Deputy Reinf. Concrete
|
11/25/2020
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
11/25/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
11/25/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Subgrade
|
11/25/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/30/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/7/2020
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
12/7/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
12/7/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Subgrade
|
12/7/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/8/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/9/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/10/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/11/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
12/11/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
12/11/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
12/11/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
12/14/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/15/2020
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
12/15/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
12/15/2020
|
Approved
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
12/15/2020
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
12/15/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Shotcrete
|
12/16/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/17/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
12/17/2020
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
12/17/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
12/17/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Subgrade
|
12/17/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/18/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
12/18/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/21/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/22/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
12/22/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
12/22/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
12/22/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/23/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/28/2020
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
12/28/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
12/28/2020
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
12/28/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Shotcrete
|
12/29/2020
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
1/8/2021
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
1/8/2021
|
Approved
|
JAMES POWERS
|
|
METHANE-Subgrade
|
1/8/2021
|
Approved
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/11/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
1/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
1/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
1/14/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
1/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
1/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
1/15/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
1/20/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
1/20/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
1/20/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/22/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/25/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
1/25/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
1/25/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
1/25/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
1/25/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
1/26/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/27/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
2/2/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
2/2/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
2/3/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/4/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
2/4/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
2/4/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
2/4/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
2/4/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Shotcrete
|
2/5/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
2/12/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
2/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
2/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
2/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
2/23/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
2/23/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
2/24/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/2/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/3/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/3/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
3/4/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/4/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
3/4/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/5/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/8/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/8/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/9/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/10/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/10/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/11/2021
|
Order to Comply Issued
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/11/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/11/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/12/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/12/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/15/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
3/16/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
3/16/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
3/16/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
3/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/18/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
3/18/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
3/19/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/22/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/22/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/23/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
3/23/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
3/23/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
3/23/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
3/23/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
3/23/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/24/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
3/24/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/24/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/25/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/26/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
3/26/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
3/26/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
3/26/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/30/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/6/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/7/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/12/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/19/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/20/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
4/20/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
4/20/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
4/20/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
4/20/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/12/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/1/2021
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/18/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
6/21/2021
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
7/19/2021
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/30/2021
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/4/2021
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
8/20/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
8/24/2021
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
8/24/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/15/2021
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
9/20/2021
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
9/27/2021
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/27/2021
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
10/8/2021
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
10/25/2021
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
11/4/2021
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
11/5/2021
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
12/6/2021
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
12/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
12/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
1/12/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
1/12/2022
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
1/14/2022
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
1/19/2022
|
Approved
|
JAMES POWERS
|
|
Drywall Nailing
|
1/31/2022
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
1/31/2022
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
2/15/2022
|
Partial Approval
|
JAMES POWERS
|
|
Pre-Inspection
|
4/29/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Rec and Parks Fee Memo
|
4/29/2022
|
Partial Approval
|
JAMES POWERS
|
|
Final
|
6/17/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
6/24/2022
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
6/29/2022
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
7/22/2022
|
Approved
|
JAMES POWERS
|
|
Green Building Final
|
7/22/2022
|
Approved
|
JAMES POWERS
|
|
Green Building Rough
|
7/22/2022
|
Approved
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
7/22/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
7/22/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
SGSOV-Seismic Gas S/O Valve
|
7/22/2022
|
SGSOV Approved
|
JAMES POWERS
|
|
Smoke Detectors
|
7/22/2022
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
7/22/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Final
|
7/25/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Special/Order Compliance
|
12/28/2022
|
Approved
|
JAMES POWERS
|
|
Final
|
3/31/2023
|
OK to Issue CofO
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/31/2023
|
Approved
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
3/31/2023
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
3/31/2023
|
Approved
|
JAMES POWERS
|