|
Excavation/Setback/Form/Re-Bar
|
1/12/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
1/12/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
1/12/2024
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
1/16/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
1/23/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
1/23/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
1/24/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
1/30/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
1/30/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
1/31/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
2/1/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
2/7/2024
|
Corrections Issued
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
2/7/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
2/8/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Shotcrete
|
2/9/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
2/9/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Shotcrete
|
2/12/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/13/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Shotcrete
|
2/13/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
2/13/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
2/14/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
2/15/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Shotcrete
|
2/15/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
2/15/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
2/16/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
2/16/2024
|
Conditional Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
2/16/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
2/22/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
2/22/2024
|
Conditional Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
2/22/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
2/27/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Shotcrete
|
2/27/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
2/27/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
2/28/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Shotcrete
|
2/28/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
2/28/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
2/28/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
2/28/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
2/28/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
3/4/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
3/4/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
3/6/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Shotcrete
|
3/6/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
3/7/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
3/8/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
3/11/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
3/11/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
3/13/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
3/13/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
3/14/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
3/14/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
3/15/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
3/15/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
3/18/2024
|
No Access for Inspection
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
4/15/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
4/16/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
4/16/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
4/30/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
4/30/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Masonry
|
5/9/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
5/9/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
5/10/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
5/10/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Pre-Stress Concrete
|
5/29/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
5/29/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
5/29/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Pre-Stress Concrete
|
5/30/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
5/30/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
5/30/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Pre-Stress Concrete
|
6/3/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Pre-Stress Concrete
|
6/4/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
6/4/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
6/5/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
6/5/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Pre-Stress Concrete
|
6/6/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
6/6/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
6/6/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Pre-Stress Concrete
|
6/11/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
6/11/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
6/11/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Pre-Stress Concrete
|
6/12/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
6/12/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
6/12/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
6/12/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
6/12/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
6/13/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
6/18/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
6/20/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
6/21/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
6/25/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
7/3/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
7/3/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
7/3/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
7/9/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Pre-Stress Concrete
|
7/17/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
7/17/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Pre-Stress Concrete
|
7/18/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
7/18/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Pre-Stress Concrete
|
7/25/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
7/25/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
7/25/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
7/25/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
8/2/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
8/2/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Pre-Stress Concrete
|
8/5/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
8/5/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
8/5/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
8/13/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
8/20/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
8/20/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
8/26/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
9/10/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
9/19/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
9/20/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
9/24/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
10/4/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Pre-Inspection
|
10/4/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
10/15/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
10/22/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Wood Construction
|
10/22/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
10/24/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Wood Frame
|
10/24/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Wood Frame
|
11/7/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
11/19/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
12/2/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Insulation
|
12/6/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
12/9/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
12/9/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
12/17/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Insulation
|
12/23/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Wood Frame
|
12/23/2024
|
Corrections Issued
|
LARRY ARNICK
|
|
Wood Frame
|
1/15/2025
|
Corrections Issued
|
LARRY ARNICK
|
|
Drywall Nailing
|
1/27/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/4/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/19/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Pre-Inspection
|
2/19/2025
|
Approved
|
LARRY ARNICK
|
|
Wood Frame
|
2/19/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
2/27/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
2/27/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
2/27/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/3/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
3/3/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
3/10/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
3/10/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
3/10/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
3/12/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/18/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
4/10/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
4/14/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Pre-Inspection
|
4/14/2025
|
Partial Inspection
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
4/16/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
4/18/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Pre-Inspection
|
4/18/2025
|
Partial Inspection
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
4/23/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
4/25/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
4/28/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
5/7/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
5/8/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
5/9/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
5/12/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
5/12/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
5/13/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
5/13/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
5/15/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
5/21/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
5/27/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
5/28/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
5/29/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
6/2/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
6/9/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Wood Frame
|
6/9/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Wood Frame
|
6/13/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
6/16/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
6/23/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
6/24/2025
|
Partial Inspection
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
6/27/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Interior/Exterior Lathing
|
7/1/2025
|
Partial Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
7/3/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
7/8/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
7/9/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
7/9/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
7/14/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
7/14/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
7/15/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
7/18/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
7/18/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
7/22/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
7/24/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
7/28/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
7/31/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
8/4/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
8/5/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
8/11/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
8/14/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
8/15/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Drywall Nailing
|
8/19/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
8/22/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Drywall Nailing
|
8/29/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
9/8/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Pre-Inspection
|
9/10/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Pre-Inspection
|
9/12/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Pre-Inspection
|
9/18/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Pre-Inspection
|
9/19/2025
|
Corrections Issued
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
9/23/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
9/25/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Pre-Inspection
|
9/25/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
9/26/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
9/29/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Masonry Wall/Backfill
|
9/29/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
9/29/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
9/29/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Pre-Inspection
|
10/2/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Special/Order Compliance
|
10/7/2025
|
Partial Inspection
|
LARRY ARNICK
|
|
Pre-Inspection
|
10/15/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Final
|
10/27/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
10/27/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Final
|
10/27/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
10/27/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
10/27/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
10/27/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
SGSOV-Seismic Gas S/O Valve
|
10/27/2025
|
SGSOV Not Ready
|
LARRY ARNICK
|
|
Smoke Detectors
|
10/27/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
10/27/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Pre-Inspection
|
10/29/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
10/31/2025
|
Approved
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
11/4/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Wood Frame
|
11/4/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
11/5/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Structural Steel Frame
|
11/5/2025
|
Approved
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
11/7/2025
|
Approved
|
SCOTT SOBEL
|
|
Pre-Inspection
|
11/7/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Pre-Inspection
|
11/21/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Final
|
12/3/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
12/3/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Final
|
12/3/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
12/3/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
12/3/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
12/3/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
SGSOV-Seismic Gas S/O Valve
|
12/3/2025
|
SGSOV Approved
|
LARRY ARNICK
|
|
Smoke Detectors
|
12/3/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
12/3/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
12/8/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
12/8/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Final
|
12/8/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
12/8/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
12/8/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
12/8/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Smoke Detectors
|
12/8/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
12/8/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
12/16/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
12/16/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Final
|
12/16/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
12/16/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
12/16/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
12/16/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Smoke Detectors
|
12/16/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
12/16/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
12/19/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
12/19/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Final
|
12/19/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
12/19/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
12/19/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
12/19/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Smoke Detectors
|
12/19/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
12/19/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
12/30/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
12/30/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Green Building Final
|
12/30/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
12/30/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
12/30/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
12/30/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Smoke Detectors
|
12/30/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
12/30/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Special/Order Compliance
|
1/6/2026
|
Partial Approval
|
LARRY ARNICK
|
|
Final
|
1/21/2026
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
1/21/2026
|
Approved
|
LARRY ARNICK
|
|
Green Building Final
|
1/21/2026
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
1/21/2026
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Pre-Inspection
|
1/21/2026
|
Partial Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
1/21/2026
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
1/21/2026
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Smoke Detectors
|
1/21/2026
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
1/21/2026
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
1/27/2026
|
OK for TCO
|
LARRY ARNICK
|
|
Green Building Final
|
1/27/2026
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
1/27/2026
|
Approved
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
1/27/2026
|
Approved
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
1/27/2026
|
Approved
|
LARRY ARNICK
|
|
Smoke Detectors
|
1/27/2026
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
1/27/2026
|
Approved
|
LARRY ARNICK
|
|
Pre-Inspection
|
2/2/2026
|
Partial Inspection
|
LARRY ARNICK
|
|
Pre-Inspection
|
2/5/2026
|
Partial Inspection
|
LARRY ARNICK
|
|
Pre-Inspection
|
2/24/2026
|
Approved
|
RONALD JIMENEZ
|
|
Final
|
2/26/2026
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Green Building Final
|
2/26/2026
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Smoke Detectors
|
2/26/2026
|
Approved
|
RONALD JIMENEZ
|
|
Green Building Final
|
3/10/2026
|
Approved
|
RONALD JIMENEZ
|
|
Pre-Inspection
|
3/10/2026
|
Approved
|
RONALD JIMENEZ
|
|
Special/Order Compliance
|
3/11/2026
|
Approved
|
RONALD JIMENEZ
|
|
Special/Order Compliance
|
3/12/2026
|
Corrections Issued
|
RONALD JIMENEZ
|
|
Final
|
3/16/2026
|
Partial Inspection
|
RONALD JIMENEZ
|
|
Final
|
3/19/2026
|
Partial Approval
|
ERNESTO CORRAL
|
|
Pre-Inspection
|
3/24/2026
|
Approved
|
RONALD JIMENEZ
|
|
Final
|
3/25/2026
|
Conditional Approval
|
RONALD JIMENEZ
|