PROPOSED 26 UNIT APARTMENT BUILDING 5 STORY III-A OVER 1 STORY CONCRETE I-A OVER 1 LEVEL BASEMETN PER DIR-2019-2947-TOC. Tier 3. (3 Extremely Low Income) 1 OF 3
Permit Issued
Issued on 3/10/2023
Issuing Office
Metro
Current Status
Issued on 3/10/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 6/4/2019 APPLICANT
Assigned to Plan Check Engineer 7/18/2019 ARMEN JIVALAGIAN
Disabled Access Plans Picked Up 7/18/2019 APPLICANT
Corrections Issued 8/7/2019 ARMEN JIVALAGIAN
Quality Review Completed 8/12/2019 TIEN JEN WANG
Building Plans Picked Up 8/13/2019 APPLICANT
Applicant returned to address corrections 9/5/2019 ARMEN JIVALAGIAN
Applicant returned to address corrections 1/6/2021 ARMEN JIVALAGIAN
Applicant returned to address corrections 1/8/2021 ARMEN JIVALAGIAN
Green Plans Picked Up 8/5/2021 APPLICANT
Applicant returned to address corrections 8/9/2021 ARMEN JIVALAGIAN
Applicant returned to address corrections 8/10/2021 ARMEN JIVALAGIAN
Applicant returned to address corrections 8/26/2021 ARMEN JIVALAGIAN
Applicant returned to address corrections 8/27/2021 ARMEN JIVALAGIAN
Applicant returned to address corrections 11/3/2021 ARMEN JIVALAGIAN
Applicant returned to address corrections 11/16/2021 ARMEN JIVALAGIAN
Applicant returned to address corrections 12/8/2021 ARMEN JIVALAGIAN
Plan Check Approved 12/9/2021 ARMEN JIVALAGIAN
Issued 3/10/2023 APPLICANT

Permit Application Clearance Information

Abandoned oil well Cleared 7/25/2019 GEORGE SUCHAND
Abandoned oil well approval Cleared 7/25/2019 GEORGE SUCHAND
Address approval Cleared 7/25/2019 JEANIE LAM
Eng Process Fee Ord 176,300 Cleared 7/25/2019 JEANIE LAM
Trees in Parkway Cleared 7/29/2019 ADRIAN SANCHEZ
Highway dedication Cleared 8/5/2019 ERIK BEASLEY
Internal circulation Cleared 8/5/2019 COLLINS ALLAN
Permit Cleared 8/5/2019 ERIK BEASLEY
Building over 3-story or 36-ft Cleared 8/9/2019 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 8/9/2019 CALOSHA APPROVED
Green Code Cleared 9/18/2019 KHEDER ALRAZAA
Hydrant and Access approval Cleared 9/24/2019 ROBERT DUFF
DAS Clearance Cleared 9/30/2019 ARMEN JIVALAGIAN
Fire Marshall Fire Life Safety Cleared 10/1/2019 DOMINIQUE MEDINA
DCP conditions approval Cleared 10/8/2019 NICHOLAS KAWAZOE
Density Bonus 12.22.A.31 Cleared 10/8/2019 NICHOLAS KAWAZOE
CPC Cleared 10/28/2019 MARITZA PRZEKOP
Frnt yard landscape/Water mgmt Cleared 10/28/2019 MARITZA PRZEKOP
Miscellaneous Cleared 10/28/2019 MARITZA PRZEKOP
Miscellaneous Cleared 10/28/2019 MARITZA PRZEKOP
Miscellaneous Cleared 10/28/2019 MARITZA PRZEKOP
Opn space landscape/Water mgmt Cleared 10/28/2019 MARITZA PRZEKOP
ZA Case Cleared 10/28/2019 MARITZA PRZEKOP
ZA Case Cleared 10/28/2019 MARITZA PRZEKOP
Bicycle Parking Cleared 11/5/2019 ELAINE LEI
Bicycle Parking Cleared 11/5/2019 ELAINE LEI
Construction near power lines Cleared 3/3/2020 RIDWAN HARDY
Construction within easement Cleared 3/3/2020 RIDWAN HARDY
Work Adjacent to Public Way Cleared 5/13/2021 ROSA SILVA
Low Impact Development Cleared 6/22/2021 JORGE MEJIA LEMUS
Roof/Waste drainage to street Cleared 6/24/2021 CHINH DINH
Sewer availability Cleared 10/13/2021 JEANIE LAM

Contact Information

Architect Uriu,, Giovanni; Lic. No.: C7487 830 SO GLENDALE AVENUE      GLENDALE, CA 91205
Contractor Harpco Construction And Development Services Inc; Lic. No.: 1033453-B 332 FOREST AVE #24      LAGUNA BEACH, CA 92651
Engineer Aboufadel,, Nicholas Fadlo; Lic. No.: C50588 4000 PARK NEWPORT SUITE 303      NEWPORT BEACH, CA 92660
Engineer Downey,, Henry Ross; Lic. No.: S2628 7463 VARNA AVE      NORTH HOLLYWOOD, CA 916054011
Engineer Minas,, Caro Jolfaie; Lic. No.: GE601 4742 SAN FERNANDO RD      GLENDALE, CA 91204

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/2/2023 Approved EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 7/19/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 7/19/2023 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 7/19/2023 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Subgrade 7/19/2023 Not Ready for Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 7/26/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 7/31/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 8/2/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 8/3/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 8/4/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 8/8/2023 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 8/8/2023 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 8/8/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 8/8/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Shotcrete 8/9/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 8/10/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 9/29/2023 Partial Approval GREGORY POMISH
METHANE-Barrier 9/29/2023 Partial Inspection GREGORY POMISH
METHANE-Subgrade 9/29/2023 Partial Inspection GREGORY POMISH
Excavation/Setback/Form/Re-Bar 11/1/2023 Partial Inspection EDWIN GREGORYONA
Special/Order Compliance 11/1/2023 Approved EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 11/13/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 11/14/2023 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 11/20/2023 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 11/20/2023 Approved EDWIN GREGORYONA
METHANE-Subgrade 11/20/2023 Approved EDWIN GREGORYONA
Deputy Reinf. Concrete 11/21/2023 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 12/12/2023 Not Ready for Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 12/22/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 12/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/4/2024 Conditional Approval MICHAEL ROSENBERG
Masonry Wall/Backfill 1/19/2024 Partial Approval EDWIN GREGORYONA
Special/Order Compliance 1/31/2024 Approved EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 2/6/2024 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 2/21/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 2/21/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/30/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 4/30/2024 Not Ready for Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 5/14/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 5/28/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 5/29/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 6/18/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 6/20/2024 Partial Approval LARRY ARNICK
Special/Order Compliance 6/27/2024 Approved EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 8/19/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 8/19/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 9/5/2024 Partial Approval EDWIN GREGORYONA
Insulation 9/5/2024 Partial Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 9/27/2024 Partial Approval EDWIN GREGORYONA
Insulation 10/4/2024 Partial Approval EDWIN GREGORYONA
Insulation 11/7/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/15/2024 Partial Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 11/25/2024 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 11/25/2024 Not Ready for Inspection RAFAEL CORTES
Footing/Foundation/Slab 12/9/2024 Partial Approval EDWIN GREGORYONA
Insulation 12/9/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 12/16/2024 Partial Approval EDWIN GREGORYONA
Insulation 12/16/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 12/18/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 12/23/2024 Partial Approval MARTIN TAVITIAN
Interior/Exterior Lathing 1/28/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 1/30/2025 Partial Inspection EDWIN GREGORYONA
Drywall Nailing 2/5/2025 Partial Inspection EDWIN GREGORYONA
Insulation 2/5/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 2/5/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/18/2025 Not Ready for Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/18/2025 Not Ready for Inspection EDWIN GREGORYONA
Insulation 2/18/2025 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 2/19/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/19/2025 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 3/4/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/11/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/24/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 4/17/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/6/2025 Partial Approval MARTIN TAVITIAN
Light Gage Steel Frame 5/6/2025 Partial Approval MARTIN TAVITIAN
Drywall Nailing 5/15/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 5/27/2025 Partial Approval MARTIN TAVITIAN
Light Gage Steel Frame 5/27/2025 Partial Approval MARTIN TAVITIAN
Masonry Wall/Backfill 5/27/2025 Partial Inspection MARTIN TAVITIAN
Interior/Exterior Lathing 6/4/2025 Partial Approval EDWIN GREGORYONA
Green Building Rough 7/15/2025 Not Ready for Inspection EDWIN GREGORYONA
Pre-Inspection 7/16/2025 Approved EDWIN GREGORYONA
Pre-Inspection 11/19/2025 Approved EDWIN GREGORYONA
Pre-Inspection 1/20/2026 Not Ready for Inspection JEFFREY FULTON
Pre-Inspection 2/4/2026 Approved MARTIN TAVITIAN
Final 4/13/2026 Not Ready for Inspection MARTIN TAVITIAN
Footing/Foundation/Slab 4/13/2026 Approved MARTIN TAVITIAN
Grading Pre-Inspection 4/13/2026 Approved MARTIN TAVITIAN
Green Building Final 4/13/2026 Not Ready for Inspection MARTIN TAVITIAN
Green Building Rough 4/13/2026 Approved MARTIN TAVITIAN
METHANE-Final 4/13/2026 Not Ready for Inspection MARTIN TAVITIAN
METHANE-Rough 4/13/2026 Approved MARTIN TAVITIAN
Reinforced Concrete Frame 4/13/2026 Partial Approval MARTIN TAVITIAN
Reinforced Masonry Frame 4/13/2026 Partial Approval MARTIN TAVITIAN
SGSOV-Seismic Gas S/O Valve 4/13/2026 SGSOV Not Ready MARTIN TAVITIAN
Smoke Detectors 4/13/2026 Not Ready for Inspection MARTIN TAVITIAN
Verify Sprinkler Sign Off 4/13/2026 Approved MARTIN TAVITIAN
Special/Order Compliance 5/8/2026 Approved MARTIN TAVITIAN
Final 5/15/2026 Not Ready for Inspection MARTIN TAVITIAN
Green Building Final 5/15/2026 Approved MARTIN TAVITIAN
METHANE-Final 5/15/2026 Approved MARTIN TAVITIAN
METHANE-Rough 5/15/2026 Approved MARTIN TAVITIAN
Reinforced Concrete Frame 5/15/2026 Approved MARTIN TAVITIAN
Reinforced Masonry Frame 5/15/2026 Approved MARTIN TAVITIAN
SGSOV-Seismic Gas S/O Valve 5/15/2026 SGSOV Approved MARTIN TAVITIAN
Smoke Detectors 5/15/2026 Not Ready for Inspection MARTIN TAVITIAN
Final 5/18/2026 Partial Inspection MARTIN TAVITIAN
Smoke Detectors 5/18/2026 Approved MARTIN TAVITIAN