823 N CLEVELAND ST 1-9 90012

Certificate Information: 823 N CLEVELAND ST 1-9 90012

Application / Permit
19010-10000-03637
Plan Check / Job No.
B19LA17175
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW FIVE STORY (9-UNIT) MULTI FAMILY APARTMENT BLDG. W/PARKING IN BASEMENT. (IA/IIIA)
Permit Issued
Issued on 11/16/2023
Issuing Office
Metro
Current Status
Issued on 11/16/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 8/15/2019 APPLICANT
Assigned to Plan Check Engineer 9/5/2019 TSE MING HUANG
Corrections Issued 9/30/2019 TSE MING HUANG
Disabled Access Plans Picked Up 9/30/2019 APPLICANT
Green Plans Picked Up 9/30/2019 APPLICANT
Quality Review Completed 10/12/2019 STANLEY RAAP
Applicant returned to address corrections 11/5/2019 TSE MING HUANG
Building Plans Picked Up 11/4/2021 APPLICANT
Applicant returned to address corrections 12/20/2021 TSE MING HUANG
Plan Check Approved 9/15/2022 TSE MING HUANG
Plan Check Approved 11/2/2023 TSE MING HUANG
Issued 11/16/2023 APPLICANT

Permit Application Clearance Information

Address approval Cleared 12/12/2019 ELAINE LEI
Encroachment in public way Cleared 12/12/2019 ELAINE LEI
Highway dedication Cleared 12/12/2019 ELAINE LEI
Permit Cleared 12/12/2019 ELAINE LEI
Eng Process Fee Ord 176,300 Cleared 1/16/2020 EMIL KYUPELYAN
Hydrant and Access approval Cleared 1/16/2020 GEORGE SUCHAND
Frnt yard landscape/Water mgmt Cleared 1/23/2020 ANNA VIDAL
Green Code Cleared 1/23/2020 TSE MING HUANG
Miscellaneous Cleared 1/23/2020 ANNA VIDAL
Opn space landscape/Water mgmt Cleared 1/23/2020 ANNA VIDAL
DAS Clearance Cleared 3/2/2020 ELIZABETH TOMS
Project located in CRA area Cleared 4/14/2020 GRACIELA ACOSTA
Sewer availability Cleared 7/23/2020 CECILIO NAVARRO
Grading Pre-Inspection Cleared 8/14/2020 PATRICK MISCHLICH
Fire Marshall Fire Life Safety Cleared 12/10/2020 ANDREW KO
Stormwater Pollution Mitigatn Cleared 6/11/2021 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 7/14/2021 JEANIE LAM
Low Impact Development Cleared 7/21/2021 AMMAR ELTAWIL
Building over 3-story or 36-ft Cleared 8/19/2021 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 8/19/2021 CALOSHA APPROVED
GPI Written Notices Cleared 11/16/2021 TSE MING HUANG

Contact Information

Architect Tighe,, Patrick J; Lic. No.: C27987 5747 VENICE BLVD      LOS ANGELES, CA 90019
Contractor Mid Construction Group; Lic. No.: 1030925-B 5850 W 3RD STREET #160      LOS ANGELES, CA 90036
Engineer Aoanan,, Virgilio Cendana; Lic. No.: C36079 1041 S GARFIELD AVE STE #210      ALHAMBRA, CA 91801
Engineer Choi,, David; Lic. No.: S4784 1327 LOMA AVENUE      LONG BEACH, CA 90804
Engineer Smith,, Melvin Bruce; Lic. No.: GE2673 2165 N MARVEL AVE      SIMI VALLEY, CA 93065

Inspector Information

RONALD JIMENEZ, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
LARRY ARNICK, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
JOEY BUCHANAN, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
ERNESTO CORRAL, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
RAFAEL ESPINOZA, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Grading Pre-Inspection 11/20/2023 No Violation (special insp) LARRY ARNICK
Piling/Pier/Caisson 11/22/2023 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 11/28/2023 Conditional Approval LARRY ARNICK
Piling/Pier/Caisson 11/28/2023 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 11/30/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/4/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Methane Barrier 3/21/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/26/2024 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 3/27/2024 Partial Inspection JEFFREY FULTON
METHANE-Barrier 3/27/2024 Partial Inspection JEFFREY FULTON
METHANE-Subgrade 3/27/2024 Not Ready for Inspection JEFFREY FULTON
Footing/Foundation/Slab 4/8/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 4/8/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Barrier 4/8/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Rough 4/8/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Subgrade 4/8/2024 Not Ready for Inspection JEFFREY FULTON
Reinforced Concrete Frame 4/8/2024 Partial Inspection JEFFREY FULTON
Special/Order Compliance 4/8/2024 Partial Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 4/8/2024 Not Ready for Inspection JEFFREY FULTON
Deputy Methane Barrier 4/17/2024 Conditional Approval JEFFREY FULTON
Footing/Foundation/Slab 4/17/2024 Partial Inspection JEFFREY FULTON
METHANE-Barrier 4/17/2024 Partial Inspection JEFFREY FULTON
METHANE-Subgrade 4/17/2024 Partial Inspection JEFFREY FULTON
Reinforced Concrete Frame 4/17/2024 Partial Inspection JEFFREY FULTON
Deputy Methane Barrier 4/24/2024 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 4/24/2024 Not Ready for Inspection LARRY ARNICK
Green Building Rough 4/24/2024 Not Ready for Inspection LARRY ARNICK
METHANE-Barrier 4/24/2024 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 4/24/2024 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 4/24/2024 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 4/24/2024 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 4/24/2024 Not Ready for Inspection LARRY ARNICK
Insulation 4/25/2024 Partial Approval NICK DANERI
Footing/Foundation/Slab 4/26/2024 Partial Approval LARRY ARNICK
Green Building Rough 4/26/2024 Not Ready for Inspection LARRY ARNICK
Insulation 4/26/2024 Off-Hour Fees Due
METHANE-Barrier 4/26/2024 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 4/26/2024 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 4/26/2024 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 4/26/2024 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 4/26/2024 Not Ready for Inspection LARRY ARNICK
Deputy Methane Barrier 5/2/2024 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 5/2/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 5/2/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Rough 5/2/2024 Conditional Approval JEFFREY FULTON
Reinforced Concrete Frame 5/2/2024 Partial Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 5/2/2024 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 5/7/2024 Not Ready for Inspection JAMES POWERS
METHANE-Rough 5/7/2024 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 5/7/2024 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 5/7/2024 Not Ready for Inspection JAMES POWERS
Deputy Methane Barrier 5/15/2024 Conditional Approval LARRY ARNICK
Deputy Methane Barrier 5/24/2024 Conditional Approval JEFFREY FULTON
METHANE-Barrier 5/24/2024 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 5/30/2024 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 5/31/2024 Partial Inspection JEFFREY FULTON
Footing/Foundation/Slab 5/31/2024 Partial Inspection JEFFREY FULTON
METHANE-Barrier 5/31/2024 Partial Inspection JEFFREY FULTON
METHANE-Subgrade 5/31/2024 Partial Inspection JEFFREY FULTON
METHANE-Barrier 6/27/2024 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 6/27/2024 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 7/3/2024 Not Ready for Inspection JEFFREY FULTON
Deputy Reinf. Concrete 8/1/2024 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 8/1/2024 Partial Inspection JEFFREY FULTON
Footing/Foundation/Slab 8/1/2024 Partial Inspection JEFFREY FULTON
METHANE-Barrier 8/1/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Subgrade 8/1/2024 Not Ready for Inspection JEFFREY FULTON
Deputy Reinf. Concrete 9/4/2024 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 9/4/2024 Partial Inspection JEFFREY FULTON
Footing/Foundation/Slab 9/4/2024 Partial Inspection JEFFREY FULTON
METHANE-Barrier 9/4/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Subgrade 9/4/2024 Not Ready for Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 9/12/2024 Partial Inspection JEFFREY FULTON
Footing/Foundation/Slab 9/12/2024 Partial Inspection JEFFREY FULTON
METHANE-Barrier 9/12/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Subgrade 9/12/2024 Not Ready for Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 9/16/2024 Not Ready for Inspection JEFFREY FULTON
Deputy Reinf. Concrete 9/18/2024 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 9/18/2024 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 9/19/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Rough 9/19/2024 Partial Inspection JEFFREY FULTON
Reinforced Concrete Frame 9/19/2024 Partial Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 9/19/2024 Not Ready for Inspection JEFFREY FULTON
Deputy Shotcrete 10/1/2024 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 10/1/2024 Partial Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 10/2/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 10/2/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Rough 10/2/2024 Not Ready for Inspection JEFFREY FULTON
Reinforced Concrete Frame 10/2/2024 Partial Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 10/2/2024 Not Ready for Inspection JEFFREY FULTON
Masonry Wall/Backfill 10/8/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 11/6/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 11/6/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Rough 11/6/2024 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 11/6/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 11/6/2024 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 11/7/2024 Corrections Issued JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 11/8/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 11/8/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Rough 11/8/2024 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 11/8/2024 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 11/12/2024 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 12/4/2024 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 12/4/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Rough 12/4/2024 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 12/4/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 12/4/2024 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 12/5/2024 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 12/6/2024 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 12/23/2024 Not Ready for Inspection LARRY ARNICK
Green Building Rough 12/23/2024 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 12/23/2024 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 12/23/2024 Not Ready for Inspection LARRY ARNICK
Deputy Steel/Welding 12/24/2024 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 12/24/2024 Partial Approval LARRY ARNICK
Structural Steel Frame 12/24/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 1/22/2025 Partial Inspection JEFFREY FULTON
Green Building Rough 1/22/2025 Not Ready for Inspection JEFFREY FULTON
METHANE-Rough 1/22/2025 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 1/22/2025 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 1/24/2025 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 1/28/2025 Corrections Issued JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 2/11/2025 Partial Inspection JEFFREY FULTON
Green Building Rough 2/11/2025 Not Ready for Inspection JEFFREY FULTON
METHANE-Rough 2/11/2025 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 2/11/2025 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 2/18/2025 Not Ready for Inspection RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 2/19/2025 Partial Approval JAMES POWERS
Drywall Nailing 2/25/2025 Partial Inspection JEFFREY FULTON
Green Building Rough 2/25/2025 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 2/27/2025 Partial Inspection JEFFREY FULTON
Green Building Rough 2/27/2025 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 3/4/2025 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 3/4/2025 Not Ready for Inspection JEFFREY FULTON
Insulation 3/4/2025 No Access for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 3/7/2025 Partial Inspection JEFFREY FULTON
METHANE-Rough 3/7/2025 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 3/7/2025 Not Ready for Inspection JEFFREY FULTON
Wood Frame 3/7/2025 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 3/12/2025 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 3/12/2025 Not Ready for Inspection JEFFREY FULTON
Insulation 3/12/2025 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 3/14/2025 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 3/14/2025 Partial Inspection JEFFREY FULTON
Green Building Rough 3/14/2025 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 3/20/2025 Not Ready for Inspection JEFFREY FULTON
METHANE-Rough 3/20/2025 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 3/20/2025 Not Ready for Inspection JEFFREY FULTON
Wood Frame 3/20/2025 Not Ready for Inspection JEFFREY FULTON
Deputy Steel/Welding 3/24/2025 Conditional Approval LARRY ARNICK
Drywall Nailing 3/24/2025 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 3/24/2025 Not Ready for Inspection JEFFREY FULTON
METHANE-Rough 3/24/2025 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 3/24/2025 Not Ready for Inspection JEFFREY FULTON
Wall Anchors 3/24/2025 Not Ready for Inspection JEFFREY FULTON
Wood Frame 3/24/2025 Not Ready for Inspection JEFFREY FULTON
Deputy Steel/Welding 3/27/2025 Conditional Approval JEFFREY FULTON
Drywall Nailing 3/27/2025 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 3/27/2025 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 3/27/2025 Approved JEFFREY FULTON
METHANE-Rough 3/27/2025 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 3/27/2025 Not Ready for Inspection JEFFREY FULTON
Wood Frame 3/27/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 4/2/2025 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 4/2/2025 Not Ready for Inspection JEFFREY FULTON
Insulation 4/9/2025 Partial Inspection JEFFREY FULTON
Insulation 4/10/2025 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 4/11/2025 Partial Approval LARRY ARNICK
Insulation 4/11/2025 Partial Approval LARRY ARNICK
METHANE-Rough 4/18/2025 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 4/18/2025 Not Ready for Inspection LARRY ARNICK
Wood Frame 4/18/2025 Not Ready for Inspection LARRY ARNICK
Deputy Wood Construction 4/21/2025 Conditional Approval JEFFREY FULTON
Wood Frame 4/21/2025 Partial Inspection JEFFREY FULTON
Insulation 4/28/2025 No Access for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 4/30/2025 Partial Inspection JEFFREY FULTON
METHANE-Rough 4/30/2025 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 4/30/2025 Not Ready for Inspection JEFFREY FULTON
Wood Frame 4/30/2025 Partial Inspection JEFFREY FULTON
Wood Frame 5/1/2025 Partial Inspection JEFFREY FULTON
METHANE-Rough 5/2/2025 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 5/2/2025 Not Ready for Inspection LARRY ARNICK
Wood Frame 5/2/2025 No Access for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 5/5/2025 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 5/8/2025 Partial Approval LARRY ARNICK
METHANE-Rough 5/9/2025 No Access for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 5/9/2025 Not Ready for Inspection LARRY ARNICK
Wood Frame 5/9/2025 No Access for Inspection LARRY ARNICK
Drywall Nailing 5/13/2025 Partial Inspection JEFFREY FULTON
Insulation 5/13/2025 Partial Inspection JEFFREY FULTON
METHANE-Rough 5/13/2025 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 5/13/2025 Not Ready for Inspection JEFFREY FULTON
Insulation 5/14/2025 Partial Inspection JEFFREY FULTON
Wood Frame 5/14/2025 Partial Inspection JEFFREY FULTON
Insulation 5/15/2025 Partial Inspection JEFFREY FULTON
Insulation 5/16/2025 Partial Inspection JEFFREY FULTON
Deputy Steel/Welding 5/19/2025 Conditional Approval JEFFREY FULTON
Drywall Nailing 5/19/2025 Partial Inspection JEFFREY FULTON
Deputy Steel/Welding 5/20/2025 Conditional Approval JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 5/20/2025 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 5/21/2025 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 5/22/2025 Partial Approval LARRY ARNICK
Insulation 5/22/2025 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 6/3/2025 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 6/3/2025 Partial Inspection JEFFREY FULTON
Insulation 6/12/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 6/17/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 6/23/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 7/9/2025 Partial Approval LARRY ARNICK
Drywall Nailing 7/18/2025 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 7/18/2025 Partial Inspection LARRY ARNICK
METHANE-Rough 7/24/2025 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 7/24/2025 Not Ready for Inspection LARRY ARNICK
Wood Frame 7/24/2025 Partial Approval LARRY ARNICK
Drywall Nailing 7/25/2025 Not Ready for Inspection LARRY ARNICK
Insulation 7/25/2025 Partial Approval LARRY ARNICK
Drywall Nailing 7/30/2025 Partial Approval LARRY ARNICK
Insulation 8/5/2025 Partial Approval LARRY ARNICK
METHANE-Rough 8/5/2025 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 8/5/2025 Not Ready for Inspection LARRY ARNICK
Wood Frame 8/5/2025 Not Ready for Inspection LARRY ARNICK
Deputy Steel/Welding 8/8/2025 Conditional Approval LARRY ARNICK
Drywall Nailing 8/8/2025 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 8/8/2025 Approved LARRY ARNICK
Green Building Final 8/8/2025 Not Ready for Inspection LARRY ARNICK
Insulation 8/8/2025 Partial Approval LARRY ARNICK
METHANE-Barrier 8/8/2025 Approved LARRY ARNICK
METHANE-Final 8/8/2025 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 8/8/2025 Approved LARRY ARNICK
METHANE-Subgrade 8/8/2025 Approved LARRY ARNICK
Reinforced Concrete Frame 8/8/2025 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 8/8/2025 Not Ready for Inspection LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 8/8/2025 SGSOV Not Ready LARRY ARNICK
Smoke Detectors 8/8/2025 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 8/8/2025 Not Ready for Inspection LARRY ARNICK
Wood Frame 8/8/2025 Partial Approval LARRY ARNICK
Drywall Nailing 8/21/2025 Partial Approval LARRY ARNICK
Drywall Nailing 8/28/2025 Not Ready for Inspection JEROME BLACKWOOD
Insulation 8/28/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 9/3/2025 Partial Inspection JEFFREY FULTON
Insulation 9/3/2025 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 10/1/2025 Approved LARRY ARNICK
Light Gage Steel Frame 10/16/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 10/20/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 10/24/2025 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 10/28/2025 Corrections Issued JEFFREY FULTON
Drywall Nailing 10/30/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 11/4/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 11/7/2025 Partial Approval LARRY ARNICK
Insulation 11/7/2025 Partial Approval SCOTT SOBEL
Order to Comply 11/10/2025 Not Required JEFFREY FULTON
Special/Order Compliance 11/10/2025 Partial Approval SCOTT SOBEL
Pre-Inspection 11/12/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 12/2/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 12/5/2025 Partial Inspection JEFFREY FULTON
METHANE-Rough 3/10/2026 Not Ready for Inspection RONALD JIMENEZ
Reinforced Concrete Frame 3/10/2026 Partial Approval RONALD JIMENEZ
Verify Sprinkler Sign Off 3/10/2026 Not Ready for Inspection RONALD JIMENEZ
Special/Order Compliance 3/17/2026 Partial Approval ALFREDO LOPEZ
Special/Order Compliance 3/19/2026 Approved ALFREDO LOPEZ
Excavation/Setback/Form/Re-Bar 4/6/2026 Partial Approval RONALD JIMENEZ
Deputy Drilled-In Anchors 4/16/2026 Conditional Approval RONALD JIMENEZ
METHANE-Rough 4/16/2026 Not Ready for Inspection RONALD JIMENEZ
Reinforced Concrete Frame 4/16/2026 Partial Approval RONALD JIMENEZ
Verify Sprinkler Sign Off 4/16/2026 Not Ready for Inspection RONALD JIMENEZ
Drywall Nailing 4/21/2026 Conditional Approval RONALD JIMENEZ