778 N SARBONNE ROAD 90077

Certificate Information: 778 N SARBONNE ROAD 90077

Application / Permit
19010-10000-04124
Plan Check / Job No.
B19LA19721
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
(N) SFD WITH ATTACHED GARAGE WITH CANTILEVERED DECK SUPPORTED ON PILES.
Permit Issued
Issued on 8/21/2020
Issuing Office
Metro
Current Status
Issued on 8/21/2020
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 9/17/2019 APPLICANT
Assigned to Plan Check Engineer 9/26/2019 FARSHAD ALIMOHAMADI
Corrections Issued 12/16/2019 FARSHAD ALIMOHAMADI
Quality Review Completed 12/22/2019 YOUNG KIM
Applicant returned to address corrections 1/24/2020 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 4/29/2020 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 5/6/2020 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 5/20/2020 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 7/2/2020 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 7/21/2020 FARSHAD ALIMOHAMADI
Green Plans Picked Up 7/29/2020 APPLICANT
Applicant returned to address corrections 8/20/2020 FARSHAD ALIMOHAMADI
Plan Check Approved 8/21/2020 FARSHAD ALIMOHAMADI
Issued 8/21/2020 APPLICANT
Building Plans Picked Up 8/21/2020 APPLICANT

Permit Application Clearance Information

Address approval Cleared 12/10/2019 THOMAS LANG
BHO/Hillside ordinance Cleared 12/10/2019 THOMAS LANG
BHO/Hillside ordinance Cleared 12/10/2019 THOMAS LANG
BHO/Hillside ordinance Cleared 12/10/2019 THOMAS LANG
Eng Process Fee Ord 176,300 Cleared 12/11/2019 ANTHONY MAINEZ
Sewer availability Cleared 12/11/2019 ANTHONY MAINEZ
Landscape for retaining wall Cleared 1/14/2020 NOAH MCCOY
ZI Cleared 1/14/2020 NOAH MCCOY
Trees in Parkway Cleared 1/17/2020 ADRIAN SANCHEZ
Green Code Cleared 4/13/2020 VIVIAN LAO
Hydrant and Access approval Cleared 5/8/2020 JOHN CONNEALLY
Low Impact Development Cleared 6/27/2020 MARTIN FRAGOSO
Permit Cleared 7/8/2020 ANTHONY MAINEZ
Roof/Waste drainage to street Cleared 7/8/2020 ANTHONY MAINEZ
Work Adjacent to Public Way Cleared 7/8/2020 SAUL GARCIA

Contact Information

Architect , ; Lic. No.: C36197       ,
Contractor Dugally Oberfeld Inc; Lic. No.: 862641-B 484 S SAN VICENTE BLVD      LOS ANGELES, CA 90048
Engineer Cox,, Steven Jeffrey; Lic. No.: C48940 130 MAGELLAN ST      THOUSAND OAKS, CA 91360
Engineer Salter,, David R; Lic. No.: C69911 3445 CEDAR ST      SANTA YNEZ, CA 93460

Inspector Information

RYAN SALAZAR, (310) 914-3862 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/25/2020 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 9/23/2020 Corrections Issued CHRISTOPHER WILSON
Pre-Inspection 9/24/2020 Corrections Issued CHRISTOPHER WILSON
Piling/Pier/Caisson 10/1/2020 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 10/9/2020 Partial Approval CHRISTOPHER WILSON
Deputy Grading 10/15/2020 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 10/20/2020 Corrections Issued CHRISTOPHER WILSON
Deputy Grading 10/22/2020 Conditional Approval CHRISTOPHER WILSON
Deputy Grading 10/23/2020 Conditional Approval CHRISTOPHER WILSON
Deputy Grading 10/27/2020 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 10/29/2020 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 10/30/2020 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 11/2/2020 Conditional Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 11/6/2020 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 11/18/2020 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 11/23/2020 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 12/1/2020 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 12/2/2020 Corrections Issued CHRISTOPHER WILSON
Deputy Grading 12/3/2020 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 12/3/2020 Partial Approval CHRISTOPHER WILSON
Deputy Grading 12/4/2020 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 12/4/2020 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 12/15/2020 Partial Approval MATT KELLERMAN
Footing/Foundation/Slab 12/16/2020 Partial Approval MATT KELLERMAN
Deputy Grading 12/21/2020 Partial Approval MATT KELLERMAN
Deputy Grading 12/22/2020 Approved MATT KELLERMAN
Footing/Foundation/Slab 12/22/2020 Partial Approval MATT KELLERMAN
Deputy Grading 12/23/2020 Partial Approval MATT KELLERMAN
Deputy Grading 12/24/2020 Partial Approval MATT KELLERMAN
Deputy Grading 1/6/2021 Conditional Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 1/7/2021 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 1/8/2021 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 1/15/2021 Corrections Issued CHRISTOPHER WILSON
Deputy Grading 1/19/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Grading 1/20/2021 Partial Approval MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 1/20/2021 Partial Inspection MATT KELLERMAN
Piling/Pier/Caisson 1/20/2021 Partial Approval MATT KELLERMAN
Deputy Grading 1/21/2021 Partial Approval MATT KELLERMAN
Deputy Grading 1/22/2021 Approved MATT KELLERMAN
Deputy Grading 1/25/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Grading 1/26/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Grading 1/27/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Grading 1/28/2021 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 1/29/2021 Not Ready for Inspection CHRISTOPHER WILSON
Piling/Pier/Caisson 2/1/2021 Partial Approval CHRISTOPHER WILSON
Deputy Grading 2/2/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Grading 2/3/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Grading 2/4/2021 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 2/4/2021 Partial Approval CHRISTOPHER WILSON
Deputy Grading 2/5/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Grading 2/8/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Grading 2/9/2021 Conditional Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 2/9/2021 Not Ready for Inspection CHRISTOPHER WILSON
Sewer 2/9/2021 Partial Approval CHRISTOPHER WILSON
Deputy Grading 2/10/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Grading 2/11/2021 Conditional Approval CARLOS MATAMOROS
Piling/Pier/Caisson 2/11/2021 Partial Approval MATT KELLERMAN
Footing/Foundation/Slab 2/18/2021 Not Ready for Inspection CHRISTOPHER WILSON
Deputy Grading 2/19/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Grading 2/22/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Grading 2/25/2021 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 2/26/2021 Corrections Issued CHRISTOPHER WILSON
Piling/Pier/Caisson 3/2/2021 Partial Approval MATT KELLERMAN
PLUMBING-Rough 3/9/2021 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 3/9/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 3/17/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 3/23/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 4/1/2021 Partial Approval MATT KELLERMAN
Footing/Foundation/Slab 4/8/2021 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 4/22/2021 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 4/22/2021 Corrections Issued CHRISTOPHER WILSON
Piling/Pier/Caisson 4/23/2021 Partial Approval CHRISTOPHER WILSON
Reinforced Concrete Frame 4/23/2021 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 4/27/2021 Conditional Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 4/29/2021 Corrections Issued CHRISTOPHER WILSON
Deputy Reinf. Concrete 4/30/2021 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 4/30/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 5/5/2021 Corrections Issued CHRISTOPHER WILSON
Piling/Pier/Caisson 5/6/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 5/10/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 5/20/2021 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 5/21/2021 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 5/25/2021 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 5/28/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 5/28/2021 Partial Approval CHRISTOPHER WILSON
Reinforced Concrete Frame 5/28/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 6/3/2021 Partial Approval MATT KELLERMAN
Reinforced Concrete Frame 6/3/2021 Partial Approval MATT KELLERMAN
Footing/Foundation/Slab 6/10/2021 Partial Approval MATT KELLERMAN
Footing/Foundation/Slab 6/16/2021 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 6/21/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 6/24/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 6/28/2021 Partial Approval CHRISTOPHER WILSON
Deputy Other (see comments) 7/1/2021 No Access for Inspection AMY COLIN
Piling/Pier/Caisson 7/1/2021 Partial Approval CHRISTOPHER WILSON
Deputy Grading 7/2/2021 Conditional Approval ADAM ESCOTO
Deputy Grading 7/6/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Grading 7/7/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Grading 7/8/2021 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 7/9/2021 Partial Approval CHRISTOPHER WILSON
Deputy Grading 7/12/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Grading 7/13/2021 Conditional Approval CHRISTOPHER WILSON
PLUMBING-Rough 7/13/2021 Corrections Issued CHRISTOPHER WILSON
Deputy Grading 7/14/2021 Conditional Approval ADAM ESCOTO
Excavation/Setback/Form/Re-Bar 7/14/2021 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 7/14/2021 Partial Approval CHRISTOPHER WILSON
Deputy Grading 7/16/2021 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 7/16/2021 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 7/20/2021 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 7/27/2021 Partial Approval CHRISTOPHER WILSON
Pre-Inspection 8/2/2021 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 8/9/2021 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 8/10/2021 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 8/18/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 8/19/2021 Corrections Issued CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 9/1/2021 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 9/3/2021 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 9/9/2021 Corrections Issued MATT KELLERMAN
Footing/Foundation/Slab 9/14/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 9/20/2021 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 9/21/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 9/29/2021 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 10/7/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 10/19/2021 Conditional Approval CHRISTOPHER WILSON
PLUMBING-Rough 10/20/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 10/26/2021 Corrections Issued CHRISTOPHER WILSON
Piling/Pier/Caisson 10/27/2021 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 10/28/2021 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 10/28/2021 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 11/10/2021 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 11/17/2021 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 11/22/2021 Partial Approval BRENDAN LOONEY
Footing/Foundation/Slab 11/23/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 12/8/2021 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 12/9/2021 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 12/9/2021 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 12/15/2021 Conditional Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 12/15/2021 Partial Approval BRENDAN LOONEY
Footing/Foundation/Slab 12/17/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 12/21/2021 Corrections Issued CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 12/22/2021 Partial Approval CHRISTOPHER WILSON
Special/Order Compliance 12/22/2021 Partial Inspection CLAYTON GRAHAM
Deputy Steel/Welding 1/6/2022 Approved CHRISTOPHER WILSON
Footing/Foundation/Slab 1/6/2022 Partial Approval CHRISTOPHER WILSON
Special/Order Compliance 1/6/2022 Approved BRENDAN LOONEY
Deputy Steel/Welding 1/7/2022 Conditional Approval CHRISTOPHER WILSON
Deputy Steel/Welding 1/13/2022 Approved MICHAEL PELHAM
Footing/Foundation/Slab 1/13/2022 Partial Approval CHRISTOPHER WILSON
Deputy Steel/Welding 1/14/2022 Conditional Approval MICHAEL PELHAM
Footing/Foundation/Slab 1/20/2022 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 1/26/2022 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 2/1/2022 Partial Approval JOHN KIDWELL
Deputy Reinf. Concrete 2/2/2022 Partial Approval JOHN KIDWELL
Piling/Pier/Caisson 2/2/2022 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 2/9/2022 Partial Approval BRENDAN LOONEY
PLUMBING-Rough 2/9/2022 Partial Approval BRENDAN LOONEY
Footing/Foundation/Slab 2/15/2022 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 2/15/2022 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 2/18/2022 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 2/18/2022 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 2/23/2022 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 2/23/2022 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 3/9/2022 Partial Approval BRENDAN LOONEY
Footing/Foundation/Slab 3/17/2022 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 3/24/2022 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 3/31/2022 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 4/5/2022 Not Ready for Inspection CHRISTOPHER WILSON
Structural Steel Frame 4/5/2022 Corrections Issued CHRISTOPHER WILSON
Structural Steel Frame 4/7/2022 Partial Approval CHRISTOPHER WILSON
Structural Steel Frame 4/13/2022 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 4/19/2022 Partial Approval CHRISTOPHER WILSON
Structural Steel Frame 4/19/2022 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 4/28/2022 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 5/4/2022 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 5/12/2022 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 5/25/2022 Partial Approval GERMAN RODRIGUEZ MENDOZA
HVAC-Rough 5/25/2022 Partial Approval GERMAN RODRIGUEZ MENDOZA
PLUMBING-Rough 5/25/2022 Partial Approval GERMAN RODRIGUEZ MENDOZA
Footing/Foundation/Slab 6/2/2022 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 6/2/2022 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 6/9/2022 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 6/16/2022 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 6/16/2022 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 6/23/2022 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 6/28/2022 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 6/28/2022 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 7/8/2022 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 8/16/2022 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 8/18/2022 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 8/22/2022 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 9/26/2022 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 10/13/2022 Corrections Issued CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 10/21/2022 Corrections Issued CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 10/25/2022 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 11/22/2022 Not Ready for Inspection CARLOS MATAMOROS
Footing/Foundation/Slab 11/28/2022 Corrections Issued GERMAN RODRIGUEZ MENDOZA
Footing/Foundation/Slab 12/5/2022 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 12/14/2022 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 1/6/2023 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 1/13/2023 Partial Approval GERMAN RODRIGUEZ MENDOZA
Reinforced Concrete Frame 1/13/2023 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
ELECTRICAL-Rough 2/3/2023 Corrections Issued CHRISTOPHER WILSON
ELECTRICAL-Rough 2/14/2023 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 2/14/2023 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 2/27/2023 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 3/2/2023 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 6/1/2023 Partial Approval CHRISTOPHER WILSON
Structural Steel Frame 6/1/2023 Partial Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 6/7/2023 Corrections Issued CHRISTOPHER WILSON
Special/Order Compliance 6/7/2023 Partial Inspection MICHAEL PELHAM
Floor/Roof Diaphrgm/Shear Wall 6/13/2023 Corrections Issued MICHAEL PELHAM
Reinforced Concrete Frame 6/21/2023 Partial Approval CHRISTOPHER WILSON
Reinforced Concrete Frame 7/5/2023 Partial Approval CHRISTOPHER WILSON
Special/Order Compliance 7/26/2023 Partial Inspection MICHAEL PELHAM
Special/Order Compliance 7/26/2023 Partial Inspection STEPHANIE SWANSON
Special/Order Compliance 8/4/2023 Corrections Issued MICHAEL PELHAM
Special/Order Compliance 8/4/2023 Partial Inspection CHRISTOPHER WILSON
Special/Order Compliance 9/6/2023 Partial Inspection CHRISTOPHER WILSON
Special/Order Compliance 9/6/2023 Partial Inspection MICHAEL PELHAM
Floor/Roof Diaphrgm/Shear Wall 10/3/2023 Partial Approval CHRISTOPHER WILSON
Special/Order Compliance 10/10/2023 Corrections Issued MICHAEL PELHAM
Pre-Inspection 10/25/2023 Approved CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 11/27/2023 Partial Approval CHRISTOPHER WILSON
Special/Order Compliance 11/27/2023 Corrections Issued CHRISTOPHER WILSON
Reinforced Concrete Frame 1/12/2024 Partial Approval CHRISTOPHER WILSON
Pre-Inspection 1/30/2024 Corrections Issued CHRISTOPHER WILSON
Pre-Inspection 4/17/2024 Partial Approval CHRISTOPHER WILSON
Structural Steel Frame 4/17/2024 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 4/18/2024 Not Ready for Inspection CHRISTOPHER WILSON
Structural Steel Frame 4/26/2024 Corrections Issued CHRISTOPHER WILSON
BUILDING-Rough-Frame 4/29/2024 Corrections Issued CHRISTOPHER WILSON
Green Building Rough 4/29/2024 Not Ready for Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 4/29/2024 Not Ready for Inspection CHRISTOPHER WILSON
Structural Steel Frame 5/15/2024 Corrections Issued CHRISTOPHER WILSON
HVAC-Rough 6/3/2024 Not Ready for Inspection CHRISTOPHER WILSON
Pre-Inspection 6/3/2024 Not Ready for Inspection CHRISTOPHER WILSON
Structural Steel Frame 6/3/2024 Not Ready for Inspection CHRISTOPHER WILSON
ELECTRICAL-Rough 6/11/2024 Corrections Issued CHRISTOPHER WILSON
Special/Order Compliance 6/21/2024 Corrections Issued CHRISTOPHER WILSON
Underground Mechanical 6/28/2024 Partial Approval CHRISTOPHER WILSON
Wood Frame 7/22/2024 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 8/6/2024 Partial Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 8/14/2024 Partial Approval MICHAEL PELHAM
Underground Mechanical 8/14/2024 Partial Approval MICHAEL PELHAM
PLUMBING-Rough 8/22/2024 Partial Approval MICHAEL PELHAM
PLUMBING-Rough 8/29/2024 Partial Approval MICHAEL PELHAM
Special/Order Compliance 8/29/2024 Partial Inspection DANIEL VERA
Special/Order Compliance 8/29/2024 Partial Inspection MICHAEL ALLEN
Special/Order Compliance 8/29/2024 Partial Inspection REGINA MENDEZ
Pre-Inspection 9/5/2024 Not Ready for Inspection CHRISTOPHER WILSON
Special/Order Compliance 9/5/2024 Partial Inspection MICHAEL PELHAM
Underground Mechanical 9/6/2024 Partial Approval CHRISTOPHER WILSON
Gas Test 9/11/2024 Not Ready for Inspection CHRISTOPHER WILSON
Underground Mechanical 9/11/2024 Corrections Issued CHRISTOPHER WILSON
Gas Test 9/12/2024 Partial Approval CHRISTOPHER WILSON
Gas Test 9/13/2024 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 9/13/2024 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 9/13/2024 Partial Inspection CHRISTOPHER WILSON
Underground Mechanical 9/17/2024 Partial Inspection CHRISTOPHER WILSON
Gas Test 9/18/2024 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 9/18/2024 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 9/20/2024 Not Ready for Inspection CHRISTOPHER WILSON
Underground Mechanical 9/20/2024 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 9/23/2024 Corrections Issued CHRISTOPHER WILSON
Rough-Elec/Plmb/HVAC 9/23/2024 Partial Approval CHRISTOPHER WILSON
Structural Steel Frame 9/25/2024 Not Ready for Inspection CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 9/30/2024 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 10/1/2024 Corrections Issued CHRISTOPHER WILSON
ELECTRICAL-Rough 10/2/2024 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 10/3/2024 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 10/4/2024 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 10/8/2024 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 10/11/2024 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 10/18/2024 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 10/21/2024 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 10/22/2024 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 10/23/2024 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 10/24/2024 Corrections Issued CHRISTOPHER WILSON
ELECTRICAL-Rough 10/29/2024 Partial Approval CHRISTOPHER WILSON
Structural Steel Frame 10/31/2024 Not Ready for Inspection CHRISTOPHER WILSON
Gas Test 11/4/2024 Partial Approval CHRISTOPHER WILSON
Special/Order Compliance 11/4/2024 Partial Inspection BOBBY KEY
BUILDING-Rough-Frame 11/8/2024 Corrections Issued CHRISTOPHER WILSON
Green Building Rough 11/8/2024 Not Ready for Inspection CHRISTOPHER WILSON
Structural Steel Frame 11/8/2024 Not Ready for Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 11/8/2024 Partial Approval CHRISTOPHER WILSON
Green Building Rough 11/15/2024 Not Ready for Inspection CHRISTOPHER WILSON
Structural Steel Frame 11/15/2024 Corrections Issued CHRISTOPHER WILSON
Verify Sprinkler Sign Off 11/15/2024 Not Ready for Inspection CHRISTOPHER WILSON
BUILDING-Rough-Frame 11/21/2024 Not Ready for Inspection CHRISTOPHER WILSON
Structural Steel Frame 11/21/2024 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 11/21/2024 Not Ready for Inspection CHRISTOPHER WILSON
BUILDING-Rough-Frame 12/2/2024 Partial Approval CHRISTOPHER WILSON
Green Building Rough 12/2/2024 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 12/4/2024 Approved CHRISTOPHER WILSON
BUILDING-Rough-Frame 12/10/2024 Not Ready for Inspection CHRISTOPHER WILSON
Green Building Rough 12/10/2024 Not Ready for Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 12/10/2024 Not Ready for Inspection CHRISTOPHER WILSON
BUILDING-Rough-Frame 12/12/2024 Partial Approval CHRISTOPHER WILSON
Green Building Rough 12/12/2024 Approved CHRISTOPHER WILSON
Verify Sprinkler Sign Off 12/12/2024 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 12/17/2024 Not Ready for Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 12/17/2024 Not Ready for Inspection CHRISTOPHER WILSON
Insulation 12/19/2024 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 12/23/2024 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 12/23/2024 Partial Approval CHRISTOPHER WILSON
Gas Test 1/8/2025 Partial Approval BOBBY KEY
Insulation 1/8/2025 Partial Approval BOBBY KEY
Insulation 1/13/2025 Partial Approval CHRISTOPHER WILSON
Special/Order Compliance 1/13/2025 Corrections Issued CHRISTOPHER WILSON
Verify Sprinkler Sign Off 1/13/2025 Not Ready for Inspection CHRISTOPHER WILSON
Gas Test 1/15/2025 Not Ready for Inspection ARAM AVEDISIAN
Pre-Inspection 1/15/2025 Not Ready for Inspection ARAM AVEDISIAN
Gas Test 1/16/2025 Partial Approval CHRISTOPHER WILSON
Pre-Inspection 1/16/2025 Not Ready for Inspection CHRISTOPHER WILSON
Gas Test 1/17/2025 Partial Approval CHRISTOPHER WILSON
Shower Pan 1/17/2025 Not Ready for Inspection CHRISTOPHER WILSON
BUILDING-Rough-Frame 1/22/2025 Partial Approval BOBBY KEY
Shower Pan 1/22/2025 Partial Approval BOBBY KEY
BUILDING-Rough-Frame 1/28/2025 Corrections Issued CHRISTOPHER WILSON
Insulation 1/28/2025 Not Ready for Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 1/28/2025 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 1/30/2025 Partial Approval CHRISTOPHER WILSON
Shower Pan 1/30/2025 Not Ready for Inspection CHRISTOPHER WILSON
Interior/Exterior Lathing 1/31/2025 Partial Approval CHRISTOPHER WILSON
Shower Pan 1/31/2025 Corrections Issued CHRISTOPHER WILSON
Drywall Nailing 2/3/2025 Partial Approval CHRISTOPHER WILSON
Interior/Exterior Lathing 2/3/2025 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 2/5/2025 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 2/5/2025 Approved CHRISTOPHER WILSON
ELECTRICAL-Rough 2/10/2025 Partial Approval STEPHANIE SWANSON
HVAC-Rough 2/10/2025 Not Ready for Inspection STEPHANIE SWANSON
Insulation 2/11/2025 Partial Approval BOBBY KEY
Insulation 2/13/2025 Not Ready for Inspection STEPHANIE SWANSON
Drywall Nailing 2/21/2025 Partial Approval CHRISTOPHER WILSON
Shower Pan 2/21/2025 Not Ready for Inspection CHRISTOPHER WILSON
Interior/Exterior Lathing 2/25/2025 Partial Approval CHRISTOPHER WILSON
Structural Steel Frame 2/25/2025 Corrections Issued CHRISTOPHER WILSON
Insulation 2/27/2025 Partial Approval CHRISTOPHER WILSON
Interior/Exterior Lathing 2/28/2025 Not Ready for Inspection CHRISTOPHER WILSON
Interior/Exterior Lathing 3/3/2025 Corrections Issued CHRISTOPHER WILSON
Interior/Exterior Lathing 3/20/2025 Partial Inspection CHRISTOPHER WILSON
PLUMBING-Rough 3/20/2025 Partial Approval CHRISTOPHER WILSON
Pre-Inspection 3/25/2025 Partial Inspection CHRISTOPHER WILSON
Interior/Exterior Lathing 3/28/2025 Partial Approval CHRISTOPHER WILSON
Shower Pan 3/28/2025 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 4/1/2025 Corrections Issued CHRISTOPHER WILSON
Drywall Nailing 4/8/2025 Partial Approval CHRISTOPHER WILSON
Interior/Exterior Lathing 4/8/2025 Partial Approval CHRISTOPHER WILSON
Interior/Exterior Lathing 4/30/2025 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 5/6/2025 Corrections Issued CHRISTOPHER WILSON
Interior/Exterior Lathing 5/14/2025 Partial Approval CHRISTOPHER WILSON
Pre-Inspection 5/14/2025 Partial Inspection CHRISTOPHER WILSON
PLUMBING-Rough 6/13/2025 Not Ready for Inspection CHRISTOPHER WILSON
Pre-Inspection 6/16/2025 Partial Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 6/18/2025 Partial Approval CHRISTOPHER WILSON
Pre-Inspection 6/20/2025 Not Ready for Inspection CHRISTOPHER WILSON
Interior/Exterior Lathing 6/25/2025 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 6/30/2025 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 7/1/2025 Corrections Issued CHRISTOPHER WILSON
Pre-Inspection 7/1/2025 Not Ready for Inspection CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 7/3/2025 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 7/7/2025 Partial Approval CHRISTOPHER WILSON
Light Gage Steel Frame 7/15/2025 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 7/15/2025 Partial Approval CHRISTOPHER WILSON
Structural Steel Frame 7/15/2025 Not Ready for Inspection CHRISTOPHER WILSON
Pre-Inspection 7/18/2025 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 7/21/2025 Partial Approval CHRISTOPHER WILSON
Interior/Exterior Lathing 7/21/2025 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 7/23/2025 Partial Approval CHRISTOPHER WILSON
Insulation 7/23/2025 Partial Approval CHRISTOPHER WILSON
Insulation 7/25/2025 Not Ready for Inspection CHRISTOPHER WILSON
Drywall Nailing 8/11/2025 Partial Approval CHRISTOPHER WILSON
Interior/Exterior Lathing 8/19/2025 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 8/22/2025 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 8/27/2025 Partial Approval CHRISTOPHER WILSON
Structural Steel Frame 8/27/2025 Approved CHRISTOPHER WILSON
Interior/Exterior Lathing 8/29/2025 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 9/4/2025 Partial Inspection CHRISTOPHER WILSON
Interior/Exterior Lathing 9/4/2025 Partial Approval CHRISTOPHER WILSON
Structural Steel Frame 9/4/2025 Approved CHRISTOPHER WILSON
Insulation 9/11/2025 Partial Approval CHRISTOPHER WILSON
Light Gage Steel Frame 9/12/2025 Partial Approval CHRISTOPHER WILSON
Light Gage Steel Frame 9/17/2025 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 9/24/2025 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 9/24/2025 Corrections Issued CHRISTOPHER WILSON
Insulation 9/24/2025 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 9/25/2025 Partial Approval CHRISTOPHER WILSON
Wood Frame 9/26/2025 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 9/29/2025 Approved CHRISTOPHER WILSON
ELECTRICAL-Rough 9/30/2025 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 10/6/2025 Partial Approval CARLOS MATAMOROS
Gas Test 10/6/2025 Approved CARLOS MATAMOROS
Insulation 10/6/2025 Partial Approval CARLOS MATAMOROS
Underground Mechanical 10/6/2025 Approved CARLOS MATAMOROS
Drywall Nailing 10/17/2025 Corrections Issued SEAN HAUPT
Drywall Nailing 10/21/2025 Partial Approval DANIEL VERA
Insulation 10/21/2025 Partial Approval DANIEL VERA
BUILDING-Rough-Frame 10/29/2025 Partial Approval SEAN HAUPT
Drywall Nailing 11/5/2025 Partial Approval CARLOS MATAMOROS
HVAC-Rough 11/12/2025 Partial Approval SEAN HAUPT
Insulation 11/13/2025 Partial Approval SEAN HAUPT
Rough-Elec/Plmb/HVAC 11/13/2025 Partial Approval SEAN HAUPT
ELECTRICAL-Rough 11/17/2025 Partial Approval CARLOS MATAMOROS
Insulation 11/17/2025 Partial Approval CARLOS MATAMOROS
Interior/Exterior Lathing 11/17/2025 Approved CARLOS MATAMOROS
Interior/Exterior Lathing 11/18/2025 Partial Approval SEAN HAUPT
Drywall Nailing 11/21/2025 Partial Approval SEAN HAUPT
Drywall Nailing 11/24/2025 Partial Approval SEAN HAUPT
HVAC-Rough 11/24/2025 Partial Approval SEAN HAUPT
Insulation 12/4/2025 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 12/31/2025 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 1/8/2026 Partial Approval CHRISTOPHER WILSON
Wood Frame 1/15/2026 Approved CHRISTOPHER WILSON
Insulation 1/20/2026 Partial Approval CHRISTOPHER WILSON
Light Gage Steel Frame 2/23/2026 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 2/25/2026 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 2/25/2026 Partial Approval CHRISTOPHER WILSON
Grounding or Bonding 2/25/2026 Partial Approval CHRISTOPHER WILSON
Interior/Exterior Lathing 3/10/2026 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 3/17/2026 Partial Approval CHRISTOPHER WILSON
Interior/Exterior Lathing 3/25/2026 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 4/13/2026 Corrections Issued CHRISTOPHER WILSON
ELECTRICAL-Rough 4/13/2026 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 4/21/2026 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 4/23/2026 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 4/23/2026 Partial Approval CHRISTOPHER WILSON
Insulation 4/23/2026 Partial Approval CHRISTOPHER WILSON
Masonry Wall/Backfill 5/5/2026 Partial Approval RYAN SALAZAR
Floor/Roof Diaphrgm/Shear Wall 5/6/2026 Partial Approval RYAN SALAZAR
Interior/Exterior Lathing 5/6/2026 Partial Approval RYAN SALAZAR