|
Grading Pre-Inspection
|
11/20/2023
|
No Violation (special insp)
|
LARRY ARNICK
|
|
Piling/Pier/Caisson
|
11/22/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
11/28/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Piling/Pier/Caisson
|
11/28/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
11/30/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
12/4/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
12/15/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Methane Barrier
|
3/21/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
3/26/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Footing/Foundation/Slab
|
3/27/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
METHANE-Barrier
|
3/27/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
METHANE-Subgrade
|
3/27/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
4/8/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
4/8/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Barrier
|
4/8/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
4/8/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Subgrade
|
4/8/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
4/8/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
4/8/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
4/8/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Deputy Methane Barrier
|
4/17/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
4/17/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
METHANE-Barrier
|
4/17/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
METHANE-Subgrade
|
4/17/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
4/17/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Methane Barrier
|
4/24/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
4/24/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
4/24/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
METHANE-Barrier
|
4/24/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
METHANE-Rough
|
4/24/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
METHANE-Subgrade
|
4/24/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
4/24/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
4/24/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
4/25/2024
|
Partial Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
4/26/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
4/26/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
4/26/2024
|
Off-Hour Fees Due
|
|
|
METHANE-Barrier
|
4/26/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
METHANE-Rough
|
4/26/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
METHANE-Subgrade
|
4/26/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
4/26/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
4/26/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Methane Barrier
|
5/2/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
5/2/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
5/2/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
5/2/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
5/2/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
5/2/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
5/7/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
5/7/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
5/7/2024
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
5/7/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Methane Barrier
|
5/15/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Methane Barrier
|
5/24/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
METHANE-Barrier
|
5/24/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
5/30/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
5/31/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
5/31/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
METHANE-Barrier
|
5/31/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
METHANE-Subgrade
|
5/31/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
METHANE-Barrier
|
6/27/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
METHANE-Subgrade
|
6/27/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/3/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
8/1/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
8/1/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
8/1/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
METHANE-Barrier
|
8/1/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Subgrade
|
8/1/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
9/4/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
9/4/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
9/4/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
METHANE-Barrier
|
9/4/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Subgrade
|
9/4/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
9/12/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
9/12/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
METHANE-Barrier
|
9/12/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Subgrade
|
9/12/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
9/16/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
9/18/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
9/18/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
9/19/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
9/19/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
9/19/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
9/19/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Deputy Shotcrete
|
10/1/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
10/1/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
10/2/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
10/2/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
10/2/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
10/2/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
10/2/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Masonry Wall/Backfill
|
10/8/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/6/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
11/6/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
11/6/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
11/6/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
11/6/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/7/2024
|
Corrections Issued
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/8/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
11/8/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
11/8/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
11/8/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/12/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/4/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
12/4/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
12/4/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
12/4/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
12/4/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/5/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/6/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/23/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
12/23/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
METHANE-Rough
|
12/23/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
12/23/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
12/24/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/24/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Structural Steel Frame
|
12/24/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/22/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
1/22/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
1/22/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
1/22/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/24/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/28/2025
|
Corrections Issued
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/11/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
2/11/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
2/11/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
2/11/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/18/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/19/2025
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
2/25/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
2/25/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
2/27/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
2/27/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
3/4/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
3/4/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Insulation
|
3/4/2025
|
No Access for Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/7/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
3/7/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
3/7/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
3/7/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
3/12/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/12/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Insulation
|
3/12/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
3/14/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/14/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
3/14/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
3/20/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
3/20/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
3/20/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
3/20/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
3/24/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
3/24/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
3/24/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
3/24/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
3/24/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wall Anchors
|
3/24/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
3/24/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
3/27/2025
|
Conditional Approval
|
JEFFREY FULTON
|
|
Drywall Nailing
|
3/27/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/27/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
3/27/2025
|
Approved
|
JEFFREY FULTON
|
|
METHANE-Rough
|
3/27/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
3/27/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
3/27/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
4/2/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/2/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Insulation
|
4/9/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
4/10/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/11/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
4/11/2025
|
Partial Approval
|
LARRY ARNICK
|
|
METHANE-Rough
|
4/18/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
4/18/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
4/18/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Wood Construction
|
4/21/2025
|
Conditional Approval
|
JEFFREY FULTON
|
|
Wood Frame
|
4/21/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
4/28/2025
|
No Access for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/30/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
4/30/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
4/30/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
4/30/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
5/1/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
5/2/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
5/2/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
5/2/2025
|
No Access for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/5/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/8/2025
|
Partial Approval
|
LARRY ARNICK
|
|
METHANE-Rough
|
5/9/2025
|
No Access for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
5/9/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
5/9/2025
|
No Access for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
5/13/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
5/13/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
5/13/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
5/13/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Insulation
|
5/14/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
5/14/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
5/15/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
5/16/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
5/19/2025
|
Conditional Approval
|
JEFFREY FULTON
|
|
Drywall Nailing
|
5/19/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
5/20/2025
|
Conditional Approval
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/20/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/21/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/22/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
5/22/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
6/3/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/3/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
6/12/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
6/17/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
6/23/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
7/9/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
7/18/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/18/2025
|
Partial Inspection
|
LARRY ARNICK
|
|
METHANE-Rough
|
7/24/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
7/24/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
7/24/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
7/25/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
7/25/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
7/30/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
8/5/2025
|
Partial Approval
|
LARRY ARNICK
|
|
METHANE-Rough
|
8/5/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
8/5/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
8/5/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
8/8/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
8/8/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
8/8/2025
|
Approved
|
LARRY ARNICK
|
|
Green Building Final
|
8/8/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
8/8/2025
|
Partial Approval
|
LARRY ARNICK
|
|
METHANE-Barrier
|
8/8/2025
|
Approved
|
LARRY ARNICK
|
|
METHANE-Final
|
8/8/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
METHANE-Rough
|
8/8/2025
|
Approved
|
LARRY ARNICK
|
|
METHANE-Subgrade
|
8/8/2025
|
Approved
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
8/8/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
8/8/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
SGSOV-Seismic Gas S/O Valve
|
8/8/2025
|
SGSOV Not Ready
|
LARRY ARNICK
|
|
Smoke Detectors
|
8/8/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
8/8/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
8/8/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
8/21/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
8/28/2025
|
Not Ready for Inspection
|
JEROME BLACKWOOD
|
|
Insulation
|
8/28/2025
|
Partial Approval
|
JEROME BLACKWOOD
|
|
Drywall Nailing
|
9/3/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
9/3/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
10/1/2025
|
Approved
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
10/16/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
10/20/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
10/24/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
10/28/2025
|
Corrections Issued
|
JEFFREY FULTON
|
|
Drywall Nailing
|
10/30/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
11/4/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
11/7/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
11/7/2025
|
Partial Approval
|
SCOTT SOBEL
|
|
Order to Comply
|
11/10/2025
|
Not Required
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
11/10/2025
|
Partial Approval
|
SCOTT SOBEL
|
|
Pre-Inspection
|
11/12/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
12/2/2025
|
Partial Approval
|
PAUL BAZERKANIAN
|
|
Drywall Nailing
|
12/5/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
3/10/2026
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Reinforced Concrete Frame
|
3/10/2026
|
Partial Approval
|
RONALD JIMENEZ
|
|
Verify Sprinkler Sign Off
|
3/10/2026
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Special/Order Compliance
|
3/17/2026
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Special/Order Compliance
|
3/19/2026
|
Approved
|
ALFREDO LOPEZ
|
|
Excavation/Setback/Form/Re-Bar
|
4/6/2026
|
Partial Approval
|
RONALD JIMENEZ
|
|
Deputy Drilled-In Anchors
|
4/16/2026
|
Conditional Approval
|
RONALD JIMENEZ
|
|
METHANE-Rough
|
4/16/2026
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Reinforced Concrete Frame
|
4/16/2026
|
Partial Approval
|
RONALD JIMENEZ
|
|
Verify Sprinkler Sign Off
|
4/16/2026
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Drywall Nailing
|
4/21/2026
|
Conditional Approval
|
RONALD JIMENEZ
|