401 E 6TH ST 90014

Certificate Information: 401 E 6TH ST 90014

Application / Permit
19010-10000-03810
Plan Check / Job No.
B19LA18067
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
New 6 story with 94 TOTAL UNITS: 83 Very Low Income, 10 Low Income, and 1 Manager Unit. 5 Story Type III-A affordable apartments over 1 Story of Type I-A commercial, residential amenities, garage and back of house spaces. No basement. Project is 100% affordable. The superstructure is a State Approved Modular Unit construction.
Permit Issued
Issued on 9/10/2021
Issuing Office
Current Status
CofO Issued on 4/30/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/27/2019 APPLICANT
Assigned to Plan Check Engineer 10/11/2019 QUAN NGHIEM
Plans on Hold 10/15/2019 JOSE RODRIGUEZ
Hold Released 11/6/2019 JOSE RODRIGUEZ
Corrections Issued 12/3/2019 QUAN NGHIEM
Quality Review Completed 12/12/2019 TIEN JEN WANG
Applicant returned to address corrections 1/29/2021 QUAN NGHIEM
Applicant returned to address corrections 4/1/2021 QUAN NGHIEM
Applicant returned to address corrections 4/6/2021 QUAN NGHIEM
Plan Check Approved 7/28/2021 QUAN NGHIEM
Issued 9/10/2021 APPLICANT
Building Plans Picked Up 9/21/2021 APPLICANT
TCO Issued (Expire Date: 01-01-2024) 7/5/2023 TED RIES
TCO Issued (Expire Date: 07-15-2024) 1/17/2024 ERNESTO CORRAL
CofO in Progress 4/29/2024 NICK DANERI
CofO Issued 4/30/2024 RAFAEL ESPINOZA
Permit Finaled 4/30/2024 RAFAEL ESPINOZA

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 2/23/2021 THOMAS LANG
Sewer availability Cleared 4/9/2021 PAMELA TENEZA
Low Impact Development Cleared 4/26/2021 AMMAR ELTAWIL
Address approval Cleared 4/29/2021 WALLIE JONG
Hydrant and Access approval Cleared 4/29/2021 KURT CORRAL
Bicycle Parking Cleared 5/7/2021 ELENA LOPEZ
Green Code Cleared 5/17/2021 AARON COSTA
Building over 36-ft Cleared 5/25/2021 CALOSHA APPROVED
Highway dedication Cleared 6/7/2021 WALLIE JONG
Roof/Waste drainage to street Cleared 6/7/2021 WALLIE JONG
Fire Marshall Fire Life Safety Cleared 6/8/2021 MENOA AGHAJANI
Work Adjacent to Public Way Cleared 6/10/2021 JOSE RODRIGUEZ
Public Housing Cleared 6/29/2021 JOEL LAUNCHBAUGH
Density Bonus 14.00.A.13 Cleared 7/13/2021 MARITESS GO
DAS Clearance Cleared 7/15/2021 QUAN NGHIEM
"D" conditions Cleared 7/20/2021 JOE LUCKEY
"Q" conditions Cleared 7/20/2021 JOE LUCKEY
Opn space landscape/Water mgmt Cleared 7/20/2021 JOE LUCKEY
Senate Bill 35 Cleared 7/20/2021 JOE LUCKEY
Redevelopment Project Area Cleared 7/21/2021 GISELLE CORELLA
Miscellaneous Cleared 7/27/2021 MAXFIELD VERMY
Hold Cleared 10/20/2021 JASON SHEETS

Contact Information

Architect Olsen,, Eric H; Lic. No.: C27721 3802 OSTROM AVE      LONG BEACH, CA 90808
Contractor Suffolk Construction Company Inc; Lic. No.: 751099-B 525 MARKET STREET   SUITE 2850    SAN FRANCISCO, CA 94105
Engineer Aden,, Mark D; Lic. No.: S4779 1314 S GRAND BLVD 2-359      SPOKANE, WA 99202

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 11/12/2021 No Access for Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 11/15/2021 Partial Inspection RAFAEL ESPINOZA
Pre-Inspection 12/14/2021 Partial Approval NICK DANERI
Deputy Reinf. Concrete 2/24/2022 Partial Approval JAMES POWERS
Footing/Foundation/Slab 2/24/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/25/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/28/2022 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 3/1/2022 Partial Approval NICK DANERI
Deputy Reinf. Concrete 3/2/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/4/2022 Conditional Approval NICK DANERI
Footing/Foundation/Slab 3/4/2022 Partial Approval NICK DANERI
Deputy Reinf. Concrete 3/7/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/8/2022 Conditional Approval NICK DANERI
Footing/Foundation/Slab 3/8/2022 Partial Approval NICK DANERI
Deputy Reinf. Concrete 3/9/2022 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 3/9/2022 Partial Approval NICK DANERI
Deputy Reinf. Concrete 3/10/2022 Conditional Approval NICK DANERI
Footing/Foundation/Slab 3/10/2022 Partial Approval NICK DANERI
Deputy Reinf. Concrete 3/14/2022 Conditional Approval NICK DANERI
Footing/Foundation/Slab 3/14/2022 Partial Approval NICK DANERI
Deputy Reinf. Concrete 3/15/2022 Conditional Approval NICK DANERI
Footing/Foundation/Slab 3/15/2022 Partial Approval NICK DANERI
Deputy Reinf. Concrete 3/17/2022 Conditional Approval NICK DANERI
Pre-Inspection 3/23/2022 Partial Inspection NICK DANERI
Deputy Reinf. Concrete 4/4/2022 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 4/4/2022 Not Ready for Inspection NICK DANERI
Excavation/Setback/Form/Re-Bar 4/8/2022 Partial Approval NICK DANERI
Deputy Reinf. Concrete 4/13/2022 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 4/26/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 4/27/2022 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 4/28/2022 Conditional Approval NICK DANERI
Footing/Foundation/Slab 4/28/2022 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 4/29/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/29/2022 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 5/2/2022 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 5/3/2022 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 5/5/2022 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 5/6/2022 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 5/9/2022 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 5/10/2022 Conditional Approval NICK DANERI
Pre-Inspection 5/10/2022 Partial Approval NICK DANERI
Deputy Reinf. Masonry 5/11/2022 Conditional Approval NICK DANERI
Masonry Wall/Backfill 5/11/2022 Partial Approval NICK DANERI
Deputy Reinf. Masonry 5/12/2022 Conditional Approval NICK DANERI
Deputy Wood Construction 5/12/2022 Conditional Approval NICK DANERI
Masonry Wall/Backfill 5/12/2022 Partial Approval NICK DANERI
Deputy Reinf. Masonry 5/13/2022 Conditional Approval NICK DANERI
Deputy Wood Construction 5/13/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 5/16/2022 Partial Approval JAMES POWERS
Deputy Wood Construction 5/16/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/17/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/17/2022 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 5/17/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 5/18/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/18/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Wood Construction 5/18/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 5/19/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/19/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Wood Construction 5/19/2022 Conditional Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 5/19/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 5/20/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/20/2022 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 5/20/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 5/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 5/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 5/24/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 5/24/2022 Conditional Approval NICK DANERI
Deputy Wood Construction 5/24/2022 Partial Approval NICK DANERI
Deputy Reinf. Masonry 5/25/2022 Conditional Approval TERRY HERR
Deputy Steel/Welding 5/25/2022 Conditional Approval TERRY HERR
Deputy Wood Construction 5/25/2022 Conditional Approval TERRY HERR
Deputy Reinf. Masonry 5/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 5/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 5/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 5/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 5/31/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/31/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 6/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/2/2022 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 6/2/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/2/2022 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 6/2/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 6/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/6/2022 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 6/7/2022 Conditional Approval ERNESTO CORRAL
Masonry Wall/Backfill 6/7/2022 Partial Approval NICK DANERI
Pre-Inspection 6/7/2022 Partial Inspection NICK DANERI
Deputy Reinf. Masonry 6/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/9/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/10/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/13/2022 Conditional Approval NICK DANERI
Light Gage Steel Frame 6/13/2022 Partial Inspection NICK DANERI
Deputy Reinf. Masonry 6/14/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/15/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/17/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 6/21/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/22/2022 Conditional Approval ERNESTO CORRAL
Drywall Nailing 6/22/2022 Partial Approval NICK DANERI
Deputy Steel/Welding 6/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/28/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/29/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/30/2022 Conditional Approval ERNESTO CORRAL
Wood Frame 6/30/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 7/1/2022 Partial Approval NICK DANERI
Deputy Steel/Welding 7/8/2022 Conditional Approval ERNESTO CORRAL
Insulation 7/13/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 7/13/2022 Partial Inspection NICK DANERI
Deputy Fireproofing 7/15/2022 Conditional Approval TED RIES
Interior/Exterior Lathing 7/19/2022 Partial Approval NICK DANERI
Deputy Fireproofing 7/20/2022 Partial Approval NICK DANERI
Deputy Steel/Welding 7/20/2022 Conditional Approval NICK DANERI
Interior/Exterior Lathing 7/26/2022 Partial Approval NICK DANERI
Pre-Inspection 7/26/2022 Partial Inspection NICK DANERI
Wood Frame 7/26/2022 Partial Approval NICK DANERI
Drywall Nailing 7/27/2022 Partial Approval NICK DANERI
Insulation 7/29/2022 Partial Approval NICK DANERI
Insulation 8/4/2022 Not Ready for Inspection NICK DANERI
Insulation 8/9/2022 Corrections Issued NICK DANERI
Special/Order Compliance 8/10/2022 Corrections Issued NICK DANERI
Insulation 8/16/2022 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 8/16/2022 Partial Approval RAFAEL ESPINOZA
Insulation 8/19/2022 Partial Approval NICK DANERI
Insulation 8/22/2022 Partial Inspection NICK DANERI
Insulation 8/25/2022 Partial Approval NICK DANERI
Interior/Exterior Lathing 8/30/2022 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 9/2/2022 Partial Approval NICK DANERI
T-Bar Ceiling 9/2/2022 Partial Approval NICK DANERI
Wood Frame 9/12/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 9/13/2022 Conditional Approval MICHAEL ROSENBERG
Insulation 9/15/2022 Partial Approval NICK DANERI
Wood Frame 9/15/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 9/19/2022 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 9/21/2022 Partial Approval NICK DANERI
Insulation 9/23/2022 Not Ready for Inspection NICK DANERI
Insulation 9/27/2022 No Access for Inspection ERNESTO CORRAL
Wood Frame 9/27/2022 No Access for Inspection ERNESTO CORRAL
Light Gage Steel Frame 9/28/2022 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 9/30/2022 Partial Approval GREGORY POMISH
Deputy Steel/Welding 10/3/2022 Conditional Approval MICHAEL ROSENBERG
Insulation 10/3/2022 Partial Approval NICK DANERI
Deputy Steel/Welding 10/4/2022 Conditional Approval MICHAEL ROSENBERG
Drywall Nailing 10/11/2022 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 10/11/2022 Partial Approval RAFAEL ESPINOZA
Wood Frame 10/11/2022 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 10/13/2022 Not Ready for Inspection RAFAEL ESPINOZA
Drywall Nailing 10/17/2022 Partial Approval RAFAEL ESPINOZA
Insulation 10/17/2022 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 10/17/2022 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 10/19/2022 Partial Inspection GREGORY POMISH
Structural Steel Frame 10/19/2022 Partial Inspection GREGORY POMISH
Wall Anchors 10/19/2022 Partial Inspection GREGORY POMISH
Wood Frame 10/19/2022 Partial Inspection GREGORY POMISH
Drywall Nailing 10/20/2022 Not Ready for Inspection GREGORY POMISH
Insulation 11/1/2022 Partial Approval NICK DANERI
Insulation 11/3/2022 Not Ready for Inspection NICK DANERI
Insulation 11/4/2022 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 11/14/2022 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 11/18/2022 Conditional Approval NICK DANERI
Wood Frame 12/6/2022 Partial Approval NICK DANERI
Drywall Nailing 12/16/2022 Partial Approval RAFAEL ESPINOZA
Special/Order Compliance 12/16/2022 Approved RAFAEL ESPINOZA
Interior/Exterior Lathing 12/21/2022 Partial Approval NICK DANERI
Interior/Exterior Lathing 12/29/2022 Not Ready for Inspection RAFAEL ESPINOZA
Interior/Exterior Lathing 1/5/2023 Partial Approval JAMES POWERS
Light Gage Steel Frame 1/18/2023 Partial Inspection NICK DANERI
Light Gage Steel Frame 1/31/2023 Partial Approval NICK DANERI
Light Gage Steel Frame 3/1/2023 Partial Inspection NICK DANERI
Deputy Reinf. Concrete 3/6/2023 Conditional Approval NICK DANERI
Light Gage Steel Frame 3/6/2023 Partial Approval NICK DANERI
Drywall Nailing 3/13/2023 Partial Inspection NICK DANERI
Special/Order Compliance 4/20/2023 Partial Inspection NICK DANERI
Final 4/26/2023 Corrections Issued NICK DANERI
Footing/Foundation/Slab 4/26/2023 Not Ready for Inspection NICK DANERI
Green Building Final 4/26/2023 Not Ready for Inspection NICK DANERI
Green Building Rough 4/26/2023 Approved NICK DANERI
Reinforced Concrete Frame 4/26/2023 Not Ready for Inspection NICK DANERI
Reinforced Masonry Frame 4/26/2023 Not Ready for Inspection NICK DANERI
SGSOV-Seismic Gas S/O Valve 4/26/2023 SGSOV Not Ready NICK DANERI
Smoke Detectors 4/26/2023 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 4/26/2023 Not Ready for Inspection NICK DANERI
Special/Order Compliance 5/3/2023 Not Ready for Inspection NICK DANERI
Final 5/5/2023 Corrections Issued LARRY ARNICK
Footing/Foundation/Slab 5/5/2023 Approved LARRY ARNICK
Green Building Final 5/5/2023 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 5/5/2023 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 5/5/2023 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 5/5/2023 Not Ready for Inspection LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 5/5/2023 SGSOV Not Ready LARRY ARNICK
Smoke Detectors 5/5/2023 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 5/5/2023 Not Ready for Inspection LARRY ARNICK
Special/Order Compliance 5/8/2023 Partial Inspection NICK DANERI
Final 5/9/2023 Partial Inspection NICK DANERI
Green Building Final 5/9/2023 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 5/9/2023 Partial Inspection NICK DANERI
Reinforced Masonry Frame 5/9/2023 Not Ready for Inspection NICK DANERI
SGSOV-Seismic Gas S/O Valve 5/9/2023 SGSOV Not Ready NICK DANERI
Smoke Detectors 5/9/2023 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 5/9/2023 Not Ready for Inspection NICK DANERI
Pre-Inspection 5/11/2023 Partial Inspection NICK DANERI
Final 5/16/2023 Not Ready for Inspection GREGORY POMISH
Green Building Final 5/16/2023 Not Ready for Inspection GREGORY POMISH
Pre-Inspection 5/16/2023 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 5/16/2023 Not Ready for Inspection GREGORY POMISH
Reinforced Masonry Frame 5/16/2023 Not Ready for Inspection GREGORY POMISH
SGSOV-Seismic Gas S/O Valve 5/16/2023 SGSOV Not Ready GREGORY POMISH
Smoke Detectors 5/16/2023 Not Ready for Inspection GREGORY POMISH
Verify Sprinkler Sign Off 5/16/2023 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 6/13/2023 Not Ready for Inspection GREGORY POMISH
Special/Order Compliance 6/14/2023 Partial Inspection NICK DANERI
Drywall Nailing 6/22/2023 Partial Approval NICK DANERI
Final 6/30/2023 Partial Inspection NICK DANERI
Green Building Final 6/30/2023 Conditional Approval NICK DANERI
Reinforced Concrete Frame 6/30/2023 Approved NICK DANERI
Reinforced Masonry Frame 6/30/2023 Approved NICK DANERI
SGSOV-Seismic Gas S/O Valve 6/30/2023 SGSOV Approved NICK DANERI
Smoke Detectors 6/30/2023 Approved NICK DANERI
Verify Sprinkler Sign Off 6/30/2023 Approved NICK DANERI
Final 7/5/2023 Partial Inspection RAFAEL ESPINOZA
Green Building Final 7/5/2023 Not Ready for Inspection RAFAEL ESPINOZA
Final 9/8/2023 Not Ready for Inspection NICK DANERI
Green Building Final 9/8/2023 Approved NICK DANERI
Special/Order Compliance 12/5/2023 Partial Inspection NICK DANERI
Final 4/29/2024 OK to Issue CofO NICK DANERI