Pre-Inspection
|
9/30/2021
|
Approved
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
11/30/2021
|
Conditional Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
12/1/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
12/1/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
12/2/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
12/7/2021
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
12/10/2021
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
12/13/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
12/15/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
12/16/2021
|
Conditional Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
12/17/2021
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
12/17/2021
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
12/17/2021
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
12/17/2021
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
12/20/2021
|
Conditional Approval
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
12/20/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/21/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
1/4/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
1/4/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
1/5/2022
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
1/11/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
1/12/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Reinf. Concrete
|
1/14/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
1/14/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
1/25/2022
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
1/28/2022
|
Conditional Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
2/3/2022
|
Partial Approval
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
2/3/2022
|
Partial Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
2/25/2022
|
Partial Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
2/25/2022
|
Partial Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
4/4/2022
|
Partial Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
4/4/2022
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
4/4/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
4/4/2022
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
4/4/2022
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
4/6/2022
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
4/13/2022
|
Conditional Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
4/13/2022
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
4/13/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
4/13/2022
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
4/13/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
4/25/2022
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
4/25/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/27/2022
|
Conditional Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
5/3/2022
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
5/3/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
5/3/2022
|
Partial Approval
|
NICK DANERI
|
|
Reinforced Masonry Frame
|
5/3/2022
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
5/3/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
5/4/2022
|
Partial Approval
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
5/4/2022
|
Partial Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
5/5/2022
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
5/6/2022
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
5/9/2022
|
Conditional Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
5/16/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
5/16/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
5/16/2022
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
5/16/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/23/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Excavation/Setback/Form/Re-Bar
|
6/28/2022
|
Partial Approval
|
NICK DANERI
|
|
Wall Anchors
|
6/28/2022
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
6/29/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Drywall Nailing
|
7/15/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/15/2022
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
7/15/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Insulation
|
7/15/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Light Gage Steel Frame
|
7/15/2022
|
Partial Approval
|
NICK DANERI
|
|
Wall Anchors
|
7/15/2022
|
Partial Approval
|
NICK DANERI
|
|
Deputy Wood Construction
|
7/18/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Drywall Nailing
|
7/25/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Green Building Rough
|
7/25/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
7/28/2022
|
Partial Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/28/2022
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
7/28/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Insulation
|
7/28/2022
|
Partial Approval
|
NICK DANERI
|
|
Deputy Wood Construction
|
7/29/2022
|
Conditional Approval
|
NICK DANERI
|
|
Drywall Nailing
|
8/4/2022
|
Partial Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/4/2022
|
Partial Inspection
|
NICK DANERI
|
|
Green Building Rough
|
8/4/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Drywall Nailing
|
8/8/2022
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
8/8/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Insulation
|
8/8/2022
|
Partial Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/17/2022
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
8/22/2022
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
8/22/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Insulation
|
8/22/2022
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
8/30/2022
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
8/30/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/9/2022
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
9/22/2022
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
9/22/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Insulation
|
9/22/2022
|
Partial Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/3/2022
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
10/17/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/17/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
10/17/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
10/17/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
10/17/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
11/3/2022
|
Partial Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/3/2022
|
Partial Approval
|
NICK DANERI
|
|
Special/Order Compliance
|
12/7/2022
|
Partial Inspection
|
NICK DANERI
|
|
Special/Order Compliance
|
12/8/2022
|
Partial Inspection
|
NICK DANERI
|
|
Special/Order Compliance
|
12/16/2022
|
Partial Inspection
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/27/2022
|
Partial Approval
|
NICK DANERI
|
|
Verify Rec and Parks Fee Memo
|
12/27/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/18/2023
|
Partial Approval
|
NICK DANERI
|
|
Deputy Wood Construction
|
1/26/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/27/2023
|
Partial Approval
|
NICK DANERI
|
|
Verify Rec and Parks Fee Memo
|
1/27/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Drywall Nailing
|
2/14/2023
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
2/14/2023
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
2/22/2023
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
2/22/2023
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
3/9/2023
|
Partial Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/24/2023
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
4/5/2023
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Insulation
|
4/5/2023
|
Approved
|
RAMAZANALI ALMASI
|
|
Drywall Nailing
|
4/11/2023
|
Partial Inspection
|
NICK DANERI
|
|
Insulation
|
4/11/2023
|
Partial Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/19/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
5/10/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Insulation
|
5/10/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
5/15/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
5/15/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
5/18/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
5/18/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
6/2/2023
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
6/8/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
6/30/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
6/30/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
7/14/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
7/28/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
7/31/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
8/3/2023
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
8/8/2023
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
8/10/2023
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
8/10/2023
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
8/28/2023
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
9/5/2023
|
Partial Approval
|
NICK DANERI
|
|
Interior/Exterior Lathing
|
9/29/2023
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
10/2/2023
|
Partial Approval
|
NICK DANERI
|
|
Interior/Exterior Lathing
|
10/2/2023
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
10/18/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
12/14/2023
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
12/28/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Insulation
|
1/3/2024
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
1/25/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Wood Construction
|
3/21/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
3/21/2024
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Verify Sprinkler Sign Off
|
3/21/2024
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Wood Frame
|
3/21/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
4/9/2024
|
Partial Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
4/30/2024
|
Partial Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
4/30/2024
|
Partial Approval
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
5/10/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Reinf. Concrete
|
6/12/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
6/12/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Footing/Foundation/Slab
|
6/12/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
7/16/2024
|
Partial Inspection
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
7/16/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Rec and Parks Fee Memo
|
9/16/2024
|
Partial Inspection
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/23/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Light Gage Steel Frame
|
9/23/2024
|
Partial Approval
|
NICK DANERI
|
|
Special/Order Compliance
|
10/28/2024
|
Partial Inspection
|
NICK DANERI
|
|
Structural Steel Frame
|
11/5/2024
|
Partial Inspection
|
NICK DANERI
|
|
Drywall Nailing
|
5/21/2025
|
Approved
|
NICK DANERI
|
|
Final
|
5/21/2025
|
Partial Inspection
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
5/21/2025
|
Approved
|
NICK DANERI
|
|
Green Building Final
|
5/21/2025
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
5/21/2025
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Masonry Frame
|
5/21/2025
|
Not Ready for Inspection
|
NICK DANERI
|
|
SGSOV-Seismic Gas S/O Valve
|
5/21/2025
|
SGSOV Not Ready
|
NICK DANERI
|
|
Smoke Detectors
|
5/21/2025
|
Not Ready for Inspection
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
5/21/2025
|
Not Ready for Inspection
|
NICK DANERI
|
|
Wood Frame
|
5/21/2025
|
Not Ready for Inspection
|
NICK DANERI
|
|
Final
|
7/18/2025
|
Corrections Issued
|
JOEY BUCHANAN
|
|
Green Building Final
|
7/18/2025
|
Approved
|
JOEY BUCHANAN
|
|
Reinforced Concrete Frame
|
7/18/2025
|
Approved
|
JOEY BUCHANAN
|
|
Reinforced Masonry Frame
|
7/18/2025
|
Approved
|
JOEY BUCHANAN
|
|
SGSOV-Seismic Gas S/O Valve
|
7/18/2025
|
SGSOV Approved
|
JOEY BUCHANAN
|
|
Smoke Detectors
|
7/18/2025
|
Approved
|
JOEY BUCHANAN
|
|
Verify Sprinkler Sign Off
|
7/18/2025
|
Approved
|
JOEY BUCHANAN
|
|
Wood Frame
|
7/18/2025
|
Approved
|
JOEY BUCHANAN
|
|
Final
|
10/15/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Final
|
11/7/2025
|
Conditional Approval
|
JOEY BUCHANAN
|