970 S FEDORA ST 1-50 90006

Certificate Information: 970 S FEDORA ST 1-50 90006

Application / Permit
19010-10000-02515
Plan Check / Job No.
B19LA12204
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
PROPOSED 5 STORY RESIDENTIAL APARTMENT OVER 1 STORY PARKING AND 1 LEVEL OF SUBTERRANEAN GARAGE. AFFORDABLE HOUSING TOC TIER 3 PER DIR-2019-1113-TOC.(5 Extremely Low Income).
Permit Issued
Issued on 2/20/2020
Issuing Office
Metro
Current Status
CofO Issued on 11/19/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/8/2019 APPLICANT
Assigned to Plan Check Engineer 8/2/2019 ARMEN JIVALAGIAN
Corrections Issued 8/13/2019 ARMEN JIVALAGIAN
Quality Review Completed 8/21/2019 TIEN JEN WANG
Building Plans Picked Up 8/23/2019 APPLICANT
Plan Check Approved 2/12/2020 ARMEN JIVALAGIAN
Issued 2/20/2020 LADBS
CofO in Progress 11/15/2021 RAFAEL ESPINOZA
CofO Issued 11/19/2021 ERNESTO CORRAL
Permit Finaled 11/19/2021 ERNESTO CORRAL

Permit Application Clearance Information

Project located in CRA area Cleared 8/13/2019 JIM URQUHART
Address approval Cleared 8/19/2019 ADRIAN SANCHEZ
Bicycle Parking Cleared 8/19/2019 ADRIAN SANCHEZ
Eng Process Fee Ord 176,300 Cleared 8/19/2019 ERIK BEASLEY
Highway dedication Cleared 8/19/2019 ERIK BEASLEY
Permit Cleared 8/19/2019 ADRIAN SANCHEZ
Trees in Parkway Cleared 8/28/2019 JOHN KIM
Building over 3-story or 36-ft Cleared 11/6/2019 CALOSHA APPROVED
Low Impact Development Cleared 12/10/2019 ANDRES COVARRUBIAS
Roof/Waste drainage to street Cleared 12/27/2019 EMIL KYUPELYAN
Construction near power lines Cleared 1/10/2020 TORI CHEN
Construction within easement Cleared 1/10/2020 TORI CHEN
Excavation more than 5-ft deep Cleared 1/22/2020 CALOSHA APPROVED
DAS Clearance Cleared 2/3/2020 ARMEN JIVALAGIAN
DCP conditions approval Cleared 2/3/2020 JAMES MCCARTHY
Density Bonus 12.22.A.31 Cleared 2/3/2020 JAMES MCCARTHY
Green Code Cleared 2/4/2020 ARMEN JIVALAGIAN
Hydrant and Access approval Cleared 2/6/2020 JEREMY CARTER
Sewer availability Cleared 2/6/2020 PAMELA TENEZA
Frnt yard landscape/Water mgmt Cleared 2/10/2020 JOE LUCKEY
Miscellaneous Cleared 2/10/2020 JOE LUCKEY
Opn space landscape/Water mgmt Cleared 2/10/2020 JOE LUCKEY
Site Plan review Cleared 2/10/2020 JOE LUCKEY
Fire Marshall Fire Life Safety Cleared 2/11/2020 OSCAR SALGADO JR
Miscellaneous Cleared 2/11/2020 JOE LUCKEY
Work Adjacent to Public Way Cleared 2/11/2020 ROSA SILVA
Miscellaneous Cleared 2/12/2020 JOE LUCKEY

Contact Information

Architect Fischer,, James Robert; Lic. No.: C32908 17904 HARTLAND STREET      RESEDA, CA 91335
Contractor Wilshire Construction L P; Lic. No.: 1048091-B 3470 WILSHIRE STE 1010      LOS ANGELES, CA 90010
Engineer Cefali,, David Allen; Lic. No.: S3658 4344 LAUREL CANYON BLVD_STE 3      STUDIO CITY, CA 91604
Engineer Ghanim,, Husam; Lic. No.: S5689 1594 CASITAS AVENUE      PASADENA, CA 91103
Engineer Krief,, Dan Dov; Lic. No.: C76041 1166 S POINT VIEW STREET      LOS ANGELES, CA 90035
Engineer Tang,, Stanley Siu Kei; Lic. No.: C56178 1105 N AVON STREET      BURBANK, CA 91505

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 5/14/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 5/14/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Other (see comments) 5/18/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/18/2020 Conditional Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 5/21/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 5/21/2020 Partial Approval RAFAEL ESPINOZA
Green Building Rough 5/27/2020 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 5/27/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 5/27/2020 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 5/27/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 5/29/2020 Partial Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 5/29/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 6/8/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/24/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 6/24/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/25/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 6/25/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/26/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 7/17/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 7/20/2020 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 7/20/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/21/2020 Conditional Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 7/29/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 7/29/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 7/29/2020 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 7/29/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/30/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 7/30/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/31/2020 Conditional Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 8/3/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 8/3/2020 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 8/3/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/5/2020 Conditional Approval NICK DANERI
Masonry Wall/Backfill 8/5/2020 Partial Approval NICK DANERI
Reinforced Masonry Frame 8/5/2020 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 8/5/2020 Not Ready for Inspection NICK DANERI
Deputy Reinf. Masonry 8/21/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/24/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/25/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/26/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/27/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 8/27/2020 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 8/27/2020 Not Ready for Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 9/8/2020 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 9/8/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 9/8/2020 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 9/8/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 9/9/2020 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 9/9/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/10/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Wood Construction 9/30/2020 Conditional Approval RAFAEL ESPINOZA
Wood Frame 9/30/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Wood Construction 10/1/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 10/15/2020 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 10/16/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 10/30/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 11/4/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 11/4/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 11/17/2020 Not Ready for Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 12/7/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Wood Construction 12/8/2020 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 12/11/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 12/16/2020 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 12/16/2020 Not Ready for Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 12/31/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 12/31/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Wood Construction 1/4/2021 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 1/8/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 1/8/2021 Partial Inspection RAFAEL ESPINOZA
Deputy Wood Construction 1/11/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 1/11/2021 Partial Inspection RAFAEL ESPINOZA
Wood Frame 1/11/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 1/12/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 1/12/2021 Partial Approval RAFAEL ESPINOZA
Insulation 1/12/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 1/14/2021 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 1/19/2021 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 1/21/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 1/21/2021 Partial Inspection DAVID BURKHEAD
Insulation 1/22/2021 Partial Approval RUSSELL BONVOULOIR
Deputy Wood Construction 1/28/2021 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 1/28/2021 Corrections Issued RAFAEL ESPINOZA
Deputy Wood Construction 1/29/2021 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 1/29/2021 Partial Approval RAFAEL ESPINOZA
Special/Order Compliance 1/29/2021 Approved RAFAEL ESPINOZA
Wood Frame 2/3/2021 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 2/10/2021 Partial Approval RAFAEL ESPINOZA
Insulation 2/12/2021 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 2/22/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 3/2/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 3/5/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 3/12/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 3/12/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 3/22/2021 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 3/22/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 3/31/2021 Partial Approval NICK DANERI
Light Gage Steel Frame 3/31/2021 Partial Approval NICK DANERI
Insulation 4/1/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 4/9/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 4/9/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 4/13/2021 Partial Approval DAVID BURKHEAD
Drywall Nailing 5/21/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 5/21/2021 Partial Approval RAFAEL ESPINOZA
Final 8/5/2021 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 8/5/2021 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Final 8/5/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 8/5/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 8/5/2021 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 8/5/2021 SGSOV Not Ready RAFAEL ESPINOZA
Smoke Detectors 8/5/2021 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 8/5/2021 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 8/20/2021 Partial Approval RAFAEL ESPINOZA
Final 10/4/2021 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 10/4/2021 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Final 10/4/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 10/4/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 10/4/2021 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 10/4/2021 SGSOV Not Ready RAFAEL ESPINOZA
Smoke Detectors 10/4/2021 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 10/4/2021 Not Ready for Inspection RAFAEL ESPINOZA
Final 10/7/2021 Partial Inspection RAFAEL ESPINOZA
Green Building Final 10/7/2021 Approved RAFAEL ESPINOZA
Final 10/29/2021 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 10/29/2021 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 10/29/2021 Approved RAFAEL ESPINOZA
Reinforced Masonry Frame 10/29/2021 Approved RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 10/29/2021 SGSOV Approved RAFAEL ESPINOZA
Smoke Detectors 10/29/2021 Approved RAFAEL ESPINOZA
Verify Sprinkler Sign Off 10/29/2021 Approved RAFAEL ESPINOZA
Final 11/9/2021 OK to Issue CofO RAFAEL ESPINOZA