753 1/2 E 25TH ST 90011

Certificate Information: 753 1/2 E 25TH ST 90011

Application / Permit
19010-10000-02652
Plan Check / Job No.
B19LA12708
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
ADDITION TO (E) 2ND DWELLING AND CONVERT TO ACCESSORY DWELLING UNIT PER ADU ORDINANCE PER LAMC 12.22A.33 (c)-(d)
Permit Issued
Issued on 5/18/2022
Issuing Office
Metro
Current Status
Permit Closed on 2/20/2026
Certificate of Occupancy
Permit Closed More Information

Permit Application Status History

Submitted 6/19/2019 APPLICANT
Green Plans Picked Up 7/3/2019 APPLICANT
Assigned to Plan Check Engineer 7/11/2019 HANS SANTIAGO
Corrections Issued 7/15/2019 HANS SANTIAGO
Quality Review Completed 7/24/2019 ARMEN JIVALAGIAN
Building Plans Picked Up 7/30/2019 APPLICANT
Plan Check Approved 5/11/2022 ANDREW SANTIAGO
Issued 5/18/2022 APPLICANT
Permit Closed 2/19/2026 SABAS ALONSO

Permit Application Clearance Information

Community Plan Implem. Overlay Cleared 9/25/2019 ANNA VAN
Community Plan Implem. Overlay Cleared 9/25/2019 JEANIE LAM
Eng Process Fee Ord 176,300 Cleared 9/25/2019 JEANIE LAM
Hydrant and Access approval Cleared 9/25/2019 GEORGE SUCHAND
Sewer availability Cleared 9/25/2019 JEANIE LAM
Community Plan Implem. Overlay Cleared 9/27/2019 ADRIAN SANCHEZ
Green Code Cleared 10/10/2019 COLIN LOREDO
Low Impact Development Cleared 11/5/2019 JORGE MEJIA LEMUS
Roof/Waste drainage to street Cleared 11/8/2019 THOMAS LANG
Community Plan Implem. Overlay Cleared 11/14/2019 RIDWAN HARDY
Address approval Cleared 12/3/2021 JEANIE LAM

Contact Information

Contractor Owner-Builder       ,
Engineer Ibrahim,, Mazin Showket; Lic. No.: C69896 4222 BRADFORD ST      LA VERNE, CA 91750
Engineer Yadegari,, Shahriar; Lic. No.: C64591 10301 KESWICK AVE      LOS ANGELES, CA 90064

Inspector Information

ALEJANDRO DE ARTOLA, (213) 202-3128 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 7/21/2022 Not Ready for Inspection JOAQUIN GREENOUGH
Final 7/21/2022 Corrections Issued JOAQUIN GREENOUGH
Footing/Foundation/Slab 7/21/2022 Not Ready for Inspection JOAQUIN GREENOUGH
Green Building Final 7/21/2022 Not Ready for Inspection JOAQUIN GREENOUGH
Green Building Rough 7/21/2022 Not Ready for Inspection JOAQUIN GREENOUGH
SGSOV-Seismic Gas S/O Valve 7/21/2022 SGSOV Not Ready JOAQUIN GREENOUGH
Smoke Detectors 7/21/2022 Not Ready for Inspection JOAQUIN GREENOUGH
BUILDING-Rough-Frame 7/26/2022 Not Ready for Inspection ALIZAH MAYAGOITIA
Final 7/26/2022 Not Ready for Inspection ALIZAH MAYAGOITIA
Footing/Foundation/Slab 7/26/2022 Corrections Issued ALIZAH MAYAGOITIA
Green Building Final 7/26/2022 Not Ready for Inspection ALIZAH MAYAGOITIA
Green Building Rough 7/26/2022 Not Ready for Inspection ALIZAH MAYAGOITIA
SGSOV-Seismic Gas S/O Valve 7/26/2022 SGSOV Not Ready ALIZAH MAYAGOITIA
Smoke Detectors 7/26/2022 Not Ready for Inspection ALIZAH MAYAGOITIA
Final 8/29/2022 Corrections Issued ENRIQUE MIRELES
SGSOV-Seismic Gas S/O Valve 8/29/2022 SGSOV Not Ready ENRIQUE MIRELES
Pre-Inspection 10/13/2022 Not Ready for Inspection SHAVONNE ESPINOZA
Pre-Inspection 10/18/2022 Partial Inspection SHAVONNE ESPINOZA
Pre-Inspection 2/19/2026 Permit Closed SABAS ALONSO