1010 S KENMORE AVE 90006

Certificate Information: 1010 S KENMORE AVE 90006

Application / Permit
19010-10000-03306
Plan Check / Job No.
B19LA16007
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 211'-2" X 121'-7" (7) STORY MIX USE 126 UNIT APARTMENT BUILDING. 1 STORY RETAIL (6000 SF). 5 LEVELS OF TYPE IIIA CONSTRUCTION OVER 2 LEVELS OF TYPE 1 CONSTRUCTION WITH PARKING GARAGE ON 1ST LEVEL AND 2 LEVELS SUBTERRANEAN PARKING. (TOC Tier 3) 13 UNITS TO BE SET ASIDE FOR EXTREMELY LOW INCOME
Permit Issued
Issued on 7/7/2020
Issuing Office
Metro
Current Status
Issued on 7/7/2020
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 8/1/2019 APPLICANT
Green Plans Picked Up 8/20/2019 APPLICANT
Assigned to Plan Check Engineer 8/22/2019 MICHAEL PEREZ
Corrections Issued 9/13/2019 MICHAEL PEREZ
Disabled Access Plans Picked Up 10/1/2019 APPLICANT
Quality Review Completed 10/2/2019 JOSE RODRIGUEZ
Building Plans Picked Up 10/9/2019 APPLICANT
Plan Check Approved 5/28/2020 MICHAEL PEREZ
Issued 7/7/2020 APPLICANT

Permit Application Clearance Information

CPC Cleared 10/9/2019 DIANA JIMENEZ
ZA Case Cleared 10/9/2019 DIANA JIMENEZ
ZA Case Cleared 10/9/2019 DIANA JIMENEZ
Project located in CRA area Cleared 10/15/2019 JIM URQUHART
Trees in Parkway Cleared 10/24/2019 JOHN KIM
Address approval Cleared 10/31/2019 THOMAS LANG
Eng Process Fee Ord 176,300 Cleared 10/31/2019 THOMAS LANG
Internal circulation Cleared 12/6/2019 EDUARDO HERMOSO
Hydrant and Access approval Cleared 12/13/2019 JEREMY CARTER
Green Code Cleared 12/23/2019 COLIN LOREDO
Low Impact Development Cleared 12/24/2019 JORGE MEJIA LEMUS
Fire Marshall Fire Life Safety Cleared 3/6/2020 DOMINIQUE MEDINA
DAS Clearance Cleared 3/10/2020 MICHAEL PEREZ
Highway dedication Cleared 3/10/2020 THOMAS LANG
Density Bonus 12.22.A.31 Cleared 3/19/2020 DORIS KWOK
Frnt yard landscape/Water mgmt Cleared 4/9/2020 PABLO ESTRADA
Miscellaneous Cleared 4/9/2020 PABLO ESTRADA
Miscellaneous Cleared 4/9/2020 PABLO ESTRADA
Opn space landscape/Water mgmt Cleared 4/9/2020 PABLO ESTRADA
Prkng lot landscape/Water mgmt Cleared 4/9/2020 PABLO ESTRADA
Site Plan review Cleared 4/9/2020 PABLO ESTRADA
Site Plan review Cleared 4/9/2020 PABLO ESTRADA
ZI Cleared 4/9/2020 GRACIELA ACOSTA
Building over 3-story or 36-ft Cleared 4/13/2020 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 4/13/2020 CALOSHA APPROVED
Bicycle Parking Cleared 4/21/2020 ELENA LOPEZ
Permit Cleared 4/21/2020 ELENA LOPEZ
Roof/Waste drainage to street Cleared 4/21/2020 ELENA LOPEZ
Work Adjacent to Public Way Cleared 5/13/2020 BOK GOH
Sewer availability Cleared 5/27/2020 PAMELA TENEZA

Contact Information

Architect Kim,, Steve Chulwon; Lic. No.: C19772 2855 W. 7TH ST. #200      LOS ANGELES, CA 90005
Contractor A R C.City; Lic. No.: 1050930-B 5500 HOLLYWOOD BLVD   STE 306    LOS ANGELES, CA 90028

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 7/9/2020 Approved RAFAEL ESPINOZA
Deputy Grading 7/20/2020 Conditional Approval RAFAEL ESPINOZA
Piling/Pier/Caisson 7/20/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/21/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/22/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/23/2020 Conditional Approval RAFAEL ESPINOZA
Piling/Pier/Caisson 7/23/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/24/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Other (see comments) 8/6/2020 Conditional Approval TIMOTHY BUXTON
Deputy Reinf. Concrete 8/6/2020 Conditional Approval TIMOTHY BUXTON
Deputy Other (see comments) 8/7/2020 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 8/7/2020 Conditional Approval JONATHAN QUACH
Special/Order Compliance 8/21/2020 Corrections Issued RAFAEL ESPINOZA
Deputy Steel/Welding 8/24/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 8/25/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 8/26/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Other (see comments) 8/26/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/26/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 8/27/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/27/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 8/28/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/1/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 9/2/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/3/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/4/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/9/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/10/2020 Conditional Approval RAFAEL ESPINOZA
Grading Pre-Inspection 9/10/2020 Approved RAFAEL ESPINOZA
Deputy Steel/Welding 9/11/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/14/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/15/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 9/16/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/16/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 9/17/2020 Conditional Approval RAFAEL ESPINOZA
Special/Order Compliance 9/17/2020 Partial Inspection RAFAEL ESPINOZA
Deputy Grading 9/18/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/21/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 9/22/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 9/23/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 9/24/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 9/25/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 9/28/2020 Not Ready for Inspection RAFAEL ESPINOZA
Pre-Inspection 9/28/2020 Partial Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 10/8/2020 Not Ready for Inspection RAFAEL ESPINOZA
Pre-Inspection 10/8/2020 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 10/16/2020 Not Ready for Inspection RAFAEL ESPINOZA
Pre-Inspection 10/16/2020 Partial Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 10/20/2020 Partial Approval RAFAEL ESPINOZA
Pre-Inspection 10/20/2020 Partial Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 11/6/2020 Partial Approval RAFAEL ESPINOZA
Pre-Inspection 11/6/2020 Approved RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/9/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 11/13/2020 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 11/16/2020 Not Ready for Inspection RAFAEL ESPINOZA
Pre-Inspection 11/16/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/19/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 11/19/2020 Partial Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 11/19/2020 Partial Approval RAFAEL ESPINOZA
Deputy Other (see comments) 11/20/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/20/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 11/20/2020 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 11/23/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Other (see comments) 11/24/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/24/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 11/24/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 11/24/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/25/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 11/25/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 11/25/2020 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Rough 11/25/2020 Not Ready for Inspection RAFAEL ESPINOZA
Masonry Wall/Backfill 11/25/2020 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 11/25/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Shotcrete 12/2/2020 Conditional Approval NICK DANERI
Deputy Other (see comments) 12/3/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/3/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 12/3/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 12/3/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 12/3/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/4/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Other (see comments) 12/7/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 12/8/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 12/9/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 12/9/2020 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 12/10/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 12/11/2020 Conditional Approval NICK DANERI
Deputy Other (see comments) 12/11/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 12/11/2020 Conditional Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 12/11/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 12/11/2020 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 12/15/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 12/15/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/16/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 12/16/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 12/16/2020 Corrections Issued RAFAEL ESPINOZA
Deputy Shotcrete 12/17/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 12/17/2020 Partial Approval RAFAEL ESPINOZA
Special/Order Compliance 12/17/2020 Approved RAFAEL ESPINOZA
Deputy Shotcrete 12/18/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 12/22/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 12/22/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 12/22/2020 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 12/23/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 12/29/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 12/30/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 12/31/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 1/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Other (see comments) 1/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 1/5/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 1/5/2021 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 1/5/2021 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 1/6/2021 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 1/7/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Shotcrete 1/8/2021 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 1/11/2021 Partial Approval RAFAEL ESPINOZA
Deputy Other (see comments) 1/12/2021 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 1/18/2021 Partial Approval LARRY ARNICK
Deputy Other (see comments) 1/20/2021 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 1/21/2021 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 1/22/2021 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 1/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/4/2021 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 2/5/2021 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 2/6/2021 Partial Approval RAFAEL ESPINOZA
Deputy Other (see comments) 2/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/8/2021 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 2/8/2021 Partial Approval RAFAEL ESPINOZA
Deputy Other (see comments) 2/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/10/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 2/10/2021 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 2/15/2021 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 2/17/2021 Partial Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 2/17/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/19/2021 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 2/20/2021 Off-Hour Fees Due
Excavation/Setback/Form/Re-Bar 2/20/2021 Partial Approval DANIEL MC AULIFFE
Deputy Shotcrete 2/22/2021 Conditional Approval NICK DANERI
Deputy Other (see comments) 2/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/23/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/24/2021 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 2/24/2021 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/26/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 3/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/2/2021 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 3/2/2021 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/4/2021 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 3/4/2021 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/5/2021 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 3/5/2021 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/8/2021 Conditional Approval NICK DANERI
Deputy Other (see comments) 3/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/15/2021 Conditional Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 3/15/2021 Corrections Issued RAFAEL ESPINOZA
Reinforced Concrete Frame 3/15/2021 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/16/2021 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 3/16/2021 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 3/16/2021 Not Ready for Inspection RAFAEL ESPINOZA
Masonry Wall/Backfill 3/17/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 3/18/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 3/18/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/23/2021 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 3/24/2021 Conditional Approval NICK DANERI
Masonry Wall/Backfill 3/25/2021 Partial Approval RAFAEL ESPINOZA
Deputy Other (see comments) 3/31/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/31/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Other (see comments) 4/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 4/1/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 4/1/2021 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 4/5/2021 Conditional Approval NICK DANERI
Deputy Other (see comments) 4/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 4/6/2021 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 4/15/2021 Partial Approval DANIEL COLLINS
Deputy Shotcrete 4/16/2021 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 4/16/2021 Partial Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 4/17/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/19/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 4/20/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/22/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 4/22/2021 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 4/22/2021 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 4/27/2021 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 4/28/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 5/4/2021 Conditional Approval NICK DANERI
Masonry Wall/Backfill 5/5/2021 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 5/11/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Other (see comments) 5/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/12/2021 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 5/12/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/18/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 5/20/2021 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 5/21/2021 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 5/27/2021 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 6/2/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 6/7/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/7/2021 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 6/8/2021 Conditional Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 6/15/2021 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 7/13/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/14/2021 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 7/20/2021 Off-Hour Fees Due
Floor/Roof Diaphrgm/Shear Wall 7/20/2021 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 7/22/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/9/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/10/2021 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 8/11/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/2/2021 Not Ready for Inspection JAMES POWERS
Excavation/Setback/Form/Re-Bar 9/3/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/8/2021 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 9/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 9/16/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/17/2021 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 9/17/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/8/2021 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 10/15/2021 Partial Approval JONATHAN QUACH
Excavation/Setback/Form/Re-Bar 10/19/2021 Partial Inspection SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 10/26/2021 Partial Inspection SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 10/27/2021 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Other (see comments) 10/28/2021 Partial Approval JAMES POWERS
Deputy Wood Construction 10/28/2021 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 10/29/2021 Partial Inspection SORIN CIRSTOIU
Drywall Nailing 11/2/2021 Partial Approval SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 11/2/2021 Partial Approval SORIN CIRSTOIU
Floor/Roof Diaphrgm/Shear Wall 11/4/2021 Partial Inspection SORIN CIRSTOIU
Floor/Roof Diaphrgm/Shear Wall 11/8/2021 Partial Inspection SORIN CIRSTOIU
Deputy Wood Construction 11/9/2021 Approved SORIN CIRSTOIU
Floor/Roof Diaphrgm/Shear Wall 11/10/2021 Partial Inspection SORIN CIRSTOIU
Floor/Roof Diaphrgm/Shear Wall 11/12/2021 Partial Inspection SORIN CIRSTOIU
Deputy Other (see comments) 11/23/2021 Approved SORIN CIRSTOIU
Deputy Wood Construction 11/23/2021 Approved SORIN CIRSTOIU
Floor/Roof Diaphrgm/Shear Wall 11/24/2021 Partial Inspection SORIN CIRSTOIU
Drywall Nailing 12/1/2021 Partial Approval SORIN CIRSTOIU
Floor/Roof Diaphrgm/Shear Wall 12/1/2021 Partial Approval SORIN CIRSTOIU
Deputy Wood Construction 12/20/2021 Conditional Approval JONATHAN QUACH
Floor/Roof Diaphrgm/Shear Wall 12/21/2021 Partial Approval SORIN CIRSTOIU
Deputy Wood Construction 1/20/2022 Approved DANIEL MC AULIFFE
Drywall Nailing 1/20/2022 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 1/20/2022 Partial Approval DANIEL MC AULIFFE
Deputy Wood Construction 1/24/2022 Conditional Approval JONATHAN QUACH
Deputy Wood Construction 1/26/2022 Conditional Approval ERNESTO CORRAL
Drywall Nailing 1/27/2022 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 2/1/2022 Partial Approval SORIN CIRSTOIU
Floor/Roof Diaphrgm/Shear Wall 2/10/2022 Partial Inspection SORIN CIRSTOIU
Floor/Roof Diaphrgm/Shear Wall 2/24/2022 Partial Approval SORIN CIRSTOIU
Floor/Roof Diaphrgm/Shear Wall 2/25/2022 Partial Inspection SORIN CIRSTOIU
Floor/Roof Diaphrgm/Shear Wall 3/9/2022 Partial Approval SORIN CIRSTOIU
Floor/Roof Diaphrgm/Shear Wall 3/10/2022 Partial Approval SORIN CIRSTOIU
Insulation 3/18/2022 Partial Inspection SORIN CIRSTOIU
Insulation 4/7/2022 Corrections Issued SORIN CIRSTOIU
Insulation 4/22/2022 Partial Approval SORIN CIRSTOIU
Insulation 5/18/2022 Conditional Approval DARRYL ARNOLD
Insulation 5/19/2022 Partial Approval JONATHAN QUACH
Drywall Nailing 5/20/2022 Partial Inspection SORIN CIRSTOIU
Insulation 5/27/2022 Corrections Issued MARK FERRARI
Deputy Other (see comments) 6/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 6/3/2022 Conditional Approval ERNESTO CORRAL
Insulation 6/6/2022 Corrections Issued RAFAEL ESPINOZA
Insulation 6/10/2022 Not Ready for Inspection NICK DANERI
Insulation 6/11/2022 Off-Hour Fees Due
Insulation 6/11/2022 Partial Approval JAMES POWERS
Deputy Wood Construction 6/13/2022 Conditional Approval ERNESTO CORRAL
Insulation 6/14/2022 Not Ready for Inspection NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 6/16/2022 Partial Approval RAFAEL ESPINOZA
Insulation 6/16/2022 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 6/17/2022 Partial Approval JAMES POWERS
Insulation 6/18/2022 Partial Approval NICK DANERI
Deputy Wood Construction 6/23/2022 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 6/24/2022 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 6/24/2022 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 6/24/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Wood Construction 6/28/2022 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 6/28/2022 Partial Approval RAFAEL ESPINOZA
Wood Frame 6/28/2022 Partial Approval RAFAEL ESPINOZA
Insulation 6/30/2022 Partial Inspection RAFAEL ESPINOZA
Deputy Wood Construction 7/1/2022 Conditional Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 7/6/2022 Partial Approval RAFAEL ESPINOZA
Deputy Other (see comments) 7/8/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Wood Construction 7/8/2022 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 7/8/2022 Partial Approval RAFAEL ESPINOZA
Insulation 7/12/2022 Partial Approval RAFAEL ESPINOZA
Wood Frame 7/13/2022 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 7/19/2022 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 7/20/2022 Partial Inspection NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 7/22/2022 Partial Approval TED RIES
Insulation 7/26/2022 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 8/10/2022 Partial Inspection RAFAEL ESPINOZA
Wood Frame 8/15/2022 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 11/28/2022 Partial Approval NICK DANERI
Insulation 3/6/2023 Partial Approval GREGORY POMISH
Special/Order Compliance 5/4/2023 Partial Inspection RAFAEL ESPINOZA
Special/Order Compliance 5/18/2023 Corrections Issued RAFAEL ESPINOZA
Special/Order Compliance 3/1/2024 Partial Inspection NICK DANERI
Special/Order Compliance 7/11/2024 Corrections Issued NICK DANERI
Drywall Nailing 10/15/2025 Partial Approval JOEY BUCHANAN
Drywall Nailing 5/21/2026 Partial Approval JOEY BUCHANAN