|
Pre-Inspection
|
7/27/2020
|
Partial Inspection
|
NICK DANERI
|
|
Deputy Steel/Welding
|
8/5/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
8/7/2020
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
8/28/2020
|
Partial Inspection
|
NICK DANERI
|
|
METHANE-Barrier
|
8/28/2020
|
Conditional Approval
|
NICK DANERI
|
|
METHANE-Subgrade
|
8/28/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
10/7/2020
|
Partial Approval
|
NICK DANERI
|
|
METHANE-Barrier
|
10/7/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
METHANE-Subgrade
|
10/7/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/9/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/13/2020
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
10/14/2020
|
Partial Approval
|
NICK DANERI
|
|
METHANE-Barrier
|
10/14/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
METHANE-Subgrade
|
10/14/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/15/2020
|
Conditional Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
10/15/2020
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/16/2020
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
10/16/2020
|
Partial Approval
|
NICK DANERI
|
|
Special/Order Compliance
|
10/16/2020
|
Partial Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/19/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/20/2020
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
10/20/2020
|
Partial Approval
|
NICK DANERI
|
|
METHANE-Barrier
|
10/20/2020
|
Partial Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/21/2020
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
10/21/2020
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/22/2020
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
10/22/2020
|
Partial Approval
|
NICK DANERI
|
|
METHANE-Barrier
|
10/22/2020
|
Partial Inspection
|
NICK DANERI
|
|
METHANE-Subgrade
|
10/22/2020
|
Partial Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/23/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
10/26/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/27/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
10/27/2020
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
10/27/2020
|
Partial Approval
|
NICK DANERI
|
|
METHANE-Barrier
|
10/27/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
METHANE-Subgrade
|
10/27/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/28/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
10/28/2020
|
Conditional Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/28/2020
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/29/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
10/29/2020
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
10/29/2020
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/30/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
10/30/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
11/2/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
11/2/2020
|
Conditional Approval
|
NICK DANERI
|
|
Reinforced Masonry Frame
|
11/2/2020
|
Partial Approval
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
11/10/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
11/12/2020
|
Approved
|
DANIEL COLLINS
|
|
METHANE-Rough
|
11/12/2020
|
Approved
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
11/12/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Verify Sprinkler Sign Off
|
11/12/2020
|
Not Ready for Inspection
|
DANIEL COLLINS
|
|
Piling/Pier/Caisson
|
11/16/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Other (see comments)
|
11/17/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
11/17/2020
|
Conditional Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
11/17/2020
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
11/18/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
11/18/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
11/19/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
11/19/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
11/20/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
11/20/2020
|
Conditional Approval
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
11/20/2020
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
11/20/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
11/23/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
11/23/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
11/25/2020
|
Conditional Approval
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
11/30/2020
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
11/30/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
Piling/Pier/Caisson
|
12/1/2020
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
12/2/2020
|
Conditional Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
12/2/2020
|
Partial Inspection
|
NICK DANERI
|
|
Deputy Shotcrete
|
12/7/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
12/9/2020
|
Conditional Approval
|
NICK DANERI
|
|
METHANE-Subgrade
|
1/11/2021
|
Conditional Approval
|
NICK DANERI
|
|
METHANE-Barrier
|
1/20/2021
|
Partial Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
1/28/2021
|
Not Ready for Inspection
|
NICK DANERI
|
|
METHANE-Barrier
|
1/28/2021
|
Approved
|
NICK DANERI
|
|
METHANE-Subgrade
|
1/28/2021
|
Approved
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
2/3/2021
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
2/3/2021
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
2/4/2021
|
Conditional Approval
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
2/9/2021
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
2/9/2021
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
2/10/2021
|
Conditional Approval
|
NICK DANERI
|
|
Piling/Pier/Caisson
|
2/10/2021
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
2/11/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
2/12/2021
|
Conditional Approval
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
3/1/2021
|
Conditional Approval
|
DANIEL COLLINS
|
|
Verify Sprinkler Sign Off
|
3/1/2021
|
Not Ready for Inspection
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
3/2/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
3/3/2021
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
3/3/2021
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
3/4/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
3/5/2021
|
Conditional Approval
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
3/9/2021
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
3/9/2021
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
3/12/2021
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
3/12/2021
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
3/17/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
3/17/2021
|
Conditional Approval
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
3/17/2021
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
3/18/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
3/18/2021
|
Conditional Approval
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
3/18/2021
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
3/19/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
3/19/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
3/22/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
3/22/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
3/23/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
3/23/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
3/24/2021
|
Conditional Approval
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
3/24/2021
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
3/24/2021
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Shotcrete
|
3/25/2021
|
Conditional Approval
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
4/9/2021
|
Partial Inspection
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
4/9/2021
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
4/22/2021
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
4/22/2021
|
Partial Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
4/23/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
4/26/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
4/27/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
4/28/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
4/29/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
4/30/2021
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
5/3/2021
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
5/4/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
5/5/2021
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
5/5/2021
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
5/6/2021
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
5/6/2021
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
5/14/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
5/19/2021
|
Not Ready for Inspection
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/1/2021
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
6/4/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
6/7/2021
|
Conditional Approval
|
NICK DANERI
|
|
Reinforced Masonry Frame
|
6/7/2021
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
6/7/2021
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
6/8/2021
|
Partial Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
6/9/2021
|
Conditional Approval
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
6/10/2021
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Masonry Frame
|
6/10/2021
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
6/10/2021
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Masonry Frame
|
6/16/2021
|
Partial Inspection
|
KATY RAMIREZ
|
|
Verify Sprinkler Sign Off
|
6/16/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
6/17/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Masonry
|
6/17/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
6/18/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Masonry
|
6/18/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
6/18/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/18/2021
|
Partial Inspection
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
6/21/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
6/22/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
6/23/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/25/2021
|
No Access for Inspection
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
6/28/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
6/28/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
6/29/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
6/29/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/29/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
6/30/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
6/30/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
7/1/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
7/1/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Wood Frame
|
7/1/2021
|
Partial Inspection
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
7/2/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
7/2/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
7/6/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
7/6/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
7/7/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
7/7/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/7/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
7/8/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
7/8/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
7/9/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
7/9/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
7/12/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
7/12/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
7/13/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
7/13/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/13/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
7/14/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
7/14/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
7/15/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
7/15/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
7/16/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
7/16/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
7/21/2021
|
Conditional Approval
|
DAVID TSAU
|
|
Deputy Wood Construction
|
7/21/2021
|
Conditional Approval
|
DAVID TSAU
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/21/2021
|
Partial Approval
|
DAVID TSAU
|
|
Deputy Steel/Welding
|
7/22/2021
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Wood Construction
|
7/22/2021
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Steel/Welding
|
7/23/2021
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Wood Construction
|
7/23/2021
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Steel/Welding
|
7/27/2021
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Wood Construction
|
7/27/2021
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Steel/Welding
|
7/28/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
7/28/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
7/29/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
7/29/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
7/30/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
7/30/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
8/3/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/3/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
8/5/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/5/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
8/6/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/6/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/9/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
8/10/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
8/11/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
8/12/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
8/13/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
8/13/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/13/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
8/16/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
8/16/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/16/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
8/17/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
8/17/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
8/18/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
8/18/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
8/19/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
8/19/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
8/20/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
8/23/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
8/24/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/24/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
8/25/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/25/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
8/27/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
8/31/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Insulation
|
8/31/2021
|
No Access for Inspection
|
KATY RAMIREZ
|
|
Wood Frame
|
8/31/2021
|
No Access for Inspection
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
9/1/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Insulation
|
9/1/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
9/2/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
9/3/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
9/7/2021
|
No Access for Inspection
|
KATY RAMIREZ
|
|
Insulation
|
9/7/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/14/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Insulation
|
9/14/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
9/16/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Insulation
|
9/17/2021
|
No Access for Inspection
|
KATY RAMIREZ
|
|
Wood Frame
|
9/17/2021
|
No Access for Inspection
|
KATY RAMIREZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/21/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Insulation
|
9/21/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Wood Frame
|
9/21/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/23/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Insulation
|
9/23/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/28/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Insulation
|
9/28/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Wood Frame
|
9/28/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Insulation
|
10/1/2021
|
Partial Inspection
|
KATY RAMIREZ
|
|
Wood Frame
|
10/1/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/4/2021
|
Not Ready for Inspection
|
RUSSELL BONVOULOIR
|
|
Insulation
|
10/4/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Wood Frame
|
10/4/2021
|
Partial Inspection
|
RUSSELL BONVOULOIR
|
|
Insulation
|
10/5/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
10/5/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/6/2021
|
Partial Inspection
|
RUSSELL BONVOULOIR
|
|
Insulation
|
10/6/2021
|
Partial Inspection
|
RUSSELL BONVOULOIR
|
|
Wood Frame
|
10/6/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Drywall Nailing
|
10/8/2021
|
Partial Inspection
|
RUSSELL BONVOULOIR
|
|
Insulation
|
10/8/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Wood Frame
|
10/8/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Drywall Nailing
|
10/12/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Insulation
|
10/12/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
10/12/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Wood Frame
|
10/12/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Drywall Nailing
|
10/13/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Insulation
|
10/13/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Wood Frame
|
10/13/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Drywall Nailing
|
10/14/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Insulation
|
10/14/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
10/14/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Wood Frame
|
10/14/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Insulation
|
10/19/2021
|
No Access for Inspection
|
KATY RAMIREZ
|
|
Wood Frame
|
10/19/2021
|
No Access for Inspection
|
KATY RAMIREZ
|
|
Drywall Nailing
|
10/20/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Insulation
|
10/20/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Wood Frame
|
10/20/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Drywall Nailing
|
10/25/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Insulation
|
10/25/2021
|
Partial Inspection
|
DANIEL COLLINS
|
|
Wood Frame
|
10/25/2021
|
Partial Inspection
|
DANIEL COLLINS
|
|
Drywall Nailing
|
10/27/2021
|
No Access for Inspection
|
KATY RAMIREZ
|
|
Insulation
|
10/27/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Wood Frame
|
10/27/2021
|
No Access for Inspection
|
KATY RAMIREZ
|
|
Drywall Nailing
|
10/28/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Insulation
|
10/28/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Wood Frame
|
10/28/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Drywall Nailing
|
10/29/2021
|
Partial Approval
|
JONATHAN QUACH
|
|
Insulation
|
10/29/2021
|
Not Ready for Inspection
|
JONATHAN QUACH
|
|
Wood Frame
|
10/29/2021
|
Not Ready for Inspection
|
JONATHAN QUACH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/3/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Wood Construction
|
11/9/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Drywall Nailing
|
11/10/2021
|
Not Ready for Inspection
|
DANIEL COLLINS
|
|
Insulation
|
11/10/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
11/10/2021
|
Not Ready for Inspection
|
DANIEL COLLINS
|
|
Wood Frame
|
11/10/2021
|
Not Ready for Inspection
|
DANIEL COLLINS
|
|
Wood Frame
|
11/15/2021
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
11/16/2021
|
No Access for Inspection
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
11/16/2021
|
No Access for Inspection
|
KATY RAMIREZ
|
|
Wood Frame
|
11/16/2021
|
No Access for Inspection
|
KATY RAMIREZ
|
|
Drywall Nailing
|
11/19/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Insulation
|
11/23/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Drywall Nailing
|
12/1/2021
|
Approved
|
DARRYL ARNOLD
|
|
Drywall Nailing
|
12/6/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Interior/Exterior Lathing
|
12/6/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
12/6/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Drywall Nailing
|
12/7/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Drywall Nailing
|
12/7/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Interior/Exterior Lathing
|
12/7/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
12/7/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Drywall Nailing
|
12/8/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Interior/Exterior Lathing
|
12/8/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Light Gage Steel Frame
|
12/8/2021
|
Partial Inspection
|
RUSSELL BONVOULOIR
|
|
Drywall Nailing
|
12/9/2021
|
Partial Inspection
|
RUSSELL BONVOULOIR
|
|
Drywall Nailing
|
12/13/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Interior/Exterior Lathing
|
12/13/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Insulation
|
12/15/2021
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Insulation
|
12/16/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
12/22/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Light Gage Steel Frame
|
12/22/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Drywall Nailing
|
1/13/2022
|
Partial Inspection
|
RUSSELL BONVOULOIR
|
|
Light Gage Steel Frame
|
1/13/2022
|
Partial Inspection
|
RUSSELL BONVOULOIR
|
|
Drywall Nailing
|
1/19/2022
|
Partial Approval
|
TED RIES
|
|
Light Gage Steel Frame
|
2/9/2022
|
Partial Approval
|
KATY RAMIREZ
|
|
Drywall Nailing
|
2/17/2022
|
Partial Approval
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
3/11/2022
|
Partial Approval
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
4/8/2022
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Wood Frame
|
5/5/2022
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Deputy Wood Construction
|
5/6/2022
|
Conditional Approval
|
DARRYL ARNOLD
|
|
Wood Frame
|
5/6/2022
|
Conditional Approval
|
DARRYL ARNOLD
|
|
Drywall Nailing
|
5/9/2022
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
Light Gage Steel Frame
|
5/24/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Special/Order Compliance
|
6/7/2022
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Special/Order Compliance
|
6/9/2022
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Interior/Exterior Lathing
|
6/13/2022
|
Off-Hour Fees Due
|
|
|
Special/Order Compliance
|
6/13/2022
|
Partial Inspection
|
KATY RAMIREZ
|
|
Drywall Nailing
|
6/15/2022
|
Partial Approval
|
KATY RAMIREZ
|
|
Drywall Nailing
|
6/30/2022
|
Partial Approval
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
6/30/2022
|
Partial Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
7/14/2022
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
7/15/2022
|
Conditional Approval
|
TED RIES
|
|
Light Gage Steel Frame
|
7/22/2022
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/28/2022
|
Partial Approval
|
KATY RAMIREZ
|
|
Drywall Nailing
|
9/21/2022
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
9/21/2022
|
Corrections Issued
|
KATY RAMIREZ
|
|
Drywall Nailing
|
9/27/2022
|
Partial Approval
|
KATY RAMIREZ
|
|
Final
|
10/18/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
10/18/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
10/18/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
10/18/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
10/18/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
SGSOV-Seismic Gas S/O Valve
|
10/18/2022
|
SGSOV Not Ready
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
10/18/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
T-Bar Ceiling
|
10/18/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
10/18/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
10/20/2022
|
Partial Inspection
|
GREGORY POMISH
|
|
Special/Order Compliance
|
11/3/2022
|
Conditional Approval
|
NICK DANERI
|
|
Drywall Nailing
|
11/8/2022
|
Approved
|
NICK DANERI
|
|
T-Bar Ceiling
|
11/8/2022
|
Partial Approval
|
NICK DANERI
|
|
Pre-Inspection
|
11/10/2022
|
Partial Inspection
|
NICK DANERI
|
|
T-Bar Ceiling
|
11/10/2022
|
Approved
|
NICK DANERI
|
|
Special/Order Compliance
|
11/17/2022
|
Partial Inspection
|
NICK DANERI
|
|
Smoke Detectors
|
11/22/2022
|
Partial Inspection
|
NICK DANERI
|
|
Final
|
11/28/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Green Building Final
|
11/28/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
11/28/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Masonry Frame
|
11/28/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
SGSOV-Seismic Gas S/O Valve
|
11/28/2022
|
SGSOV Not Ready
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
11/28/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Verify Rec and Parks Fee Memo
|
12/5/2022
|
Conditional Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
12/5/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Grading Pre-Inspection
|
12/6/2022
|
Approved
|
NICK DANERI
|
|
Grading Pre-Inspection
|
12/12/2022
|
Approved
|
GREGORY POMISH
|
|
Green Building Final
|
12/12/2022
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Posting Pre-Inspection
|
12/12/2022
|
Approved
|
GREGORY POMISH
|
|
Smoke Detectors
|
12/12/2022
|
Approved
|
GREGORY POMISH
|
|
Special/Order Compliance
|
12/12/2022
|
Partial Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
12/12/2022
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Special/Order Compliance
|
12/13/2022
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Green Building Final
|
12/16/2022
|
Approved
|
NICK DANERI
|
|
Special/Order Compliance
|
1/24/2023
|
Partial Inspection
|
NICK DANERI
|
|
Special/Order Compliance
|
5/22/2023
|
Conditional Approval
|
NICK DANERI
|
|
Final
|
8/4/2023
|
OK to Issue CofO
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
8/4/2023
|
Approved
|
NICK DANERI
|
|
Reinforced Masonry Frame
|
8/4/2023
|
Approved
|
NICK DANERI
|
|
SGSOV-Seismic Gas S/O Valve
|
8/4/2023
|
SGSOV Approved
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
8/4/2023
|
Approved
|
NICK DANERI
|