10759 W AYRES AVE 90064

Certificate Information: 10759 W AYRES AVE 90064

Application / Permit
19010-10000-04373
Plan Check / Job No.
B19LA20912
Group
Building
Type
Bldg-Addition
Sub-Type
Commercial
Primary Use
(8) Garage - Public
Work Description
(PHASE I): DEMO AND REBUILD THE WEST PORTION OF THE (E) PARKING STRUCTURE AT 10 FEET FROM THE EXISTING AND CONNECT TO BY 10' WIDE ROOF. THE NEW WEST PORTION IS PROPOSED TO BE 4 STORY WITH ONE LEVEL BASEMENT AND ROOF DECK PARKING. (PHASE II) RENOVATE EAST PORTION OF THE GARAGE INCLUDING; EXTERIOR PATCHING, RESTRIPING, AND EXTERIOR GUARD CABLES..
Permit Issued
Issued on 6/2/2020
Issuing Office
Metro
Current Status
CofO Issued on 6/1/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/2/2019 APPLICANT
Green Plans Picked Up 10/8/2019 APPLICANT
Assigned to Plan Check Engineer 10/10/2019 KESETE HAREGOT
Disabled Access Plans Picked Up 10/10/2019 APPLICANT
Corrections Issued 10/16/2019 KESETE HAREGOT
Quality Review Completed 11/5/2019 TIEN JEN WANG
Building Plans Picked Up 11/7/2019 APPLICANT
Applicant returned to address corrections 12/30/2019 KESETE HAREGOT
Applicant returned to address corrections 2/26/2020 KESETE HAREGOT
Applicant returned to address corrections 3/12/2020 KESETE HAREGOT
Plan Check Approved 6/1/2020 KESETE HAREGOT
Issued 6/2/2020 LADBS
TCO Issued (Expire Date: 08-24-2022) 2/25/2022 DAVID TSAU
CofO in Progress 5/24/2022 DERRICK SPENCER
Permit Finaled 6/1/2022 HENRY BAGHDASSARIAN
CofO Issued 6/1/2022 HENRY BAGHDASSARIAN
Permit Finaled 6/1/2022 HENRY BAGHDASSARIAN

Permit Application Clearance Information

Address approval Cleared 11/22/2019 THOMAS LANG
Frnt yard landscape/Water mgmt Cleared 11/22/2019 SOPHIE GABEL-SCHEINBAU
Highway dedication Cleared 11/22/2019 THOMAS LANG
Sewer availability Cleared 11/22/2019 THOMAS LANG
ZA Case Cleared 11/22/2019 SOPHIE GABEL-SCHEINBAU
ZI Cleared 11/22/2019 SOPHIE GABEL-SCHEINBAU
Green Code Cleared 12/10/2019 KHEDER ALRAZAA
Eng Process Fee Ord 176,300 Cleared 2/24/2020 CELINA MORENO
DAS Clearance Cleared 2/28/2020 SHINE LIN
Highway dedication Cleared 3/2/2020 RAYMOND MUGAMBWA
Permit Cleared 3/9/2020 CECILIO NAVARRO
Building over 3-story or 36-ft Cleared 3/12/2020 CALOSHA APPROVED
Hydrant and Access approval Cleared 3/25/2020 JOHN CONNEALLY
Low Impact Development Cleared 4/17/2020 ORVAL HERNANDEZ-MARCI
Roof/Waste drainage to street Cleared 4/22/2020 EMIL KYUPELYAN
Specific Plan Cleared 5/12/2020 PEDRO AYALA

Contact Information

Architect Pagan,, Eric Anthony; Lic. No.: C35033 330 N SCREENLAND DRIVE APT 104      BURBANK, CA 91505
Contractor Del Amo Construction Inc; Lic. No.: 744458-B 23840 MADISON STREET      TORRANCE, CA 90505
Engineer Bornand,, Christophe N; Lic. No.: C80596 3582 VETERAN AVE      LOS ANGELES, CA 90034
Engineer Waggoner,, Michael Alan; Lic. No.: S3738 10641 BENT TREE RD      SANTA ANA, CA 92705

Inspector Information

DERRICK SPENCER, (310) 914-3919 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/16/2020 Approved DERRICK SPENCER
Pre-Inspection 6/17/2020 Approved DERRICK SPENCER
Pre-Inspection 6/18/2020 Approved DERRICK SPENCER
Pre-Inspection 6/19/2020 Approved DERRICK SPENCER
Pre-Inspection 6/24/2020 Approved DERRICK SPENCER
Pre-Inspection 6/25/2020 Approved DERRICK SPENCER
Pre-Inspection 6/26/2020 Approved DERRICK SPENCER
Pre-Inspection 6/29/2020 Approved DERRICK SPENCER
Pre-Inspection 6/30/2020 Approved DERRICK SPENCER
Pre-Inspection 7/1/2020 Approved DERRICK SPENCER
Pre-Inspection 7/2/2020 Approved DERRICK SPENCER
Pre-Inspection 7/6/2020 Approved DERRICK SPENCER
Pre-Inspection 7/7/2020 Approved DERRICK SPENCER
Pre-Inspection 7/8/2020 Approved DERRICK SPENCER
Pre-Inspection 7/9/2020 Approved DERRICK SPENCER
Pre-Inspection 7/10/2020 Approved DERRICK SPENCER
Pre-Inspection 7/13/2020 Approved DERRICK SPENCER
Pre-Inspection 7/15/2020 Approved DERRICK SPENCER
Pre-Inspection 7/16/2020 Approved DERRICK SPENCER
Pre-Inspection 7/17/2020 Approved DERRICK SPENCER
Pre-Inspection 7/21/2020 Approved DERRICK SPENCER
Grading Pre-Inspection 7/22/2020 Approved DERRICK SPENCER
Piling/Pier/Caisson 7/22/2020 Approved DERRICK SPENCER
Pre-Inspection 7/22/2020 Approved DERRICK SPENCER
Pre-Inspection 7/23/2020 Approved DERRICK SPENCER
Grading Pre-Inspection 7/24/2020 Approved DERRICK SPENCER
Pre-Inspection 7/24/2020 Approved DERRICK SPENCER
Pre-Inspection 7/28/2020 Approved DERRICK SPENCER
Pre-Inspection 7/29/2020 Approved DERRICK SPENCER
Pre-Inspection 7/30/2020 Approved DERRICK SPENCER
Deputy Grading 8/21/2020 Approved DERRICK SPENCER
Deputy Grading 8/24/2020 Approved DERRICK SPENCER
Pre-Inspection 9/23/2020 Approved DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 10/7/2020 Not Ready for Inspection DERRICK SPENCER
Pre-Inspection 10/7/2020 Approved DERRICK SPENCER
Footing/Foundation/Slab 10/13/2020 Partial Approval DERRICK SPENCER
METHANE-Barrier 10/13/2020 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 10/13/2020 Not Ready for Inspection DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 10/14/2020 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 10/16/2020 Partial Approval DERRICK SPENCER
METHANE-Barrier 10/16/2020 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 10/16/2020 Not Ready for Inspection DERRICK SPENCER
Footing/Foundation/Slab 10/20/2020 Partial Approval DERRICK SPENCER
METHANE-Barrier 10/20/2020 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 10/20/2020 Not Ready for Inspection DERRICK SPENCER
Footing/Foundation/Slab 10/23/2020 Partial Approval DERRICK SPENCER
METHANE-Barrier 10/23/2020 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 10/23/2020 Not Ready for Inspection DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 10/26/2020 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 10/28/2020 Partial Approval DERRICK SPENCER
METHANE-Barrier 10/28/2020 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 10/28/2020 Not Ready for Inspection DERRICK SPENCER
Green Building Rough 10/29/2020 Not Ready for Inspection DERRICK SPENCER
METHANE-Rough 10/29/2020 Not Ready for Inspection DERRICK SPENCER
Reinforced Concrete Frame 10/29/2020 Partial Approval DERRICK SPENCER
Reinforced Masonry Frame 10/29/2020 Partial Approval DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 10/30/2020 Partial Approval DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 11/2/2020 Partial Approval DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 11/4/2020 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 11/5/2020 Partial Approval DERRICK SPENCER
METHANE-Barrier 11/5/2020 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 11/5/2020 Not Ready for Inspection DERRICK SPENCER
Green Building Rough 11/6/2020 Not Ready for Inspection DERRICK SPENCER
METHANE-Rough 11/6/2020 Not Ready for Inspection DERRICK SPENCER
Reinforced Concrete Frame 11/6/2020 Partial Approval DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 11/9/2020 Partial Approval DERRICK SPENCER
Masonry Wall/Backfill 11/9/2020 Partial Approval DERRICK SPENCER
Green Building Rough 11/13/2020 Not Ready for Inspection DERRICK SPENCER
METHANE-Rough 11/13/2020 Not Ready for Inspection DERRICK SPENCER
Reinforced Concrete Frame 11/13/2020 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 11/16/2020 Partial Approval DERRICK SPENCER
METHANE-Barrier 11/16/2020 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 11/16/2020 Not Ready for Inspection DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 11/17/2020 Partial Approval DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 11/18/2020 Partial Approval DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 11/19/2020 Partial Approval DERRICK SPENCER
Green Building Rough 11/19/2020 Order to Comply Issued DERRICK SPENCER
METHANE-Rough 11/19/2020 Not Ready for Inspection DERRICK SPENCER
Reinforced Concrete Frame 11/19/2020 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 11/20/2020 Partial Approval DERRICK SPENCER
METHANE-Barrier 11/20/2020 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 11/20/2020 Not Ready for Inspection DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 11/23/2020 Partial Approval DERRICK SPENCER
Green Building Rough 11/24/2020 Not Ready for Inspection DERRICK SPENCER
METHANE-Rough 11/24/2020 Not Ready for Inspection DERRICK SPENCER
Reinforced Concrete Frame 11/24/2020 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 11/25/2020 Partial Approval DERRICK SPENCER
METHANE-Barrier 11/25/2020 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 11/25/2020 Not Ready for Inspection DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 11/30/2020 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 12/2/2020 Partial Approval DERRICK SPENCER
METHANE-Barrier 12/2/2020 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 12/2/2020 Not Ready for Inspection DERRICK SPENCER
Green Building Rough 12/3/2020 Not Ready for Inspection DERRICK SPENCER
METHANE-Rough 12/3/2020 Not Ready for Inspection DERRICK SPENCER
Reinforced Concrete Frame 12/3/2020 Partial Approval DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 12/4/2020 Partial Inspection SORIN CIRSTOIU
Footing/Foundation/Slab 12/8/2020 Partial Approval DERRICK SPENCER
Green Building Rough 12/8/2020 Not Ready for Inspection DERRICK SPENCER
METHANE-Barrier 12/8/2020 Not Ready for Inspection DERRICK SPENCER
METHANE-Rough 12/8/2020 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 12/8/2020 Not Ready for Inspection DERRICK SPENCER
Reinforced Concrete Frame 12/8/2020 Partial Approval DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 12/9/2020 Partial Approval DERRICK SPENCER
Green Building Rough 12/11/2020 Not Ready for Inspection DERRICK SPENCER
METHANE-Rough 12/11/2020 Not Ready for Inspection DERRICK SPENCER
Reinforced Concrete Frame 12/11/2020 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 12/14/2020 Partial Approval DERRICK SPENCER
METHANE-Barrier 12/14/2020 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 12/14/2020 Not Ready for Inspection DERRICK SPENCER
Footing/Foundation/Slab 12/22/2020 Partial Approval DERRICK SPENCER
METHANE-Barrier 12/22/2020 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 12/22/2020 Not Ready for Inspection DERRICK SPENCER
Footing/Foundation/Slab 1/5/2021 Partial Approval DERRICK SPENCER
METHANE-Barrier 1/5/2021 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 1/5/2021 Not Ready for Inspection DERRICK SPENCER
Green Building Rough 1/6/2021 Approved DERRICK SPENCER
METHANE-Rough 1/6/2021 Not Ready for Inspection DERRICK SPENCER
Reinforced Concrete Frame 1/6/2021 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 1/11/2021 Partial Approval DERRICK SPENCER
METHANE-Barrier 1/11/2021 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 1/11/2021 Not Ready for Inspection DERRICK SPENCER
METHANE-Rough 1/13/2021 Not Ready for Inspection DERRICK SPENCER
Reinforced Concrete Frame 1/13/2021 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 1/20/2021 Partial Approval DERRICK SPENCER
METHANE-Barrier 1/20/2021 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 1/20/2021 Not Ready for Inspection DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 1/21/2021 Partial Approval DERRICK SPENCER
Deputy Reinf. Concrete 1/22/2021 Approved DERRICK SPENCER
METHANE-Rough 2/1/2021 Not Ready for Inspection DERRICK SPENCER
Reinforced Concrete Frame 2/1/2021 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 2/2/2021 Partial Approval DERRICK SPENCER
METHANE-Barrier 2/2/2021 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 2/2/2021 Not Ready for Inspection DERRICK SPENCER
METHANE-Rough 2/5/2021 Not Ready for Inspection DERRICK SPENCER
Reinforced Concrete Frame 2/5/2021 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 2/8/2021 Partial Approval DERRICK SPENCER
METHANE-Barrier 2/8/2021 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 2/8/2021 Not Ready for Inspection DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 2/9/2021 Partial Approval DERRICK SPENCER
METHANE-Rough 2/11/2021 Approved DERRICK SPENCER
Reinforced Concrete Frame 2/11/2021 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 2/12/2021 Partial Approval DERRICK SPENCER
METHANE-Barrier 2/12/2021 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 2/12/2021 Not Ready for Inspection DERRICK SPENCER
Reinforced Concrete Frame 2/17/2021 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 2/19/2021 Not Ready for Inspection DERRICK SPENCER
METHANE-Barrier 2/19/2021 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 2/19/2021 Not Ready for Inspection DERRICK SPENCER
Deputy Reinf. Concrete 2/23/2021 Approved DERRICK SPENCER
Reinforced Concrete Frame 2/24/2021 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 2/25/2021 Partial Approval JONATHAN ALLEN
METHANE-Barrier 2/25/2021 Approved JONATHAN ALLEN
METHANE-Subgrade 2/25/2021 Approved JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 2/26/2021 Partial Approval DERRICK SPENCER
Pre-Inspection 2/26/2021 Approved DERRICK SPENCER
Reinforced Concrete Frame 3/1/2021 Partial Approval DERRICK SPENCER
Reinforced Concrete Frame 3/4/2021 Partial Approval DERRICK SPENCER
Reinforced Concrete Frame 3/9/2021 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 3/11/2021 Partial Approval DERRICK SPENCER
Reinforced Concrete Frame 3/15/2021 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 3/17/2021 Partial Approval DERRICK SPENCER
Reinforced Concrete Frame 3/23/2021 Partial Approval DERRICK SPENCER
Reinforced Concrete Frame 3/30/2021 Partial Approval DERRICK SPENCER
Reinforced Concrete Frame 4/5/2021 Partial Approval JONATHAN ALLEN
Footing/Foundation/Slab 4/12/2021 Partial Approval DERRICK SPENCER
Reinforced Masonry Frame 4/12/2021 Partial Approval DERRICK SPENCER
Deputy Reinf. Concrete 4/13/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 4/14/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 4/15/2021 Approved DERRICK SPENCER
Reinforced Masonry Frame 4/15/2021 Partial Approval DERRICK SPENCER
Deputy Reinf. Masonry 4/16/2021 Approved DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 4/16/2021 Partial Approval DERRICK SPENCER
Deputy Pre-Stress Concrete 4/19/2021 Approved DERRICK SPENCER
Deputy Reinf. Concrete 4/19/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 4/19/2021 Approved DERRICK SPENCER
Deputy Pre-Stress Concrete 4/20/2021 Approved DERRICK SPENCER
Deputy Reinf. Concrete 4/20/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 4/20/2021 Approved DERRICK SPENCER
Deputy Pre-Stress Concrete 4/21/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 4/21/2021 Approved DERRICK SPENCER
Reinforced Concrete Frame 4/21/2021 Partial Approval DERRICK SPENCER
Deputy Pre-Stress Concrete 4/22/2021 Approved DERRICK SPENCER
Deputy Reinf. Concrete 4/22/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 4/22/2021 Approved DERRICK SPENCER
Deputy Pre-Stress Concrete 4/23/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 4/23/2021 Approved DERRICK SPENCER
Reinforced Masonry Frame 4/23/2021 Partial Approval DERRICK SPENCER
Deputy Pre-Stress Concrete 4/26/2021 Approved DERRICK SPENCER
Deputy Reinf. Concrete 4/26/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 4/26/2021 Approved DERRICK SPENCER
Deputy Pre-Stress Concrete 4/27/2021 Approved DERRICK SPENCER
Deputy Reinf. Concrete 4/27/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 4/27/2021 Approved DERRICK SPENCER
Deputy Pre-Stress Concrete 4/28/2021 Approved DERRICK SPENCER
Deputy Reinf. Concrete 4/28/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 4/28/2021 Approved DERRICK SPENCER
Reinforced Masonry Frame 4/28/2021 Partial Approval DERRICK SPENCER
Deputy Pre-Stress Concrete 4/29/2021 Approved DERRICK SPENCER
Deputy Reinf. Concrete 4/29/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 4/29/2021 Approved DERRICK SPENCER
Deputy Pre-Stress Concrete 4/30/2021 Approved DERRICK SPENCER
Deputy Reinf. Concrete 4/30/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 4/30/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 5/3/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 5/4/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 5/5/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 5/6/2021 Approved DERRICK SPENCER
Reinforced Masonry Frame 5/6/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 5/7/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 5/10/2021 Conditional Approval JOHN DODGE
Deputy Reinf. Masonry 5/11/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 5/12/2021 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Masonry 5/13/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 5/14/2021 Conditional Approval TED RIES
Reinforced Masonry Frame 5/14/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 5/17/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 5/18/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 5/19/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 5/20/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 5/21/2021 Approved DERRICK SPENCER
Reinforced Concrete Frame 5/21/2021 Partial Approval DERRICK SPENCER
Deputy Reinf. Masonry 5/24/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 5/25/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 5/26/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 5/27/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 5/28/2021 Approved DERRICK SPENCER
Deputy Fireproofing 6/7/2021 Approved DERRICK SPENCER
Deputy Fireproofing 6/8/2021 Approved DERRICK SPENCER
Deputy Fireproofing 6/9/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 6/24/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 6/25/2021 Approved DERRICK SPENCER
Reinforced Masonry Frame 6/25/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 6/28/2021 Approved DERRICK SPENCER
Footing/Foundation/Slab 8/19/2021 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 8/23/2021 Partial Approval DERRICK SPENCER
Deputy Reinf. Masonry 8/31/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 9/1/2021 Approved DERRICK SPENCER
Reinforced Masonry Frame 9/1/2021 Partial Approval DERRICK SPENCER
Interior/Exterior Lathing 9/22/2021 Approved DERRICK SPENCER
Light Gage Steel Frame 10/19/2021 Approved DERRICK SPENCER
Final 12/17/2021 Not Ready for Inspection DERRICK SPENCER
Footing/Foundation/Slab 12/17/2021 Approved DERRICK SPENCER
Green Building Final 12/17/2021 Approved DERRICK SPENCER
Reinforced Concrete Frame 12/17/2021 Approved DERRICK SPENCER
SGSOV-Seismic Gas S/O Valve 12/17/2021 SGSOV Approved DERRICK SPENCER
Smoke Detectors 12/17/2021 Approved DERRICK SPENCER
Final 2/10/2022 Not Ready for Inspection DERRICK SPENCER
Final 3/2/2022 Not Ready for Inspection DERRICK SPENCER
Final 5/13/2022 Partial Inspection PAUL DAVIDSON
Final 5/23/2022 OK to Issue CofO DERRICK SPENCER