshall Fire Life Safety Cleared 12/1/2020 ANDREW KO

Contact Information

Architect Blatter,, Jay Irwin; Lic. No.: C22984 622 ROLLING BROOK LANE      SANTA BARBARA, CA 93110
Contractor Westside Contractors Inc; Lic. No.: 971757-B 10474 SANTA MONICA BLVD STE402      LOS ANGELES, CA 90025
Engineer Dermendjian,, Raffi Hrag; Lic. No.: C88261 9325 SHOSHONE AVENUE      NORTHRIDGE, CA 91325
Engineer Nelson,, William Mc Kee; Lic. No.: S3417 5 DELLWOOD      DOVE CANYON, CA 92679
Engineer Smith,, Chris Wayne; Lic. No.: S6106 1852 CORINTH AVE #11      LOS ANGELES, CA 90025
Engineer Walter,, Scott John; Lic. No.: GE2476 14428 HAMLIN ST STE 200      VAN NUYS, CA 91401

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 1/20/2021 Partial Approval LARRY ARNICK
Piling/Pier/Caisson 1/26/2021 Partial Inspection LARRY ARNICK
Deputy Reinf. Concrete 1/27/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/28/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/29/2021 Conditional Approval LARRY ARNICK
Deputy Other (see comments) 2/2/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/3/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/4/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Grading 2/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Grading 3/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Grading 3/2/2021 Partial Approval EDWIN GREGORYONA
Deputy Grading 3/9/2021 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 3/25/2021 Not Ready for Inspection EDWIN GREGORYONA
Grading Pre-Inspection 3/25/2021 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 4/9/2021 Partial Approval EDWIN GREGORYONA
Special/Order Compliance 4/9/2021 Approved EDWIN GREGORYONA
Deputy Other (see comments) 4/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 4/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/23/2021 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 4/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 4/27/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/27/2021 Partial Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 4/27/2021 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/27/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Shotcrete 4/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 4/29/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/29/2021 Partial Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 4/29/2021 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/29/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Shotcrete 4/30/2021 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 4/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 5/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 5/7/2021 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 5/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 5/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/25/2021 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 5/25/2021 Partial Approval NICK DANERI
Deputy Reinf. Concrete 5/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 8/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/12/2021 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 8/12/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 8/13/2021 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 8/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Other (see comments) 8/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/18/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 9/21/2021 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 9/21/2021 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 9/21/2021 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 9/30/2021 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 9/30/2021 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 9/30/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 10/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 10/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Other (see comments) 10/7/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 10/12/2021 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 10/12/2021 Partial Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 10/12/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 10/13/2021 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 10/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 10/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/20/2021 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 10/25/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 10/27/2021 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 10/27/2021 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 10/27/2021 Not Ready for Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 10/28/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 11/16/2021 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 11/16/2021 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 11/16/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Wood Construction 11/29/2021 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 11/29/2021 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 12/1/2021 Partial Approval JAMES POWERS
Deputy Wood Construction 12/2/2021 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 12/6/2021 Partial Approval NICK DANERI
Deputy Wood Construction 12/7/2021 Partial Approval EDWIN GREGORYONA
Pre-Inspection 12/15/2021 Approved EDWIN GREGORYONA
Deputy Wood Construction 1/5/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 1/7/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 1/7/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 1/26/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 1/28/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 1/28/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 1/31/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 2/9/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/9/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 2/17/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/17/2022 Partial Inspection EDWIN GREGORYONA
Deputy Wood Construction 2/23/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/24/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/3/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 3/8/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/9/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Wood Construction 3/15/2022 Partial Approval EDWIN GREGORYONA
Insulation 3/15/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 3/17/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/17/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/21/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 3/23/2022 Partial Approval EDWIN GREGORYONA
Wood Frame 3/23/2022 Not Ready for Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/25/2022 Partial Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/4/2022 Partial Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/7/2022 Partial Inspection EDWIN GREGORYONA
Deputy Wood Construction 4/20/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/20/2022 Partial Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/26/2022 Partial Approval RUSSELL BONVOULOIR
Deputy Wood Construction 4/27/2022 Conditional Approval RUSSELL BONVOULOIR
Floor/Roof Diaphrgm/Shear Wall 4/29/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 5/2/2022 Partial Approval EDWIN GREGORYONA
Pre-Inspection 5/2/2022 Approved EDWIN GREGORYONA
Deputy Wood Construction 5/4/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/4/2022 Not Ready for Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 5/4/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 5/5/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Wood Construction 5/6/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 5/6/2022 Partial Approval EDWIN GREGORYONA
Wood Frame 5/9/2022 Partial Inspection EDWIN GREGORYONA
Drywall Nailing 5/17/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 5/20/2022 Conditional Approval ERNESTO CORRAL
Drywall Nailing 5/23/2022 Not Ready for Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 5/23/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Wood Construction 5/24/2022 Conditional Approval ERNESTO CORRAL
Drywall Nailing 5/25/2022 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 5/26/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 6/3/2022 Conditional Approval ERNESTO CORRAL
Drywall Nailing 6/3/2022 Partial Approval RAFAEL ESPINOZA
Insulation 6/3/2022 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 6/7/2022 Partial Inspection EDWIN GREGORYONA
Deputy Wood Construction 6/13/2022 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 6/14/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 6/23/2022 Conditional Approval ERNESTO CORRAL
Interior/Exterior Lathing 6/23/2022 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 6/28/2022 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 6/30/2022 Partial Inspection RUSSELL BONVOULOIR
Floor/Roof Diaphrgm/Shear Wall 7/6/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Wood Construction 7/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 7/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 7/12/2022 Conditional Approval ERNESTO CORRAL
Pre-Inspection 7/12/2022 Partial Approval EDWIN GREGORYONA
Pre-Inspection 7/14/2022 Conditional Approval RUSSELL BONVOULOIR
Pre-Inspection 7/15/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 7/27/2022 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 8/2/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 8/8/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 8/25/2022 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 8/25/2022 Partial Inspection EDWIN GREGORYONA
Deputy Wood Construction 9/1/2022 Conditional Approval WINSTON DUNNING
Pre-Inspection 9/6/2022 Partial Approval EDWIN GREGORYONA
Pre-Inspection 9/21/2022 Approved EDWIN GREGORYONA
Pre-Inspection 10/12/2022 Approved EDWIN GREGORYONA
Drywall Nailing 10/19/2022 Not Ready for Inspection EDWIN GREGORYONA
Light Gage Steel Frame 11/29/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 12/9/2022 Partial Approval EDWIN GREGORYONA
Pre-Inspection 2/10/2023 Approved EDWIN GREGORYONA
Footing/Foundation/Slab 2/22/2023 Partial Approval EDWIN GREGORYONA
Pre-Inspection 4/6/2023 Approved EDWIN GREGORYONA
Pre-Inspection 4/17/2023 Approved EDWIN GREGORYONA
Final 4/26/2023 Conditional Approval ALFREDO LOPEZ
Footing/Foundation/Slab 4/26/2023 Approved ALFREDO LOPEZ
Green Building Final 4/26/2023 Approved ALFREDO LOPEZ
Green Building Rough 4/26/2023 Approved ALFREDO LOPEZ
Reinforced Concrete Frame 4/26/2023 Approved ALFREDO LOPEZ
Reinforced Masonry Frame 4/26/2023 Approved ALFREDO LOPEZ
SGSOV-Seismic Gas S/O Valve 4/26/2023 SGSOV Approved ALFREDO LOPEZ
Smoke Detectors 4/26/2023 Approved ALFREDO LOPEZ
Verify Sprinkler Sign Off 4/26/2023 Approved ALFREDO LOPEZ
Final 5/1/2023 OK for TCO LARRY ARNICK
Pre-Inspection 5/1/2023 Conditional Approval LARRY ARNICK
Final 5/3/2023 OK for TCO EDWIN GREGORYONA
Final 9/27/2023 Partial Inspection EDWIN GREGORYONA
Special/Order Compliance 10/3/2023 Approved EDWIN GREGORYONA