4339 S BERRYMAN AVE 1-28 90066

Certificate Information: 4339 S BERRYMAN AVE 1-28 90066

Application / Permit
19010-10000-02497
Plan Check / Job No.
B19LA12075
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
(N) 28 UNIT TYPE IIIA APARTMENT OVER TYPE IA BASEMENT PARKING GARAGE
Permit Issued
Issued on 3/7/2022
Issuing Office
Metro
Current Status
CofO Issued on 6/3/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/14/2019 APPLICANT
Assigned to Plan Check Engineer 7/3/2019 HERNAN ARREOLA
Corrections Issued 7/11/2019 HERNAN ARREOLA
Quality Review Completed 7/18/2019 SIAVOSH POURSABAHIAN
Plan Check Approved 2/22/2021 HERNAN ARREOLA
Issued 3/7/2022 APPLICANT
Building Plans Picked Up 3/8/2022 APPLICANT
CofO in Progress 6/2/2025 DERRICK SPENCER
Permit Finaled 6/3/2025 HENRY BAGHDASSARIAN
CofO Issued 6/3/2025 HENRY BAGHDASSARIAN
Permit Finaled 6/3/2025 HENRY BAGHDASSARIAN

Permit Application Clearance Information

Trees in Parkway Cleared 11/14/2019 JOHN KIM
Address approval Cleared 7/29/2020 OSCAR GUTIERREZ
Highway dedication Cleared 8/6/2020 RAYMOND MUGAMBWA
Hydrant and Access approval Cleared 8/11/2020 MATTHEW CRAIG
Green Code Cleared 8/31/2020 KHEDER ALRAZAA
Eng Process Fee Ord 176,300 Cleared 9/23/2020 RAYMOND MUGAMBWA
Construction near power lines Cleared 9/24/2020 RIDWAN HARDY
Construction within easement Cleared 9/24/2020 RIDWAN HARDY
Specific Plan Cleared 10/13/2020 FREDDY GARCIA
Fire Marshall Fire Life Safety Cleared 10/22/2020 WILLIAM JOHNS
Frnt yard landscape/Water mgmt Cleared 11/13/2020 NOAH MCCOY
Opn space landscape/Water mgmt Cleared 11/13/2020 NOAH MCCOY
Low Impact Development Cleared 1/16/2021 MITESH PATEL
Roof/Waste drainage to street Cleared 1/20/2021 ANTHONY MAINEZ
Sewer availability Cleared 1/26/2021 ANTHONY MAINEZ
Building over 3-story or 36-ft Cleared 2/19/2021 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 2/19/2021 CALOSHA APPROVED

Contact Information

Architect Albert,, Stephen M; Lic. No.: C9412 2032 STONER AVE      LOS ANGELES, CA 90025
Contractor Lv Construction Inc; Lic. No.: 1043604-B 1768 MARY ROAD      ACTON, CA 93510
Engineer Fischer,, Kurt Mark; Lic. No.: S5432 PO BOX 809      POWAY, CA 92074

Inspector Information

VASIL MIHALEV, (310) 914-3920 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/17/2022 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 8/8/2022 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 8/15/2022 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 8/15/2022 Partial Approval JEFF BYTHEWAY
Green Building Rough 8/16/2022 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 8/16/2022 Partial Inspection JEFF BYTHEWAY
Verify Sprinkler Sign Off 8/16/2022 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/17/2022 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 8/19/2022 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 8/19/2022 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 8/26/2022 Partial Approval JEFF BYTHEWAY
Structural Steel Frame 8/26/2022 Not Ready for Inspection JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 8/31/2022 Partial Approval JEFF BYTHEWAY
Green Building Rough 9/1/2022 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 9/1/2022 Partial Approval JEFF BYTHEWAY
Deputy Shotcrete 9/2/2022 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 9/7/2022 Approved DERRICK SPENCER
Reinforced Concrete Frame 9/7/2022 Partial Approval DERRICK SPENCER
Deputy Reinf. Concrete 9/8/2022 Approved JEFF BYTHEWAY
Deputy Shotcrete 9/8/2022 Approved JEFF BYTHEWAY
Deputy Shotcrete 9/9/2022 Approved DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 9/12/2022 Partial Approval JEFF BYTHEWAY
Pre-Inspection 9/12/2022 Partial Inspection GRANT WOODS
Deputy Reinf. Concrete 9/13/2022 Approved GRANT WOODS
Deputy Shotcrete 9/13/2022 Approved GRANT WOODS
Excavation/Setback/Form/Re-Bar 9/23/2022 Partial Approval GRANT WOODS
Excavation/Setback/Form/Re-Bar 10/20/2022 Not Ready for Inspection GRANT WOODS
Excavation/Setback/Form/Re-Bar 10/21/2022 Partial Approval GRANT WOODS
Footing/Foundation/Slab 10/24/2022 Not Ready for Inspection GRANT WOODS
Reinforced Concrete Frame 10/25/2022 Not Ready for Inspection GRANT WOODS
Excavation/Setback/Form/Re-Bar 10/26/2022 Partial Approval GRANT WOODS
Deputy Reinf. Concrete 10/27/2022 Approved GRANT WOODS
Footing/Foundation/Slab 10/27/2022 Partial Approval GRANT WOODS
Excavation/Setback/Form/Re-Bar 11/17/2022 Not Ready for Inspection GRANT WOODS
Deputy Reinf. Concrete 11/23/2022 Conditional Approval GRANT WOODS
Deputy Reinf. Concrete 12/2/2022 Conditional Approval GRANT WOODS
Deputy Reinf. Concrete 12/6/2022 Conditional Approval GRANT WOODS
Excavation/Setback/Form/Re-Bar 12/7/2022 Not Ready for Inspection GRANT WOODS
Excavation/Setback/Form/Re-Bar 12/13/2022 Not Ready for Inspection GRANT WOODS
Deputy Reinf. Concrete 12/14/2022 Approved GRANT WOODS
Excavation/Setback/Form/Re-Bar 12/14/2022 Partial Approval GRANT WOODS
Deputy Drilled-In Anchors 12/28/2022 Approved GRANT WOODS
Deputy Drilled-In Anchors 12/29/2022 Approved GRANT WOODS
Deputy Reinf. Concrete 12/30/2022 Approved GRANT WOODS
Deputy Reinf. Concrete 1/5/2023 Approved GRANT WOODS
Reinforced Concrete Frame 1/9/2023 Partial Approval GRANT WOODS
Special/Order Compliance 1/9/2023 Approved MICHAEL PETRUSKO
Deputy Reinf. Concrete 1/26/2023 Conditional Approval GRANT WOODS
Footing/Foundation/Slab 1/27/2023 Not Ready for Inspection GRANT WOODS
Deputy Drilled-In Anchors 1/30/2023 Approved SHAVONNE ESPINOZA
Deputy Reinf. Concrete 1/30/2023 Approved SHAVONNE ESPINOZA
Deputy Reinf. Concrete 1/31/2023 Approved DERRICK SPENCER
Footing/Foundation/Slab 1/31/2023 Partial Approval DERRICK SPENCER
Deputy Reinf. Concrete 2/1/2023 Conditional Approval DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 2/1/2023 Partial Approval DERRICK SPENCER
Deputy Reinf. Concrete 2/2/2023 Approved DERRICK SPENCER
Deputy Reinf. Masonry 2/2/2023 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 2/6/2023 Conditional Approval DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 2/14/2023 Not Ready for Inspection GRANT WOODS
Excavation/Setback/Form/Re-Bar 2/15/2023 Not Ready for Inspection GRANT WOODS
Reinforced Concrete Frame 2/15/2023 Not Ready for Inspection GRANT WOODS
Excavation/Setback/Form/Re-Bar 2/16/2023 Not Ready for Inspection GRANT WOODS
Deputy Drilled-In Anchors 2/24/2023 Conditional Approval GRANT WOODS
Deputy Steel/Welding 3/1/2023 Conditional Approval GRANT WOODS
Deputy Steel/Welding 3/2/2023 Conditional Approval GRANT WOODS
Excavation/Setback/Form/Re-Bar 3/2/2023 Not Ready for Inspection GRANT WOODS
Footing/Foundation/Slab 3/2/2023 Not Ready for Inspection GRANT WOODS
Deputy Reinf. Concrete 3/3/2023 Approved GRANT WOODS
Excavation/Setback/Form/Re-Bar 3/3/2023 Partial Approval GRANT WOODS
Deputy Drilled-In Anchors 3/9/2023 Conditional Approval GRANT WOODS
Deputy Steel/Welding 3/9/2023 Conditional Approval GRANT WOODS
Deputy Steel/Welding 3/13/2023 Conditional Approval GRANT WOODS
Deputy Drilled-In Anchors 3/15/2023 Conditional Approval GRANT WOODS
Deputy Steel/Welding 3/16/2023 Approved GRANT WOODS
Deputy Reinf. Concrete 3/17/2023 Approved GRANT WOODS
Deputy Steel/Welding 3/17/2023 Approved GRANT WOODS
Excavation/Setback/Form/Re-Bar 3/17/2023 Partial Approval GRANT WOODS
Footing/Foundation/Slab 3/17/2023 Partial Approval GRANT WOODS
Structural Steel Frame 3/17/2023 Corrections Issued GRANT WOODS
Deputy Drilled-In Anchors 3/23/2023 Conditional Approval GRANT WOODS
Deputy Wood Construction 4/12/2023 Conditional Approval AMANUEL BERHE
Deputy Wood Construction 4/13/2023 Approved GRANT WOODS
Structural Steel Frame 4/13/2023 Not Ready for Inspection GRANT WOODS
Wood Frame 4/13/2023 Partial Approval GRANT WOODS
Floor/Roof Diaphrgm/Shear Wall 4/27/2023 Partial Inspection SORIN CIRSTOIU
Wood Frame 4/27/2023 Partial Inspection SORIN CIRSTOIU
Deputy Steel/Welding 5/1/2023 Conditional Approval GRANT WOODS
Deputy Steel/Welding 5/2/2023 Conditional Approval GRANT WOODS
Deputy Steel/Welding 5/4/2023 Conditional Approval GRANT WOODS
Deputy Steel/Welding 5/9/2023 Approved GRANT WOODS
Structural Steel Frame 5/10/2023 Not Ready for Inspection AMANUEL BERHE
Wood Frame 5/10/2023 Not Ready for Inspection AMANUEL BERHE
Deputy Wood Construction 5/15/2023 Approved GRANT WOODS
Floor/Roof Diaphrgm/Shear Wall 5/16/2023 Not Ready for Inspection GRANT WOODS
Reinforced Concrete Frame 5/16/2023 Not Ready for Inspection GRANT WOODS
Wood Frame 5/16/2023 Not Ready for Inspection GRANT WOODS
Footing/Foundation/Slab 5/23/2023 Not Ready for Inspection GRANT WOODS
Reinforced Concrete Frame 5/23/2023 Not Ready for Inspection GRANT WOODS
Deputy Reinf. Concrete 5/24/2023 Approved GRANT WOODS
Deputy Steel/Welding 5/31/2023 Conditional Approval GRANT WOODS
Deputy Steel/Welding 6/1/2023 Conditional Approval GRANT WOODS
Deputy Steel/Welding 6/2/2023 Conditional Approval GRANT WOODS
Deputy Wood Construction 6/2/2023 Conditional Approval GRANT WOODS
Deputy Wood Construction 6/5/2023 Conditional Approval GRANT WOODS
Deputy Steel/Welding 6/6/2023 Conditional Approval GRANT WOODS
Deputy Wood Construction 6/9/2023 Conditional Approval GRANT WOODS
Floor/Roof Diaphrgm/Shear Wall 6/9/2023 Partial Approval GRANT WOODS
Deputy Wood Construction 6/13/2023 Conditional Approval GRANT WOODS
Deputy Wood Construction 6/15/2023 Conditional Approval GRANT WOODS
Deputy Wood Construction 6/20/2023 Conditional Approval GRANT WOODS
Deputy Wood Construction 6/23/2023 Conditional Approval GRANT WOODS
Floor/Roof Diaphrgm/Shear Wall 6/29/2023 Not Ready for Inspection GRANT WOODS
Wall Anchors 6/29/2023 Not Ready for Inspection GRANT WOODS
Wood Frame 6/29/2023 Not Ready for Inspection GRANT WOODS
Deputy Wood Construction 7/14/2023 Conditional Approval GRANT WOODS
Deputy Wood Construction 7/17/2023 Conditional Approval GRANT WOODS
Deputy Steel/Welding 7/19/2023 Approved GRANT WOODS
Deputy Wood Construction 7/19/2023 Approved GRANT WOODS
Floor/Roof Diaphrgm/Shear Wall 7/19/2023 Partial Approval GRANT WOODS
Wood Frame 7/19/2023 Partial Approval GRANT WOODS
Deputy Wood Construction 8/18/2023 Conditional Approval GRANT WOODS
Floor/Roof Diaphrgm/Shear Wall 8/24/2023 Partial Approval GRANT WOODS
Floor/Roof Diaphrgm/Shear Wall 9/7/2023 Not Ready for Inspection GRANT WOODS
Special/Order Compliance 9/13/2023 Corrections Issued GRANT WOODS
Deputy Wood Construction 9/25/2023 Conditional Approval GRANT WOODS
Deputy Steel/Welding 10/4/2023 Conditional Approval GRANT WOODS
Deputy Wood Construction 10/16/2023 Conditional Approval GRANT WOODS
Deputy Wood Construction 10/26/2023 Approved GRANT WOODS
Floor/Roof Diaphrgm/Shear Wall 10/26/2023 Partial Approval GRANT WOODS
Wall Anchors 10/26/2023 Not Ready for Inspection GRANT WOODS
Floor/Roof Diaphrgm/Shear Wall 11/22/2023 Not Ready for Inspection GRANT WOODS
Deputy Other (see comments) 12/1/2023 Approved GRANT WOODS
Deputy Wood Construction 12/15/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Other (see comments) 1/2/2024 No Access for Inspection GRANT WOODS
Deputy Other (see comments) 1/8/2024 No Access for Inspection GRANT WOODS
Deputy Wood Construction 1/18/2024 Conditional Approval GRANT WOODS
Floor/Roof Diaphrgm/Shear Wall 1/19/2024 Not Ready for Inspection GRANT WOODS
Floor/Roof Diaphrgm/Shear Wall 1/24/2024 Partial Inspection GRANT WOODS
Drywall Nailing 1/26/2024 Partial Approval GRANT WOODS
Deputy Fireproofing 2/14/2024 Conditional Approval GRANT WOODS
Insulation 2/16/2024 Partial Approval GRANT WOODS
Interior/Exterior Lathing 3/19/2024 Partial Approval GRANT WOODS
Light Gage Steel Frame 4/19/2024 Not Ready for Inspection GRANT WOODS
Light Gage Steel Frame 4/22/2024 Not Ready for Inspection GRANT WOODS
Insulation 4/25/2024 Partial Approval GRANT WOODS
Insulation 4/26/2024 Not Ready for Inspection GRANT WOODS
Light Gage Steel Frame 4/26/2024 Partial Approval GRANT WOODS
Interior/Exterior Lathing 5/3/2024 Partial Approval RICARDO ROBLES
Insulation 5/9/2024 Partial Approval ALAN NOVAK
Light Gage Steel Frame 5/9/2024 Partial Approval ALAN NOVAK
Deputy Wood Construction 6/24/2024 Conditional Approval GRANT WOODS
Light Gage Steel Frame 7/30/2024 Not Ready for Inspection GRANT WOODS
Light Gage Steel Frame 8/12/2024 Partial Approval GRANT WOODS
Interior/Exterior Lathing 8/30/2024 Partial Approval GRANT WOODS
Pre-Inspection 11/20/2024 Not Ready for Inspection GRANT WOODS
Masonry Wall/Backfill 11/22/2024 Not Ready for Inspection GRANT WOODS
Special/Order Compliance 11/25/2024 Partial Approval GRANT WOODS
Pre-Inspection 12/12/2024 Partial Inspection GRANT WOODS
Special/Order Compliance 1/27/2025 Partial Inspection GRANT WOODS
Pre-Inspection 3/11/2025 Approved DERRICK SPENCER
Deputy Other (see comments) 3/12/2025 Approved DERRICK SPENCER
Deputy Steel/Welding 3/13/2025 Approved DERRICK SPENCER
Smoke Detectors 4/11/2025 Approved DERRICK SPENCER
Special/Order Compliance 5/7/2025 Approved DERRICK SPENCER
Drywall Nailing 5/28/2025 Approved DERRICK SPENCER
Final 5/28/2025 OK to Issue CofO DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 5/28/2025 Approved DERRICK SPENCER
Footing/Foundation/Slab 5/28/2025 Approved DERRICK SPENCER
Green Building Final 5/28/2025 Approved DERRICK SPENCER
Interior/Exterior Lathing 5/28/2025 Approved DERRICK SPENCER
Reinforced Concrete Frame 5/28/2025 Approved DERRICK SPENCER
Reinforced Masonry Frame 5/28/2025 Approved DERRICK SPENCER
SGSOV-Seismic Gas S/O Valve 5/28/2025 SGSOV Approved DERRICK SPENCER
Verify Rec and Parks Fee Memo 5/28/2025 Approved DERRICK SPENCER
Wood Frame 5/28/2025 Approved DERRICK SPENCER