825 S CORONADO ST 1-77 90057

Certificate Information: 825 S CORONADO ST 1-77 90057

Application / Permit
19010-10000-02002
Plan Check / Job No.
B19LA09875
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 77 UNIT (7 STORY) APARTMENT BUILDING PER TOC GUIDELINES, 5 LEVELS OF TYPE IIIA CONSTRUCTION OVER 2 LEVELS OF TYPE 1 AND ONE LEVEL OF SUBTERRANEAN PARKING. NFPA 13 SPRINKLERS THROUGHOUT. 8 UNITS TO BE SET ASIDE FOR EXTREMELY LOW INCOME
Permit Issued
Issued on 9/28/2021
Issuing Office
Metro
Current Status
CofO Issued on 11/17/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/14/2019 APPLICANT
Disabled Access Plans Picked Up 5/28/2019 APPLICANT
Assigned to Plan Check Engineer 5/30/2019 MICHAEL PEREZ
Corrections Issued 6/11/2019 MICHAEL PEREZ
Quality Review Completed 6/13/2019 SIAVOSH POURSABAHIAN
Green Plans Picked Up 7/22/2021 APPLICANT
Applicant returned to address corrections 9/14/2021 MICHAEL PEREZ
Applicant returned to address corrections 9/15/2021 MICHAEL PEREZ
Applicant returned to address corrections 9/16/2021 MICHAEL PEREZ
Plan Check Approved 9/22/2021 MICHAEL PEREZ
Issued 9/28/2021 APPLICANT
Building Plans Picked Up 9/29/2021 APPLICANT
Permit Finaled 11/17/2025 ERNESTO CORRAL
CofO Issued 11/17/2025 ERNESTO CORRAL
Permit Finaled 11/17/2025 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 10/15/2019 THOMAS LANG
Eng Process Fee Ord 176,300 Cleared 10/15/2019 THOMAS LANG
Permit Cleared 10/15/2019 THOMAS LANG
Project located in CRA area Cleared 10/24/2019 JIM URQUHART
Trees in Parkway Cleared 11/14/2019 JOHN KIM
Density Bonus 12.22.A.31 Cleared 2/3/2020 JAMES MCCARTHY
"Q" conditions Cleared 2/18/2020 ANNA VIDAL
"T" removal Cleared 2/18/2020 ANNA VIDAL
APC Cleared 2/18/2020 ANNA VIDAL
Frnt yard landscape/Water mgmt Cleared 2/18/2020 ANNA VIDAL
Miscellaneous Cleared 2/18/2020 ANNA VIDAL
Miscellaneous Cleared 2/18/2020 ANNA VIDAL
Miscellaneous Cleared 2/18/2020 ANNA VIDAL
Opn space landscape/Water mgmt Cleared 2/18/2020 ANNA VIDAL
Prkng lot landscape/Water mgmt Cleared 2/18/2020 ANNA VIDAL
Site Plan review Cleared 2/18/2020 ANNA VIDAL
DAS Clearance Cleared 4/28/2020 SHINE LIN
Hydrant and Access approval Cleared 6/26/2020 MATTHEW CRAIG
Encroachment in public way Cleared 7/15/2020 ELAINE LEI
Bicycle Parking Cleared 7/22/2020 ELAINE LEI
Sewer availability Cleared 10/5/2020 ELENA LOPEZ
Green Code Cleared 10/22/2020 COLIN LOREDO
Low Impact Development Cleared 3/12/2021 ORVAL HERNANDEZ-MARCI
Highway dedication Cleared 3/16/2021 THOMAS LANG
Roof/Waste drainage to street Cleared 6/16/2021 CECILIO NAVARRO
Fire Marshall Fire Life Safety Cleared 7/8/2021 OSCAR SALGADO JR
Work Adjacent to Public Way Cleared 8/24/2021 ROSA SILVA
Building over 3-story or 36-ft Cleared 9/22/2021 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 9/22/2021 CALOSHA APPROVED

Contact Information

Architect Albert,, Stephen M; Lic. No.: C9412 2032 STONER AVE      LOS ANGELES, CA 90025
Contractor S H Z Development Inc; Lic. No.: 899219-B 11516 SANTA MONICA BLVD      LOS ANGELES, CA 90025
Engineer Cefali,, David Allen; Lic. No.: S3658 4344 LAUREL CANYON BLVD_STE 3      STUDIO CITY, CA 91604
Engineer Jitechian,, Ara; Lic. No.: C54893 9433 VIA PATRICIA      BURBANK, CA 91504

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 9/30/2021 Approved RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/30/2021 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 12/1/2021 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 12/1/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/2/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 12/7/2021 Conditional Approval NICK DANERI
Footing/Foundation/Slab 12/10/2021 Partial Approval NICK DANERI
Deputy Reinf. Concrete 12/13/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 12/15/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 12/16/2021 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 12/17/2021 Partial Approval NICK DANERI
Green Building Rough 12/17/2021 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 12/17/2021 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 12/17/2021 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 12/20/2021 Conditional Approval NICK DANERI
Reinforced Concrete Frame 12/20/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/21/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 1/4/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 1/4/2022 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 1/5/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 1/11/2022 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 1/12/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/14/2022 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 1/14/2022 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 1/25/2022 Partial Approval NICK DANERI
Deputy Reinf. Concrete 1/28/2022 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 2/3/2022 Partial Approval NICK DANERI
Masonry Wall/Backfill 2/3/2022 Partial Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 2/25/2022 Partial Approval NICK DANERI
Footing/Foundation/Slab 2/25/2022 Partial Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 4/4/2022 Partial Approval NICK DANERI
Footing/Foundation/Slab 4/4/2022 Partial Approval NICK DANERI
Green Building Rough 4/4/2022 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 4/4/2022 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 4/4/2022 Partial Approval NICK DANERI
Deputy Reinf. Concrete 4/6/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/13/2022 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 4/13/2022 Partial Approval NICK DANERI
Green Building Rough 4/13/2022 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 4/13/2022 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 4/13/2022 Not Ready for Inspection NICK DANERI
Excavation/Setback/Form/Re-Bar 4/25/2022 Corrections Issued RAFAEL ESPINOZA
Masonry Wall/Backfill 4/25/2022 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 4/27/2022 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 5/3/2022 Partial Approval NICK DANERI
Green Building Rough 5/3/2022 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 5/3/2022 Partial Approval NICK DANERI
Reinforced Masonry Frame 5/3/2022 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 5/3/2022 Not Ready for Inspection NICK DANERI
Excavation/Setback/Form/Re-Bar 5/4/2022 Partial Approval NICK DANERI
Masonry Wall/Backfill 5/4/2022 Partial Approval NICK DANERI
Deputy Shotcrete 5/5/2022 Conditional Approval NICK DANERI
Deputy Shotcrete 5/6/2022 Conditional Approval NICK DANERI
Deputy Shotcrete 5/9/2022 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 5/16/2022 Not Ready for Inspection JAMES POWERS
Green Building Rough 5/16/2022 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 5/16/2022 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 5/16/2022 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 5/23/2022 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 6/28/2022 Partial Approval NICK DANERI
Wall Anchors 6/28/2022 Partial Approval NICK DANERI
Deputy Reinf. Concrete 6/29/2022 Conditional Approval ERNESTO CORRAL
Drywall Nailing 7/15/2022 Not Ready for Inspection NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 7/15/2022 Partial Approval NICK DANERI
Green Building Rough 7/15/2022 Not Ready for Inspection NICK DANERI
Insulation 7/15/2022 Not Ready for Inspection NICK DANERI
Light Gage Steel Frame 7/15/2022 Partial Approval NICK DANERI
Wall Anchors 7/15/2022 Partial Approval NICK DANERI
Deputy Wood Construction 7/18/2022 Conditional Approval WINSTON DUNNING
Drywall Nailing 7/25/2022 Partial Approval EDWIN GREGORYONA
Green Building Rough 7/25/2022 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 7/28/2022 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 7/28/2022 Partial Approval NICK DANERI
Green Building Rough 7/28/2022 Not Ready for Inspection NICK DANERI
Insulation 7/28/2022 Partial Approval NICK DANERI
Deputy Wood Construction 7/29/2022 Conditional Approval NICK DANERI
Drywall Nailing 8/4/2022 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 8/4/2022 Partial Inspection NICK DANERI
Green Building Rough 8/4/2022 Not Ready for Inspection NICK DANERI
Drywall Nailing 8/8/2022 Partial Approval NICK DANERI
Green Building Rough 8/8/2022 Not Ready for Inspection NICK DANERI
Insulation 8/8/2022 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 8/17/2022 Partial Approval NICK DANERI
Drywall Nailing 8/22/2022 Partial Approval NICK DANERI
Green Building Rough 8/22/2022 Not Ready for Inspection NICK DANERI
Insulation 8/22/2022 Partial Approval NICK DANERI
Drywall Nailing 8/30/2022 Partial Approval NICK DANERI
Green Building Rough 8/30/2022 Not Ready for Inspection NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 9/9/2022 Partial Approval NICK DANERI
Drywall Nailing 9/22/2022 Partial Approval NICK DANERI
Green Building Rough 9/22/2022 Not Ready for Inspection NICK DANERI
Insulation 9/22/2022 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 10/3/2022 Partial Approval NICK DANERI
Drywall Nailing 10/17/2022 Not Ready for Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 10/17/2022 Partial Approval RAFAEL ESPINOZA
Green Building Rough 10/17/2022 Approved RAFAEL ESPINOZA
Verify Sprinkler Sign Off 10/17/2022 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 10/17/2022 Partial Inspection RAFAEL ESPINOZA
Drywall Nailing 11/3/2022 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 11/3/2022 Partial Approval NICK DANERI
Special/Order Compliance 12/7/2022 Partial Inspection NICK DANERI
Special/Order Compliance 12/8/2022 Partial Inspection NICK DANERI
Special/Order Compliance 12/16/2022 Partial Inspection NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 12/27/2022 Partial Approval NICK DANERI
Verify Rec and Parks Fee Memo 12/27/2022 Not Ready for Inspection NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 1/18/2023 Partial Approval NICK DANERI
Deputy Wood Construction 1/26/2023 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 1/27/2023 Partial Approval NICK DANERI
Verify Rec and Parks Fee Memo 1/27/2023 Not Ready for Inspection NICK DANERI
Drywall Nailing 2/14/2023 Partial Approval NICK DANERI
Insulation 2/14/2023 Partial Approval NICK DANERI
Drywall Nailing 2/22/2023 Partial Approval NICK DANERI
Insulation 2/22/2023 Partial Approval NICK DANERI
Insulation 3/9/2023 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 3/24/2023 Partial Approval NICK DANERI
Drywall Nailing 4/5/2023 Partial Approval RAMAZANALI ALMASI
Insulation 4/5/2023 Approved RAMAZANALI ALMASI
Drywall Nailing 4/11/2023 Partial Inspection NICK DANERI
Insulation 4/11/2023 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 4/19/2023 Partial Approval LARRY ARNICK
Drywall Nailing 5/10/2023 Partial Inspection RAFAEL ESPINOZA
Insulation 5/10/2023 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 5/15/2023 Not Ready for Inspection LARRY ARNICK
Insulation 5/15/2023 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 5/18/2023 Partial Approval LARRY ARNICK
Insulation 5/18/2023 Partial Approval LARRY ARNICK
Insulation 6/2/2023 Partial Approval NICK DANERI
Insulation 6/8/2023 Not Ready for Inspection GREGORY POMISH
Drywall Nailing 6/30/2023 Partial Approval LARRY ARNICK
Insulation 6/30/2023 Partial Approval LARRY ARNICK
Insulation 7/14/2023 Partial Approval LARRY ARNICK
Insulation 7/28/2023 Partial Inspection GREGORY POMISH
Insulation 7/31/2023 Partial Approval GREGORY POMISH
Insulation 8/3/2023 Partial Approval NICK DANERI
Drywall Nailing 8/8/2023 Partial Approval NICK DANERI
Drywall Nailing 8/10/2023 Partial Approval NICK DANERI
Insulation 8/10/2023 Partial Approval NICK DANERI
Drywall Nailing 8/28/2023 Partial Approval NICK DANERI
Drywall Nailing 9/5/2023 Partial Approval NICK DANERI
Interior/Exterior Lathing 9/29/2023 Partial Approval NICK DANERI
Insulation 10/2/2023 Partial Approval NICK DANERI
Interior/Exterior Lathing 10/2/2023 Partial Approval NICK DANERI
Drywall Nailing 10/18/2023 Partial Approval GREGORY POMISH
Drywall Nailing 12/14/2023 Partial Approval NICK DANERI
Insulation 12/28/2023 Not Ready for Inspection NICK DANERI
Insulation 1/3/2024 Partial Approval NICK DANERI
Drywall Nailing 1/25/2024 Partial Approval NICK DANERI
Deputy Wood Construction 3/21/2024 Partial Approval EDWIN GREGORYONA
Insulation 3/21/2024 Partial Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 3/21/2024 Partial Inspection EDWIN GREGORYONA
Wood Frame 3/21/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 4/9/2024 Partial Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 4/30/2024 Partial Approval NICK DANERI
Footing/Foundation/Slab 4/30/2024 Partial Approval NICK DANERI
Masonry Wall/Backfill 5/10/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/12/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 6/12/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 6/12/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 7/16/2024 Partial Inspection NICK DANERI
Masonry Wall/Backfill 7/16/2024 Partial Approval NICK DANERI
Verify Rec and Parks Fee Memo 9/16/2024 Partial Inspection NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 9/23/2024 Not Ready for Inspection NICK DANERI
Light Gage Steel Frame 9/23/2024 Partial Approval NICK DANERI
Special/Order Compliance 10/28/2024 Partial Inspection NICK DANERI
Structural Steel Frame 11/5/2024 Partial Inspection NICK DANERI
Drywall Nailing 5/21/2025 Approved NICK DANERI
Final 5/21/2025 Partial Inspection NICK DANERI
Footing/Foundation/Slab 5/21/2025 Approved NICK DANERI
Green Building Final 5/21/2025 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 5/21/2025 Not Ready for Inspection NICK DANERI
Reinforced Masonry Frame 5/21/2025 Not Ready for Inspection NICK DANERI
SGSOV-Seismic Gas S/O Valve 5/21/2025 SGSOV Not Ready NICK DANERI
Smoke Detectors 5/21/2025 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 5/21/2025 Not Ready for Inspection NICK DANERI
Wood Frame 5/21/2025 Not Ready for Inspection NICK DANERI
Final 7/18/2025 Corrections Issued JOEY BUCHANAN
Green Building Final 7/18/2025 Approved JOEY BUCHANAN
Reinforced Concrete Frame 7/18/2025 Approved JOEY BUCHANAN
Reinforced Masonry Frame 7/18/2025 Approved JOEY BUCHANAN
SGSOV-Seismic Gas S/O Valve 7/18/2025 SGSOV Approved JOEY BUCHANAN
Smoke Detectors 7/18/2025 Approved JOEY BUCHANAN
Verify Sprinkler Sign Off 7/18/2025 Approved JOEY BUCHANAN
Wood Frame 7/18/2025 Approved JOEY BUCHANAN
Final 10/15/2025 Conditional Approval JOEY BUCHANAN
Final 11/7/2025 Conditional Approval JOEY BUCHANAN