|
Pre-Inspection
|
8/12/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/21/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
8/27/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
8/28/2020
|
Approved
|
DERRICK SPENCER
|
|
Green Building Rough
|
8/31/2020
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
8/31/2020
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Verify Sprinkler Sign Off
|
8/31/2020
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Pre-Inspection
|
9/1/2020
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
9/2/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Green Building Rough
|
9/3/2020
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
9/3/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Verify Sprinkler Sign Off
|
9/3/2020
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Piling/Pier/Caisson
|
9/8/2020
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Green Building Rough
|
9/10/2020
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
9/10/2020
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Verify Sprinkler Sign Off
|
9/10/2020
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
9/11/2020
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Excavation/Setback/Form/Re-Bar
|
9/14/2020
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Green Building Rough
|
9/15/2020
|
Approved
|
JOEY BUCHANAN
|
|
Reinforced Concrete Frame
|
9/15/2020
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Verify Sprinkler Sign Off
|
9/15/2020
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Excavation/Setback/Form/Re-Bar
|
9/17/2020
|
Off-Hour Fees Due
|
|
|
Masonry Wall/Backfill
|
9/17/2020
|
Partial Approval
|
JOEY BUCHANAN
|
|
Piling/Pier/Caisson
|
9/17/2020
|
Partial Approval
|
JOEY BUCHANAN
|
|
Reinforced Concrete Frame
|
9/17/2020
|
Off-Hour Fees Due
|
|
|
Verify Sprinkler Sign Off
|
9/17/2020
|
Off-Hour Fees Due
|
|
|
Deputy Reinf. Concrete
|
9/18/2020
|
Approved
|
SORIN CIRSTOIU
|
|
Reinforced Concrete Frame
|
9/18/2020
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Verify Sprinkler Sign Off
|
9/18/2020
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
9/21/2020
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
9/21/2020
|
Approved
|
DERRICK SPENCER
|
|
Piling/Pier/Caisson
|
9/21/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
9/22/2020
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
9/22/2020
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
9/23/2020
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
9/23/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Verify Sprinkler Sign Off
|
9/23/2020
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
9/24/2020
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Other (see comments)
|
9/25/2020
|
Approved
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
9/25/2020
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Reinforced Concrete Frame
|
9/28/2020
|
Partial Approval
|
ALAN NOVAK
|
|
Deputy Reinf. Concrete
|
9/30/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
10/1/2020
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
10/1/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
10/2/2020
|
Approved
|
DERRICK SPENCER
|
|
Deputy Drilled-In Anchors
|
10/6/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Drilled-In Anchors
|
10/7/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
10/13/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
10/13/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
10/14/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
10/14/2020
|
Off-Hour Fees Due
|
|
|
Deputy Reinf. Concrete
|
10/23/2020
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
10/26/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
10/27/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
10/28/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
10/29/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
10/30/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
11/2/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
11/2/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
11/4/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
11/5/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
11/6/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
11/6/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
11/6/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
11/9/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
11/9/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
11/9/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
11/10/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
11/10/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
11/10/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
11/10/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
11/10/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
11/11/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
11/12/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
11/12/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
11/12/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
11/13/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
11/13/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
11/13/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
11/13/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
11/13/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Drilled-In Anchors
|
11/16/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
11/16/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
11/16/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
11/16/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
11/17/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
11/17/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
11/17/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
11/17/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
11/18/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
11/18/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
11/18/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
11/19/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
11/20/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
11/20/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
11/23/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
11/24/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
11/30/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
12/15/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
12/16/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/23/2020
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Masonry Frame
|
12/30/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
12/31/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
1/5/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Reinforced Masonry Frame
|
1/8/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
1/13/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Reinforced Masonry Frame
|
1/13/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
2/12/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
2/15/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
3/3/2021
|
Corrections Issued
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
3/4/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
3/24/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/30/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
4/15/2021
|
Corrections Issued
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/26/2021
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
4/30/2021
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/17/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/8/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/10/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/11/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
6/22/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/28/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
6/29/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/2/2021
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Insulation
|
7/2/2021
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/7/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Insulation
|
7/8/2021
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Wood Frame
|
7/8/2021
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/9/2021
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Insulation
|
7/14/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Wood Frame
|
7/20/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Wood Frame
|
7/22/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/26/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
7/27/2021
|
Corrections Issued
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/28/2021
|
Partial Approval
|
NICK LAROCCA
|
|
Wood Frame
|
7/30/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
8/2/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Wood Frame
|
8/4/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/5/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
8/10/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
8/12/2021
|
Corrections Issued
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
8/13/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
8/20/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/23/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
8/26/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Wood Frame
|
8/26/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/30/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
9/1/2021
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Wood Frame
|
9/3/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
9/8/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/13/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/20/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Insulation
|
9/22/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
9/28/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
10/1/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Wood Frame
|
10/12/2021
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Wood Frame
|
10/15/2021
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Wood Frame
|
10/18/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
10/22/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/25/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/27/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
10/28/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
10/29/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/2/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
11/2/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/8/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
11/10/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Wood Frame
|
11/15/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Insulation
|
11/16/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
11/18/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
11/19/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
11/23/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
12/3/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
12/9/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
12/17/2021
|
Partial Approval
|
JOEY BUCHANAN
|
|
Light Gage Steel Frame
|
12/20/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Insulation
|
12/21/2021
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Insulation
|
12/23/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
12/30/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
1/4/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
1/11/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
1/13/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
1/14/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
1/21/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
1/24/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
1/26/2022
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Wood Frame
|
2/1/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Insulation
|
2/2/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Insulation
|
2/4/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
2/14/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
2/17/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
3/3/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
3/8/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
3/17/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
3/17/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
3/21/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
3/21/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
3/23/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
4/5/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
4/8/2022
|
Corrections Issued
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
4/12/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
4/29/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
5/24/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
6/1/2022
|
Partial Approval
|
DAVID TSAU
|
|
Interior/Exterior Lathing
|
6/2/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
6/16/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
7/13/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
7/15/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
8/11/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
8/16/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
8/23/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Final
|
9/6/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
9/6/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Green Building Final
|
9/6/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
9/6/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
9/6/2022
|
Approved
|
JEFF BYTHEWAY
|
|
SGSOV-Seismic Gas S/O Valve
|
9/6/2022
|
SGSOV Approved
|
JEFF BYTHEWAY
|
|
Smoke Detectors
|
9/6/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Structural Steel Frame
|
9/6/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Final
|
10/7/2022
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Green Building Final
|
10/7/2022
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Smoke Detectors
|
10/7/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Final
|
10/12/2022
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Green Building Final
|
10/12/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Smoke Detectors
|
10/12/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
10/18/2022
|
Approved
|
DAVID TSAU
|
|
Final
|
11/2/2022
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Green Building Final
|
11/2/2022
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Pre-Inspection
|
11/9/2022
|
Approved
|
DERRICK SPENCER
|
|
Final
|
11/23/2022
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Green Building Final
|
11/23/2022
|
Approved
|
DERRICK SPENCER
|
|
Final
|
11/30/2022
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Final
|
12/8/2022
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Final
|
3/8/2023
|
OK to Issue CofO
|
DERRICK SPENCER
|