Footing/Foundation/Slab
|
6/4/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Barrier
|
6/4/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Subgrade
|
6/4/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/5/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/8/2020
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
6/8/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
6/8/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Subgrade
|
6/8/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/9/2020
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
6/11/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
6/11/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
6/11/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/25/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
6/25/2020
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
6/25/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
6/25/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
6/25/2020
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
6/25/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Barrier
|
7/2/2020
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
7/13/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Barrier
|
7/13/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
7/13/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
7/22/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
7/22/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
7/22/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
7/23/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
7/23/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
7/23/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/29/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/30/2020
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
7/30/2020
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
7/31/2020
|
Approved
|
JAMES POWERS
|
|
METHANE-Rough
|
7/31/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
7/31/2020
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
7/31/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/4/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/5/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Rough
|
8/5/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
8/5/2020
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/5/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/6/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/6/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/7/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/10/2020
|
Partial Approval
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
8/11/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Rough
|
8/12/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
8/12/2020
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/12/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/17/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Rough
|
8/19/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
8/19/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/19/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Barrier
|
8/20/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
8/20/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
8/20/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Rough
|
8/25/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
8/25/2020
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/25/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/28/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Rough
|
8/28/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
8/28/2020
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/28/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/31/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Rough
|
9/4/2020
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
9/4/2020
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/4/2020
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
9/8/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/11/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/16/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Rough
|
9/16/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
9/16/2020
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/16/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/17/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/21/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Rough
|
9/21/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
9/21/2020
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/21/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/22/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
9/29/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
9/30/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/1/2020
|
Partial Approval
|
JAMES POWERS
|
|
Structural Steel Frame
|
10/1/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/2/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/5/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/6/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/7/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/8/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/9/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/13/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/14/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/14/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/19/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/20/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/21/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/22/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/23/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/26/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/27/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/28/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/29/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/30/2020
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
10/30/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Structural Steel Frame
|
10/30/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/2/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/4/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/5/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/6/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
11/9/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/9/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
11/10/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/10/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
11/12/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
11/12/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
11/13/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
11/13/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
11/16/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
11/17/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
11/17/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
11/18/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
11/18/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
11/19/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
11/19/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
11/20/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
11/23/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/2/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/3/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/4/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/8/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/9/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/10/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/11/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
12/14/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/14/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
12/15/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/15/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/16/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/18/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/22/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/23/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/24/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/30/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/31/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/4/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/5/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/6/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
1/7/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/7/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
1/8/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/8/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Methane Barrier
|
1/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
1/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Methane Barrier
|
1/15/2021
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
1/21/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
1/25/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/25/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
1/25/2021
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
1/25/2021
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Subgrade
|
1/25/2021
|
Approved
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
1/26/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/26/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
1/27/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/27/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
1/28/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/28/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
1/29/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/29/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Methane Barrier
|
2/5/2021
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
2/9/2021
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
2/9/2021
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
2/9/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
2/10/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
2/10/2021
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
2/10/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
2/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
2/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
2/22/2021
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
2/22/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
2/23/2021
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
3/2/2021
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
3/18/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
3/19/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/23/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/24/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
4/15/2021
|
Partial Approval
|
JAMES POWERS
|
|
Special/Order Compliance
|
6/10/2021
|
Partial Approval
|
JAMES POWERS
|
|
Final
|
6/11/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
6/11/2021
|
Approved
|
JAMES POWERS
|
|
Green Building Final
|
6/11/2021
|
Approved
|
JAMES POWERS
|
|
METHANE-Barrier
|
6/11/2021
|
Approved
|
JAMES POWERS
|
|
METHANE-Final
|
6/11/2021
|
Approved
|
JAMES POWERS
|
|
METHANE-Rough
|
6/11/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
6/11/2021
|
Partial Approval
|
JAMES POWERS
|
|
SGSOV-Seismic Gas S/O Valve
|
6/11/2021
|
SGSOV No Gas
|
JAMES POWERS
|
|
Smoke Detectors
|
6/11/2021
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
6/11/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
6/16/2021
|
Approved
|
JAMES POWERS
|
|
Special/Order Compliance
|
7/7/2021
|
Approved
|
JAMES POWERS
|
|
Final
|
9/20/2021
|
OK to Issue CofO
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
9/20/2021
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/20/2021
|
Approved
|
JAMES POWERS
|