200 N VERMONT AVE 1-490 90004

Certificate Information: 200 N VERMONT AVE 1-490 90004

Application / Permit
19010-10000-04128
Plan Check / Job No.
B19LA19740
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
(N) 6 STORY 490 UNITS. 5 STORY TYPE IIIA OVER 1 LEVEL TYPE IA MIXED USED PARKING & COMMERCIAL OVER 2 LEVELS TYPE 1A SUBTERRANEAN PARKING THIS PROJECT IS A TOC PROJECT TIER 4
Permit Issued
Issued on 5/10/2021
Issuing Office
Metro
Current Status
Issued on 5/10/2021
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 10/1/2019 APPLICANT
Assigned to Plan Check Engineer 10/21/2019 HERNAN ARREOLA
Corrections Issued 10/24/2019 HERNAN ARREOLA
Quality Review Completed 11/13/2019 BILL STUTSMAN
Applicant returned to address corrections 4/22/2020 HERNAN ARREOLA
Applicant returned to address corrections 6/11/2020 HERNAN ARREOLA
Applicant returned to address corrections 6/12/2020 HERNAN ARREOLA
Applicant returned to address corrections 7/22/2020 HERNAN ARREOLA
Applicant returned to address corrections 10/29/2020 HERNAN ARREOLA
Building Plans Picked Up 1/12/2021 APPLICANT
Plan Check Approved 4/1/2021 HERNAN ARREOLA
Issued 5/10/2021 APPLICANT
TCO Issued (Expire Date: 01-27-2025) 7/31/2024 ADAM BURGESS
TCO Issued (Expire Date: 08-10-2025) 2/11/2025 ERNESTO CORRAL
TCO Issued (Expire Date: 01-20-2026) 7/24/2025 ADAM BURGESS
TCO Issued (Expire Date: 08-04-2026) 2/5/2026 ADAM BURGESS

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 12/27/2019 THOMAS LANG
Address approval Cleared 1/3/2020 THOMAS LANG
Permit Cleared 1/3/2020 THOMAS LANG
Hydrant and Access approval Cleared 6/3/2020 KURT CORRAL
Building over 3-story or 36-ft Cleared 6/11/2020 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 6/11/2020 CALOSHA APPROVED
GPI Written Notices Cleared 6/11/2020 HERNAN ARREOLA
Grading Pre-Inspection Cleared 6/11/2020 HERNAN ARREOLA
Metro Rail approval Cleared 6/12/2020 HERNAN ARREOLA
Demolition - OSHA Cleared 7/20/2020 CALOSHA APPROVED
Green Code Cleared 8/5/2020 NEGAR NEJAD
Trees in Parkway Cleared 8/10/2020 JOHN KIM
Haul Route Cleared 9/14/2020 VERONICA LOPEZ
Highway dedication Cleared 9/21/2020 CELINA MORENO
Fire Marshall Fire Life Safety Cleared 10/7/2020 VIDAL GARCIA
Work Adjacent to Public Way Cleared 10/9/2020 BOK GOH
Low Impact Development Cleared 11/19/2020 JORGE MEJIA LEMUS
Roof/Waste drainage to street Cleared 12/1/2020 JUAN ASHTON
Sewer availability Cleared 12/11/2020 RENZ SORIANO
Density Bonus 12.22.A.31 Cleared 1/26/2021 MICHAEL ZIRBES
Site Plan review Cleared 2/8/2021 RICHARD REASER
Specific Plan Cleared 2/8/2021 RICHARD REASER
Opn space landscape/Water mgmt Cleared 3/1/2021 RICHARD REASER
Project located in CRA area Cleared 3/8/2021 GISELLE CORELLA
Driveway location Cleared 3/31/2021 EDUARDO HERMOSO
Internal circulation Cleared 3/31/2021 EDUARDO HERMOSO

Contact Information

Architect Kim,, Mark Sung-Eun; Lic. No.: C31002 1900 MAIN ST. STE 800      IRVINE, CA 92612
Contractor Wilshire Construction L P; Lic. No.: 1048091-B 3470 WILSHIRE STE 1010      LOS ANGELES, CA 90010
Engineer Arriola,, Kirby Norman; Lic. No.: C31416 PO BOX 5566      OXNARD, CA 93031
Engineer Funk,, David Lyle; Lic. No.: S5421 319 MAIN STREET      EL SEGUNDO, CA 90245

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/12/2021 Approved DAVID BURKHEAD
Deputy Grading 5/17/2021 Conditional Approval DAVID BURKHEAD
Deputy Grading 5/18/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/18/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 5/19/2021 Conditional Approval DAVID BURKHEAD
Deputy Grading 5/20/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/20/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/21/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 5/24/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/24/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 5/25/2021 Conditional Approval DAVID BURKHEAD
Deputy Grading 5/26/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/26/2021 Conditional Approval DAVID BURKHEAD
Deputy Grading 5/27/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/27/2021 Conditional Approval DAVID BURKHEAD
Deputy Grading 5/28/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/28/2021 Conditional Approval DAVID BURKHEAD
Deputy Grading 6/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Grading 6/3/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/3/2021 Conditional Approval DAVID BURKHEAD
Deputy Grading 6/4/2021 Conditional Approval DAVID BURKHEAD
Deputy Grading 6/7/2021 Conditional Approval DAVID BURKHEAD
Deputy Grading 6/8/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/8/2021 Conditional Approval DAVID BURKHEAD
Piling/Pier/Caisson 6/8/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Grading 6/9/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/9/2021 Conditional Approval DAVID BURKHEAD
Piling/Pier/Caisson 6/9/2021 Partial Inspection DAVID BURKHEAD
Deputy Grading 6/10/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/10/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 6/11/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/11/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/14/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 6/15/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/15/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 6/16/2021 Conditional Approval DAVID BURKHEAD
Deputy Grading 6/17/2021 Conditional Approval DAVID BURKHEAD
Deputy Grading 6/18/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/21/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/23/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/24/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/25/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/28/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/28/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/29/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/29/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/30/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/30/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/1/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/1/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/6/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/7/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/8/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/9/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/3/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/4/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/9/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/11/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/12/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/16/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/17/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/19/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/20/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/23/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/25/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/27/2021 Conditional Approval DAVID BURKHEAD
Green Building Rough 9/28/2021 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 9/28/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 9/28/2021 Partial Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 9/28/2021 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 10/15/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Steel/Welding 10/19/2021 Conditional Approval DANIEL MC AULIFFE
METHANE-Barrier 10/20/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Methane Barrier 10/21/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/21/2021 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 10/21/2021 Partial Approval DANIEL MC AULIFFE
METHANE-Subgrade 10/21/2021 Partial Approval DANIEL MC AULIFFE
Deputy Methane Barrier 10/22/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/22/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Methane Barrier 10/25/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/25/2021 Approved DAVID BURKHEAD
Deputy Reinf. Concrete 10/26/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 10/26/2021 Partial Approval DAVID BURKHEAD
Green Building Rough 10/26/2021 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 10/26/2021 Partial Inspection DAVID BURKHEAD
METHANE-Rough 10/26/2021 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 10/26/2021 Partial Inspection DAVID BURKHEAD
Reinforced Concrete Frame 10/26/2021 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 10/26/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Methane Barrier 10/27/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/27/2021 Conditional Approval DAVID BURKHEAD
Deputy Methane Barrier 10/28/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/28/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 10/28/2021 Partial Approval DAVID BURKHEAD
Deputy Methane Barrier 10/29/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/29/2021 Conditional Approval DAVID BURKHEAD
Deputy Methane Barrier 11/1/2021 Conditional Approval DAVID BURKHEAD
Deputy Methane Barrier 11/2/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 11/2/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/3/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 11/3/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/4/2021 Conditional Approval DAVID BURKHEAD
Green Building Rough 11/4/2021 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 11/4/2021 Partial Inspection DAVID BURKHEAD
Reinforced Concrete Frame 11/4/2021 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 11/4/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 11/5/2021 Approved DAVID BURKHEAD
Deputy Reinf. Concrete 11/5/2021 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 11/5/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/8/2021 Conditional Approval DAVID BURKHEAD
Pre-Inspection 11/8/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/9/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 11/9/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/10/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 11/10/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/12/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 11/12/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 11/12/2021 Partial Approval DAVID BURKHEAD
METHANE-Barrier 11/12/2021 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 11/12/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 11/15/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 11/15/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/16/2021 Approved DAVID BURKHEAD
Deputy Shotcrete 11/16/2021 Approved DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 11/16/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 11/17/2021 Approved DAVID BURKHEAD
Deputy Shotcrete 11/17/2021 Approved DAVID BURKHEAD
Green Building Rough 11/17/2021 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 11/17/2021 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 11/17/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 11/17/2021 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 11/17/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 11/18/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 11/18/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/19/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 11/19/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 11/19/2021 Partial Approval DAVID BURKHEAD
METHANE-Barrier 11/19/2021 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 11/19/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 11/22/2021 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 11/22/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/23/2021 Approved DANIEL MC AULIFFE
Deputy Shotcrete 11/23/2021 Approved DANIEL MC AULIFFE
Piling/Pier/Caisson 11/23/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/24/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 11/24/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/29/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 11/29/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/30/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 11/30/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/1/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 12/1/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 12/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/3/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 12/3/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/6/2021 Approved DAVID BURKHEAD
Deputy Shotcrete 12/6/2021 Approved DAVID BURKHEAD
Green Building Rough 12/6/2021 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 12/6/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 12/6/2021 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 12/6/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 12/7/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 12/7/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/7/2021 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 12/8/2021 Partial Approval DAVID BURKHEAD
METHANE-Barrier 12/8/2021 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 12/8/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 12/9/2021 Conditional Approval DANIEL MC AULIFFE
Green Building Rough 12/13/2021 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 12/13/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 12/13/2021 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 12/13/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Shotcrete 12/17/2021 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 12/17/2021 Partial Approval DAVID BURKHEAD
Deputy Shotcrete 12/20/2021 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 12/21/2021 Partial Approval DAVID BURKHEAD
Green Building Rough 12/21/2021 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 12/21/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 12/21/2021 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 12/21/2021 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 1/6/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 1/6/2022 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 1/6/2022 Partial Approval DAVID BURKHEAD
Reinforced Masonry Frame 1/6/2022 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 1/6/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Shotcrete 1/7/2022 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 1/10/2022 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 1/12/2022 Conditional Approval DANIEL MC AULIFFE
Green Building Rough 1/12/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 1/12/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 1/12/2022 Not Ready for Inspection DAVID BURKHEAD
Structural Steel Frame 1/12/2022 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 1/12/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 1/13/2022 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 1/13/2022 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 1/13/2022 Partial Approval DAVID BURKHEAD
METHANE-Barrier 1/13/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 1/13/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 1/14/2022 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 1/14/2022 Conditional Approval DAVID BURKHEAD
Wall Anchors 1/14/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 1/19/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 1/20/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 1/21/2022 Conditional Approval DAVID BURKHEAD
Green Building Rough 1/21/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 1/21/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 1/21/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 1/21/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 1/24/2022 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 1/24/2022 Partial Approval DAVID BURKHEAD
METHANE-Barrier 1/27/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Shotcrete 1/31/2022 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 2/2/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 2/2/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 2/3/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 2/3/2022 Approved DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 2/3/2022 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 2/3/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 2/4/2022 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 2/4/2022 Conditional Approval DAVID BURKHEAD
Green Building Rough 2/4/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 2/4/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 2/4/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 2/4/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 2/7/2022 Partial Approval DANIEL MC AULIFFE
Deputy Shotcrete 2/8/2022 Conditional Approval DAVID BURKHEAD
METHANE-Subgrade 2/8/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 2/10/2022 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 2/10/2022 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 2/11/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 2/11/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Shotcrete 2/14/2022 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 2/18/2022 Partial Approval DAVID BURKHEAD
METHANE-Barrier 2/18/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 2/18/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 2/22/2022 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 2/23/2022 Partial Approval DAVID BURKHEAD
Green Building Rough 2/23/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 2/23/2022 Partial Approval DAVID BURKHEAD
Piling/Pier/Caisson 2/23/2022 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 2/23/2022 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 2/25/2022 Partial Approval DAVID BURKHEAD
METHANE-Barrier 2/25/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 2/25/2022 Partial Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 3/9/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/10/2022 Approved DAVID BURKHEAD
Footing/Foundation/Slab 3/10/2022 Partial Approval DAVID BURKHEAD
METHANE-Barrier 3/10/2022 Partial Approval DAVID BURKHEAD
METHANE-Subgrade 3/10/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 3/11/2022 Approved DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 3/11/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 3/14/2022 Conditional Approval DANIEL MC AULIFFE
Green Building Rough 3/17/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 3/17/2022 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 3/17/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 3/18/2022 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 3/18/2022 Partial Approval DAVID BURKHEAD
METHANE-Barrier 3/18/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 3/18/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 3/21/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 3/22/2022 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 3/22/2022 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 3/22/2022 Partial Inspection DANIEL MC AULIFFE
METHANE-Rough 3/22/2022 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 3/22/2022 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 3/22/2022 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/23/2022 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/23/2022 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/24/2022 Approved DANIEL MC AULIFFE
Wall Anchors 3/24/2022 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/25/2022 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/25/2022 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/29/2022 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 3/29/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 3/29/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 3/29/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 3/30/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 3/31/2022 Conditional Approval DAVID BURKHEAD
Green Building Rough 3/31/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 3/31/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 3/31/2022 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 3/31/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 4/1/2022 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 4/1/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 4/4/2022 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 4/4/2022 Partial Approval DAVID BURKHEAD
METHANE-Barrier 4/4/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 4/4/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 4/5/2022 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 4/5/2022 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 4/5/2022 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 4/6/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/6/2022 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 4/6/2022 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 4/6/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 4/6/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 4/6/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Other (see comments) 4/7/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/7/2022 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 4/7/2022 Conditional Approval DAVID BURKHEAD
Green Building Rough 4/7/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 4/7/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 4/7/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 4/7/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 4/7/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 4/8/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/11/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/12/2022 Conditional Approval DAVID BURKHEAD
Green Building Rough 4/12/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 4/12/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 4/12/2022 Partial Approval DAVID BURKHEAD
Structural Steel Frame 4/12/2022 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 4/12/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 4/13/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/14/2022 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 4/15/2022 Conditional Approval DAVID BURKHEAD
Green Building Rough 4/15/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 4/15/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 4/15/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 4/15/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 4/18/2022 Conditional Approval DAVID BURKHEAD
Structural Steel Frame 4/18/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Other (see comments) 4/19/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/19/2022 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 4/19/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/20/2022 Conditional Approval DAVID BURKHEAD
Green Building Rough 4/20/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 4/20/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 4/20/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 4/20/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 4/21/2022 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 4/21/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/22/2022 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 4/25/2022 Partial Inspection DANIEL MC AULIFFE
METHANE-Barrier 4/25/2022 Not Ready for Inspection DANIEL MC AULIFFE
METHANE-Subgrade 4/25/2022 Partial Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 4/26/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/27/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/28/2022 Conditional Approval DAVID BURKHEAD
Green Building Rough 4/28/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 4/28/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 4/28/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 4/28/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 4/29/2022 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 4/29/2022 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 5/2/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/2/2022 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 5/2/2022 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 5/5/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/6/2022 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 5/6/2022 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 5/6/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/9/2022 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 5/9/2022 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 5/10/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/10/2022 Conditional Approval DAVID BURKHEAD
Green Building Rough 5/10/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 5/10/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 5/10/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 5/10/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 5/11/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/12/2022 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 5/12/2022 Partial Approval DAVID BURKHEAD
METHANE-Barrier 5/12/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 5/12/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 5/13/2022 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 5/13/2022 Partial Approval DAVID BURKHEAD
Deputy Shotcrete 5/16/2022 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 5/18/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/19/2022 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 5/19/2022 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 5/20/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/20/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 5/20/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/25/2022 Conditional Approval DAVID BURKHEAD
Green Building Rough 5/25/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 5/25/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 5/25/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 5/25/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 5/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 5/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/31/2022 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 5/31/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/6/2022 Conditional Approval ERNESTO CORRAL
Masonry Wall/Backfill 6/7/2022 Partial Approval DAVID BURKHEAD
Deputy Methane Barrier 6/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/8/2022 No Result Entered DANIEL MC AULIFFE
Deputy Methane Barrier 6/9/2022 Conditional Approval ERNESTO CORRAL
Structural Steel Frame 6/9/2022 Partial Approval NICK DANERI
Deputy Reinf. Concrete 6/10/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 6/10/2022 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 6/10/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 6/10/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/13/2022 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 6/13/2022 Partial Approval DAVID BURKHEAD
METHANE-Barrier 6/13/2022 Partial Approval DAVID BURKHEAD
METHANE-Subgrade 6/13/2022 Approved DAVID BURKHEAD
Masonry Wall/Backfill 6/13/2022 Partial Approval DAVID BURKHEAD
Deputy Shotcrete 6/14/2022 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 6/14/2022 No Result Entered DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 6/14/2022 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 6/15/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/15/2022 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 6/15/2022 Partial Approval DAVID BURKHEAD
Green Building Rough 6/16/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 6/16/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 6/16/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 6/16/2022 Not Ready for Inspection DAVID BURKHEAD
Masonry Wall/Backfill 6/17/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 6/21/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/22/2022 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 6/22/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 6/22/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Other (see comments) 6/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/24/2022 Conditional Approval ERNESTO CORRAL
Green Building Rough 6/24/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 6/24/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 6/24/2022 Partial Approval DAVID BURKHEAD
Reinforced Masonry Frame 6/24/2022 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 6/24/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Masonry 6/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Other (see comments) 6/28/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/28/2022 Conditional Approval ERNESTO CORRAL
Masonry Wall/Backfill 6/28/2022 Partial Approval DAVID BURKHEAD
Green Building Rough 7/6/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 7/6/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 7/6/2022 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 7/6/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 7/7/2022 Conditional Approval ERNESTO CORRAL
Masonry Wall/Backfill 7/7/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/14/2022 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/14/2022 Partial Approval DAVID BURKHEAD
Green Building Rough 7/14/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 7/14/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 7/14/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 7/14/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 7/15/2022 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 7/15/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/18/2022 Conditional Approval DAVID BURKHEAD
Masonry Wall/Backfill 7/18/2022 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 7/20/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/20/2022 Conditional Approval DAVID BURKHEAD
Green Building Rough 7/20/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 7/20/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 7/20/2022 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 7/20/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 7/21/2022 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 7/21/2022 Partial Approval DAVID BURKHEAD
METHANE-Barrier 7/21/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 7/22/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/25/2022 Conditional Approval ERNESTO CORRAL
Structural Steel Frame 7/25/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/26/2022 Conditional Approval ERNESTO CORRAL
Masonry Wall/Backfill 7/27/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/29/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 7/29/2022 Conditional Approval DAVID BURKHEAD
Masonry Wall/Backfill 7/29/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 8/1/2022 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 8/1/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/2/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 8/3/2022 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 8/3/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 8/4/2022 Conditional Approval ERNESTO CORRAL
Green Building Rough 8/5/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 8/5/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 8/5/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 8/5/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Shotcrete 8/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/8/2022 Conditional Approval ERNESTO CORRAL
Wood Frame 8/8/2022 Partial Approval JAMES POWERS
Green Building Rough 8/9/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 8/9/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 8/9/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 8/9/2022 Not Ready for Inspection DAVID BURKHEAD
Masonry Wall/Backfill 8/10/2022 Partial Approval GREGORY POMISH
Deputy Other (see comments) 8/12/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/12/2022 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 8/16/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/17/2022 No Result Entered DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/18/2022 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 8/18/2022 Partial Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 8/19/2022 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 8/19/2022 Partial Approval GREGORY POMISH
METHANE-Barrier 8/19/2022 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 8/22/2022 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 8/22/2022 Not Ready for Inspection NICK DANERI
Green Building Rough 8/22/2022 Not Ready for Inspection NICK DANERI
METHANE-Rough 8/22/2022 Not Ready for Inspection NICK DANERI
Reinforced Masonry Frame 8/22/2022 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 8/22/2022 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 8/24/2022 Approved RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 8/24/2022 Partial Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 8/24/2022 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 8/24/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/25/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/25/2022 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 8/25/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/26/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/29/2022 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 8/29/2022 Partial Approval TED RIES
Masonry Wall/Backfill 8/31/2022 Partial Approval DAVID BURKHEAD
Structural Steel Frame 8/31/2022 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 8/31/2022 Partial Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 9/1/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 9/2/2022 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 9/2/2022 Partial Approval DAVID BURKHEAD
Green Building Rough 9/3/2022 Off-Hour Fees Due
METHANE-Rough 9/3/2022 Off-Hour Fees Due
Reinforced Concrete Frame 9/3/2022 Off-Hour Fees Due
Verify Sprinkler Sign Off 9/3/2022 Off-Hour Fees Due
Deputy Reinf. Concrete 9/6/2022 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/6/2022 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 9/7/2022 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 9/7/2022 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 9/8/2022 Not Ready for Inspection DAVID BURKHEAD
Masonry Wall/Backfill 9/8/2022 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 9/12/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 9/14/2022 Conditional Approval DAVID BURKHEAD
Wood Frame 9/15/2022 Partial Approval NICK DANERI
Deputy Reinf. Concrete 9/16/2022 Conditional Approval MICHAEL ROSENBERG
Masonry Wall/Backfill 9/19/2022 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 9/20/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 9/21/2022 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 9/21/2022 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 9/23/2022 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 9/23/2022 Partial Approval TED RIES
Insulation 9/23/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 9/26/2022 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 9/26/2022 Conditional Approval DAVID BURKHEAD
Masonry Wall/Backfill 9/26/2022 Partial Approval DAVID BURKHEAD
Special/Order Compliance 9/26/2022 Corrections Issued DAVID BURKHEAD
Wood Frame 9/26/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/27/2022 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 9/27/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/28/2022 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 9/28/2022 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 9/28/2022 Partial Approval DAVID BURKHEAD
METHANE-Barrier 9/28/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 9/29/2022 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 9/29/2022 Conditional Approval DAVID BURKHEAD
Wood Frame 9/29/2022 Partial Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 9/30/2022 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 9/30/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/3/2022 Approved DAVID BURKHEAD
Deputy Wood Construction 10/3/2022 Conditional Approval DAVID BURKHEAD
Insulation 10/3/2022 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 10/3/2022 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 10/4/2022 Conditional Approval DAVID BURKHEAD
Drywall Nailing 10/4/2022 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 10/4/2022 Partial Inspection DAVID BURKHEAD
Deputy Wood Construction 10/6/2022 Conditional Approval DAVID BURKHEAD
Masonry Wall/Backfill 10/6/2022 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 10/7/2022 Conditional Approval DAVID BURKHEAD
Pre-Inspection 10/7/2022 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 10/7/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 10/12/2022 Conditional Approval DAVID BURKHEAD
Wood Frame 10/12/2022 Partial Approval DAVID BURKHEAD
Wood Frame 10/14/2022 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 10/17/2022 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 10/18/2022 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 10/18/2022 Partial Approval DAVID BURKHEAD
Green Building Rough 10/18/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 10/18/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 10/18/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 10/18/2022 Not Ready for Inspection DAVID BURKHEAD
T-Bar Ceiling 10/18/2022 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 10/18/2022 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 10/21/2022 Not Ready for Inspection GREGORY POMISH
Insulation 10/21/2022 Not Ready for Inspection GREGORY POMISH
METHANE-Barrier 10/21/2022 Not Ready for Inspection GREGORY POMISH
Structural Steel Frame 10/21/2022 Not Ready for Inspection GREGORY POMISH
Wood Frame 10/21/2022 Partial Approval GREGORY POMISH
Deputy Wood Construction 10/24/2022 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 10/24/2022 Partial Approval DAVID BURKHEAD
Insulation 10/24/2022 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 10/24/2022 Not Ready for Inspection DAVID BURKHEAD
Posting Pre-Inspection 10/24/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 10/24/2022 Not Ready for Inspection DAVID BURKHEAD
Structural Steel Frame 10/25/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 10/26/2022 Conditional Approval DAVID BURKHEAD
Masonry Wall/Backfill 10/26/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 10/27/2022 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 10/27/2022 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 10/27/2022 Partial Approval DAVID BURKHEAD
Green Building Rough 10/27/2022 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 10/27/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 10/27/2022 Not Ready for Inspection DAVID BURKHEAD
Masonry Wall/Backfill 10/27/2022 Not Ready for Inspection DAVID BURKHEAD
Piling/Pier/Caisson 10/27/2022 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 10/27/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 10/27/2022 Not Ready for Inspection DAVID BURKHEAD
Smoke Detectors 10/27/2022 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 10/27/2022 Not Ready for Inspection DAVID BURKHEAD
Structural Steel Frame 10/27/2022 Not Ready for Inspection DAVID BURKHEAD
T-Bar Ceiling 10/27/2022 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 10/27/2022 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 10/27/2022 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 10/28/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 10/28/2022 Not Ready for Inspection DAVID BURKHEAD
Piling/Pier/Caisson 10/28/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 10/31/2022 Conditional Approval DAVID BURKHEAD
Wood Frame 10/31/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 11/2/2022 Conditional Approval MICHAEL ROSENBERG
Insulation 11/2/2022 Not Ready for Inspection DAVID BURKHEAD
Masonry Wall/Backfill 11/2/2022 Not Ready for Inspection DAVID BURKHEAD
Wall Anchors 11/2/2022 Partial Approval DAVID BURKHEAD
Wood Frame 11/2/2022 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 11/3/2022 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 11/3/2022 Partial Inspection DAVID BURKHEAD
Green Building Rough 11/3/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 11/3/2022 Partial Inspection DAVID BURKHEAD
METHANE-Rough 11/3/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 11/3/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 11/3/2022 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 11/3/2022 Not Ready for Inspection DAVID BURKHEAD
Wall Anchors 11/3/2022 Partial Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 11/4/2022 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 11/8/2022 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 11/8/2022 Not Ready for Inspection EDWIN GREGORYONA
Wood Frame 11/8/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 11/9/2022 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 11/9/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 11/10/2022 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 11/10/2022 Partial Inspection RAFAEL ESPINOZA
Wood Frame 11/10/2022 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 11/14/2022 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 11/14/2022 Partial Approval MARK FERRARI
Deputy Wood Construction 11/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 11/16/2022 Conditional Approval MICHAEL ROSENBERG
Wood Frame 11/16/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/17/2022 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 11/17/2022 Conditional Approval DAVID BURKHEAD
Green Building Rough 11/17/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 11/17/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 11/17/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 11/17/2022 Partial Inspection DAVID BURKHEAD
Deputy Wood Construction 11/18/2022 Conditional Approval MICHAEL ROSENBERG
Insulation 11/18/2022 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 11/19/2022 Partial Approval NICK DANERI
Deputy Wood Construction 11/21/2022 Conditional Approval DAVID BURKHEAD
Green Building Rough 11/21/2022 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 11/21/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 11/21/2022 Not Ready for Inspection DAVID BURKHEAD
Piling/Pier/Caisson 11/21/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 11/21/2022 Not Ready for Inspection DAVID BURKHEAD
Structural Steel Frame 11/21/2022 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 11/21/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 11/22/2022 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 11/22/2022 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 11/22/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 11/22/2022 Not Ready for Inspection DAVID BURKHEAD
Masonry Wall/Backfill 11/22/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 11/22/2022 Not Ready for Inspection DAVID BURKHEAD
Smoke Detectors 11/22/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 11/23/2022 Conditional Approval NICK DANERI
Wall Anchors 11/23/2022 Partial Inspection NICK DANERI
Wood Frame 11/23/2022 Partial Approval NICK DANERI
Masonry Wall/Backfill 11/28/2022 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 11/29/2022 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 11/29/2022 Partial Approval JAMES POWERS
Green Building Rough 11/29/2022 Not Ready for Inspection JAMES POWERS
METHANE-Rough 11/29/2022 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 11/29/2022 Not Ready for Inspection JAMES POWERS
Deputy Wood Construction 11/30/2022 Conditional Approval DAVID BURKHEAD
Drywall Nailing 11/30/2022 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 11/30/2022 Partial Approval DAVID BURKHEAD
Insulation 11/30/2022 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 11/30/2022 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 11/30/2022 Not Ready for Inspection DAVID BURKHEAD
Structural Steel Frame 11/30/2022 Not Ready for Inspection DAVID BURKHEAD
T-Bar Ceiling 11/30/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 12/1/2022 Conditional Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 12/1/2022 Partial Inspection GREGORY POMISH
Deputy Wood Construction 12/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 12/6/2022 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 12/6/2022 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 12/6/2022 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 12/6/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 12/6/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 12/6/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 12/6/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 12/6/2022 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 12/6/2022 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 12/6/2022 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 12/7/2022 Conditional Approval DAVID BURKHEAD
Drywall Nailing 12/7/2022 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 12/7/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 12/7/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 12/8/2022 Conditional Approval MICHAEL ROSENBERG
Drywall Nailing 12/8/2022 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 12/8/2022 Partial Approval DAVID BURKHEAD
Grading Pre-Inspection 12/8/2022 Approved DAVID BURKHEAD
Interior/Exterior Lathing 12/8/2022 Not Ready for Inspection DAVID BURKHEAD
Masonry Wall/Backfill 12/8/2022 Partial Approval DAVID BURKHEAD
Smoke Detectors 12/8/2022 Not Ready for Inspection DAVID BURKHEAD
T-Bar Ceiling 12/8/2022 Not Ready for Inspection DAVID BURKHEAD
Wall Anchors 12/8/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Masonry 12/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 12/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 12/12/2022 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 12/13/2022 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 12/13/2022 Partial Approval RAMAZANALI ALMASI
Deputy Wood Construction 12/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 12/16/2022 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 12/16/2022 Conditional Approval MICHAEL ROSENBERG
Wood Frame 12/16/2022 Partial Approval GREGORY POMISH
Deputy Wood Construction 12/19/2022 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 12/19/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 12/20/2022 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 12/20/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 12/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 12/21/2022 Conditional Approval MICHAEL ROSENBERG
Insulation 12/23/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 12/28/2022 Conditional Approval DAVID BURKHEAD
Smoke Detectors 12/28/2022 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 12/28/2022 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 12/29/2022 Conditional Approval DAVID BURKHEAD
Wood Frame 12/29/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 12/30/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 1/3/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 1/4/2023 Conditional Approval DAVID BURKHEAD
Wood Frame 1/4/2023 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 1/5/2023 Partial Inspection DAVID BURKHEAD
Drywall Nailing 1/6/2023 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 1/11/2023 Conditional Approval DAVID BURKHEAD
Wood Frame 1/11/2023 Partial Approval DAVID BURKHEAD
Wood Frame 1/12/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 1/17/2023 Conditional Approval DAVID BURKHEAD
Drywall Nailing 1/17/2023 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 1/17/2023 Not Ready for Inspection DAVID BURKHEAD
Insulation 1/17/2023 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 1/17/2023 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 1/17/2023 Not Ready for Inspection DAVID BURKHEAD
Wall Anchors 1/17/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 1/18/2023 Conditional Approval DAVID BURKHEAD
Insulation 1/18/2023 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 1/19/2023 Conditional Approval DAVID BURKHEAD
Green Building Rough 1/19/2023 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 1/19/2023 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 1/19/2023 Partial Approval DAVID BURKHEAD
Wood Frame 1/19/2023 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 1/20/2023 Conditional Approval DAVID BURKHEAD
Wood Frame 1/20/2023 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 1/23/2023 Conditional Approval MICHAEL ROSENBERG
METHANE-Rough 1/24/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 1/24/2023 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 1/25/2023 Partial Approval DAVID BURKHEAD
METHANE-Barrier 1/25/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 1/26/2023 Conditional Approval DAVID BURKHEAD
Drywall Nailing 1/26/2023 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 1/26/2023 Partial Approval DAVID BURKHEAD
Insulation 1/26/2023 Not Ready for Inspection DAVID BURKHEAD
Masonry Wall/Backfill 1/26/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 1/26/2023 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 1/27/2023 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 1/27/2023 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 1/30/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 1/31/2023 Conditional Approval DAVID BURKHEAD
Wood Frame 1/31/2023 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 2/1/2023 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 2/2/2023 Partial Inspection TIMOTHY POWELL
Light Gage Steel Frame 2/2/2023 Partial Approval DAVID BURKHEAD
METHANE-Rough 2/2/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 2/2/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 2/2/2023 Not Ready for Inspection DAVID BURKHEAD
Structural Steel Frame 2/2/2023 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 2/2/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 2/2/2023 Corrections Issued DAVID BURKHEAD
Deputy Wood Construction 2/7/2023 Conditional Approval DAVID BURKHEAD
Wood Frame 2/7/2023 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 2/8/2023 Conditional Approval MICHAEL ROSENBERG
Wood Frame 2/8/2023 Partial Inspection DAVID BURKHEAD
Deputy Wood Construction 2/9/2023 Conditional Approval DAVID BURKHEAD
Green Building Rough 2/9/2023 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 2/9/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 2/9/2023 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 2/9/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 2/10/2023 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 2/10/2023 Conditional Approval DAVID BURKHEAD
Drywall Nailing 2/10/2023 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 2/10/2023 Partial Approval DAVID BURKHEAD
Insulation 2/10/2023 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 2/10/2023 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 2/13/2023 Conditional Approval NICK DANERI
Deputy Wood Construction 2/13/2023 Conditional Approval NICK DANERI
Green Building Rough 2/13/2023 Not Ready for Inspection NICK DANERI
Light Gage Steel Frame 2/13/2023 Partial Approval NICK DANERI
METHANE-Rough 2/13/2023 Approved NICK DANERI
Reinforced Concrete Frame 2/13/2023 Partial Inspection NICK DANERI
Reinforced Masonry Frame 2/13/2023 Not Ready for Inspection NICK DANERI
Structural Steel Frame 2/13/2023 Partial Inspection NICK DANERI
Verify Sprinkler Sign Off 2/13/2023 Partial Inspection NICK DANERI
Wood Frame 2/13/2023 Partial Inspection NICK DANERI
Deputy Wood Construction 2/14/2023 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 2/14/2023 Partial Approval DAVID BURKHEAD
METHANE-Barrier 2/14/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 2/16/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/17/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/17/2023 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 2/17/2023 Conditional Approval DAVID BURKHEAD
Wood Frame 2/17/2023 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 2/21/2023 Conditional Approval DAVID BURKHEAD
Drywall Nailing 2/21/2023 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 2/21/2023 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 2/21/2023 Partial Approval DAVID BURKHEAD
Insulation 2/21/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 2/22/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 2/23/2023 Conditional Approval DAVID BURKHEAD
Drywall Nailing 2/23/2023 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 2/23/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 2/24/2023 Conditional Approval DAVID BURKHEAD
METHANE-Barrier 2/24/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 2/24/2023 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 2/27/2023 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 2/28/2023 Not Ready for Inspection TED RIES
Light Gage Steel Frame 2/28/2023 Partial Approval TED RIES
Reinforced Concrete Frame 2/28/2023 Not Ready for Inspection TED RIES
Reinforced Masonry Frame 2/28/2023 Not Ready for Inspection TED RIES
Verify Sprinkler Sign Off 2/28/2023 Approved TED RIES
Wood Frame 2/28/2023 Partial Approval TED RIES
Deputy Wood Construction 3/1/2023 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 3/1/2023 Corrections Issued DAVID BURKHEAD
Deputy Wood Construction 3/2/2023 Conditional Approval DAVID BURKHEAD
Drywall Nailing 3/2/2023 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 3/2/2023 Not Ready for Inspection DAVID BURKHEAD
Insulation 3/2/2023 Partial Approval DAVID BURKHEAD
T-Bar Ceiling 3/2/2023 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 3/3/2023 Conditional Approval DAVID BURKHEAD
Insulation 3/3/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 3/3/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 3/6/2023 Conditional Approval DAVID BURKHEAD
Wood Frame 3/6/2023 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 3/7/2023 Partial Approval EDWIN GREGORYONA
Insulation 3/7/2023 Not Ready for Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 3/7/2023 Not Ready for Inspection EDWIN GREGORYONA
Wood Frame 3/7/2023 Partial Approval EDWIN GREGORYONA
Wood Frame 3/8/2023 Partial Approval GREGORY POMISH
Wood Frame 3/10/2023 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 3/14/2023 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 3/14/2023 Partial Approval DAVID BURKHEAD
Wood Frame 3/14/2023 Partial Inspection DAVID BURKHEAD
Deputy Wood Construction 3/15/2023 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 3/15/2023 Not Ready for Inspection DAVID BURKHEAD
Insulation 3/15/2023 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 3/15/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 3/15/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 3/16/2023 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 3/16/2023 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 3/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 3/20/2023 Conditional Approval MICHAEL ROSENBERG
Wood Frame 3/20/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/21/2023 Partial Approval MARTIN TAVITIAN
Floor/Roof Diaphrgm/Shear Wall 3/21/2023 Partial Approval MARTIN TAVITIAN
Insulation 3/21/2023 Partial Approval MARTIN TAVITIAN
Drywall Nailing 3/22/2023 Partial Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 3/22/2023 Partial Inspection GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 3/22/2023 Partial Inspection GREGORY POMISH
Footing/Foundation/Slab 3/22/2023 Partial Inspection GREGORY POMISH
METHANE-Barrier 3/22/2023 Partial Inspection GREGORY POMISH
Pre-Inspection 3/22/2023 Partial Inspection GREGORY POMISH
Wood Frame 3/22/2023 Partial Inspection GREGORY POMISH
Drywall Nailing 3/23/2023 Partial Approval DAVID BURKHEAD
Green Building Rough 3/23/2023 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 3/23/2023 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 3/23/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 3/23/2023 Not Ready for Inspection DAVID BURKHEAD
Wall Anchors 3/23/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 3/23/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 3/24/2023 Partial Inspection GREGORY POMISH
Footing/Foundation/Slab 3/24/2023 Partial Inspection GREGORY POMISH
Insulation 3/24/2023 Partial Inspection GREGORY POMISH
Interior/Exterior Lathing 3/24/2023 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 3/24/2023 Partial Inspection GREGORY POMISH
METHANE-Barrier 3/24/2023 Partial Inspection GREGORY POMISH
Structural Steel Frame 3/24/2023 Partial Inspection GREGORY POMISH
Wall Anchors 3/24/2023 Partial Inspection GREGORY POMISH
Wood Frame 3/24/2023 Partial Inspection GREGORY POMISH
Wood Frame 3/29/2023 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 3/30/2023 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 3/30/2023 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 3/30/2023 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 3/30/2023 Approved DAVID BURKHEAD
Insulation 3/30/2023 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 3/30/2023 Not Ready for Inspection DAVID BURKHEAD
Piling/Pier/Caisson 3/30/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 3/30/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 3/31/2023 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 4/3/2023 Partial Approval DAVID BURKHEAD
Wood Frame 4/3/2023 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 4/4/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 4/5/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 4/5/2023 Partial Inspection DAVID BURKHEAD
Insulation 4/7/2023 Partial Approval DAVID BURKHEAD
Wood Frame 4/11/2023 Not Ready for Inspection DAVID BURKHEAD
Structural Steel Frame 4/12/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 4/12/2023 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 4/13/2023 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 4/13/2023 Not Ready for Inspection DAVID BURKHEAD
Piling/Pier/Caisson 4/13/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 4/13/2023 Not Ready for Inspection DAVID BURKHEAD
Structural Steel Frame 4/14/2023 Partial Approval DAVID BURKHEAD
Wood Frame 4/18/2023 Partial Approval DAVID BURKHEAD
Insulation 4/19/2023 Partial Approval DAVID BURKHEAD
Wood Frame 4/21/2023 Partial Inspection DAVID BURKHEAD
Wood Frame 4/24/2023 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 4/25/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 4/25/2023 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 4/26/2023 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 4/26/2023 Partial Approval DAVID BURKHEAD
Wood Frame 4/26/2023 Partial Approval DAVID BURKHEAD
METHANE-Barrier 4/27/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 4/27/2023 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 4/28/2023 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 5/2/2023 Not Ready for Inspection NICK DANERI
Light Gage Steel Frame 5/3/2023 Partial Approval GREGORY POMISH
Wood Frame 5/3/2023 Partial Approval GREGORY POMISH
Insulation 5/4/2023 Partial Approval GREGORY POMISH
Wall Anchors 5/5/2023 Partial Approval GREGORY POMISH
Wood Frame 5/8/2023 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 5/9/2023 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 5/10/2023 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 5/10/2023 Not Ready for Inspection DAVID BURKHEAD
Insulation 5/10/2023 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 5/10/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 5/11/2023 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 5/12/2023 Not Ready for Inspection DAVID BURKHEAD
Insulation 5/12/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 5/12/2023 Partial Approval DAVID BURKHEAD
Insulation 5/17/2023 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 5/17/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 5/17/2023 Not Ready for Inspection DAVID BURKHEAD
Masonry Wall/Backfill 5/17/2023 Not Ready for Inspection DAVID BURKHEAD
Structural Steel Frame 5/17/2023 Not Ready for Inspection DAVID BURKHEAD
Insulation 5/18/2023 Partial Approval DAVID BURKHEAD
Insulation 5/19/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 5/19/2023 Partial Approval DAVID BURKHEAD
Structural Steel Frame 5/19/2023 Not Ready for Inspection DAVID BURKHEAD
Insulation 5/23/2023 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/23/2023 Partial Approval DAVID BURKHEAD
METHANE-Barrier 5/23/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 5/23/2023 Not Ready for Inspection DAVID BURKHEAD
Structural Steel Frame 5/23/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 5/23/2023 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 5/24/2023 Partial Approval DAVID BURKHEAD
Insulation 5/25/2023 Partial Approval DAVID BURKHEAD
Wood Frame 5/25/2023 Partial Inspection DAVID BURKHEAD
Insulation 5/31/2023 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 6/1/2023 Partial Approval RAFAEL ESPINOZA
Insulation 6/1/2023 Partial Approval RAFAEL ESPINOZA
Insulation 6/6/2023 Partial Approval GREGORY POMISH
METHANE-Barrier 6/6/2023 Not Ready for Inspection GREGORY POMISH
Wood Frame 6/6/2023 Partial Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 6/7/2023 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 6/8/2023 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Barrier 6/8/2023 Partial Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 6/9/2023 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/9/2023 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 6/12/2023 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 6/12/2023 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 6/13/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 6/15/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 6/15/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 6/20/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 6/22/2023 Partial Approval DAVID BURKHEAD
Wood Frame 6/22/2023 Partial Approval DAVID BURKHEAD
Wood Frame 6/29/2023 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 7/3/2023 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 7/3/2023 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 7/7/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 7/13/2023 Partial Approval DAVID BURKHEAD
Grading Pre-Inspection 7/18/2023 Approved DAVID BURKHEAD
Insulation 7/18/2023 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 7/18/2023 Partial Approval DAVID BURKHEAD
METHANE-Barrier 7/18/2023 Approved DAVID BURKHEAD
Posting Pre-Inspection 7/18/2023 Approved DAVID BURKHEAD
T-Bar Ceiling 7/18/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 7/18/2023 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 7/21/2023 Partial Approval DAVID BURKHEAD
Masonry Wall/Backfill 7/24/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 7/24/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 7/24/2023 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 7/25/2023 Approved DAVID BURKHEAD
Masonry Wall/Backfill 7/25/2023 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 7/28/2023 Conditional Approval DAVID BURKHEAD
Reinforced Masonry Frame 7/28/2023 Partial Approval DAVID BURKHEAD
Wood Frame 8/3/2023 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 8/9/2023 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 8/11/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 8/14/2023 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 8/15/2023 Partial Approval GREGORY POMISH
Wood Frame 8/16/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 8/29/2023 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 8/29/2023 Partial Approval DAVID BURKHEAD
T-Bar Ceiling 9/5/2023 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 9/7/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 9/8/2023 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 9/8/2023 Not Ready for Inspection DAVID BURKHEAD
Insulation 9/8/2023 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 9/8/2023 Partial Approval DAVID BURKHEAD
Wood Frame 9/8/2023 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 9/12/2023 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 9/12/2023 Corrections Issued RAFAEL ESPINOZA
Wood Frame 9/14/2023 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 9/18/2023 Not Ready for Inspection RAFAEL ESPINOZA
Interior/Exterior Lathing 9/18/2023 Not Ready for Inspection RAFAEL ESPINOZA
Light Gage Steel Frame 9/18/2023 Not Ready for Inspection RAFAEL ESPINOZA
T-Bar Ceiling 9/18/2023 Not Ready for Inspection RAFAEL ESPINOZA
Light Gage Steel Frame 9/19/2023 Not Ready for Inspection RAFAEL ESPINOZA
Light Gage Steel Frame 9/20/2023 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 10/2/2023 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 10/2/2023 Not Ready for Inspection DAVID BURKHEAD
T-Bar Ceiling 10/2/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 10/2/2023 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 10/13/2023 Partial Inspection RAFAEL ESPINOZA
Interior/Exterior Lathing 10/13/2023 Partial Inspection RAFAEL ESPINOZA
T-Bar Ceiling 10/13/2023 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 10/17/2023 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 10/17/2023 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 11/3/2023 Partial Approval DAVID BURKHEAD
Wood Frame 11/3/2023 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 11/6/2023 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 11/6/2023 Not Ready for Inspection DAVID BURKHEAD
Insulation 11/6/2023 Not Ready for Inspection DAVID BURKHEAD
Smoke Detectors 11/6/2023 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 11/6/2023 Not Ready for Inspection DAVID BURKHEAD
T-Bar Ceiling 11/6/2023 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 11/9/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 11/15/2023 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 11/16/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 11/16/2023 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 11/22/2023 Not Ready for Inspection DAVID BURKHEAD
Insulation 11/22/2023 Not Ready for Inspection DAVID BURKHEAD
T-Bar Ceiling 11/22/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 11/22/2023 Partial Approval DAVID BURKHEAD
Green Building Final 12/1/2023 Not Ready for Inspection RAFAEL ESPINOZA
Smoke Detectors 12/1/2023 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 12/1/2023 Partial Approval RAFAEL ESPINOZA
Wall Anchors 12/1/2023 Partial Inspection RAFAEL ESPINOZA
Insulation 12/5/2023 Not Ready for Inspection NICK DANERI
Pre-Inspection 12/5/2023 Partial Inspection NICK DANERI
Special/Order Compliance 12/5/2023 Partial Approval NICK DANERI
Wood Frame 12/5/2023 Conditional Approval NICK DANERI
Light Gage Steel Frame 12/12/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 1/4/2024 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 1/8/2024 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 1/9/2024 Partial Approval DAVID BURKHEAD
Deputy Shotcrete 1/12/2024 Conditional Approval MICHAEL ROSENBERG
Drywall Nailing 1/17/2024 Partial Approval DAVID BURKHEAD
Final 1/17/2024 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 1/17/2024 Not Ready for Inspection DAVID BURKHEAD
Green Building Final 1/17/2024 Not Ready for Inspection DAVID BURKHEAD
Piling/Pier/Caisson 1/17/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 1/17/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 1/17/2024 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 1/17/2024 SGSOV Not Ready DAVID BURKHEAD
Smoke Detectors 1/17/2024 Not Ready for Inspection DAVID BURKHEAD
Wall Anchors 1/17/2024 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 1/17/2024 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 1/19/2024 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 2/1/2024 Conditional Approval MICHAEL ROSENBERG
T-Bar Ceiling 2/22/2024 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 2/22/2024 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 3/5/2024 Partial Approval DAVID BURKHEAD
T-Bar Ceiling 3/6/2024 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 3/26/2024 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 4/3/2024 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 4/16/2024 Not Ready for Inspection DAVID BURKHEAD
Green Building Final 4/16/2024 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 4/16/2024 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 4/16/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 4/16/2024 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 4/16/2024 SGSOV Not Ready DAVID BURKHEAD
Smoke Detectors 4/16/2024 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 4/22/2024 Partial Inspection DAVID BURKHEAD
Final 4/24/2024 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 4/24/2024 Not Ready for Inspection DAVID BURKHEAD
Green Building Final 4/24/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 4/24/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 4/24/2024 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 4/24/2024 SGSOV Not Ready DAVID BURKHEAD
Smoke Detectors 4/24/2024 Not Ready for Inspection DAVID BURKHEAD
Final 4/26/2024 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 4/26/2024 Approved DAVID BURKHEAD
Green Building Final 4/26/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 4/26/2024 Approved DAVID BURKHEAD
Reinforced Masonry Frame 4/26/2024 Approved DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 4/26/2024 SGSOV Not Ready DAVID BURKHEAD
Smoke Detectors 4/26/2024 Not Ready for Inspection DAVID BURKHEAD
Final 5/13/2024 Not Ready for Inspection DAVID BURKHEAD
Green Building Final 5/13/2024 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 5/13/2024 SGSOV Not Ready DAVID BURKHEAD
Smoke Detectors 5/13/2024 Not Ready for Inspection DAVID BURKHEAD
Final 6/18/2024 Not Ready for Inspection LARRY ARNICK
Green Building Final 6/18/2024 Not Ready for Inspection LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 6/18/2024 SGSOV Not Ready LARRY ARNICK
Smoke Detectors 6/18/2024 Not Ready for Inspection LARRY ARNICK
Final 6/25/2024 Partial Inspection EDWIN GREGORYONA
Final 6/26/2024 Partial Inspection DAVID BURKHEAD
Green Building Final 6/26/2024 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 6/26/2024 SGSOV Not Ready DAVID BURKHEAD
Smoke Detectors 6/26/2024 Partial Inspection DAVID BURKHEAD
Pre-Inspection 6/27/2024 Corrections Issued DAVID BURKHEAD
Pre-Inspection 6/28/2024 Corrections Issued DAVID BURKHEAD
Pre-Inspection 7/1/2024 Partial Approval DAVID BURKHEAD
Final 7/2/2024 Partial Inspection DAVID BURKHEAD
Green Building Final 7/2/2024 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 7/2/2024 SGSOV Not Ready DAVID BURKHEAD
Smoke Detectors 7/2/2024 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 7/2/2024 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 7/3/2024 Partial Inspection DAVID BURKHEAD
Pre-Inspection 7/5/2024 Partial Inspection DAVID BURKHEAD
Pre-Inspection 7/8/2024 Corrections Issued DAVID BURKHEAD
Insulation 7/9/2024 Partial Inspection DAVID BURKHEAD
Pre-Inspection 7/10/2024 Partial Inspection DAVID BURKHEAD
Special/Order Compliance 7/11/2024 Corrections Issued DAVID BURKHEAD
Structural Steel Frame 7/11/2024 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 7/15/2024 Not Ready for Inspection DAVID BURKHEAD
Structural Steel Frame 7/16/2024 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 7/18/2024 Partial Approval DAVID BURKHEAD
Pre-Inspection 7/19/2024 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 7/22/2024 Partial Approval DAVID BURKHEAD
Final 7/26/2024 Not Ready for Inspection DAVID BURKHEAD
Green Building Final 7/26/2024 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 7/26/2024 SGSOV Approved DAVID BURKHEAD
Smoke Detectors 7/26/2024 Approved DAVID BURKHEAD
Final 7/31/2024 Partial Inspection DAVID BURKHEAD
Green Building Final 7/31/2024 Partial Approval DAVID BURKHEAD
Green Building Final 7/31/2024 Partial Inspection DAVID BURKHEAD
Special/Order Compliance 7/31/2024 Approved DAVID BURKHEAD
Pre-Inspection 8/1/2024 Partial Inspection DAVID BURKHEAD
Special/Order Compliance 11/22/2024 Corrections Issued DAVID BURKHEAD
Special/Order Compliance 1/13/2025 Partial Approval DAVID BURKHEAD
Special/Order Compliance 2/6/2025 Corrections Issued DAVID BURKHEAD
Special/Order Compliance 7/15/2025 Approved DAVID BURKHEAD
Special/Order Compliance 12/29/2025 Approved DAVID BURKHEAD