Footing/Foundation/Slab
|
1/25/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
1/26/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
1/29/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
1/29/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
1/30/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
2/12/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
2/13/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
2/14/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
2/14/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
2/15/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
2/15/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
2/16/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
2/22/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
2/23/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
2/28/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
3/4/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Masonry Wall/Backfill
|
3/4/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Special/Order Compliance
|
3/4/2024
|
Partial Inspection
|
DEANDRE HOFFMAN
|
|
Deputy Shotcrete
|
3/5/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
3/5/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Green Building Rough
|
3/5/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
3/5/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Special/Order Compliance
|
3/5/2024
|
Partial Inspection
|
DEANDRE HOFFMAN
|
|
Verify Sprinkler Sign Off
|
3/5/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
3/7/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Special/Order Compliance
|
3/7/2024
|
Partial Inspection
|
BRIAN KELLY
|
|
Special/Order Compliance
|
3/7/2024
|
Partial Inspection
|
DEANDRE HOFFMAN
|
|
Deputy Shotcrete
|
3/8/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
3/8/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Special/Order Compliance
|
3/8/2024
|
Partial Inspection
|
DEANDRE HOFFMAN
|
|
Deputy Shotcrete
|
3/11/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
3/11/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Pre-Inspection
|
3/11/2024
|
Partial Approval
|
DEANDRE HOFFMAN
|
|
Reinforced Concrete Frame
|
3/11/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
3/11/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
3/12/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
3/12/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Green Building Rough
|
3/12/2024
|
Not Ready for Inspection
|
DEANDRE HOFFMAN
|
|
Reinforced Concrete Frame
|
3/12/2024
|
Partial Inspection
|
DEANDRE HOFFMAN
|
|
Verify Sprinkler Sign Off
|
3/12/2024
|
Not Ready for Inspection
|
DEANDRE HOFFMAN
|
|
Deputy Reinf. Concrete
|
3/13/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
3/13/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
3/13/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
3/13/2024
|
Partial Approval
|
DEANDRE HOFFMAN
|
|
Deputy Shotcrete
|
3/14/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
3/15/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
3/15/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
3/15/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
3/15/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
3/18/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
3/18/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
3/19/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
3/19/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
3/19/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
3/19/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
3/20/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Piling/Pier/Caisson
|
3/20/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
3/27/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Masonry Wall/Backfill
|
3/27/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
4/11/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
4/24/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
4/25/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
4/25/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
4/25/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
4/25/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
4/25/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
4/26/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
4/26/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
4/29/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
4/30/2024
|
Conditional Approval
|
DEANDRE HOFFMAN
|
|
Deputy Reinf. Concrete
|
5/1/2024
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Masonry Wall/Backfill
|
5/8/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Masonry Wall/Backfill
|
5/14/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Reinforced Masonry Frame
|
5/15/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
5/22/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Masonry Frame
|
5/22/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Masonry Frame
|
5/31/2024
|
Partial Approval
|
DEANDRE HOFFMAN
|
|
Reinforced Masonry Frame
|
6/5/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
6/10/2024
|
Partial Inspection
|
DEANDRE HOFFMAN
|
|
Reinforced Concrete Frame
|
6/10/2024
|
Partial Inspection
|
DEANDRE HOFFMAN
|
|
Verify Sprinkler Sign Off
|
6/10/2024
|
Not Ready for Inspection
|
DEANDRE HOFFMAN
|
|
Deputy Reinf. Concrete
|
6/11/2024
|
Conditional Approval
|
DEANDRE HOFFMAN
|
|
Footing/Foundation/Slab
|
6/11/2024
|
Partial Approval
|
DEANDRE HOFFMAN
|
|
Deputy Reinf. Concrete
|
6/12/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/18/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
6/18/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
6/18/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
6/18/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
6/18/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
6/20/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
6/24/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
6/24/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Masonry Frame
|
6/24/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
6/24/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Green Building Rough
|
6/26/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
6/26/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
6/26/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
6/27/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
6/28/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Special/Order Compliance
|
6/28/2024
|
Partial Inspection
|
DEANDRE HOFFMAN
|
|
Deputy Reinf. Concrete
|
7/1/2024
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
7/1/2024
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
7/1/2024
|
Conditional Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
7/1/2024
|
Corrections Issued
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
7/1/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
7/2/2024
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
7/2/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
7/3/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
7/8/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
7/9/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
7/10/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
7/10/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
7/10/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
7/10/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
7/10/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
7/11/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
7/11/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
7/12/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
7/12/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
7/12/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
7/15/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
7/16/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
7/17/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
7/19/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
7/19/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
7/19/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
9/13/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
9/16/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
9/23/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Masonry Frame
|
10/1/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
10/24/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Special/Order Compliance
|
10/24/2024
|
Partial Inspection
|
DEANDRE HOFFMAN
|
|
Excavation/Setback/Form/Re-Bar
|
10/31/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
11/5/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
11/8/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Special/Order Compliance
|
11/8/2024
|
Partial Inspection
|
DEANDRE HOFFMAN
|
|
Deputy Reinf. Concrete
|
11/13/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
11/15/2024
|
Corrections Issued
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
11/18/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Special/Order Compliance
|
11/18/2024
|
Partial Inspection
|
BRIAN KELLY
|
|
Deputy Drilled-In Anchors
|
1/13/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
1/22/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Special/Order Compliance
|
1/22/2025
|
Partial Inspection
|
DEANDRE HOFFMAN
|
|
Footing/Foundation/Slab
|
1/24/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Special/Order Compliance
|
1/24/2025
|
Partial Inspection
|
DEANDRE HOFFMAN
|
|
Deputy Reinf. Masonry
|
1/30/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Special/Order Compliance
|
1/30/2025
|
Partial Inspection
|
DEANDRE HOFFMAN
|
|
Pre-Inspection
|
4/29/2025
|
Partial Inspection
|
DEANDRE HOFFMAN
|
|
Special/Order Compliance
|
4/29/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Pre-Inspection
|
5/2/2025
|
Partial Inspection
|
DEANDRE HOFFMAN
|
|
Special/Order Compliance
|
5/2/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
6/24/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
6/26/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
7/8/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
7/17/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
7/18/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
7/25/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
8/1/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
8/6/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
8/19/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
11/18/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
1/27/2026
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
2/10/2026
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
2/13/2026
|
Conditional Approval
|
ROBERT DAVIS
|