9522 S AVIATION BLVD TPSS# 3 90045

Certificate Information: 9522 S AVIATION BLVD TPSS# 3 90045

Application / Permit
19010-10000-03659
Plan Check / Job No.
B19LA17255
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(3) Airport Building
Work Description
LAX APM: NEW ONE STORY CONCRETE BUILDING FOR ELECTRICAL EQUIPMENT BUILDING FOR TRACTION POWER SUBSTATION SYSTEM (TPSS #3). GRADING UNDER PERMIT 20030-10000-01596.
Permit Issued
Issued on 5/12/2020
Issuing Office
Metro
Current Status
Issued on 5/12/2020
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 8/16/2019 APPLICANT
Assigned to Plan Check Engineer 8/22/2019 JOHN FRANCIA
Corrections Issued 8/28/2019 JOHN FRANCIA
Quality Review Completed 8/29/2019 MINYE PAK
Building Plans Picked Up 9/3/2019 APPLICANT
Disabled Access Plans Picked Up 9/3/2019 APPLICANT
Applicant returned to address corrections 12/10/2019 JOHN FRANCIA
Applicant returned to address corrections 2/25/2020 JOHN FRANCIA
Applicant returned to address corrections 3/6/2020 JOHN FRANCIA
Green Plans Picked Up 4/27/2020 APPLICANT
Plan Check Approved 5/11/2020 JOHN FRANCIA
Issued 5/12/2020 LADBS
TCO Issued (Expire Date: 07-07-2026) 1/8/2026 NICK LAROCCA

Permit Application Clearance Information

DAS Clearance Cleared 8/27/2019 WAI LAU
CPC Cleared 9/13/2019 SOPHIE GABEL-SCHEINBAU
CPC Cleared 9/13/2019 SOPHIE GABEL-SCHEINBAU
Tract Map conditions Cleared 9/13/2019 SOPHIE GABEL-SCHEINBAU
Tract Map conditions Cleared 9/13/2019 SOPHIE GABEL-SCHEINBAU
Tract Map conditions Cleared 9/13/2019 SOPHIE GABEL-SCHEINBAU
Address approval Cleared 9/18/2019 MARYAM AZARBAYJANI
Permit Cleared 9/18/2019 MARYAM AZARBAYJANI
City owned building/parcel Cleared 9/19/2019 HAROOT AVANESIAN
Project Permit Cleared 9/19/2019 JOHN FRANCIA
Construction near power lines Cleared 10/10/2019 WALTER RAMIREZ
Hydrant and Access approval Cleared 10/10/2019 JOHN CONNEALLY
Trees in Parkway Cleared 10/23/2019 JOHN KIM
Driveway location Cleared 10/28/2019 PEDRO AYALA
Specific Plan Cleared 10/28/2019 PEDRO AYALA
Eng Process Fee Ord 176,300 Cleared 12/13/2019 MARYAM AZARBAYJANI
Encroachment in public way Cleared 12/16/2019 MARYAM AZARBAYJANI
Highway dedication Cleared 12/16/2019 MARYAM AZARBAYJANI
Miscellaneous Cleared 12/16/2019 MARYAM AZARBAYJANI
Roof/Waste drainage to street Cleared 12/16/2019 MARYAM AZARBAYJANI
Sewer availability Cleared 12/16/2019 MARYAM AZARBAYJANI
Drainage to Storm Drain Cleared 1/10/2020 MARYAM AZARBAYJANI
Airport buildings Cleared 2/5/2020 ANDREW KO
Green Code Cleared 2/7/2020 DONALD CRICHLOW
Green Code Cleared 2/7/2020 DONALD CRICHLOW
Low Impact Development Cleared 4/8/2020 MARTIN FRAGOSO
Stormwater Pollution Mitigatn Cleared 4/8/2020 MARTIN FRAGOSO

Contact Information

Architect Gonzales,, Anthony Chris; Lic. No.: C19409 452 35TH STREET      MANHATTAN BEACH, CA 90266
Contractor Fluor Flatiron Balfour Beatty Dragados; Lic. No.: 1036344-B 5050 BUSINESS CENTER DRIVE   SUITE 250    FAIRFIELD, CA 94534
Engineer Kashighandi,, Pirooz; Lic. No.: GE3104 1417 S WESTGATE AVE 207      LOS ANGELES, CA 90025
Engineer Renn,, Joseph William; Lic. No.: S5520 10900 NE 35TH PL #1      BELLEVUE, WA 98004
Engineer Werts,, Chester Anthony; Lic. No.: C49861 5449 40TH AVE SW      OLYMPIA, WA 98512

Inspector Information

NICK LAROCCA, (213) 473-2153 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Green Building Rough 8/9/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 8/9/2021 Not Ready for Inspection JONATHAN ALLEN
Verify Sprinkler Sign Off 8/9/2021 Not Ready for Inspection JONATHAN ALLEN
Footing/Foundation/Slab 8/13/2021 Partial Approval JONATHAN ALLEN
Green Building Rough 8/25/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 8/25/2021 Partial Approval JONATHAN ALLEN
Verify Sprinkler Sign Off 8/25/2021 Not Ready for Inspection JONATHAN ALLEN
Green Building Rough 9/1/2021 Approved ALAN NOVAK
Reinforced Concrete Frame 9/1/2021 Partial Approval ALAN NOVAK
Verify Sprinkler Sign Off 9/1/2021 Approved ALAN NOVAK
Reinforced Concrete Frame 9/8/2021 Not Ready for Inspection ALAN NOVAK
Reinforced Concrete Frame 10/13/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/11/2022 Partial Approval ALAN NOVAK
Pre-Inspection 1/13/2022 Not Ready for Inspection NICK LAROCCA
Footing/Foundation/Slab 1/19/2022 Partial Approval JONATHAN ALLEN
Pre-Inspection 1/19/2022 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/19/2022 Partial Approval JONATHAN ALLEN
Pre-Inspection 1/20/2022 Approved JONATHAN ALLEN
Pre-Inspection 1/21/2022 Partial Approval JONATHAN ALLEN
Pre-Inspection 1/24/2022 Not Ready for Inspection JONATHAN ALLEN
Footing/Foundation/Slab 3/14/2022 Not Ready for Inspection NICK LAROCCA
Footing/Foundation/Slab 3/15/2022 Partial Approval NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 4/8/2022 Partial Approval NICK LAROCCA
Deputy Reinf. Masonry 4/21/2022 No Result Entered ALBERT COMISARI
Drywall Nailing 5/2/2022 Approved NICK LAROCCA
Footing/Foundation/Slab 5/4/2022 Partial Approval NICK LAROCCA
Light Gage Steel Frame 6/29/2022 Partial Approval NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 7/26/2022 Partial Approval NICK LAROCCA
Pre-Inspection 7/26/2022 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 11/3/2022 Approved NICK LAROCCA
Pre-Inspection 11/10/2022 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 12/22/2022 Partial Approval ALAN NOVAK
Pre-Inspection 10/2/2023 Approved ALAN NOVAK