5620 W DE LONGPRE AVE 90028

Certificate Information: 5620 W DE LONGPRE AVE 90028

Application / Permit
19010-10000-01942
Plan Check / Job No.
B19LA09476
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
New 8-Story (4 levels of Type IIIA over 4 levels of Type IA) 184 Unit Apartment building over 1 level of TYPE IA subterranean parking.
Permit Issued
Issued on 6/16/2021
Issuing Office
Metro
Current Status
CofO Issued on 12/14/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/14/2019 APPLICANT
Assigned to Plan Check Engineer 5/30/2019 HERNAN ARREOLA
Corrections Issued 6/10/2019 HERNAN ARREOLA
Quality Review Completed 6/13/2019 BILL STUTSMAN
Applicant returned to address corrections 11/25/2019 HERNAN ARREOLA
Applicant returned to address corrections 12/5/2019 HERNAN ARREOLA
Applicant returned to address corrections 1/17/2020 HERNAN ARREOLA
Green Plans Picked Up 5/5/2021 APPLICANT
Plan Check Approved 6/16/2021 HERNAN ARREOLA
Issued 6/16/2021 APPLICANT
Building Plans Picked Up 6/21/2021 APPLICANT
TCO Issued (Expire Date: 01-24-2024) 7/28/2023 ERNESTO CORRAL
CofO in Progress 11/29/2023 DAVID BURKHEAD
CofO Issued 12/14/2023 ADAM BURGESS
Permit Finaled 12/14/2023 ADAM BURGESS

Permit Application Clearance Information

Address approval Cleared 8/22/2019 JEANETTE VONG
Hydrant and Access approval Cleared 9/10/2019 JOHN CONNEALLY
Internal circulation Cleared 10/1/2019 MOHAMMAD HASAN
Eng Process Fee Ord 176,300 Cleared 11/7/2019 PAMELA TENEZA
Green Code Cleared 11/20/2019 HERNAN ARREOLA
Trees in Parkway Cleared 2/14/2020 ADRIAN SANCHEZ
Building over 3-story or 36-ft Cleared 5/6/2020 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 5/12/2020 CALOSHA APPROVED
Construction near power lines Cleared 6/16/2020 RIDWAN HARDY
DAS Clearance Cleared 8/12/2020 ELIZABETH TOMS
Highway dedication Cleared 1/28/2021 ELAINE LEI
Sewer availability Cleared 3/4/2021 PAMELA TENEZA
Low Impact Development Cleared 4/6/2021 ANDRES COVARRUBIAS
Roof/Waste drainage to street Cleared 5/6/2021 LINDA MARGARET
Fire Marshall Fire Life Safety Cleared 5/20/2021 ANDREW KO
Frnt yard landscape/Water mgmt Cleared 6/10/2021 ERIN STRELICH
Opn space landscape/Water mgmt Cleared 6/10/2021 ERIN STRELICH
Site Plan review Cleared 6/10/2021 ERIN STRELICH
ZA Case Cleared 6/10/2021 ERIN STRELICH
ZA Case Cleared 6/10/2021 ERIN STRELICH
Project located in CRA area Cleared 6/11/2021 GISELLE CORELLA

Contact Information

Architect Dixon,, James Troy; Lic. No.: C16900 4418 MARIOTA AVE.      TOLUCA LAKE, CA 91602
Contractor Holland Construction Inc; Lic. No.: 944880-B 1111 MAIN STREET STE 700      VANCOUVER, WA 98660
Engineer Chen,, Wei-Chih; Lic. No.: S5150 1732 DATE AVE      TORRANCE, CA 90503
Engineer Dummer,, Ashley Michelle; Lic. No.: C83450 1350 FRONT ST RM 2050      SAN DIEGO, CA 92101
Engineer Young,, Don Yuk-Man; Lic. No.: C35713 149 PASADENA AVE STE B      SOUTH PASADENA, CA 91030
Geologist Scott,, Brett A; Lic. No.: EG2529 5158 COCHRAN STREET      SIMI VALLEY, CA 93063

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 6/18/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 6/18/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 6/22/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 6/22/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 6/22/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/23/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/24/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/25/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/30/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/1/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/6/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 7/6/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/7/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/8/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/9/2021 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/13/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/13/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/13/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 7/13/2021 Partial Approval DAVID BURKHEAD
Green Building Rough 7/13/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 7/13/2021 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 7/13/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Other (see comments) 7/14/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/14/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/14/2021 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/15/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/15/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/15/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 7/15/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Other (see comments) 7/16/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/16/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/16/2021 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/19/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/19/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/19/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/21/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/21/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 7/21/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/22/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/22/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 7/22/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/23/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/23/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 7/23/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/26/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/26/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/27/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 7/27/2021 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 7/27/2021 Partial Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 7/28/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 7/28/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/29/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/29/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/30/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/30/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 7/30/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 8/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 8/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/3/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 8/3/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 8/3/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/4/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 8/4/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 8/4/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 8/5/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 8/5/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 8/5/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/6/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 8/6/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 8/6/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/10/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/11/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/12/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/13/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/17/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 8/17/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/18/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/19/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/20/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 8/20/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/23/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/24/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 8/24/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/25/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/26/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/27/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 8/27/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/30/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 8/30/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 8/30/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/31/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 8/31/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/1/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/1/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/2/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 9/2/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/3/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/3/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 9/3/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/7/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/7/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/8/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/8/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/9/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/9/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/10/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/10/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 9/10/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/14/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/14/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/15/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/15/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/16/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/16/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 9/16/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/17/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/17/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/20/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/21/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/22/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 9/22/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/23/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/24/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/27/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/27/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/28/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/28/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 9/28/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/29/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/29/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/30/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/30/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 9/30/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/1/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 10/1/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/5/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 10/5/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 10/5/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/6/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 10/6/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/7/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 10/7/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/8/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 10/8/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 10/8/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/12/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Shotcrete 10/12/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 10/13/2021 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 10/13/2021 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/14/2021 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 10/14/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/15/2021 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 10/15/2021 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 10/15/2021 Partial Approval JONATHAN QUACH
Deputy Reinf. Concrete 10/18/2021 Approved DANIEL MC AULIFFE
Deputy Shotcrete 10/18/2021 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 10/18/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/19/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 10/19/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/20/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 10/20/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/21/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 10/21/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/22/2021 Approved DANIEL MC AULIFFE
Deputy Shotcrete 10/22/2021 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 10/22/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/25/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 10/25/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/26/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 10/26/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/27/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 10/27/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 10/27/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/28/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 10/28/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/29/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 10/29/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/1/2021 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 11/1/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/3/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/4/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 11/4/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 11/4/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/5/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 11/5/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/8/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 11/8/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/9/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/10/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 11/10/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/12/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/16/2021 Approved DAVID BURKHEAD
Deputy Shotcrete 11/16/2021 Approved DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 11/16/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/17/2021 Approved DAVID BURKHEAD
Deputy Shotcrete 11/17/2021 Approved DAVID BURKHEAD
Deputy Reinf. Concrete 11/18/2021 Approved DAVID BURKHEAD
Deputy Shotcrete 11/18/2021 Approved DAVID BURKHEAD
Deputy Reinf. Concrete 11/19/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 11/19/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/22/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 11/22/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/23/2021 Approved DANIEL MC AULIFFE
Deputy Shotcrete 11/23/2021 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 11/23/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/24/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 11/24/2021 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 11/24/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/29/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 11/29/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/30/2021 Approved DAVID BURKHEAD
Deputy Shotcrete 11/30/2021 Approved DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 11/30/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/1/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 12/1/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 12/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/3/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 12/3/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/6/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 12/6/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/7/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 12/7/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/7/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/8/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 12/8/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/9/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 12/9/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/10/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 12/10/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/13/2021 Approved DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/13/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/14/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/15/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/16/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/17/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/20/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 12/20/2021 Conditional Approval DAVID BURKHEAD
Green Building Rough 12/20/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 12/20/2021 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 12/20/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 12/21/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 12/21/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/22/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 12/22/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/23/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 12/23/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/27/2021 Partial Approval DAVID BURKHEAD
Green Building Rough 12/27/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 12/27/2021 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 12/27/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 12/28/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 12/28/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 1/4/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 1/4/2022 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 1/4/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 1/5/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 1/5/2022 Conditional Approval DAVID BURKHEAD
Masonry Wall/Backfill 1/5/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 1/6/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 1/6/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 1/7/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 1/7/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 1/10/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/10/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 1/11/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/11/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 1/12/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/12/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 1/13/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/13/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 1/14/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/14/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 1/18/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 1/19/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 1/19/2022 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 1/19/2022 Conditional Approval DAVID BURKHEAD
Green Building Rough 1/19/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 1/19/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 1/19/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Masonry 1/20/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 1/21/2022 Conditional Approval DAVID BURKHEAD
Masonry Wall/Backfill 1/21/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 1/24/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 1/25/2022 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 1/25/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 1/31/2022 Conditional Approval DAVID BURKHEAD
Green Building Rough 1/31/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 1/31/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 1/31/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Masonry 2/1/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 2/2/2022 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 2/2/2022 Conditional Approval DAVID BURKHEAD
Wood Frame 2/2/2022 Partial Inspection DAVID BURKHEAD
Deputy Reinf. Masonry 2/3/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 2/4/2022 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 2/7/2022 Conditional Approval DANIEL MC AULIFFE
Green Building Rough 2/7/2022 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 2/7/2022 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 2/7/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Masonry 2/8/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 2/9/2022 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 2/9/2022 Partial Inspection DAVID BURKHEAD
Deputy Reinf. Masonry 2/10/2022 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 2/10/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 2/11/2022 Conditional Approval DAVID BURKHEAD
Masonry Wall/Backfill 2/11/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 2/14/2022 Partial Inspection DAVID BURKHEAD
Wood Frame 2/15/2022 Partial Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 2/16/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/16/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 2/16/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 2/16/2022 Conditional Approval DAVID BURKHEAD
Green Building Rough 2/16/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 2/16/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 2/16/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 2/17/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 2/17/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 2/17/2022 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 2/17/2022 Conditional Approval DAVID BURKHEAD
Wood Frame 2/17/2022 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 2/18/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 2/18/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 2/18/2022 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 2/18/2022 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 2/22/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 2/23/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 2/24/2022 Conditional Approval DAVID BURKHEAD
Wood Frame 2/24/2022 Partial Inspection DAVID BURKHEAD
Deputy Reinf. Masonry 2/25/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 2/28/2022 Conditional Approval DAVID BURKHEAD
Drywall Nailing 2/28/2022 Partial Inspection DAVID BURKHEAD
Deputy Reinf. Masonry 3/1/2022 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 3/1/2022 Corrections Issued DAVID BURKHEAD
Deputy Reinf. Masonry 3/2/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 3/3/2022 Conditional Approval DAVID BURKHEAD
Wood Frame 3/3/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 3/4/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 3/7/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 3/8/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 3/9/2022 Conditional Approval DAVID BURKHEAD
Wood Frame 3/9/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 3/10/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 3/11/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 3/14/2022 Conditional Approval DAVID BURKHEAD
Wood Frame 3/14/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 3/15/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 3/16/2022 Conditional Approval DAVID BURKHEAD
Wood Frame 3/16/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 3/17/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 3/18/2022 Conditional Approval DAVID BURKHEAD
Wood Frame 3/18/2022 Partial Inspection DAVID BURKHEAD
Deputy Reinf. Masonry 3/22/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/22/2022 Conditional Approval DAVID BURKHEAD
Wood Frame 3/22/2022 Partial Inspection DAVID BURKHEAD
Deputy Reinf. Masonry 3/23/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/23/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/24/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/24/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/25/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/29/2022 Conditional Approval DAVID BURKHEAD
Wood Frame 3/29/2022 Partial Inspection DAVID BURKHEAD
Wood Frame 3/31/2022 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 4/4/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/4/2022 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 4/5/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/5/2022 Conditional Approval DAVID BURKHEAD
Wood Frame 4/5/2022 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 4/6/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/6/2022 Conditional Approval DAVID BURKHEAD
Wood Frame 4/8/2022 Partial Approval JONATHAN QUACH
Wood Frame 4/13/2022 Partial Approval DAVID BURKHEAD
Wood Frame 4/15/2022 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 4/20/2022 Conditional Approval DAVID BURKHEAD
Wood Frame 4/20/2022 Partial Approval DAVID BURKHEAD
Wood Frame 4/26/2022 Partial Approval DAVID BURKHEAD
Wood Frame 4/28/2022 Partial Inspection DAVID BURKHEAD
Wood Frame 5/2/2022 Partial Approval DAVID BURKHEAD
Wood Frame 5/4/2022 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 5/11/2022 Partial Approval DAVID BURKHEAD
Wood Frame 5/11/2022 Partial Approval DAVID BURKHEAD
Wood Frame 5/13/2022 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 5/17/2022 Partial Approval DAVID BURKHEAD
Wood Frame 5/19/2022 Partial Approval DAVID BURKHEAD
Wood Frame 5/24/2022 Partial Approval DAVID BURKHEAD
Wood Frame 5/26/2022 Partial Approval DAVID BURKHEAD
Wood Frame 6/2/2022 Partial Approval TED RIES
Wood Frame 6/6/2022 Partial Approval DAVID BURKHEAD
Wood Frame 6/9/2022 Partial Approval DAVID BURKHEAD
Wood Frame 6/14/2022 Partial Approval DAVID BURKHEAD
Wood Frame 6/15/2022 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 6/16/2022 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 6/17/2022 Conditional Approval WINSTON DUNNING
Wood Frame 6/17/2022 Partial Inspection DAVID BURKHEAD
Wood Frame 6/23/2022 Partial Approval DAVID BURKHEAD
Insulation 6/28/2022 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 6/28/2022 Partial Approval DAVID BURKHEAD
Wood Frame 6/29/2022 Partial Approval GREGORY POMISH
Wood Frame 6/30/2022 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 7/6/2022 Partial Approval DAVID BURKHEAD
Wood Frame 7/8/2022 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 7/11/2022 Partial Approval GREGORY POMISH
Wood Frame 7/12/2022 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 7/13/2022 Conditional Approval ERNESTO CORRAL
Insulation 7/14/2022 Partial Approval DAVID BURKHEAD
Wood Frame 7/14/2022 Partial Approval DAVID BURKHEAD
Wood Frame 7/18/2022 Partial Approval DAVID BURKHEAD
Wood Frame 7/19/2022 Partial Approval DAVID BURKHEAD
Wood Frame 7/21/2022 Partial Approval DAVID BURKHEAD
Wood Frame 7/27/2022 Partial Inspection DAVID BURKHEAD
Wood Frame 7/29/2022 Partial Approval DAVID BURKHEAD
Wood Frame 8/2/2022 Partial Approval DAVID BURKHEAD
Wood Frame 8/3/2022 Not Ready for Inspection GREGORY POMISH
Wood Frame 8/4/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 8/8/2022 Partial Inspection DAVID BURKHEAD
Insulation 8/8/2022 Partial Inspection DAVID BURKHEAD
Interior/Exterior Lathing 8/8/2022 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 8/8/2022 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 8/8/2022 Partial Inspection DAVID BURKHEAD
Deputy Wood Construction 8/10/2022 No Result Entered DANIEL MC AULIFFE
Deputy Wood Construction 8/15/2022 No Result Entered DANIEL MC AULIFFE
Wood Frame 8/15/2022 Partial Approval DAVID BURKHEAD
Wood Frame 8/19/2022 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 8/22/2022 Conditional Approval TED RIES
Deputy Wood Construction 8/23/2022 Conditional Approval WINSTON DUNNING
Deputy Wood Construction 8/24/2022 Conditional Approval TED RIES
Wood Frame 8/24/2022 Partial Approval TED RIES
Deputy Wood Construction 8/25/2022 Conditional Approval WINSTON DUNNING
Deputy Wood Construction 8/26/2022 Conditional Approval TED RIES
Wood Frame 8/26/2022 Partial Approval TED RIES
Deputy Wood Construction 8/29/2022 Conditional Approval WINSTON DUNNING
Wood Frame 8/30/2022 Partial Approval TED RIES
Deputy Wood Construction 8/31/2022 Conditional Approval DAVID BURKHEAD
Wood Frame 8/31/2022 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 9/6/2022 Partial Approval DAVID BURKHEAD
Wood Frame 9/6/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 9/16/2022 Not Ready for Inspection TED RIES
Wood Frame 9/16/2022 Not Ready for Inspection TED RIES
Wood Frame 9/19/2022 Partial Approval DAVID BURKHEAD
Wood Frame 9/22/2022 Partial Approval DAVID BURKHEAD
Wood Frame 9/26/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 9/28/2022 Partial Approval TED RIES
Interior/Exterior Lathing 9/28/2022 Partial Approval TED RIES
Wood Frame 9/28/2022 Partial Approval TED RIES
Light Gage Steel Frame 10/3/2022 Partial Approval DAVID BURKHEAD
Wood Frame 10/6/2022 Partial Approval DAVID BURKHEAD
Wood Frame 10/17/2022 Partial Approval DAVID BURKHEAD
Insulation 10/20/2022 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 10/20/2022 Partial Approval DAVID BURKHEAD
Insulation 10/27/2022 Partial Approval DAVID BURKHEAD
Wood Frame 10/27/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 10/31/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 10/31/2022 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 11/3/2022 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 11/3/2022 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 11/15/2022 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 11/17/2022 Not Ready for Inspection GREGORY POMISH
Wood Frame 11/21/2022 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 11/28/2022 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 11/30/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 11/30/2022 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 11/30/2022 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 12/5/2022 Partial Approval DAVID BURKHEAD
Insulation 12/6/2022 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 12/28/2022 Partial Approval DAVID BURKHEAD
Special/Order Compliance 1/19/2023 Approved DAVID BURKHEAD
Light Gage Steel Frame 2/10/2023 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 2/14/2023 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 2/14/2023 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 2/14/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 2/14/2023 Not Ready for Inspection DAVID BURKHEAD
T-Bar Ceiling 2/14/2023 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 2/14/2023 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 2/17/2023 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 3/9/2023 Partial Approval TED RIES
Masonry Wall/Backfill 3/9/2023 Partial Approval TED RIES
Final 4/5/2023 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 4/5/2023 Approved DAVID BURKHEAD
Green Building Final 4/5/2023 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 4/5/2023 Approved DAVID BURKHEAD
Reinforced Concrete Frame 4/5/2023 Conditional Approval DAVID BURKHEAD
Reinforced Masonry Frame 4/5/2023 Conditional Approval DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 4/5/2023 SGSOV Not Ready DAVID BURKHEAD
Smoke Detectors 4/5/2023 Partial Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 4/5/2023 Conditional Approval DAVID BURKHEAD
Final 5/11/2023 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 5/11/2023 SGSOV Not Ready DAVID BURKHEAD
Final 5/23/2023 Not Ready for Inspection DAVID BURKHEAD
Green Building Final 5/23/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 5/23/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 5/23/2023 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 5/23/2023 SGSOV Not Ready DAVID BURKHEAD
Smoke Detectors 5/23/2023 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 5/23/2023 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 5/24/2023 Partial Inspection DAVID BURKHEAD
Special/Order Compliance 5/25/2023 Partial Inspection DAVID BURKHEAD
Final 5/26/2023 Partial Inspection DAVID BURKHEAD
Green Building Final 5/26/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 5/26/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 5/26/2023 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 5/26/2023 SGSOV Not Ready DAVID BURKHEAD
Smoke Detectors 5/26/2023 Partial Inspection DAVID BURKHEAD
Special/Order Compliance 5/26/2023 Approved DAVID BURKHEAD
Verify Sprinkler Sign Off 5/26/2023 Partial Approval DAVID BURKHEAD
Final 6/8/2023 Corrections Issued DAVID BURKHEAD
Green Building Final 6/8/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 6/8/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 6/8/2023 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 6/8/2023 SGSOV Not Ready DAVID BURKHEAD
Smoke Detectors 6/8/2023 Approved DAVID BURKHEAD
Verify Sprinkler Sign Off 6/8/2023 Partial Approval DAVID BURKHEAD
Final 6/12/2023 Partial Inspection DAVID BURKHEAD
Green Building Final 6/12/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 6/12/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 6/12/2023 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 6/12/2023 SGSOV Not Ready DAVID BURKHEAD
Verify Sprinkler Sign Off 6/12/2023 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 6/14/2023 Approved DAVID BURKHEAD
Final 6/20/2023 Partial Inspection DAVID BURKHEAD
Green Building Final 6/20/2023 Approved DAVID BURKHEAD
Reinforced Concrete Frame 6/20/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 6/20/2023 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 6/20/2023 SGSOV Approved DAVID BURKHEAD
Verify Sprinkler Sign Off 6/20/2023 Partial Approval DAVID BURKHEAD
Final 6/29/2023 Corrections Issued DAVID BURKHEAD
Reinforced Concrete Frame 6/29/2023 Partial Inspection DAVID BURKHEAD
Reinforced Masonry Frame 6/29/2023 Partial Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 6/29/2023 Partial Approval DAVID BURKHEAD
Special/Order Compliance 6/30/2023 Partial Inspection DAVID BURKHEAD
Pre-Inspection 7/12/2023 Approved DAVID BURKHEAD
Final 7/27/2023 Partial Inspection DAVID BURKHEAD
Reinforced Concrete Frame 7/27/2023 Approved DAVID BURKHEAD
Reinforced Masonry Frame 7/27/2023 Approved DAVID BURKHEAD
Verify Sprinkler Sign Off 7/27/2023 Approved DAVID BURKHEAD
Final 11/3/2023 Not Ready for Inspection DAVID BURKHEAD
Final 11/29/2023 OK to Issue CofO DAVID BURKHEAD