2130 E VIOLET ST 90021

Certificate Information: 2130 E VIOLET ST 90021

Application / Permit
19010-10000-01818
Plan Check / Job No.
B19LA08716
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(13) Office
Work Description
A 9-story ground-up mixed use building with retail on the ground floor, 5 levels of above-grade parking, 4 levels of office space (core and shell only ) and a roof top amenity space.
Permit Issued
Issued on 8/3/2020
Issuing Office
Metro
Current Status
CofO Issued on 7/19/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/22/2019 APPLICANT
Assigned to Plan Check Engineer 6/6/2019 LARRY LEE
Disabled Access Plans Picked Up 6/25/2019 APPLICANT
Corrections Issued 6/28/2019 LARRY LEE
Quality Review Completed 7/5/2019 CHARLES CHANG
Applicant returned to address corrections 9/30/2019 LARRY LEE
Applicant returned to address corrections 11/21/2019 LARRY LEE
Applicant returned to address corrections 3/10/2020 LARRY LEE
Applicant returned to address corrections 5/29/2020 LARRY LEE
Applicant returned to address corrections 6/11/2020 LARRY LEE
Green Plans Picked Up 6/15/2020 APPLICANT
Plan Check Approved 7/8/2020 LARRY LEE
Issued 8/3/2020 APPLICANT
Building Plans Picked Up 8/3/2020 APPLICANT
TCO Issued (Expire Date: 03-20-2023) 9/21/2022 ERNESTO CORRAL
TCO Issued (Expire Date: 09-12-2023) 3/16/2023 TED RIES
TCO Issued (Expire Date: 02-18-2024) 8/22/2023 ERNESTO CORRAL
TCO Issued (Expire Date: 08-12-2024) 2/14/2024 ERNESTO CORRAL
CofO in Progress 7/9/2024 RAFAEL ESPINOZA
Permit Finaled 7/19/2024 ADAM BURGESS
CofO Issued 7/19/2024 ADAM BURGESS
Permit Finaled 7/19/2024 ADAM BURGESS

Permit Application Clearance Information

Address approval Cleared 8/20/2019 JEANETTE VONG
Eng Process Fee Ord 176,300 Cleared 8/20/2019 ROBYN STEELE
Project located in CRA area Cleared 8/20/2019 JIM URQUHART
Highway dedication Cleared 8/28/2019 JEANETTE VONG
Trees in Parkway Cleared 9/20/2019 ADRIAN SANCHEZ
Building over 3-story or 36-ft Cleared 10/3/2019 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 10/3/2019 CALOSHA APPROVED
Green Code Cleared 10/7/2019 COLIN LOREDO
Sewer availability Cleared 10/8/2019 JEANETTE VONG
Low Impact Development Cleared 10/15/2019 JORGE MEJIA LEMUS
Roof/Waste drainage to street Cleared 10/23/2019 JEANIE LAM
Internal circulation Cleared 10/24/2019 MOHAMMAD HASAN
Hydrant and Access approval Cleared 10/30/2019 JEREMY CARTER
"D" conditions Cleared 1/30/2020 JOE LUCKEY
"Q" conditions Cleared 1/30/2020 JOE LUCKEY
CPC Cleared 1/30/2020 JOE LUCKEY
Miscellaneous Cleared 1/30/2020 JOE LUCKEY
Site Plan review Cleared 1/30/2020 JOE LUCKEY
ZI Cleared 1/30/2020 JOE LUCKEY
Fire Marshall Fire Life Safety Cleared 3/4/2020 WILLIAM JOHNS
"T" removal Cleared 4/28/2020 JOE LUCKEY
Work Adjacent to Public Way Cleared 6/4/2020 LARRY LEE
DAS Clearance Cleared 6/8/2020 LARRY LEE
Permit Cleared 6/11/2020 LINDA MARGARET

Contact Information

Architect Nouizi,, Ilyes M; Lic. No.: C32135 14252 CULVER DRIVE SUITE A-605      IRVINE, CA 92604
Contractor Swinerton Builders; Lic. No.: 92-B 260 TOWNSEND ST 5TH FL-LEGAL      SAN FRANCISCO, CA 94107
Engineer Mengelkoch,, Samuel Owen; Lic. No.: S5439 813 WILCOX AVE 203      LOS ANGELES, CA 90038
Engineer Varela,, Gregorio; Lic. No.: C81201 1108 S ADAMS ST      GLENDALE, CA 91205

Inspector Information

RONALD JIMENEZ, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
LARRY ARNICK, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
JOEY BUCHANAN, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
ERNESTO CORRAL, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
RAFAEL ESPINOZA, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 8/4/2020 Partial Inspection RAFAEL ESPINOZA
Grading Pre-Inspection 8/4/2020 Partial Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/31/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/1/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/2/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/3/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/4/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/8/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 9/8/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/9/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/10/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/11/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/14/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 9/14/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/15/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 9/15/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/16/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 9/16/2020 Partial Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/17/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/18/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/21/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/22/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/23/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 9/23/2020 Partial Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/24/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 9/24/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/25/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/28/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/29/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/30/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/1/2020 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 10/2/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 10/2/2020 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 10/2/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/6/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/6/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/7/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/7/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/8/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/8/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 10/8/2020 Partial Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/9/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/9/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 10/9/2020 Not Ready for Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 10/10/2020 Partial Approval DAVID TSAU
Deputy Drilled-In Anchors 10/13/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/13/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/14/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/15/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 10/15/2020 Partial Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/16/2020 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 10/16/2020 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 10/16/2020 Partial Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 10/16/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/19/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/19/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 10/19/2020 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/20/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/20/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/21/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/21/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/22/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/22/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/23/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/23/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 10/23/2020 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/26/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/26/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/27/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/27/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 10/27/2020 Partial Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/28/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/28/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/29/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/30/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/2/2020 Conditional Approval NICK DANERI
Footing/Foundation/Slab 11/4/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/5/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/6/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/9/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/10/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/12/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/13/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/16/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 11/16/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/17/2020 Conditional Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 11/17/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/18/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/19/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/20/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 11/24/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/1/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/2/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 12/2/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/3/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 12/3/2020 Partial Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/4/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 12/4/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/7/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 12/8/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/8/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 12/9/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/9/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 12/10/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/10/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 12/11/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/11/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 12/14/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/14/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 12/15/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 12/16/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 12/16/2020 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 12/16/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 12/17/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 12/17/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 12/17/2020 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 12/17/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Pre-Stress Concrete 12/18/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 12/21/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 12/21/2020 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 12/22/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/22/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 12/23/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/23/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 12/23/2020 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 12/24/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/24/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 12/28/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/28/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 12/29/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/29/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 12/30/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 12/31/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 1/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 1/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 1/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 1/7/2021 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 1/7/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 1/8/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 1/8/2021 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 1/8/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 1/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 1/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 1/13/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 1/13/2021 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 1/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 1/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 1/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 1/20/2021 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 1/20/2021 Partial Approval DANIEL COLLINS
Verify Sprinkler Sign Off 1/20/2021 Not Ready for Inspection DANIEL COLLINS
Deputy Pre-Stress Concrete 1/21/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/21/2021 Conditional Approval DANIEL COLLINS
Deputy Pre-Stress Concrete 1/22/2021 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 1/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 1/26/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 1/27/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 1/28/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 1/29/2021 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 2/1/2021 Partial Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 2/1/2021 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 2/1/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 2/2/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 2/2/2021 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 2/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 2/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 2/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 2/8/2021 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 2/8/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 2/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 2/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 2/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 2/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/16/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 2/16/2021 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 2/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 2/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 2/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/19/2021 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 2/19/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 2/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/22/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 2/22/2021 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 2/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/23/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 2/23/2021 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 2/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/24/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 2/24/2021 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 2/24/2021 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 2/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 2/26/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/26/2021 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 2/26/2021 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 3/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/1/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 3/1/2021 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 3/1/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 3/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 3/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/3/2021 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 3/3/2021 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 3/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 3/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/5/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 3/5/2021 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 3/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 3/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/9/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 3/9/2021 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 3/9/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 3/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 3/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 3/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 3/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 3/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 3/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 3/18/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 3/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 3/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 3/19/2021 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 3/19/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 3/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 3/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 3/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 3/23/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 3/23/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 3/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 3/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 3/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 3/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 3/26/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/26/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 3/26/2021 Conditional Approval NICK DANERI
Insulation 3/26/2021 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 3/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 3/30/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 3/30/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 3/31/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/31/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 4/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 4/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/6/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 4/6/2021 Partial Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/7/2021 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 4/7/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/12/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 4/12/2021 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 4/12/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/13/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/13/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 4/13/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/14/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 4/14/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/15/2021 Conditional Approval RONALD PACHECO
Deputy Steel/Welding 4/15/2021 Conditional Approval RONALD PACHECO
Deputy Reinf. Concrete 4/16/2021 Conditional Approval LANNY MERRICK
Deputy Steel/Welding 4/16/2021 Conditional Approval LANNY MERRICK
Deputy Reinf. Concrete 4/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 4/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 4/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/26/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 4/26/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/26/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/27/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 4/27/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/27/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 4/27/2021 Partial Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/28/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 4/28/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/28/2021 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 4/28/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/29/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/30/2021 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 4/30/2021 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 5/3/2021 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 5/3/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/4/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 5/4/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/7/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 5/10/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 5/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 5/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 5/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 5/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 5/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 5/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/17/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 5/17/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/20/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/20/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/21/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/21/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 5/21/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/24/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 5/24/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/26/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/26/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 5/26/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/27/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/27/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 5/27/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/28/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/28/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/1/2021 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 6/3/2021 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/7/2021 Partial Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/8/2021 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 6/8/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/11/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/12/2021 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 6/12/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 6/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/18/2021 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 6/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/21/2021 Conditional Approval LANNY MERRICK
Deputy Reinf. Concrete 6/21/2021 Conditional Approval LANNY MERRICK
Deputy Steel/Welding 6/21/2021 Conditional Approval LANNY MERRICK
Deputy Drilled-In Anchors 6/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/22/2021 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 6/22/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/24/2021 Conditional Approval RAFAEL ESPINOZA
Light Gage Steel Frame 6/24/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/25/2021 Corrections Issued RAFAEL ESPINOZA
Deputy Steel/Welding 6/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/28/2021 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 6/28/2021 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 6/28/2021 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 6/29/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/29/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/29/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/14/2021 Conditional Approval RAFAEL ESPINOZA
Structural Steel Frame 7/14/2021 Partial Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/19/2021 Conditional Approval LANNY MERRICK
Deputy Steel/Welding 7/19/2021 Conditional Approval LANNY MERRICK
Deputy Drilled-In Anchors 7/20/2021 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 7/20/2021 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 7/21/2021 Conditional Approval LANNY MERRICK
Deputy Steel/Welding 7/21/2021 Conditional Approval LANNY MERRICK
Deputy Drilled-In Anchors 7/22/2021 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 7/22/2021 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 7/23/2021 Conditional Approval LANNY MERRICK
Deputy Steel/Welding 7/23/2021 Conditional Approval LANNY MERRICK
Light Gage Steel Frame 7/26/2021 Partial Approval JONATHAN QUACH
Deputy Drilled-In Anchors 7/27/2021 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 7/27/2021 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 7/28/2021 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 7/28/2021 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 7/29/2021 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 7/29/2021 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 7/30/2021 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 7/30/2021 Conditional Approval JONATHAN QUACH
Footing/Foundation/Slab 7/30/2021 Partial Approval JONATHAN QUACH
Deputy Drilled-In Anchors 8/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/2/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 8/3/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 8/3/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 8/6/2021 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/20/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/20/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/26/2021 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 8/26/2021 Conditional Approval DANIEL COLLINS
Light Gage Steel Frame 8/26/2021 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 8/27/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/27/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/31/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/31/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/31/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 8/31/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 8/31/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/2/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 9/2/2021 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 9/2/2021 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/16/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 9/16/2021 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 9/16/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/17/2021 Conditional Approval RAFAEL ESPINOZA
Light Gage Steel Frame 9/17/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/20/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/20/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/20/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 9/20/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/21/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/21/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/21/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/22/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 9/22/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/23/2021 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 9/23/2021 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 9/23/2021 Conditional Approval JONATHAN QUACH
Reinforced Concrete Frame 9/23/2021 Partial Approval JONATHAN QUACH
Verify Sprinkler Sign Off 9/23/2021 Not Ready for Inspection JONATHAN QUACH
Deputy Drilled-In Anchors 9/24/2021 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 9/24/2021 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 9/24/2021 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 9/27/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 9/27/2021 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 9/27/2021 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 9/27/2021 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/28/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/28/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/28/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/29/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/29/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/29/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 9/29/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 9/29/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/5/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 10/5/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 10/5/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 10/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/7/2021 Conditional Approval DANIEL COLLINS
Deputy Fireproofing 10/7/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/7/2021 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 10/7/2021 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 10/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/13/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 10/13/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/14/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 10/14/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 10/14/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/18/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 10/18/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 10/18/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/20/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/20/2021 Conditional Approval RAFAEL ESPINOZA
Light Gage Steel Frame 10/20/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/21/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/21/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/26/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/26/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/26/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/27/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/27/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/27/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/28/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/28/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/28/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 10/28/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/29/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/29/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/29/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/5/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 11/5/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Other (see comments) 11/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/9/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 11/9/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Other (see comments) 11/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Other (see comments) 11/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/12/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 11/12/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Other (see comments) 11/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 11/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Other (see comments) 11/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 11/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 11/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/18/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 11/18/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 11/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 11/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 11/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/24/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 11/24/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/29/2021 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 11/29/2021 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 11/29/2021 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 11/29/2021 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 11/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 11/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/30/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 11/30/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 12/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 12/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 12/1/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 12/1/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 12/1/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 12/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 12/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 12/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 12/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 12/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 12/3/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 12/3/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 12/3/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 12/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 12/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 12/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 12/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy EIFS 12/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 12/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 12/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 12/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy EIFS 12/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 12/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 12/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 12/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy EIFS 12/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 12/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 12/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 12/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy EIFS 12/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 12/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 12/10/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 12/10/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 12/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy EIFS 12/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 12/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 12/13/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 12/27/2021 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 12/28/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 1/14/2022 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 1/14/2022 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 1/18/2022 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 1/18/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 1/21/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 1/21/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 1/24/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 1/24/2022 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 1/25/2022 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 1/26/2022 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 2/1/2022 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 2/1/2022 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 2/2/2022 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 2/2/2022 Not Ready for Inspection RAFAEL ESPINOZA
Drywall Nailing 2/8/2022 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 2/8/2022 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 2/23/2022 Partial Approval TED RIES
Light Gage Steel Frame 2/28/2022 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 3/3/2022 Corrections Issued RAFAEL ESPINOZA
Drywall Nailing 3/4/2022 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 3/10/2022 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 3/30/2022 Approved RAFAEL ESPINOZA
Deputy Drilled-In Anchors 4/1/2022 Conditional Approval RAFAEL ESPINOZA
Pre-Inspection 4/5/2022 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 4/5/2022 No Access for Inspection RAFAEL ESPINOZA
Pre-Inspection 4/14/2022 Approved RAFAEL ESPINOZA
Deputy Drilled-In Anchors 4/19/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 4/21/2022 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 4/25/2022 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 4/25/2022 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 4/27/2022 Approved RAFAEL ESPINOZA
Deputy Steel/Welding 5/31/2022 Conditional Approval ERNESTO CORRAL
Final 6/30/2022 Corrections Issued RAFAEL ESPINOZA
Footing/Foundation/Slab 6/30/2022 Approved RAFAEL ESPINOZA
Green Building Final 6/30/2022 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 6/30/2022 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 6/30/2022 SGSOV Not Ready RAFAEL ESPINOZA
Smoke Detectors 6/30/2022 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 6/30/2022 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 2/27/2023 Partial Inspection RAFAEL ESPINOZA
Special/Order Compliance 8/15/2023 Partial Inspection RAFAEL ESPINOZA
Special/Order Compliance 1/23/2024 Approved RAFAEL ESPINOZA
Special/Order Compliance 2/12/2024 Approved RAFAEL ESPINOZA
Final 7/9/2024 OK to Issue CofO RAFAEL ESPINOZA
Reinforced Concrete Frame 7/9/2024 Approved RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 7/9/2024 SGSOV Approved RAFAEL ESPINOZA
Smoke Detectors 7/9/2024 Approved RAFAEL ESPINOZA
Verify Sprinkler Sign Off 7/9/2024 Approved RAFAEL ESPINOZA
Special/Order Compliance 7/17/2024 Approved RAFAEL ESPINOZA