1298 W 37TH ST UNIT 1-8 90007

Certificate Information: 1298 W 37TH ST UNIT 1-8 90007

Application / Permit
19010-10000-02276
Plan Check / Job No.
B19LA11132
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Dwelling - multiple
Work Description
NEW 3-STORY 7 UNIT (1 of 7 unit is very low income units) TOWNHOUSE, ADU BUILDING PER TOC TIER 3. FULLY SPRINKLERED PER NFPA 13. (Attached ADU per Ordinance, LAMC 12.22 A.33(c) and (e))
Permit Issued
Issued on 1/12/2022
Issuing Office
Current Status
CofO Issued on 5/27/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/30/2019 APPLICANT
Assigned to Plan Check Engineer 7/3/2019 JOSE RODRIGUEZ
Disabled Access Plans Picked Up 7/12/2019 APPLICANT
Corrections Issued 8/15/2019 JOSE RODRIGUEZ
Quality Review Completed 8/19/2019 HERNAN ARREOLA
Applicant returned to address corrections 8/27/2019 JOSE RODRIGUEZ
Applicant returned to address corrections 9/9/2019 JOSE RODRIGUEZ
Applicant returned to address corrections 10/7/2019 JOSE RODRIGUEZ
Applicant returned to address corrections 2/11/2020 AUNG SOE
Applicant returned to address corrections 12/28/2020 AUNG SOE
Green Plans Picked Up 11/3/2021 APPLICANT
Plan Check Approved 12/9/2021 AUNG SOE
Plan Check Approved 1/12/2022 AUNG SOE
Issued 1/12/2022 APPLICANT
Building Plans Picked Up 1/13/2022 APPLICANT
CofO in Progress 5/22/2025 JAMES POWERS
Permit Finaled 5/27/2025 ERNESTO CORRAL
CofO Issued 5/27/2025 ERNESTO CORRAL
Permit Finaled 5/27/2025 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 10/7/2019 ELENA LOPEZ
Eng Process Fee Ord 176,300 Cleared 10/7/2019 ELENA LOPEZ
Highway dedication Cleared 10/7/2019 ELENA LOPEZ
Permit Cleared 10/7/2019 ELENA LOPEZ
ZI Cleared 10/18/2019 HELEN JADALI
Density Bonus 12.22.A.31 Cleared 10/21/2020 DORIS KWOK
DAS Clearance Cleared 4/8/2021 SOMKIAT SUPANYACHOTSKUL
Green Code Cleared 4/22/2021 NEGAR NEJAD
Frnt yard landscape/Water mgmt Cleared 6/22/2021 KENTON TRINH
Miscellaneous Cleared 6/22/2021 KENTON TRINH
Miscellaneous Cleared 6/22/2021 KENTON TRINH
Opn space landscape/Water mgmt Cleared 6/22/2021 KENTON TRINH
ZI Cleared 6/23/2021 KENTON TRINH
Low Impact Development Cleared 6/29/2021 JORGE MEJIA LEMUS
Roof/Waste drainage to street Cleared 7/7/2021 WALLIE JONG
Sewer availability Cleared 7/8/2021 WALLIE JONG
Work Adjacent to Public Way Cleared 7/29/2021 CHIU TAM
Trees in Parkway Cleared 8/12/2021 JOHN KIM
Hydrant and Access approval Cleared 10/1/2021 MATTHEW CRAIG

Contact Information

Contractor Countrywide Development & Contracting Inc; Lic. No.: 800028-B 4633 W 156TH STREET      LAWNDALE, CA 90260
Engineer Azad,, Jila H; Lic. No.: C77585 2340 FOX HILLS DRIVE   UNIT 305    LOS ANGELES, CA 90064
Engineer Namvar,, Mohammad Alipour; Lic. No.: C39797 231 VISTA DEL MAR STE D      REDONDO BEACH, CA 90277
Engineer Schmahl,, Lawrence Joseph; Lic. No.: L5748 11209 HOWARD STREET      WHITTIER, CA 90606
Engineer Tucker,, Keith D; Lic. No.: GE841 PO BOX 8133      HUNTINGTON BEACH, CA 92615

Inspector Information

ALFREDO LOPEZ, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI
JAMES POWERS, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 6/28/2022 Partial Approval JAMES POWERS
METHANE-Barrier 6/28/2022 Approved JAMES POWERS
METHANE-Subgrade 6/28/2022 Approved JAMES POWERS
Footing/Foundation/Slab 8/5/2022 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 12/16/2022 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 1/6/2023 Partial Approval JAMES POWERS
Green Building Rough 1/6/2023 Not Ready for Inspection JAMES POWERS
METHANE-Rough 1/6/2023 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 1/6/2023 Not Ready for Inspection JAMES POWERS
Green Building Rough 1/13/2023 Not Ready for Inspection JAMES POWERS
METHANE-Rough 1/13/2023 Approved JAMES POWERS
Verify Sprinkler Sign Off 1/13/2023 Not Ready for Inspection JAMES POWERS
Wood Frame 1/13/2023 Partial Approval JAMES POWERS
Green Building Rough 1/26/2023 Not Ready for Inspection GREGORY POMISH
Verify Sprinkler Sign Off 1/26/2023 Not Ready for Inspection GREGORY POMISH
Wood Frame 1/26/2023 Partial Approval GREGORY POMISH
Green Building Rough 2/9/2023 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 2/9/2023 Not Ready for Inspection JAMES POWERS
Wood Frame 2/9/2023 Not Ready for Inspection JAMES POWERS
Green Building Rough 2/22/2023 Approved JAMES POWERS
Verify Sprinkler Sign Off 2/22/2023 Not Ready for Inspection JAMES POWERS
Wood Frame 2/22/2023 Partial Approval JAMES POWERS
Drywall Nailing 2/24/2023 Partial Approval JAMES POWERS
Deputy Wood Construction 4/26/2023 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 5/19/2023 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 5/19/2023 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 6/15/2023 Not Ready for Inspection JAMES POWERS
Wood Frame 6/15/2023 Partial Approval JAMES POWERS
Insulation 6/28/2023 Approved JAMES POWERS
Drywall Nailing 7/25/2023 Approved JAMES POWERS
Interior/Exterior Lathing 8/25/2023 Approved JAMES POWERS
Final 4/11/2025 OK for TCO JAMES POWERS
Footing/Foundation/Slab 4/11/2025 Approved JAMES POWERS
Green Building Final 4/11/2025 Approved JAMES POWERS
SGSOV-Seismic Gas S/O Valve 4/11/2025 SGSOV Approved JAMES POWERS
Smoke Detectors 4/11/2025 Approved JAMES POWERS
Verify Sprinkler Sign Off 4/11/2025 Approved JAMES POWERS
Wood Frame 4/11/2025 Approved JAMES POWERS
Final 5/21/2025 OK to Issue CofO JAMES POWERS