424 N FIRMIN ST 90026

Certificate Information: 424 N FIRMIN ST 90026

Application / Permit
19010-10000-02083
Plan Check / Job No.
B19LA10318
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
FOR NEW 64 UNIT LOW INCOME 7-STORY APT BLDG 100% AFFORDABLE OVER LOWER LEVEL PARKING. TOC TIER 3 PER DIR-2018-3691-TOC-SPP-WDI-1A
Permit Issued
Issued on 7/10/2020
Issuing Office
Metro
Current Status
CofO Issued on 8/4/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/17/2019 APPLICANT
Green Plans Picked Up 5/31/2019 APPLICANT
Assigned to Plan Check Engineer 6/13/2019 ARMEN JIVALAGIAN
Corrections Issued 7/2/2019 ARMEN JIVALAGIAN
Quality Review Completed 7/10/2019 TIEN JEN WANG
Building Plans Picked Up 7/16/2019 APPLICANT
Disabled Access Plans Picked Up 7/19/2019 APPLICANT
Applicant returned to address corrections 10/8/2019 ARMEN JIVALAGIAN
Applicant returned to address corrections 2/20/2020 ARMEN JIVALAGIAN
Applicant returned to address corrections 2/25/2020 ARMEN JIVALAGIAN
Applicant returned to address corrections 3/5/2020 ARMEN JIVALAGIAN
Applicant returned to address corrections 3/10/2020 ARMEN JIVALAGIAN
Applicant returned to address corrections 3/16/2020 ARMEN JIVALAGIAN
Applicant returned to address corrections 3/17/2020 ARMEN JIVALAGIAN
Applicant returned to address corrections 3/20/2020 ARMEN JIVALAGIAN
Applicant returned to address corrections 3/24/2020 ARMEN JIVALAGIAN
Applicant returned to address corrections 5/5/2020 ARMEN JIVALAGIAN
Applicant returned to address corrections 5/19/2020 ARMEN JIVALAGIAN
Applicant returned to address corrections 5/20/2020 ARMEN JIVALAGIAN
Applicant returned to address corrections 5/26/2020 ARMEN JIVALAGIAN
Applicant returned to address corrections 6/8/2020 ARMEN JIVALAGIAN
Applicant returned to address corrections 6/17/2020 ARMEN JIVALAGIAN
Plan Check Approved 6/26/2020 ARMEN JIVALAGIAN
Issued 7/10/2020 APPLICANT
TCO Issued (Expire Date: 06-14-2023) 12/16/2022 ERNESTO CORRAL
TCO Issued (Expire Date: 12-02-2023) 6/5/2023 ERNESTO CORRAL
CofO in Progress 8/4/2023 NICK DANERI
CofO Issued 8/4/2023 ERNESTO CORRAL
Permit Finaled 8/4/2023 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 8/8/2019 CELINA MORENO
Highway dedication Cleared 2/11/2020 JEANIE LAM
Hydrant and Access approval Cleared 2/11/2020 GILBERT URREA
Permit Cleared 2/11/2020 JEANIE LAM
Green Code Cleared 2/18/2020 SARAH ABOULHOSN
Construction near power lines Cleared 2/19/2020 WALTER RAMIREZ
Construction within easement Cleared 2/19/2020 WALTER RAMIREZ
GPI Written Notices Cleared 2/20/2020 ARMEN JIVALAGIAN
Grading Pre-Inspection Cleared 2/20/2020 ARMEN JIVALAGIAN
Eng Process Fee Ord 176,300 Cleared 2/26/2020 EMIL KYUPELYAN
Trees in Parkway Cleared 3/4/2020 JOHN KIM
Public Housing Cleared 3/10/2020 LUIS ALVAREZ
Building over 3-story or 36-ft Cleared 3/20/2020 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 3/20/2020 CALOSHA APPROVED
DCP conditions approval Cleared 4/14/2020 KENNETH LE
Density Bonus 12.22.A.31 Cleared 4/14/2020 KENNETH LE
Frnt yard landscape/Water mgmt Cleared 4/22/2020 MAIDEL LUEVANO
Landscape for retaining wall Cleared 4/22/2020 MAIDEL LUEVANO
Miscellaneous Cleared 4/22/2020 MAIDEL LUEVANO
Miscellaneous Cleared 4/22/2020 MAIDEL LUEVANO
Miscellaneous Cleared 4/22/2020 MAIDEL LUEVANO
Opn space landscape/Water mgmt Cleared 4/22/2020 MAIDEL LUEVANO
Permanent Supportive Housing Cleared 4/22/2020 MAIDEL LUEVANO
Site Plan review Cleared 4/22/2020 MAIDEL LUEVANO
Specific Plan Cleared 4/22/2020 MAIDEL LUEVANO
Work Adjacent to Public Way Cleared 5/15/2020 ROSA SILVA
Internal circulation Cleared 5/20/2020 PETE EYRE
Specific Plan Cleared 5/20/2020 PETE EYRE
Methane Ordinance Cleared 6/2/2020 VIDAL GARCIA
Sewer availability Cleared 6/9/2020 JEANIE LAM
Low Impact Development Cleared 6/16/2020 ANDRES COVARRUBIAS
DAS Clearance Cleared 6/18/2020 FARUK SEZER
Fire Marshall Fire Life Safety Cleared 6/24/2020 MENOA AGHAJANI
Roof/Waste drainage to street Cleared 6/24/2020 RENZ SORIANO
Abandoned oil well Cleared 6/29/2020 JOHN CONNEALLY
Abandoned oil well approval Cleared 6/29/2020 JOHN CONNEALLY

Contact Information

Architect Thatch,, John Michael; Lic. No.: C12372 DAHLIN GROUP ARCH. PLANNING   5865 OWENS DR.    PLEASANTON, CA 94588
Contractor Walton Construction Inc; Lic. No.: 1034491-B 358 E FOOTHILL BLVD STE 100      SAN DIMAS, CA 91773
Engineer Bornand,, Christophe N; Lic. No.: C80596 3582 VETERAN AVE      LOS ANGELES, CA 90034
Engineer Orue,, Aldrin Jose; Lic. No.: S4399 2015 PALOMA ST      PASADENA, CA 91104
Engineer Walter,, Scott John; Lic. No.: GE2476 14428 HAMLIN ST STE 200      VAN NUYS, CA 91401

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 7/27/2020 Partial Inspection NICK DANERI
Deputy Steel/Welding 8/5/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 8/7/2020 Conditional Approval NICK DANERI
Footing/Foundation/Slab 8/28/2020 Partial Inspection NICK DANERI
METHANE-Barrier 8/28/2020 Conditional Approval NICK DANERI
METHANE-Subgrade 8/28/2020 Not Ready for Inspection NICK DANERI
Footing/Foundation/Slab 10/7/2020 Partial Approval NICK DANERI
METHANE-Barrier 10/7/2020 Not Ready for Inspection NICK DANERI
METHANE-Subgrade 10/7/2020 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 10/9/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/13/2020 Conditional Approval NICK DANERI
Footing/Foundation/Slab 10/14/2020 Partial Approval NICK DANERI
METHANE-Barrier 10/14/2020 Not Ready for Inspection NICK DANERI
METHANE-Subgrade 10/14/2020 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 10/15/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 10/15/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 10/16/2020 Conditional Approval NICK DANERI
Footing/Foundation/Slab 10/16/2020 Partial Approval NICK DANERI
Special/Order Compliance 10/16/2020 Partial Inspection NICK DANERI
Deputy Reinf. Concrete 10/19/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/20/2020 Conditional Approval NICK DANERI
Footing/Foundation/Slab 10/20/2020 Partial Approval NICK DANERI
METHANE-Barrier 10/20/2020 Partial Inspection NICK DANERI
Deputy Reinf. Concrete 10/21/2020 Conditional Approval NICK DANERI
Footing/Foundation/Slab 10/21/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 10/22/2020 Conditional Approval NICK DANERI
Footing/Foundation/Slab 10/22/2020 Partial Approval NICK DANERI
METHANE-Barrier 10/22/2020 Partial Inspection NICK DANERI
METHANE-Subgrade 10/22/2020 Partial Inspection NICK DANERI
Deputy Reinf. Concrete 10/23/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/26/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/27/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 10/27/2020 Conditional Approval NICK DANERI
Footing/Foundation/Slab 10/27/2020 Partial Approval NICK DANERI
METHANE-Barrier 10/27/2020 Not Ready for Inspection NICK DANERI
METHANE-Subgrade 10/27/2020 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 10/28/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 10/28/2020 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 10/28/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 10/29/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 10/29/2020 Conditional Approval NICK DANERI
Footing/Foundation/Slab 10/29/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 10/30/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 10/30/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/2/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 11/2/2020 Conditional Approval NICK DANERI
Reinforced Masonry Frame 11/2/2020 Partial Approval NICK DANERI
Reinforced Concrete Frame 11/10/2020 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Rough 11/12/2020 Approved DANIEL COLLINS
METHANE-Rough 11/12/2020 Approved DANIEL COLLINS
Reinforced Concrete Frame 11/12/2020 Conditional Approval DANIEL COLLINS
Verify Sprinkler Sign Off 11/12/2020 Not Ready for Inspection DANIEL COLLINS
Piling/Pier/Caisson 11/16/2020 Not Ready for Inspection NICK DANERI
Deputy Other (see comments) 11/17/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/17/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 11/17/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 11/18/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 11/18/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/19/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 11/19/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/20/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 11/20/2020 Conditional Approval NICK DANERI
Reinforced Concrete Frame 11/20/2020 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 11/20/2020 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 11/23/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 11/23/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 11/25/2020 Conditional Approval NICK DANERI
Reinforced Concrete Frame 11/30/2020 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 11/30/2020 Not Ready for Inspection NICK DANERI
Piling/Pier/Caisson 12/1/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 12/2/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 12/2/2020 Partial Inspection NICK DANERI
Deputy Shotcrete 12/7/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 12/9/2020 Conditional Approval NICK DANERI
METHANE-Subgrade 1/11/2021 Conditional Approval NICK DANERI
METHANE-Barrier 1/20/2021 Partial Approval NICK DANERI
Footing/Foundation/Slab 1/28/2021 Not Ready for Inspection NICK DANERI
METHANE-Barrier 1/28/2021 Approved NICK DANERI
METHANE-Subgrade 1/28/2021 Approved NICK DANERI
Deputy Reinf. Concrete 2/3/2021 Conditional Approval NICK DANERI
Footing/Foundation/Slab 2/3/2021 Partial Approval NICK DANERI
Deputy Reinf. Concrete 2/4/2021 Conditional Approval NICK DANERI
Reinforced Concrete Frame 2/9/2021 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 2/9/2021 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 2/10/2021 Conditional Approval NICK DANERI
Piling/Pier/Caisson 2/10/2021 Partial Approval NICK DANERI
Deputy Reinf. Concrete 2/11/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/12/2021 Conditional Approval NICK DANERI
Reinforced Concrete Frame 3/1/2021 Conditional Approval DANIEL COLLINS
Verify Sprinkler Sign Off 3/1/2021 Not Ready for Inspection DANIEL COLLINS
Deputy Reinf. Concrete 3/2/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/3/2021 Conditional Approval NICK DANERI
Footing/Foundation/Slab 3/3/2021 Partial Approval NICK DANERI
Deputy Reinf. Concrete 3/4/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/5/2021 Conditional Approval NICK DANERI
Reinforced Concrete Frame 3/9/2021 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 3/9/2021 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 3/12/2021 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 3/12/2021 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 3/17/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 3/17/2021 Conditional Approval NICK DANERI
Reinforced Concrete Frame 3/17/2021 Partial Approval NICK DANERI
Deputy Reinf. Concrete 3/18/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 3/18/2021 Conditional Approval NICK DANERI
Reinforced Concrete Frame 3/18/2021 Partial Approval NICK DANERI
Deputy Reinf. Concrete 3/19/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 3/19/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/22/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 3/22/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/23/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 3/23/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 3/24/2021 Conditional Approval NICK DANERI
Reinforced Concrete Frame 3/24/2021 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 3/24/2021 Not Ready for Inspection NICK DANERI
Deputy Shotcrete 3/25/2021 Conditional Approval NICK DANERI
Reinforced Concrete Frame 4/9/2021 Partial Inspection NICK DANERI
Verify Sprinkler Sign Off 4/9/2021 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 4/22/2021 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 4/22/2021 Partial Inspection NICK DANERI
Deputy Reinf. Concrete 4/23/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/26/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/27/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/28/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/29/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/30/2021 Conditional Approval NICK DANERI
Footing/Foundation/Slab 5/3/2021 Partial Approval NICK DANERI
Deputy Reinf. Concrete 5/4/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 5/5/2021 Conditional Approval NICK DANERI
Footing/Foundation/Slab 5/5/2021 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 5/6/2021 Conditional Approval NICK DANERI
Footing/Foundation/Slab 5/6/2021 Partial Approval NICK DANERI
Wood Frame 5/14/2021 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 5/19/2021 Not Ready for Inspection NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 6/1/2021 Partial Approval NICK DANERI
Deputy Reinf. Masonry 6/4/2021 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 6/7/2021 Conditional Approval NICK DANERI
Reinforced Masonry Frame 6/7/2021 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 6/7/2021 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 6/8/2021 Partial Approval NICK DANERI
Deputy Shotcrete 6/9/2021 Conditional Approval NICK DANERI
Reinforced Concrete Frame 6/10/2021 Not Ready for Inspection NICK DANERI
Reinforced Masonry Frame 6/10/2021 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 6/10/2021 Not Ready for Inspection NICK DANERI
Reinforced Masonry Frame 6/16/2021 Partial Inspection KATY RAMIREZ
Verify Sprinkler Sign Off 6/16/2021 Not Ready for Inspection KATY RAMIREZ
Deputy Reinf. Concrete 6/17/2021 Conditional Approval KATY RAMIREZ
Deputy Reinf. Masonry 6/17/2021 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 6/18/2021 Conditional Approval KATY RAMIREZ
Deputy Reinf. Masonry 6/18/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 6/18/2021 Conditional Approval KATY RAMIREZ
Floor/Roof Diaphrgm/Shear Wall 6/18/2021 Partial Inspection KATY RAMIREZ
Deputy Wood Construction 6/21/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 6/22/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 6/23/2021 Conditional Approval KATY RAMIREZ
Floor/Roof Diaphrgm/Shear Wall 6/25/2021 No Access for Inspection KATY RAMIREZ
Deputy Steel/Welding 6/28/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 6/28/2021 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 6/29/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 6/29/2021 Conditional Approval KATY RAMIREZ
Floor/Roof Diaphrgm/Shear Wall 6/29/2021 Not Ready for Inspection KATY RAMIREZ
Deputy Steel/Welding 6/30/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 6/30/2021 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/1/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 7/1/2021 Conditional Approval KATY RAMIREZ
Wood Frame 7/1/2021 Partial Inspection KATY RAMIREZ
Deputy Steel/Welding 7/2/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 7/2/2021 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/6/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 7/6/2021 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/7/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 7/7/2021 Conditional Approval KATY RAMIREZ
Floor/Roof Diaphrgm/Shear Wall 7/7/2021 Partial Approval KATY RAMIREZ
Deputy Steel/Welding 7/8/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 7/8/2021 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/9/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 7/9/2021 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/12/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 7/12/2021 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/13/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 7/13/2021 Conditional Approval KATY RAMIREZ
Floor/Roof Diaphrgm/Shear Wall 7/13/2021 Partial Approval KATY RAMIREZ
Deputy Steel/Welding 7/14/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 7/14/2021 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/15/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 7/15/2021 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/16/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 7/16/2021 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/21/2021 Conditional Approval DAVID TSAU
Deputy Wood Construction 7/21/2021 Conditional Approval DAVID TSAU
Floor/Roof Diaphrgm/Shear Wall 7/21/2021 Partial Approval DAVID TSAU
Deputy Steel/Welding 7/22/2021 Conditional Approval JONATHAN QUACH
Deputy Wood Construction 7/22/2021 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 7/23/2021 Conditional Approval JONATHAN QUACH
Deputy Wood Construction 7/23/2021 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 7/27/2021 Conditional Approval JONATHAN QUACH
Deputy Wood Construction 7/27/2021 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 7/28/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 7/28/2021 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/29/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 7/29/2021 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/30/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 7/30/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 8/3/2021 Conditional Approval KATY RAMIREZ
Floor/Roof Diaphrgm/Shear Wall 8/3/2021 Partial Approval KATY RAMIREZ
Deputy Wood Construction 8/5/2021 Conditional Approval KATY RAMIREZ
Floor/Roof Diaphrgm/Shear Wall 8/5/2021 Not Ready for Inspection KATY RAMIREZ
Deputy Wood Construction 8/6/2021 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 8/6/2021 Partial Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 8/9/2021 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 8/10/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 8/11/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 8/12/2021 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 8/13/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 8/13/2021 Conditional Approval KATY RAMIREZ
Floor/Roof Diaphrgm/Shear Wall 8/13/2021 Not Ready for Inspection KATY RAMIREZ
Deputy Steel/Welding 8/16/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 8/16/2021 Conditional Approval KATY RAMIREZ
Floor/Roof Diaphrgm/Shear Wall 8/16/2021 Partial Approval KATY RAMIREZ
Deputy Steel/Welding 8/17/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 8/17/2021 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 8/18/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 8/18/2021 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 8/19/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 8/19/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 8/20/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 8/23/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 8/24/2021 Conditional Approval KATY RAMIREZ
Floor/Roof Diaphrgm/Shear Wall 8/24/2021 Partial Approval KATY RAMIREZ
Deputy Wood Construction 8/25/2021 Conditional Approval KATY RAMIREZ
Floor/Roof Diaphrgm/Shear Wall 8/25/2021 Partial Approval KATY RAMIREZ
Deputy Wood Construction 8/27/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 8/31/2021 Conditional Approval KATY RAMIREZ
Insulation 8/31/2021 No Access for Inspection KATY RAMIREZ
Wood Frame 8/31/2021 No Access for Inspection KATY RAMIREZ
Deputy Wood Construction 9/1/2021 Conditional Approval KATY RAMIREZ
Insulation 9/1/2021 Partial Approval KATY RAMIREZ
Deputy Wood Construction 9/2/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 9/3/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 9/7/2021 No Access for Inspection KATY RAMIREZ
Insulation 9/7/2021 Partial Approval KATY RAMIREZ
Floor/Roof Diaphrgm/Shear Wall 9/14/2021 Partial Approval KATY RAMIREZ
Insulation 9/14/2021 Partial Approval KATY RAMIREZ
Deputy Wood Construction 9/16/2021 Conditional Approval KATY RAMIREZ
Insulation 9/17/2021 No Access for Inspection KATY RAMIREZ
Wood Frame 9/17/2021 No Access for Inspection KATY RAMIREZ
Floor/Roof Diaphrgm/Shear Wall 9/21/2021 Partial Approval KATY RAMIREZ
Insulation 9/21/2021 Partial Approval KATY RAMIREZ
Wood Frame 9/21/2021 Not Ready for Inspection KATY RAMIREZ
Floor/Roof Diaphrgm/Shear Wall 9/23/2021 Partial Approval KATY RAMIREZ
Insulation 9/23/2021 Not Ready for Inspection KATY RAMIREZ
Floor/Roof Diaphrgm/Shear Wall 9/28/2021 Partial Approval DANIEL COLLINS
Insulation 9/28/2021 Partial Approval DANIEL COLLINS
Wood Frame 9/28/2021 Partial Approval DANIEL COLLINS
Insulation 10/1/2021 Partial Inspection KATY RAMIREZ
Wood Frame 10/1/2021 Partial Approval KATY RAMIREZ
Floor/Roof Diaphrgm/Shear Wall 10/4/2021 Not Ready for Inspection RUSSELL BONVOULOIR
Insulation 10/4/2021 Partial Approval RUSSELL BONVOULOIR
Wood Frame 10/4/2021 Partial Inspection RUSSELL BONVOULOIR
Insulation 10/5/2021 Partial Approval EDWIN GREGORYONA
Wood Frame 10/5/2021 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 10/6/2021 Partial Inspection RUSSELL BONVOULOIR
Insulation 10/6/2021 Partial Inspection RUSSELL BONVOULOIR
Wood Frame 10/6/2021 Partial Approval RUSSELL BONVOULOIR
Drywall Nailing 10/8/2021 Partial Inspection RUSSELL BONVOULOIR
Insulation 10/8/2021 Partial Approval RUSSELL BONVOULOIR
Wood Frame 10/8/2021 Partial Approval RUSSELL BONVOULOIR
Drywall Nailing 10/12/2021 Not Ready for Inspection KATY RAMIREZ
Insulation 10/12/2021 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 10/12/2021 Not Ready for Inspection KATY RAMIREZ
Wood Frame 10/12/2021 Not Ready for Inspection KATY RAMIREZ
Drywall Nailing 10/13/2021 Not Ready for Inspection KATY RAMIREZ
Insulation 10/13/2021 Not Ready for Inspection KATY RAMIREZ
Wood Frame 10/13/2021 Partial Approval KATY RAMIREZ
Drywall Nailing 10/14/2021 Not Ready for Inspection KATY RAMIREZ
Insulation 10/14/2021 Not Ready for Inspection KATY RAMIREZ
Light Gage Steel Frame 10/14/2021 Not Ready for Inspection KATY RAMIREZ
Wood Frame 10/14/2021 Partial Approval KATY RAMIREZ
Insulation 10/19/2021 No Access for Inspection KATY RAMIREZ
Wood Frame 10/19/2021 No Access for Inspection KATY RAMIREZ
Drywall Nailing 10/20/2021 Not Ready for Inspection KATY RAMIREZ
Insulation 10/20/2021 Not Ready for Inspection KATY RAMIREZ
Wood Frame 10/20/2021 Partial Approval KATY RAMIREZ
Drywall Nailing 10/25/2021 Partial Approval DANIEL COLLINS
Insulation 10/25/2021 Partial Inspection DANIEL COLLINS
Wood Frame 10/25/2021 Partial Inspection DANIEL COLLINS
Drywall Nailing 10/27/2021 No Access for Inspection KATY RAMIREZ
Insulation 10/27/2021 Not Ready for Inspection KATY RAMIREZ
Wood Frame 10/27/2021 No Access for Inspection KATY RAMIREZ
Drywall Nailing 10/28/2021 Not Ready for Inspection KATY RAMIREZ
Insulation 10/28/2021 Partial Approval KATY RAMIREZ
Wood Frame 10/28/2021 Partial Approval KATY RAMIREZ
Drywall Nailing 10/29/2021 Partial Approval JONATHAN QUACH
Insulation 10/29/2021 Not Ready for Inspection JONATHAN QUACH
Wood Frame 10/29/2021 Not Ready for Inspection JONATHAN QUACH
Floor/Roof Diaphrgm/Shear Wall 11/3/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 11/9/2021 Conditional Approval KATY RAMIREZ
Drywall Nailing 11/10/2021 Not Ready for Inspection DANIEL COLLINS
Insulation 11/10/2021 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 11/10/2021 Not Ready for Inspection DANIEL COLLINS
Wood Frame 11/10/2021 Not Ready for Inspection DANIEL COLLINS
Wood Frame 11/15/2021 Partial Approval TED RIES
Drywall Nailing 11/16/2021 No Access for Inspection KATY RAMIREZ
Light Gage Steel Frame 11/16/2021 No Access for Inspection KATY RAMIREZ
Wood Frame 11/16/2021 No Access for Inspection KATY RAMIREZ
Drywall Nailing 11/19/2021 Partial Approval RUSSELL BONVOULOIR
Insulation 11/23/2021 Partial Approval KATY RAMIREZ
Drywall Nailing 12/1/2021 Approved DARRYL ARNOLD
Drywall Nailing 12/6/2021 Partial Approval KATY RAMIREZ
Interior/Exterior Lathing 12/6/2021 Not Ready for Inspection KATY RAMIREZ
Light Gage Steel Frame 12/6/2021 Partial Approval KATY RAMIREZ
Drywall Nailing 12/7/2021 Not Ready for Inspection KATY RAMIREZ
Drywall Nailing 12/7/2021 Partial Approval KATY RAMIREZ
Interior/Exterior Lathing 12/7/2021 Not Ready for Inspection KATY RAMIREZ
Light Gage Steel Frame 12/7/2021 Partial Approval KATY RAMIREZ
Drywall Nailing 12/8/2021 Partial Approval RUSSELL BONVOULOIR
Interior/Exterior Lathing 12/8/2021 Partial Approval RUSSELL BONVOULOIR
Light Gage Steel Frame 12/8/2021 Partial Inspection RUSSELL BONVOULOIR
Drywall Nailing 12/9/2021 Partial Inspection RUSSELL BONVOULOIR
Drywall Nailing 12/13/2021 Partial Approval KATY RAMIREZ
Interior/Exterior Lathing 12/13/2021 Partial Approval KATY RAMIREZ
Insulation 12/15/2021 Not Ready for Inspection KATY RAMIREZ
Insulation 12/16/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 12/22/2021 Partial Approval RUSSELL BONVOULOIR
Light Gage Steel Frame 12/22/2021 Partial Approval RUSSELL BONVOULOIR
Drywall Nailing 1/13/2022 Partial Inspection RUSSELL BONVOULOIR
Light Gage Steel Frame 1/13/2022 Partial Inspection RUSSELL BONVOULOIR
Drywall Nailing 1/19/2022 Partial Approval TED RIES
Light Gage Steel Frame 2/9/2022 Partial Approval KATY RAMIREZ
Drywall Nailing 2/17/2022 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 3/11/2022 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 4/8/2022 Not Ready for Inspection KATY RAMIREZ
Wood Frame 5/5/2022 Partial Inspection ERNESTO CORRAL
Deputy Wood Construction 5/6/2022 Conditional Approval DARRYL ARNOLD
Wood Frame 5/6/2022 Conditional Approval DARRYL ARNOLD
Drywall Nailing 5/9/2022 Partial Approval RUSSELL BONVOULOIR
Light Gage Steel Frame 5/24/2022 Partial Approval TIMOTHY BUXTON
Special/Order Compliance 6/7/2022 Not Ready for Inspection KATY RAMIREZ
Special/Order Compliance 6/9/2022 Not Ready for Inspection KATY RAMIREZ
Interior/Exterior Lathing 6/13/2022 Off-Hour Fees Due
Special/Order Compliance 6/13/2022 Partial Inspection KATY RAMIREZ
Drywall Nailing 6/15/2022 Partial Approval KATY RAMIREZ
Drywall Nailing 6/30/2022 Partial Approval GREGORY POMISH
Light Gage Steel Frame 6/30/2022 Partial Approval GREGORY POMISH
Footing/Foundation/Slab 7/14/2022 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 7/15/2022 Conditional Approval TED RIES
Light Gage Steel Frame 7/22/2022 Partial Approval GREGORY POMISH
Drywall Nailing 7/28/2022 Partial Approval KATY RAMIREZ
Drywall Nailing 9/21/2022 Not Ready for Inspection KATY RAMIREZ
Light Gage Steel Frame 9/21/2022 Corrections Issued KATY RAMIREZ
Drywall Nailing 9/27/2022 Partial Approval KATY RAMIREZ
Final 10/18/2022 Partial Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 10/18/2022 Approved RAFAEL ESPINOZA
Green Building Final 10/18/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 10/18/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 10/18/2022 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 10/18/2022 SGSOV Not Ready RAFAEL ESPINOZA
Smoke Detectors 10/18/2022 Not Ready for Inspection RAFAEL ESPINOZA
T-Bar Ceiling 10/18/2022 Approved RAFAEL ESPINOZA
Verify Sprinkler Sign Off 10/18/2022 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 10/20/2022 Partial Inspection GREGORY POMISH
Special/Order Compliance 11/3/2022 Conditional Approval NICK DANERI
Drywall Nailing 11/8/2022 Approved NICK DANERI
T-Bar Ceiling 11/8/2022 Partial Approval NICK DANERI
Pre-Inspection 11/10/2022 Partial Inspection NICK DANERI
T-Bar Ceiling 11/10/2022 Approved NICK DANERI
Special/Order Compliance 11/17/2022 Partial Inspection NICK DANERI
Smoke Detectors 11/22/2022 Partial Inspection NICK DANERI
Final 11/28/2022 Not Ready for Inspection NICK DANERI
Green Building Final 11/28/2022 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 11/28/2022 Not Ready for Inspection NICK DANERI
Reinforced Masonry Frame 11/28/2022 Not Ready for Inspection NICK DANERI
SGSOV-Seismic Gas S/O Valve 11/28/2022 SGSOV Not Ready NICK DANERI
Verify Sprinkler Sign Off 11/28/2022 Not Ready for Inspection NICK DANERI
Verify Rec and Parks Fee Memo 12/5/2022 Conditional Approval NICK DANERI
Verify Sprinkler Sign Off 12/5/2022 Not Ready for Inspection NICK DANERI
Grading Pre-Inspection 12/6/2022 Approved NICK DANERI
Grading Pre-Inspection 12/12/2022 Approved GREGORY POMISH
Green Building Final 12/12/2022 Not Ready for Inspection GREGORY POMISH
Posting Pre-Inspection 12/12/2022 Approved GREGORY POMISH
Smoke Detectors 12/12/2022 Approved GREGORY POMISH
Special/Order Compliance 12/12/2022 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 12/12/2022 Not Ready for Inspection GREGORY POMISH
Special/Order Compliance 12/13/2022 Not Ready for Inspection GREGORY POMISH
Green Building Final 12/16/2022 Approved NICK DANERI
Special/Order Compliance 1/24/2023 Partial Inspection NICK DANERI
Special/Order Compliance 5/22/2023 Conditional Approval NICK DANERI
Final 8/4/2023 OK to Issue CofO NICK DANERI
Reinforced Concrete Frame 8/4/2023 Approved NICK DANERI
Reinforced Masonry Frame 8/4/2023 Approved NICK DANERI
SGSOV-Seismic Gas S/O Valve 8/4/2023 SGSOV Approved NICK DANERI
Verify Sprinkler Sign Off 8/4/2023 Approved NICK DANERI