Pre-Inspection
|
3/18/2020
|
Approved
|
JAMES POWERS
|
|
Grading Pre-Inspection
|
4/3/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
4/3/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
7/22/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
7/22/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
7/22/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/23/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Other (see comments)
|
7/29/2020
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
7/29/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
7/29/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
7/29/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/30/2020
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
7/30/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/31/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/4/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
8/5/2020
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
8/5/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
8/5/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Subgrade
|
8/5/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/6/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Other (see comments)
|
8/12/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
8/12/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
8/12/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
8/12/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/14/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
8/18/2020
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
8/18/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
8/19/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
8/19/2020
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
8/20/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
8/20/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Subgrade
|
8/20/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
8/21/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/21/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
8/21/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
8/25/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/25/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
8/25/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
8/26/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/26/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
8/26/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
8/27/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/27/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
8/27/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
8/28/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/28/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
8/28/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
8/31/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/31/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
8/31/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
9/1/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
9/1/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
9/1/2020
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
9/1/2020
|
Partial Approval
|
NICK DANERI
|
|
METHANE-Barrier
|
9/1/2020
|
Partial Inspection
|
NICK DANERI
|
|
METHANE-Subgrade
|
9/1/2020
|
Partial Inspection
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
9/2/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
9/2/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
9/2/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
9/3/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/3/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
9/3/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
9/4/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/4/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
9/4/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
9/8/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Reinf. Concrete
|
9/8/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Shotcrete
|
9/8/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Drilled-In Anchors
|
9/9/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
9/9/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Shotcrete
|
9/9/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Green Building Rough
|
9/9/2020
|
Partial Inspection
|
KATY RAMIREZ
|
|
METHANE-Rough
|
9/9/2020
|
Partial Inspection
|
KATY RAMIREZ
|
|
Reinforced Concrete Frame
|
9/9/2020
|
Partial Approval
|
KATY RAMIREZ
|
|
Verify Sprinkler Sign Off
|
9/9/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
9/10/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/10/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
9/10/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
9/11/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/11/2020
|
Order to Comply Issued
|
JAMES POWERS
|
|
Deputy Shotcrete
|
9/11/2020
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
9/11/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
9/11/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Subgrade
|
9/11/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
9/14/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/14/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
9/14/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
9/15/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/15/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
9/15/2020
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/15/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
9/15/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
9/15/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
9/15/2020
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/15/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
9/16/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/16/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
9/16/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
9/16/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
9/16/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
9/16/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
9/17/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
9/18/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/18/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
9/18/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
9/21/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/21/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
9/22/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/22/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
9/22/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
9/23/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/23/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
9/23/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
9/24/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/24/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
9/24/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
9/25/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/25/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
9/25/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
9/28/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/28/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
9/28/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
9/29/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/29/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
9/29/2020
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
9/29/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
9/29/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
9/29/2020
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/29/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
9/30/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/30/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
9/30/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/1/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/1/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
10/1/2020
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
10/1/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/2/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/2/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
10/2/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/5/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/5/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
10/5/2020
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
10/5/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
10/5/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
10/5/2020
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
10/5/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/6/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/6/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
10/6/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
10/7/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/9/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/13/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/13/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/14/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/14/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/15/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/15/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/16/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/16/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/27/2020
|
Conditional Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/28/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/29/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/30/2020
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/30/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
10/30/2020
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Subgrade
|
10/30/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/2/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/4/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/5/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/6/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
11/12/2020
|
Conditional Approval
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
11/12/2020
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
11/13/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
12/1/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/2/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/3/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/4/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/8/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/9/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/10/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/11/2020
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
12/11/2020
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
12/12/2020
|
Off-Hour Fees Due
|
|
|
Excavation/Setback/Form/Re-Bar
|
12/12/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/14/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/15/2020
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
12/15/2020
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
12/16/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/17/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/18/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/21/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/22/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/23/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/24/2020
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
12/24/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/28/2020
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
12/28/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/29/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/31/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/4/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/5/2021
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
1/5/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/6/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/7/2021
|
Partial Approval
|
JAMES POWERS
|
|
Pre-Inspection
|
1/11/2021
|
Approved
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/12/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/19/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/20/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/26/2021
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/26/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/27/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/28/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/29/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/1/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
2/3/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
2/4/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
2/5/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
2/9/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/9/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
4/12/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
4/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
4/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
4/15/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
4/15/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
4/15/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
4/15/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
4/19/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
4/20/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
4/21/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
4/21/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
4/23/2021
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
4/23/2021
|
Not Ready for Inspection
|
NICK DANERI
|
|
METHANE-Rough
|
4/23/2021
|
Approved
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
4/23/2021
|
Not Ready for Inspection
|
NICK DANERI
|
|
Wood Frame
|
4/23/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Wood Construction
|
4/26/2021
|
Corrections Issued
|
NICK DANERI
|
|
Deputy Wood Construction
|
4/27/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Wood Construction
|
4/29/2021
|
Conditional Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/4/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
5/4/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
5/4/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/5/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
5/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
5/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/19/2021
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/21/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
5/24/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
5/25/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
5/27/2021
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
6/16/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
6/16/2021
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
6/16/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
6/16/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
6/25/2021
|
Conditional Approval
|
JONATHAN QUACH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/29/2021
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
7/7/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
7/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/19/2021
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/20/2021
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
7/20/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
7/22/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
7/23/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
7/26/2021
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
7/28/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
8/2/2021
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
8/5/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/5/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/10/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/11/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/12/2021
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
8/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/18/2021
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
8/20/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/20/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
8/20/2021
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/25/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/25/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/31/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/31/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
8/31/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
9/1/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
9/8/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
9/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
9/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/14/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Grading Pre-Inspection
|
9/14/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
9/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/17/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
9/21/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/21/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
9/23/2021
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
9/24/2021
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
9/28/2021
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
9/29/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Wood Construction
|
9/30/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
9/30/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
10/4/2021
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
10/8/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
10/20/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Insulation
|
10/21/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Insulation
|
10/22/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
10/22/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
10/27/2021
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
10/29/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
11/5/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
11/12/2021
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
11/12/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
12/2/2021
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
12/7/2021
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
12/8/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
12/8/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
12/10/2021
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
12/28/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
12/30/2021
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
1/7/2022
|
Not Ready for Inspection
|
TED RIES
|
|
Light Gage Steel Frame
|
1/10/2022
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
1/11/2022
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
1/11/2022
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
1/11/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
1/11/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
1/12/2022
|
Partial Approval
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
1/20/2022
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
2/9/2022
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
2/10/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
T-Bar Ceiling
|
3/7/2022
|
Partial Approval
|
JAMES POWERS
|
|
Special/Order Compliance
|
3/21/2022
|
Partial Inspection
|
NICK DANERI
|
|
Insulation
|
3/22/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
T-Bar Ceiling
|
3/24/2022
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
4/7/2022
|
Partial Approval
|
JAMES POWERS
|
|
Structural Steel Frame
|
4/11/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
4/11/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Special/Order Compliance
|
4/20/2022
|
Partial Inspection
|
NICK DANERI
|
|
Pre-Inspection
|
4/29/2022
|
Partial Approval
|
JAMES POWERS
|
|
T-Bar Ceiling
|
5/5/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
5/18/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
6/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Special/Order Compliance
|
12/5/2022
|
Conditional Approval
|
NICK DANERI
|
|
Final
|
3/8/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Final
|
3/8/2023
|
Approved
|
JAMES POWERS
|
|
Drywall Nailing
|
3/9/2023
|
Approved
|
JAMES POWERS
|
|
Final
|
3/9/2023
|
OK to Issue CofO
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
3/9/2023
|
Approved
|
JAMES POWERS
|
|
METHANE-Barrier
|
3/9/2023
|
Approved
|
JAMES POWERS
|
|
METHANE-Subgrade
|
3/9/2023
|
Approved
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/9/2023
|
Approved
|
JAMES POWERS
|
|
SGSOV-Seismic Gas S/O Valve
|
3/9/2023
|
SGSOV Approved
|
JAMES POWERS
|
|
Smoke Detectors
|
3/9/2023
|
Approved
|
JAMES POWERS
|
|
Structural Steel Frame
|
3/9/2023
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
3/9/2023
|
Approved
|
JAMES POWERS
|
|
Wood Frame
|
3/9/2023
|
Approved
|
JAMES POWERS
|