Piling/Pier/Caisson
|
9/3/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
10/17/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
10/19/2020
|
Approved
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
10/20/2020
|
Approved
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
10/21/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
10/23/2020
|
Approved
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
10/27/2020
|
Approved
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
11/2/2020
|
Conditional Approval
|
ALBERT COMISARI
|
|
Pre-Inspection
|
11/4/2020
|
Approved
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
11/5/2020
|
Approved
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
11/6/2020
|
Approved
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
11/12/2020
|
Approved
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
11/13/2020
|
Approved
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
11/16/2020
|
Approved
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
11/17/2020
|
Approved
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
11/18/2020
|
Approved
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
11/19/2020
|
Approved
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
11/20/2020
|
Approved
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
11/23/2020
|
Approved
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
11/24/2020
|
Approved
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
11/25/2020
|
Approved
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
12/1/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
12/1/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
12/4/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
12/5/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Footing/Foundation/Slab
|
12/7/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
12/8/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
12/9/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
12/10/2020
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
12/11/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
12/14/2020
|
Conditional Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
12/15/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
12/16/2020
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
12/17/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
12/18/2020
|
Not Ready for Inspection
|
ALBERT COMISARI
|
|
Piling/Pier/Caisson
|
12/21/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
12/22/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
12/23/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
12/24/2020
|
Conditional Approval
|
ALBERT COMISARI
|
|
Piling/Pier/Caisson
|
12/29/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
12/30/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
1/5/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
1/6/2021
|
Approved
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
1/7/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Green Building Rough
|
1/8/2021
|
Approved
|
JONATHAN ALLEN
|
|
Reinforced Concrete Frame
|
1/8/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Verify Sprinkler Sign Off
|
1/8/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
1/12/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
1/13/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
1/14/2021
|
Partial Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
1/15/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Footing/Foundation/Slab
|
1/19/2021
|
Partial Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
1/20/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
1/21/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
1/22/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
1/25/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Piling/Pier/Caisson
|
1/26/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Piling/Pier/Caisson
|
1/27/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
1/29/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Reinforced Concrete Frame
|
1/29/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Verify Sprinkler Sign Off
|
1/29/2021
|
Approved
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
2/1/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Footing/Foundation/Slab
|
2/3/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
2/5/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
2/8/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
2/9/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Footing/Foundation/Slab
|
2/10/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Reinforced Concrete Frame
|
2/10/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
2/12/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
2/16/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
2/17/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
2/18/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
2/19/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
2/23/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
2/24/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
2/25/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
2/26/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
3/1/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Footing/Foundation/Slab
|
3/2/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
3/9/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
3/10/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Reinforced Concrete Frame
|
3/11/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
3/12/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
3/15/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
3/16/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
3/17/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
3/18/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
3/19/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Piling/Pier/Caisson
|
3/22/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
3/23/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
3/24/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
3/25/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
3/30/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
3/31/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
4/1/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
4/7/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
4/7/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
4/8/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Reinforced Concrete Frame
|
4/9/2021
|
Partial Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
4/13/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
4/14/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
4/15/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
4/16/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Reinforced Concrete Frame
|
4/16/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
4/19/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
4/20/2021
|
Partial Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
4/21/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
4/22/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
4/23/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Piling/Pier/Caisson
|
4/26/2021
|
Partial Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
4/28/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
5/4/2021
|
Partial Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
5/5/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
5/7/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
5/12/2021
|
Partial Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
5/13/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
5/14/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
5/18/2021
|
Partial Inspection
|
JONATHAN ALLEN
|
|
Reinforced Concrete Frame
|
5/19/2021
|
Partial Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
5/20/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
5/21/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
5/24/2021
|
Partial Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
5/25/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
5/26/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
5/27/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Deputy Grading
|
5/28/2021
|
Conditional Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
5/28/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
6/1/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
6/2/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Reinforced Concrete Frame
|
6/3/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
6/4/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
6/8/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Piling/Pier/Caisson
|
6/9/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Piling/Pier/Caisson
|
6/11/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Piling/Pier/Caisson
|
6/14/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
6/15/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
6/16/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
6/17/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
6/18/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
6/21/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
6/22/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
6/23/2021
|
Partial Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
6/24/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
6/30/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
7/1/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/2/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
7/7/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
7/8/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Reinforced Concrete Frame
|
7/8/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
7/9/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
7/12/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Piling/Pier/Caisson
|
7/13/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
7/14/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
7/15/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Piling/Pier/Caisson
|
7/16/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Piling/Pier/Caisson
|
7/19/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
7/20/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
7/21/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
7/22/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
7/23/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
7/26/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
7/27/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
7/28/2021
|
Partial Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
7/30/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
8/3/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
8/4/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Piling/Pier/Caisson
|
8/10/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Reinforced Concrete Frame
|
9/17/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Reinforced Concrete Frame
|
11/15/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/21/2022
|
Partial Approval
|
JONATHAN ALLEN
|
|
Footing/Foundation/Slab
|
2/8/2022
|
Partial Approval
|
NICK LAROCCA
|
|
Reinforced Concrete Frame
|
2/8/2022
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
4/29/2022
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
5/2/2022
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
5/3/2022
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
5/4/2022
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
5/5/2022
|
Conditional Approval
|
ALAN NOVAK
|
|
Footing/Foundation/Slab
|
5/13/2022
|
Partial Approval
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
5/26/2022
|
Partial Approval
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
5/31/2022
|
Approved
|
NICK LAROCCA
|
|
Posting Pre-Inspection
|
6/3/2022
|
Approved
|
NICK LAROCCA
|
|
Pre-Inspection
|
6/3/2022
|
Partial Approval
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
6/10/2022
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Pre-Inspection
|
6/10/2022
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
7/1/2022
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
7/5/2022
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
7/6/2022
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
7/7/2022
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
7/8/2022
|
Approved
|
NICK LAROCCA
|
|
Reinforced Masonry Frame
|
9/14/2022
|
Partial Approval
|
NICK LAROCCA
|
|
Pre-Inspection
|
10/14/2022
|
Approved
|
ALAN NOVAK
|
|
Special/Order Compliance
|
10/17/2022
|
Approved
|
ALAN NOVAK
|
|
Drywall Nailing
|
12/18/2025
|
Approved
|
NICK LAROCCA
|
|
Final
|
12/18/2025
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Green Building Final
|
12/18/2025
|
Approved
|
NICK LAROCCA
|
|
Reinforced Masonry Frame
|
12/18/2025
|
Approved
|
NICK LAROCCA
|
|
SGSOV-Seismic Gas S/O Valve
|
12/18/2025
|
SGSOV Approved
|
NICK LAROCCA
|
|
Smoke Detectors
|
12/18/2025
|
Approved
|
NICK LAROCCA
|
|
Special/Order Compliance
|
12/23/2025
|
Partial Approval
|
NICK LAROCCA
|