3564 S MCCLINTOCK AVE 90089

Certificate Information: 3564 S MCCLINTOCK AVE 90089

Application / Permit
19010-10000-04385
Plan Check / Job No.
B19LA20947
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(13) Office
Work Description
FOR NEW 3-STORY ADMINISTRATION BUILDING
Permit Issued
Issued on 4/24/2020
Issuing Office
Metro
Current Status
CofO Issued on 9/21/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/2/2019 APPLICANT
Assigned to Plan Check Engineer 10/10/2019 VU NGUYEN
Disabled Access Plans Picked Up 10/16/2019 APPLICANT
Corrections Issued 10/22/2019 VU NGUYEN
Green Plans Picked Up 10/22/2019 APPLICANT
Quality Review Completed 11/5/2019 JOSE RODRIGUEZ
Building Plans Picked Up 11/6/2019 APPLICANT
Applicant returned to address corrections 1/15/2020 VU NGUYEN
Applicant returned to address corrections 4/2/2020 VU NGUYEN
Plan Check Approved 4/7/2020 VU NGUYEN
Issued 4/24/2020 LADBS
CofO in Progress 9/21/2021 JAMES POWERS
CofO Issued 9/21/2021 ERNESTO CORRAL
Permit Finaled 9/21/2021 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 11/4/2019 EMIL KYUPELYAN
Eng Process Fee Ord 176,300 Cleared 11/4/2019 EMIL KYUPELYAN
Miscellaneous Cleared 11/19/2019 RICHARD REASER
Miscellaneous Cleared 11/19/2019 RICHARD REASER
Miscellaneous Cleared 11/19/2019 RICHARD REASER
Miscellaneous Cleared 11/19/2019 RICHARD REASER
Miscellaneous Cleared 11/19/2019 RICHARD REASER
Miscellaneous Cleared 11/19/2019 RICHARD REASER
Miscellaneous Cleared 11/19/2019 RICHARD REASER
ZA Case Cleared 11/19/2019 RICHARD REASER
ZI Cleared 11/19/2019 LAMBERT GIESSINGER
Community Plan Implem. Overlay Cleared 11/21/2019 HELEN JADALI
Sewer availability Cleared 12/19/2019 JEANIE LAM
CPC Cleared 1/22/2020 KYLE WINSTON
Specific Plan Cleared 1/22/2020 KYLE WINSTON
Specific Plan Cleared 1/22/2020 KYLE WINSTON
Specific Plan Cleared 1/22/2020 KYLE WINSTON
DAS Clearance Cleared 1/23/2020 VU NGUYEN
Hydrant and Access approval Cleared 2/4/2020 ROBERT DUFF
Low Impact Development Cleared 3/13/2020 MARTIN FRAGOSO
Green Code Cleared 3/16/2020 VIVIAN LAO
Roof/Waste drainage to street Cleared 3/17/2020 EMIL KYUPELYAN
Building over 3-story or 36-ft Cleared 4/2/2020 CALOSHA APPROVED

Contact Information

Contractor Del Amo Construction Inc; Lic. No.: 744458-B 23840 MADISON STREET      TORRANCE, CA 90505

Inspector Information

ALFREDO LOPEZ, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI
JAMES POWERS, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 6/4/2020 Not Ready for Inspection JAMES POWERS
METHANE-Barrier 6/4/2020 Partial Approval JAMES POWERS
METHANE-Subgrade 6/4/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/5/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/8/2020 Partial Approval JAMES POWERS
Footing/Foundation/Slab 6/8/2020 Partial Approval JAMES POWERS
METHANE-Barrier 6/8/2020 Partial Approval JAMES POWERS
METHANE-Subgrade 6/8/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/9/2020 Partial Approval JAMES POWERS
Footing/Foundation/Slab 6/11/2020 Partial Approval JAMES POWERS
METHANE-Barrier 6/11/2020 Not Ready for Inspection JAMES POWERS
METHANE-Subgrade 6/11/2020 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 6/25/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/25/2020 Partial Approval JAMES POWERS
Green Building Rough 6/25/2020 Not Ready for Inspection JAMES POWERS
METHANE-Rough 6/25/2020 Not Ready for Inspection JAMES POWERS
Reinforced Masonry Frame 6/25/2020 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 6/25/2020 Not Ready for Inspection JAMES POWERS
METHANE-Barrier 7/2/2020 Partial Approval JAMES POWERS
Footing/Foundation/Slab 7/13/2020 Not Ready for Inspection JAMES POWERS
METHANE-Barrier 7/13/2020 Not Ready for Inspection JAMES POWERS
METHANE-Subgrade 7/13/2020 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 7/22/2020 Partial Approval JAMES POWERS
METHANE-Barrier 7/22/2020 Not Ready for Inspection JAMES POWERS
METHANE-Subgrade 7/22/2020 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 7/23/2020 Partial Approval JAMES POWERS
METHANE-Barrier 7/23/2020 Not Ready for Inspection JAMES POWERS
METHANE-Subgrade 7/23/2020 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 7/29/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/30/2020 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/30/2020 Partial Approval JAMES POWERS
Green Building Rough 7/31/2020 Approved JAMES POWERS
METHANE-Rough 7/31/2020 Not Ready for Inspection JAMES POWERS
Reinforced Masonry Frame 7/31/2020 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 7/31/2020 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Masonry 8/4/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/5/2020 Partial Approval JAMES POWERS
METHANE-Rough 8/5/2020 Not Ready for Inspection JAMES POWERS
Reinforced Masonry Frame 8/5/2020 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 8/5/2020 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 8/6/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/6/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/7/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/10/2020 Partial Approval JAMES POWERS
Masonry Wall/Backfill 8/11/2020 Partial Approval JAMES POWERS
METHANE-Rough 8/12/2020 Not Ready for Inspection JAMES POWERS
Reinforced Masonry Frame 8/12/2020 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 8/12/2020 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 8/17/2020 Partial Approval JAMES POWERS
METHANE-Rough 8/19/2020 Not Ready for Inspection JAMES POWERS
Reinforced Masonry Frame 8/19/2020 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 8/19/2020 Not Ready for Inspection JAMES POWERS
METHANE-Barrier 8/20/2020 Not Ready for Inspection JAMES POWERS
METHANE-Subgrade 8/20/2020 Not Ready for Inspection JAMES POWERS
Reinforced Masonry Frame 8/20/2020 Partial Approval JAMES POWERS
METHANE-Rough 8/25/2020 Not Ready for Inspection JAMES POWERS
Reinforced Masonry Frame 8/25/2020 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 8/25/2020 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Masonry 8/28/2020 Partial Approval JAMES POWERS
METHANE-Rough 8/28/2020 Not Ready for Inspection JAMES POWERS
Reinforced Masonry Frame 8/28/2020 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 8/28/2020 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Masonry 8/31/2020 Partial Approval JAMES POWERS
METHANE-Rough 9/4/2020 Partial Approval JAMES POWERS
Reinforced Masonry Frame 9/4/2020 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 9/4/2020 Partial Approval JAMES POWERS
Reinforced Masonry Frame 9/8/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/11/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/16/2020 Partial Approval JAMES POWERS
METHANE-Rough 9/16/2020 Not Ready for Inspection JAMES POWERS
Reinforced Masonry Frame 9/16/2020 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 9/16/2020 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Masonry 9/17/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/21/2020 Partial Approval JAMES POWERS
METHANE-Rough 9/21/2020 Not Ready for Inspection JAMES POWERS
Reinforced Masonry Frame 9/21/2020 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 9/21/2020 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Masonry 9/22/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/29/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/30/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/1/2020 Partial Approval JAMES POWERS
Structural Steel Frame 10/1/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/2/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/5/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/6/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/7/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/8/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/9/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/13/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/14/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/14/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/19/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/20/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/21/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/22/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/23/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/26/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/27/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/28/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/29/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/30/2020 Partial Approval JAMES POWERS
Light Gage Steel Frame 10/30/2020 Not Ready for Inspection JAMES POWERS
Structural Steel Frame 10/30/2020 Not Ready for Inspection JAMES POWERS
Deputy Steel/Welding 11/2/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/4/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/5/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/6/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/9/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/9/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/10/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/10/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/12/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 11/12/2020 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 11/13/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 11/13/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 11/16/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 11/17/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/17/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 11/18/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/18/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 11/19/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/19/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 11/20/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 11/23/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/2/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/3/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/4/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/8/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/9/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/10/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/11/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/14/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/14/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/15/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/15/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/16/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/18/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/22/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/23/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/24/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/30/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/31/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/4/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/5/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/6/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/7/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/7/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/8/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/8/2021 Partial Approval JAMES POWERS
Deputy Methane Barrier 1/14/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/14/2021 Partial Approval JAMES POWERS
Deputy Methane Barrier 1/15/2021 Partial Approval JAMES POWERS
Light Gage Steel Frame 1/21/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/25/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/25/2021 Partial Approval JAMES POWERS
Footing/Foundation/Slab 1/25/2021 Partial Approval JAMES POWERS
METHANE-Barrier 1/25/2021 Partial Approval JAMES POWERS
METHANE-Subgrade 1/25/2021 Approved JAMES POWERS
Deputy Drilled-In Anchors 1/26/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/26/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/27/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/27/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/28/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/28/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/29/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/29/2021 Partial Approval JAMES POWERS
Deputy Methane Barrier 2/5/2021 Partial Approval JAMES POWERS
Drywall Nailing 2/9/2021 Partial Approval JAMES POWERS
Light Gage Steel Frame 2/9/2021 Partial Approval JAMES POWERS
Wood Frame 2/9/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/10/2021 Partial Approval JAMES POWERS
Footing/Foundation/Slab 2/10/2021 Partial Approval JAMES POWERS
METHANE-Barrier 2/10/2021 Not Ready for Inspection JAMES POWERS
Drywall Nailing 2/17/2021 Partial Approval JAMES POWERS
Insulation 2/17/2021 Partial Approval JAMES POWERS
Drywall Nailing 2/22/2021 Partial Approval JAMES POWERS
Insulation 2/22/2021 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 2/23/2021 Partial Approval JAMES POWERS
Light Gage Steel Frame 3/2/2021 Partial Approval JAMES POWERS
Light Gage Steel Frame 3/18/2021 Not Ready for Inspection RAFAEL ESPINOZA
Light Gage Steel Frame 3/19/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/23/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/24/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/15/2021 Partial Approval JAMES POWERS
Special/Order Compliance 6/10/2021 Partial Approval JAMES POWERS
Final 6/11/2021 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 6/11/2021 Approved JAMES POWERS
Green Building Final 6/11/2021 Approved JAMES POWERS
METHANE-Barrier 6/11/2021 Approved JAMES POWERS
METHANE-Final 6/11/2021 Approved JAMES POWERS
METHANE-Rough 6/11/2021 Partial Approval JAMES POWERS
Reinforced Masonry Frame 6/11/2021 Partial Approval JAMES POWERS
SGSOV-Seismic Gas S/O Valve 6/11/2021 SGSOV No Gas JAMES POWERS
Smoke Detectors 6/11/2021 Approved JAMES POWERS
Verify Sprinkler Sign Off 6/11/2021 Not Ready for Inspection JAMES POWERS
Insulation 6/16/2021 Approved JAMES POWERS
Special/Order Compliance 7/7/2021 Approved JAMES POWERS
Final 9/20/2021 OK to Issue CofO JAMES POWERS
Reinforced Masonry Frame 9/20/2021 Approved JAMES POWERS
Verify Sprinkler Sign Off 9/20/2021 Approved JAMES POWERS