6329 N CLYBOURN AVE 91606

Certificate Information: 6329 N CLYBOURN AVE 91606

Application / Permit
19010-10000-02143
Plan Check / Job No.
B19LA10560
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
TOC-TIER#3 <<100% AFFORDABLE housing with all PUBLIC FUNDING>> 103 units (101 affordable units with 2 managers units), 4 stories Type VA construction over 1 level Type IA subterranean parking
Permit Issued
Issued on 12/23/2020
Issuing Office
Metro
Current Status
CofO Issued on 1/11/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/24/2019 APPLICANT
Assigned to Plan Check Engineer 6/20/2019 DEAN LEE
Corrections Issued 7/2/2019 DEAN LEE
Quality Review Completed 7/11/2019 HERNAN ARREOLA
Applicant returned to address corrections 9/10/2019 DEAN LEE
Applicant returned to address corrections 4/29/2020 DEAN LEE
Applicant returned to address corrections 5/13/2020 DEAN LEE
Applicant returned to address corrections 6/10/2020 DEAN LEE
Applicant returned to address corrections 10/5/2020 DEAN LEE
Applicant returned to address corrections 11/19/2020 DEAN LEE
Applicant returned to address corrections 12/1/2020 DEAN LEE
Applicant returned to address corrections 12/2/2020 DEAN LEE
Applicant returned to address corrections 12/8/2020 DEAN LEE
Applicant returned to address corrections 12/10/2020 DEAN LEE
Applicant returned to address corrections 12/14/2020 DEAN LEE
Plan Check Approved 12/15/2020 DEAN LEE
Issued 12/23/2020 APPLICANT
Building Plans Picked Up 8/5/2021 APPLICANT
TCO Issued (Expire Date: 01-28-2024) 8/1/2023 RICKEY JACKSON
CofO in Progress 1/11/2024 RICKEY JACKSON
Permit Finaled 1/11/2024 RICKEY JACKSON
CofO Issued 1/11/2024 RICKEY JACKSON
Permit Finaled 1/11/2024 RICKEY JACKSON

Permit Application Clearance Information

Certificate of Compliance Cleared 6/25/2020 STEVEN WECHSLER
Address approval Cleared 7/31/2020 LEE GUILBEAUX
Highway dedication Cleared 7/31/2020 LEE GUILBEAUX
Low Impact Development Cleared 10/4/2020 MARTIN FRAGOSO
Eng Process Fee Ord 176,300 Cleared 10/13/2020 GUILLERMO PETRA
Driveway location Cleared 10/22/2020 SHEILA AHORAIAN
Internal circulation Cleared 10/22/2020 SHEILA AHORAIAN
Hydrant and Access approval Cleared 10/26/2020 KURT CORRAL
Permit Cleared 10/27/2020 LEE GUILBEAUX
Roof/Waste drainage to street Cleared 10/27/2020 LEE GUILBEAUX
Trees in Parkway Cleared 11/10/2020 JOHN KIM
Public Housing Cleared 11/13/2020 JORGE ALCANTAR
Density Bonus 12.22.A.25 Cleared 11/16/2020 KENNETH LE
Green Code Cleared 12/3/2020 DONALD CRICHLOW
Construction near power lines Cleared 12/8/2020 WALTER RAMIREZ
Construction within easement Cleared 12/8/2020 WALTER RAMIREZ
DAS Clearance Cleared 12/8/2020 DEAN LEE
Fire Marshall Fire Life Safety Cleared 12/9/2020 WILLIAM JOHNS
"Q" conditions Cleared 12/14/2020 STEVEN WECHSLER
"T" removal Cleared 12/14/2020 STEVEN WECHSLER
CPC Cleared 12/14/2020 STEVEN WECHSLER
CPC Cleared 12/14/2020 STEVEN WECHSLER
Opn space landscape/Water mgmt Cleared 12/14/2020 STEVEN WECHSLER
Sewer availability Cleared 12/14/2020 ROSE MARIE SMITH
Site Plan review Cleared 12/14/2020 STEVEN WECHSLER
Building over 3-story or 36-ft Cleared 1/15/2021 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 1/15/2021 CALOSHA APPROVED

Contact Information

Architect Arnold,, John Howard; Lic. No.: C30834 2166 W 30TH STREET      LOS ANGELES, CA 90018
Contractor Bernards Builders Inc; Lic. No.: 977134-B 555 FIRST ST      SAN FERNANDO, CA 91340
Engineer Derkalousdian,, Hrair Harry; Lic. No.: C79694 3622 VIRGINIA STREET      GLENDALE, CA 91214
Engineer Powers,, Brian Frederick; Lic. No.: C75902 2090 WEST 31ST STREET      LOS ANGELES, CA 90018
Engineer Wilkerson,, Ryan Lee; Lic. No.: S4728 20734 SARDINIA WAY      PORTER RANCH, CA 91326

Inspector Information

DEANDRE HOFFMAN, (818) 374-1182 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Grading 3/26/2021 Conditional Approval JOHN KITCKO
Deputy Grading 3/30/2021 Approved JOHN KITCKO
Deputy Grading 3/31/2021 Approved JOHN KITCKO
Deputy Grading 4/1/2021 Approved JOHN KITCKO
Deputy Grading 4/5/2021 Conditional Approval RICKEY JACKSON
Deputy Grading 4/6/2021 Conditional Approval JOHN KITCKO
Deputy Grading 4/7/2021 Approved HAMID PISHEHVAR
Deputy Grading 4/8/2021 Approved JOHN KITCKO
Deputy Grading 4/9/2021 Conditional Approval JEFFREY DURAN
Deputy Grading 4/12/2021 Approved JOHN KITCKO
Deputy Grading 4/13/2021 Approved JOHN KITCKO
Deputy Grading 4/14/2021 Approved JOHN KITCKO
Deputy Grading 4/15/2021 Approved JOHN KITCKO
Deputy Grading 4/16/2021 Approved JOHN KITCKO
Footing/Foundation/Slab 4/28/2021 Not Ready for Inspection JOHN KITCKO
Pre-Inspection 5/4/2021 Partial Inspection JOHN KITCKO
Pre-Inspection 5/7/2021 Partial Inspection JOHN KITCKO
Pre-Inspection 5/18/2021 Partial Inspection JOHN KITCKO
Deputy Reinf. Concrete 5/21/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 5/21/2021 Partial Inspection JOHN KITCKO
Footing/Foundation/Slab 5/21/2021 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Concrete 5/24/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 5/24/2021 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Concrete 5/25/2021 Approved JOHN KITCKO
Footing/Foundation/Slab 5/25/2021 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 5/26/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 5/27/2021 Approved JOHN KITCKO
Footing/Foundation/Slab 5/27/2021 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 6/4/2021 Approved DANNY RODRIGUEZ
Deputy Shotcrete 6/4/2021 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 6/4/2021 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 6/7/2021 Conditional Approval RICKEY JACKSON
Deputy Shotcrete 6/7/2021 Conditional Approval RICKEY JACKSON
Deputy Reinf. Concrete 6/8/2021 Approved JOHN KITCKO
Deputy Shotcrete 6/8/2021 Approved JOHN KITCKO
Pre-Inspection 6/8/2021 Partial Inspection JOHN KITCKO
Deputy Reinf. Concrete 6/9/2021 Approved JOHN KITCKO
Deputy Shotcrete 6/9/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 6/9/2021 Partial Inspection JOHN KITCKO
Deputy Reinf. Concrete 6/10/2021 Approved JOHN KITCKO
Deputy Shotcrete 6/10/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 6/10/2021 Partial Approval JOHN KITCKO
Piling/Pier/Caisson 6/10/2021 Partial Approval JOHN KITCKO
Footing/Foundation/Slab 6/11/2021 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Concrete 6/14/2021 Approved JOHN KITCKO
Deputy Shotcrete 6/14/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 6/14/2021 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 6/15/2021 Approved JOHN KITCKO
Deputy Shotcrete 6/15/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 6/16/2021 Approved JOE VELASQUEZ
Deputy Shotcrete 6/16/2021 Approved JOE VELASQUEZ
Excavation/Setback/Form/Re-Bar 6/16/2021 Corrections Issued JOE VELASQUEZ
Deputy Reinf. Concrete 6/17/2021 Approved JOHN KITCKO
Deputy Shotcrete 6/17/2021 Approved JOHN KITCKO
Piling/Pier/Caisson 6/17/2021 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 6/18/2021 Approved JOHN KITCKO
Deputy Shotcrete 6/18/2021 Approved JOHN KITCKO
Footing/Foundation/Slab 6/18/2021 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 6/21/2021 Partial Inspection JOHN KITCKO
Footing/Foundation/Slab 6/28/2021 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 6/30/2021 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 7/1/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 7/13/2021 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/27/2021 Partial Approval JOHN KITCKO
Footing/Foundation/Slab 8/2/2021 Partial Inspection JOHN KITCKO
Footing/Foundation/Slab 8/11/2021 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 8/12/2021 Approved JOHN KITCKO
Green Building Rough 8/27/2021 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 8/27/2021 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 8/27/2021 Approved JOHN KITCKO
Footing/Foundation/Slab 8/30/2021 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 8/31/2021 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 9/7/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/8/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/9/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 9/9/2021 Not Ready for Inspection JOHN KITCKO
Green Building Rough 9/9/2021 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 9/9/2021 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Concrete 9/10/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 9/10/2021 Partial Approval JOHN KITCKO
Wood Frame 9/10/2021 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Concrete 9/13/2021 Approved JOHN KITCKO
Footing/Foundation/Slab 9/13/2021 Partial Approval JOHN KITCKO
Pre-Inspection 9/14/2021 Partial Inspection JOHN KITCKO
Light Gage Steel Frame 9/22/2021 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 9/23/2021 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 9/30/2021 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 10/6/2021 Not Ready for Inspection JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 10/8/2021 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 10/14/2021 Conditional Approval JOHN KITCKO
Structural Steel Frame 10/14/2021 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Masonry 10/18/2021 Approved JOHN KITCKO
Deputy Wood Construction 10/18/2021 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 10/18/2021 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 10/19/2021 Approved JOHN KITCKO
Deputy Reinf. Masonry 10/20/2021 Approved JOHN KITCKO
Deputy Reinf. Masonry 10/21/2021 Approved JOHN KITCKO
Deputy Reinf. Masonry 10/22/2021 Approved JOHN KITCKO
Deputy Reinf. Masonry 10/25/2021 Approved JOHN KITCKO
Deputy Reinf. Masonry 10/26/2021 Approved JOHN KITCKO
Deputy Reinf. Masonry 10/27/2021 Approved JOHN KITCKO
Deputy Reinf. Masonry 10/27/2021 Conditional Approval JOHN KITCKO
Deputy Wood Construction 10/27/2021 Conditional Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 10/27/2021 Partial Inspection JOHN KITCKO
Reinforced Masonry Frame 10/27/2021 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 10/28/2021 Approved JOHN KITCKO
Deputy Wood Construction 10/28/2021 Approved JOHN KITCKO
Deputy Reinf. Masonry 10/29/2021 Conditional Approval JOHN KITCKO
Green Building Rough 11/1/2021 Not Ready for Inspection JOHN KITCKO
Wood Frame 11/1/2021 Partial Approval JOHN KITCKO
Drywall Nailing 11/8/2021 Partial Approval JOE VELASQUEZ
Floor/Roof Diaphrgm/Shear Wall 11/8/2021 Not Ready for Inspection JOE VELASQUEZ
Green Building Rough 11/8/2021 Not Ready for Inspection JOE VELASQUEZ
Deputy Wood Construction 11/9/2021 Conditional Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 11/9/2021 Not Ready for Inspection KENNETH ROBERTS
Floor/Roof Diaphrgm/Shear Wall 11/10/2021 Partial Approval SORIN CIRSTOIU
Footing/Foundation/Slab 11/12/2021 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 11/15/2021 Not Ready for Inspection JOHN KITCKO
Green Building Rough 11/15/2021 Partial Inspection JOHN KITCKO
Wood Frame 11/15/2021 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Concrete 11/17/2021 Approved JOHN KITCKO
Deputy Wood Construction 11/17/2021 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 11/17/2021 Partial Inspection JOHN KITCKO
Insulation 11/17/2021 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Concrete 11/18/2021 Approved JOHN KITCKO
Deputy Wood Construction 11/18/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 11/18/2021 Not Ready for Inspection JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 11/18/2021 Partial Approval JOHN KITCKO
Insulation 11/18/2021 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Concrete 11/19/2021 Approved JOHN KITCKO
Deputy Wood Construction 11/19/2021 Approved JOHN KITCKO
Drywall Nailing 11/22/2021 Not Ready for Inspection ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 11/22/2021 Partial Approval ROBERT DAVIS
Green Building Rough 11/22/2021 Not Ready for Inspection ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 11/24/2021 No Access for Inspection JOHN KITCKO
Drywall Nailing 11/29/2021 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 11/29/2021 Not Ready for Inspection JOHN KITCKO
Green Building Rough 11/29/2021 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 12/1/2021 Partial Approval JOHN KITCKO
Green Building Rough 12/2/2021 Partial Approval JOHN KITCKO
Wood Frame 12/2/2021 Partial Approval JOHN KITCKO
Drywall Nailing 12/3/2021 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 12/6/2021 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 12/6/2021 Partial Approval JOHN KITCKO
Footing/Foundation/Slab 12/6/2021 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 12/7/2021 Not Ready for Inspection JOHN KITCKO
Insulation 12/7/2021 Not Ready for Inspection JOHN KITCKO
Green Building Rough 12/8/2021 Not Ready for Inspection JOHN KITCKO
Insulation 12/8/2021 Partial Approval JOHN KITCKO
Wood Frame 12/8/2021 Not Ready for Inspection JOHN KITCKO
Insulation 12/10/2021 Partial Approval JOHN KITCKO
Drywall Nailing 12/15/2021 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 12/15/2021 Partial Approval JOHN KITCKO
Green Building Rough 12/15/2021 Not Ready for Inspection JOHN KITCKO
Insulation 12/15/2021 Partial Inspection JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 12/16/2021 Partial Approval JOHN KITCKO
Drywall Nailing 12/17/2021 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 12/17/2021 Partial Approval JOHN KITCKO
Green Building Rough 12/17/2021 Not Ready for Inspection JOHN KITCKO
Wood Frame 12/20/2021 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 12/21/2021 Partial Approval JOHN KITCKO
Drywall Nailing 12/22/2021 Partial Approval JOHN KITCKO
Green Building Rough 12/22/2021 Not Ready for Inspection JOHN KITCKO
Insulation 12/22/2021 Not Ready for Inspection JOHN KITCKO
Insulation 12/27/2021 Partial Approval JOHN KITCKO
Insulation 12/28/2021 Partial Approval JOHN KITCKO
Drywall Nailing 12/29/2021 Partial Approval JOHN KITCKO
Green Building Rough 12/29/2021 Not Ready for Inspection JOHN KITCKO
Insulation 12/29/2021 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 1/4/2022 Partial Approval JOHN KITCKO
Green Building Rough 1/4/2022 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 1/6/2022 Partial Approval JOHN KITCKO
Green Building Rough 1/6/2022 Not Ready for Inspection JOHN KITCKO
Insulation 1/7/2022 Not Ready for Inspection JOHN KITCKO
Insulation 1/10/2022 Not Ready for Inspection JOHN KITCKO
Insulation 1/11/2022 Partial Inspection JOHN KITCKO
Deputy Wood Construction 1/12/2022 Approved JOHN KITCKO
Drywall Nailing 1/12/2022 Partial Approval JOHN KITCKO
Green Building Rough 1/12/2022 Partial Approval JOHN KITCKO
Insulation 1/12/2022 Not Ready for Inspection JOHN KITCKO
Insulation 1/14/2022 Not Ready for Inspection JOHN KITCKO
Pre-Inspection 1/14/2022 Partial Inspection JOHN KITCKO
Insulation 1/18/2022 Partial Approval JOHN KITCKO
Drywall Nailing 1/20/2022 Partial Approval JOHN KITCKO
Insulation 1/20/2022 Partial Approval JOHN KITCKO
Drywall Nailing 1/21/2022 Partial Approval DANIEL VARNUM
Insulation 1/21/2022 Partial Approval DANIEL VARNUM
Drywall Nailing 1/25/2022 Partial Approval JOHN KITCKO
Green Building Rough 1/25/2022 Not Ready for Inspection JOHN KITCKO
Special/Order Compliance 1/25/2022 Partial Inspection JEFFREY FULTON
Drywall Nailing 1/27/2022 Partial Approval JOHN KITCKO
Insulation 1/28/2022 Partial Inspection JOHN KITCKO
Insulation 1/31/2022 Partial Inspection JOHN KITCKO
Pre-Inspection 2/3/2022 Not Ready for Inspection JOHN KITCKO
Insulation 2/7/2022 Partial Inspection JOHN KITCKO
Deputy Reinf. Masonry 2/8/2022 Approved JOHN KITCKO
Deputy Steel/Welding 2/8/2022 Approved JOHN KITCKO
Insulation 2/8/2022 No Access for Inspection JOHN KITCKO
Deputy Reinf. Masonry 2/9/2022 Approved JOHN KITCKO
Deputy Steel/Welding 2/9/2022 Approved JOHN KITCKO
Drywall Nailing 2/9/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 2/10/2022 Approved JOHN KITCKO
Deputy Steel/Welding 2/10/2022 Approved JOHN KITCKO
Green Building Rough 2/10/2022 Partial Approval JOHN KITCKO
Wood Frame 2/10/2022 Partial Approval JOHN KITCKO
Drywall Nailing 2/14/2022 Partial Approval JOHN KITCKO
Green Building Rough 2/15/2022 Partial Inspection JOHN KITCKO
Wood Frame 2/15/2022 Partial Approval JOHN KITCKO
Insulation 2/16/2022 Partial Approval JOHN KITCKO
Insulation 2/17/2022 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 2/22/2022 Partial Approval KENNETH ROBERTS
Insulation 2/22/2022 Partial Approval KENNETH ROBERTS
Insulation 2/23/2022 Partial Approval DANIEL VARNUM
Wood Frame 2/23/2022 Partial Approval DANIEL VARNUM
Drywall Nailing 2/24/2022 Partial Approval JOHN KITCKO
Green Building Rough 2/24/2022 Approved JOHN KITCKO
Insulation 2/25/2022 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 2/28/2022 Partial Approval JOHN KITCKO
Wood Frame 2/28/2022 Partial Approval JOHN KITCKO
Wall Anchors 3/2/2022 Not Ready for Inspection JOHN KITCKO
Wood Frame 3/2/2022 Partial Approval JOHN KITCKO
Insulation 3/3/2022 Partial Approval JOHN KITCKO
Insulation 3/4/2022 Partial Approval JOHN KITCKO
Insulation 3/7/2022 Partial Approval JOHN KITCKO
Drywall Nailing 3/8/2022 Partial Inspection ANDREW DORSO
Insulation 3/8/2022 Partial Inspection ANDREW DORSO
Drywall Nailing 3/10/2022 Partial Inspection JEFFREY FULTON
Wood Frame 3/10/2022 Partial Inspection JEFFREY FULTON
Drywall Nailing 3/11/2022 Partial Inspection ANDREW DORSO
Insulation 3/11/2022 Partial Inspection ANDREW DORSO
Insulation 3/14/2022 Partial Approval JOHN KITCKO
Wood Frame 3/15/2022 Partial Approval JOHN KITCKO
Drywall Nailing 3/16/2022 Partial Approval JOHN KITCKO
Insulation 3/21/2022 Partial Approval JOHN KITCKO
Wood Frame 3/22/2022 Partial Approval JOHN KITCKO
Drywall Nailing 3/23/2022 Partial Inspection JOHN KITCKO
Drywall Nailing 3/25/2022 Partial Approval JOHN KITCKO
Insulation 3/25/2022 Not Ready for Inspection JOHN KITCKO
Insulation 3/29/2022 Partial Approval JOHN KITCKO
Drywall Nailing 3/30/2022 Partial Approval JOHN KITCKO
Wood Frame 3/31/2022 Partial Approval JOHN KITCKO
Drywall Nailing 4/1/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 4/4/2022 Approved JOHN KITCKO
Interior/Exterior Lathing 4/4/2022 Partial Inspection JOHN KITCKO
Drywall Nailing 4/6/2022 Partial Approval JOHN KITCKO
Insulation 4/7/2022 Partial Approval JOHN KITCKO
Wood Frame 4/8/2022 Conditional Approval JOHN KITCKO
Drywall Nailing 4/11/2022 Partial Approval JOHN KITCKO
Light Gage Steel Frame 4/12/2022 Partial Approval JOHN KITCKO
Insulation 4/18/2022 Partial Inspection JEFFREY FULTON
Drywall Nailing 4/20/2022 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 4/22/2022 Partial Approval JOHN KITCKO
Drywall Nailing 4/25/2022 Partial Approval JOHN KITCKO
Drywall Nailing 4/27/2022 Partial Approval JOHN KITCKO
Light Gage Steel Frame 4/28/2022 Partial Inspection JOHN KITCKO
Interior/Exterior Lathing 5/2/2022 Partial Inspection JOHN KITCKO
Interior/Exterior Lathing 5/3/2022 Partial Approval JOHN KITCKO
Interior/Exterior Lathing 5/5/2022 Partial Inspection JOHN KITCKO
Wood Frame 5/6/2022 Partial Approval JOHN KITCKO
Interior/Exterior Lathing 5/10/2022 Partial Approval JOHN KITCKO
Drywall Nailing 5/11/2022 Partial Approval JOHN KITCKO
Drywall Nailing 5/13/2022 Partial Approval JOHN KITCKO
Insulation 5/13/2022 Partial Approval JOHN KITCKO
Interior/Exterior Lathing 6/6/2022 Not Ready for Inspection JOHN KITCKO
Light Gage Steel Frame 6/6/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 6/13/2022 Approved JOHN KITCKO
Interior/Exterior Lathing 6/13/2022 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 6/27/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 6/28/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/1/2022 Conditional Approval JOHN KITCKO
Pre-Inspection 8/3/2022 Not Ready for Inspection DANIEL VARNUM
Pre-Inspection 8/4/2022 Partial Inspection DANIEL VARNUM
Deputy Reinf. Concrete 8/15/2022 Conditional Approval JOHN KITCKO
Pre-Inspection 8/15/2022 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Masonry 8/18/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/22/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 9/6/2022 Approved JOHN KITCKO
Pre-Inspection 9/15/2022 Corrections Issued JOHN KITCKO
Pre-Inspection 9/19/2022 No Access for Inspection JOHN KITCKO
Pre-Inspection 9/20/2022 Corrections Issued JOHN KITCKO
Pre-Inspection 9/22/2022 Partial Inspection JOHN KITCKO
Deputy Reinf. Concrete 9/28/2022 Approved JOHN KITCKO
Pre-Inspection 9/30/2022 Partial Inspection JOHN KITCKO
Pre-Inspection 10/11/2022 Not Ready for Inspection JOHN KITCKO
Pre-Inspection 10/31/2022 Partial Inspection JOHN KITCKO
Pre-Inspection 11/18/2022 Partial Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 12/6/2022 Not Ready for Inspection JEFFREY FULTON
Footing/Foundation/Slab 12/6/2022 Not Ready for Inspection JEFFREY FULTON
Posting Pre-Inspection 12/6/2022 Not Ready for Inspection JEFFREY FULTON
Pre-Inspection 12/6/2022 Partial Inspection JEFFREY FULTON
Special/Order Compliance 12/6/2022 Partial Inspection DEANDRE HOFFMAN
Pre-Inspection 12/13/2022 Partial Inspection JOHN KITCKO
Deputy Reinf. Concrete 12/28/2022 Approved JOHN KITCKO
Drywall Nailing 12/28/2022 Approved JOHN KITCKO
Final 12/28/2022 Partial Inspection JOHN KITCKO
Footing/Foundation/Slab 12/28/2022 Not Ready for Inspection JOHN KITCKO
Green Building Final 12/28/2022 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 12/28/2022 Approved JOHN KITCKO
SGSOV-Seismic Gas S/O Valve 12/28/2022 SGSOV Not Ready JOHN KITCKO
Smoke Detectors 12/28/2022 Not Ready for Inspection JOHN KITCKO
Wall Anchors 12/28/2022 Approved JOHN KITCKO
Wood Frame 12/28/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 12/29/2022 Approved JOHN KITCKO
Deputy Reinf. Masonry 1/3/2023 Approved JOHN KITCKO
Deputy Reinf. Masonry 1/4/2023 Approved JOHN KITCKO
Final 1/5/2023 Partial Inspection JOHN KITCKO
Footing/Foundation/Slab 1/5/2023 Approved JOHN KITCKO
Green Building Final 1/5/2023 Not Ready for Inspection JOHN KITCKO
SGSOV-Seismic Gas S/O Valve 1/5/2023 SGSOV Not Ready JOHN KITCKO
Smoke Detectors 1/5/2023 Not Ready for Inspection JOHN KITCKO
Special/Order Compliance 1/5/2023 Approved BRIAN KELLY
Insulation 4/6/2023 Corrections Issued JOHN KITCKO
Special/Order Compliance 4/6/2023 Partial Inspection CAMERON CHABAN
Special/Order Compliance 5/22/2023 Partial Inspection JOHN KITCKO
Final 6/21/2023 Partial Inspection JOHN KITCKO
Green Building Final 6/21/2023 Not Ready for Inspection JOHN KITCKO
SGSOV-Seismic Gas S/O Valve 6/21/2023 SGSOV Not Ready JOHN KITCKO
Smoke Detectors 6/21/2023 Not Ready for Inspection JOHN KITCKO
Special/Order Compliance 6/21/2023 Not Ready for Inspection JOHN KITCKO
Special/Order Compliance 6/22/2023 Partial Inspection JOHN KITCKO
Special/Order Compliance 6/23/2023 Partial Inspection JOHN KITCKO
Final 6/26/2023 Partial Inspection JOHN KITCKO
Green Building Final 6/26/2023 Partial Inspection JOHN KITCKO
SGSOV-Seismic Gas S/O Valve 6/26/2023 SGSOV Not Ready JOHN KITCKO
Smoke Detectors 6/26/2023 Approved JOHN KITCKO
Special/Order Compliance 6/26/2023 Partial Inspection JOHN KITCKO
Special/Order Compliance 6/27/2023 Partial Inspection JOHN KITCKO
Special/Order Compliance 6/28/2023 Partial Inspection JOHN KITCKO
Special/Order Compliance 6/30/2023 Corrections Issued JOHN KITCKO
Final 7/3/2023 Not Ready for Inspection JOHN KITCKO
Green Building Final 7/3/2023 Partial Inspection JOHN KITCKO
SGSOV-Seismic Gas S/O Valve 7/3/2023 SGSOV Not Ready JOHN KITCKO
Special/Order Compliance 7/3/2023 Not Ready for Inspection JOHN KITCKO
Special/Order Compliance 7/5/2023 Partial Inspection JOHN KITCKO
Special/Order Compliance 7/6/2023 Partial Approval CAMERON CHABAN
Final 7/10/2023 Partial Inspection JOHN KITCKO
Green Building Final 7/10/2023 Not Ready for Inspection JOHN KITCKO
SGSOV-Seismic Gas S/O Valve 7/10/2023 SGSOV Not Ready JOHN KITCKO
Final 7/12/2023 Not Ready for Inspection JOHN KITCKO
Green Building Final 7/12/2023 Not Ready for Inspection JOHN KITCKO
SGSOV-Seismic Gas S/O Valve 7/12/2023 SGSOV Not Ready JOHN KITCKO
Special/Order Compliance 7/12/2023 Partial Inspection JOHN KITCKO
Final 7/14/2023 Not Ready for Inspection JOHN KITCKO
Green Building Final 7/14/2023 Approved JOHN KITCKO
SGSOV-Seismic Gas S/O Valve 7/14/2023 SGSOV Approved JOHN KITCKO
Special/Order Compliance 7/14/2023 Partial Inspection JOHN KITCKO
Special/Order Compliance 7/26/2023 Partial Inspection JOHN KITCKO
Final 7/31/2023 Not Ready for Inspection JEFFREY DURAN
Special/Order Compliance 7/31/2023 Not Ready for Inspection JEFFREY DURAN
Final 10/10/2023 Partial Inspection JOHN KITCKO
Special/Order Compliance 10/10/2023 Partial Inspection JOHN KITCKO
Special/Order Compliance 10/13/2023 Not Ready for Inspection JOHN KITCKO
Final 10/20/2023 Not Ready for Inspection JOHN KITCKO
Special/Order Compliance 10/20/2023 Not Ready for Inspection JOHN KITCKO
Special/Order Compliance 10/23/2023 Not Ready for Inspection JOHN KITCKO
Final 10/26/2023 Not Ready for Inspection JOHN KITCKO
Special/Order Compliance 10/26/2023 Not Ready for Inspection JOHN KITCKO
Special/Order Compliance 10/27/2023 Not Ready for Inspection JOHN KITCKO
Final 11/3/2023 Not Ready for Inspection JOHN KITCKO
Special/Order Compliance 11/3/2023 Not Ready for Inspection JOHN KITCKO
Final 12/27/2023 OK to Issue CofO JOHN KITCKO
Special/Order Compliance 1/3/2024 Partial Inspection JEFFREY FULTON