|
Deputy Grading
|
3/26/2021
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Grading
|
3/30/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Grading
|
3/31/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Grading
|
4/1/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Grading
|
4/5/2021
|
Conditional Approval
|
RICKEY JACKSON
|
|
Deputy Grading
|
4/6/2021
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Grading
|
4/7/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Grading
|
4/8/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Grading
|
4/9/2021
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Grading
|
4/12/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Grading
|
4/13/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Grading
|
4/14/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Grading
|
4/15/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Grading
|
4/16/2021
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
4/28/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Pre-Inspection
|
5/4/2021
|
Partial Inspection
|
JOHN KITCKO
|
|
Pre-Inspection
|
5/7/2021
|
Partial Inspection
|
JOHN KITCKO
|
|
Pre-Inspection
|
5/18/2021
|
Partial Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
5/21/2021
|
Approved
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
5/21/2021
|
Partial Inspection
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
5/21/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
5/24/2021
|
Approved
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
5/24/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
5/25/2021
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
5/25/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
5/26/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
5/27/2021
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
5/27/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
6/4/2021
|
Approved
|
DANNY RODRIGUEZ
|
|
Deputy Shotcrete
|
6/4/2021
|
Approved
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
6/4/2021
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
6/7/2021
|
Conditional Approval
|
RICKEY JACKSON
|
|
Deputy Shotcrete
|
6/7/2021
|
Conditional Approval
|
RICKEY JACKSON
|
|
Deputy Reinf. Concrete
|
6/8/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Shotcrete
|
6/8/2021
|
Approved
|
JOHN KITCKO
|
|
Pre-Inspection
|
6/8/2021
|
Partial Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
6/9/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Shotcrete
|
6/9/2021
|
Approved
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
6/9/2021
|
Partial Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
6/10/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Shotcrete
|
6/10/2021
|
Approved
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
6/10/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Piling/Pier/Caisson
|
6/10/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
6/11/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
6/14/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Shotcrete
|
6/14/2021
|
Approved
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
6/14/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
6/15/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Shotcrete
|
6/15/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
6/16/2021
|
Approved
|
JOE VELASQUEZ
|
|
Deputy Shotcrete
|
6/16/2021
|
Approved
|
JOE VELASQUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
6/16/2021
|
Corrections Issued
|
JOE VELASQUEZ
|
|
Deputy Reinf. Concrete
|
6/17/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Shotcrete
|
6/17/2021
|
Approved
|
JOHN KITCKO
|
|
Piling/Pier/Caisson
|
6/17/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
6/18/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Shotcrete
|
6/18/2021
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
6/18/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
6/21/2021
|
Partial Inspection
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
6/28/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
6/30/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
7/1/2021
|
Approved
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
7/13/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
7/27/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
8/2/2021
|
Partial Inspection
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
8/11/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
8/12/2021
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
8/27/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
8/27/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
8/27/2021
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
8/30/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
8/31/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/7/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/8/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/9/2021
|
Approved
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
9/9/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
9/9/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
9/9/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/10/2021
|
Approved
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
9/10/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Wood Frame
|
9/10/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/13/2021
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
9/13/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Pre-Inspection
|
9/14/2021
|
Partial Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
9/22/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/23/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/30/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/6/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/8/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/14/2021
|
Conditional Approval
|
JOHN KITCKO
|
|
Structural Steel Frame
|
10/14/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
10/18/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Wood Construction
|
10/18/2021
|
Approved
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/18/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
10/19/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
10/20/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
10/21/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
10/22/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
10/25/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
10/26/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
10/27/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
10/27/2021
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Wood Construction
|
10/27/2021
|
Conditional Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/27/2021
|
Partial Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
10/27/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
10/28/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Wood Construction
|
10/28/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
10/29/2021
|
Conditional Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
11/1/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
11/1/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
11/8/2021
|
Partial Approval
|
JOE VELASQUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/8/2021
|
Not Ready for Inspection
|
JOE VELASQUEZ
|
|
Green Building Rough
|
11/8/2021
|
Not Ready for Inspection
|
JOE VELASQUEZ
|
|
Deputy Wood Construction
|
11/9/2021
|
Conditional Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/9/2021
|
Not Ready for Inspection
|
KENNETH ROBERTS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/10/2021
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Footing/Foundation/Slab
|
11/12/2021
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/15/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
11/15/2021
|
Partial Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
11/15/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
11/17/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Wood Construction
|
11/17/2021
|
Approved
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/17/2021
|
Partial Inspection
|
JOHN KITCKO
|
|
Insulation
|
11/17/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
11/18/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Wood Construction
|
11/18/2021
|
Approved
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
11/18/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/18/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
11/18/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
11/19/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Wood Construction
|
11/19/2021
|
Approved
|
JOHN KITCKO
|
|
Drywall Nailing
|
11/22/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/22/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
11/22/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/24/2021
|
No Access for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
11/29/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/29/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
11/29/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/1/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
12/2/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Wood Frame
|
12/2/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
12/3/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
12/6/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/6/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
12/6/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/7/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
12/7/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
12/8/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
12/8/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Wood Frame
|
12/8/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
12/10/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
12/15/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/15/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
12/15/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
12/15/2021
|
Partial Inspection
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/16/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
12/17/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/17/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
12/17/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
12/20/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
12/21/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
12/22/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
12/22/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
12/22/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
12/27/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
12/28/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
12/29/2021
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
12/29/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
12/29/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
1/4/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
1/4/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
1/6/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
1/6/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
1/7/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
1/10/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
1/11/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Deputy Wood Construction
|
1/12/2022
|
Approved
|
JOHN KITCKO
|
|
Drywall Nailing
|
1/12/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
1/12/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
1/12/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
1/14/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Pre-Inspection
|
1/14/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Insulation
|
1/18/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
1/20/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
1/20/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
1/21/2022
|
Partial Approval
|
DANIEL VARNUM
|
|
Insulation
|
1/21/2022
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
1/25/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
1/25/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
1/25/2022
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
1/27/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
1/28/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Insulation
|
1/31/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Pre-Inspection
|
2/3/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
2/7/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
2/8/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
2/8/2022
|
Approved
|
JOHN KITCKO
|
|
Insulation
|
2/8/2022
|
No Access for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
2/9/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
2/9/2022
|
Approved
|
JOHN KITCKO
|
|
Drywall Nailing
|
2/9/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
2/10/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
2/10/2022
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
2/10/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Wood Frame
|
2/10/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
2/14/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
2/15/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
2/15/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
2/16/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
2/17/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
2/22/2022
|
Partial Approval
|
KENNETH ROBERTS
|
|
Insulation
|
2/22/2022
|
Partial Approval
|
KENNETH ROBERTS
|
|
Insulation
|
2/23/2022
|
Partial Approval
|
DANIEL VARNUM
|
|
Wood Frame
|
2/23/2022
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
2/24/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
2/24/2022
|
Approved
|
JOHN KITCKO
|
|
Insulation
|
2/25/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
2/28/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Wood Frame
|
2/28/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Wall Anchors
|
3/2/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
3/2/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
3/3/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
3/4/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
3/7/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/8/2022
|
Partial Inspection
|
ANDREW DORSO
|
|
Insulation
|
3/8/2022
|
Partial Inspection
|
ANDREW DORSO
|
|
Drywall Nailing
|
3/10/2022
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
3/10/2022
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
3/11/2022
|
Partial Inspection
|
ANDREW DORSO
|
|
Insulation
|
3/11/2022
|
Partial Inspection
|
ANDREW DORSO
|
|
Insulation
|
3/14/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Wood Frame
|
3/15/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/16/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
3/21/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Wood Frame
|
3/22/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/23/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/25/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
3/25/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
3/29/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
3/30/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Wood Frame
|
3/31/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
4/1/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
4/4/2022
|
Approved
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
4/4/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
4/6/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
4/7/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Wood Frame
|
4/8/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
4/11/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
4/12/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
4/18/2022
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
4/20/2022
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
4/22/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
4/25/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
4/27/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
4/28/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
5/2/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
5/3/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
5/5/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
5/6/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
5/10/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
5/11/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
5/13/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
5/13/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
6/6/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Light Gage Steel Frame
|
6/6/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
6/13/2022
|
Approved
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
6/13/2022
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
6/27/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
6/28/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
8/1/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Pre-Inspection
|
8/3/2022
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Pre-Inspection
|
8/4/2022
|
Partial Inspection
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
8/15/2022
|
Conditional Approval
|
JOHN KITCKO
|
|
Pre-Inspection
|
8/15/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
8/18/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
8/22/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
9/6/2022
|
Approved
|
JOHN KITCKO
|
|
Pre-Inspection
|
9/15/2022
|
Corrections Issued
|
JOHN KITCKO
|
|
Pre-Inspection
|
9/19/2022
|
No Access for Inspection
|
JOHN KITCKO
|
|
Pre-Inspection
|
9/20/2022
|
Corrections Issued
|
JOHN KITCKO
|
|
Pre-Inspection
|
9/22/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/28/2022
|
Approved
|
JOHN KITCKO
|
|
Pre-Inspection
|
9/30/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Pre-Inspection
|
10/11/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Pre-Inspection
|
10/31/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Pre-Inspection
|
11/18/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
12/6/2022
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
12/6/2022
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Posting Pre-Inspection
|
12/6/2022
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Pre-Inspection
|
12/6/2022
|
Partial Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
12/6/2022
|
Partial Inspection
|
DEANDRE HOFFMAN
|
|
Pre-Inspection
|
12/13/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/28/2022
|
Approved
|
JOHN KITCKO
|
|
Drywall Nailing
|
12/28/2022
|
Approved
|
JOHN KITCKO
|
|
Final
|
12/28/2022
|
Partial Inspection
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
12/28/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Final
|
12/28/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
12/28/2022
|
Approved
|
JOHN KITCKO
|
|
SGSOV-Seismic Gas S/O Valve
|
12/28/2022
|
SGSOV Not Ready
|
JOHN KITCKO
|
|
Smoke Detectors
|
12/28/2022
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wall Anchors
|
12/28/2022
|
Approved
|
JOHN KITCKO
|
|
Wood Frame
|
12/28/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
12/29/2022
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
1/3/2023
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
1/4/2023
|
Approved
|
JOHN KITCKO
|
|
Final
|
1/5/2023
|
Partial Inspection
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
1/5/2023
|
Approved
|
JOHN KITCKO
|
|
Green Building Final
|
1/5/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
SGSOV-Seismic Gas S/O Valve
|
1/5/2023
|
SGSOV Not Ready
|
JOHN KITCKO
|
|
Smoke Detectors
|
1/5/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
1/5/2023
|
Approved
|
BRIAN KELLY
|
|
Insulation
|
4/6/2023
|
Corrections Issued
|
JOHN KITCKO
|
|
Special/Order Compliance
|
4/6/2023
|
Partial Inspection
|
CAMERON CHABAN
|
|
Special/Order Compliance
|
5/22/2023
|
Partial Inspection
|
JOHN KITCKO
|
|
Final
|
6/21/2023
|
Partial Inspection
|
JOHN KITCKO
|
|
Green Building Final
|
6/21/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
SGSOV-Seismic Gas S/O Valve
|
6/21/2023
|
SGSOV Not Ready
|
JOHN KITCKO
|
|
Smoke Detectors
|
6/21/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
6/21/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
6/22/2023
|
Partial Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
6/23/2023
|
Partial Inspection
|
JOHN KITCKO
|
|
Final
|
6/26/2023
|
Partial Inspection
|
JOHN KITCKO
|
|
Green Building Final
|
6/26/2023
|
Partial Inspection
|
JOHN KITCKO
|
|
SGSOV-Seismic Gas S/O Valve
|
6/26/2023
|
SGSOV Not Ready
|
JOHN KITCKO
|
|
Smoke Detectors
|
6/26/2023
|
Approved
|
JOHN KITCKO
|
|
Special/Order Compliance
|
6/26/2023
|
Partial Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
6/27/2023
|
Partial Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
6/28/2023
|
Partial Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
6/30/2023
|
Corrections Issued
|
JOHN KITCKO
|
|
Final
|
7/3/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Final
|
7/3/2023
|
Partial Inspection
|
JOHN KITCKO
|
|
SGSOV-Seismic Gas S/O Valve
|
7/3/2023
|
SGSOV Not Ready
|
JOHN KITCKO
|
|
Special/Order Compliance
|
7/3/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
7/5/2023
|
Partial Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
7/6/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Final
|
7/10/2023
|
Partial Inspection
|
JOHN KITCKO
|
|
Green Building Final
|
7/10/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
SGSOV-Seismic Gas S/O Valve
|
7/10/2023
|
SGSOV Not Ready
|
JOHN KITCKO
|
|
Final
|
7/12/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Final
|
7/12/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
SGSOV-Seismic Gas S/O Valve
|
7/12/2023
|
SGSOV Not Ready
|
JOHN KITCKO
|
|
Special/Order Compliance
|
7/12/2023
|
Partial Inspection
|
JOHN KITCKO
|
|
Final
|
7/14/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Final
|
7/14/2023
|
Approved
|
JOHN KITCKO
|
|
SGSOV-Seismic Gas S/O Valve
|
7/14/2023
|
SGSOV Approved
|
JOHN KITCKO
|
|
Special/Order Compliance
|
7/14/2023
|
Partial Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
7/26/2023
|
Partial Inspection
|
JOHN KITCKO
|
|
Final
|
7/31/2023
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
7/31/2023
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Final
|
10/10/2023
|
Partial Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
10/10/2023
|
Partial Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
10/13/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Final
|
10/20/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
10/20/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
10/23/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Final
|
10/26/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
10/26/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
10/27/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Final
|
11/3/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
11/3/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Final
|
12/27/2023
|
OK to Issue CofO
|
JOHN KITCKO
|
|
Special/Order Compliance
|
1/3/2024
|
Partial Inspection
|
JEFFREY FULTON
|