5935 W PICO BLVD 90035

Certificate Information: 5935 W PICO BLVD 90035

Application / Permit
19010-10000-01697
Plan Check / Job No.
B19LA08192
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
Seven story mixed use building consisting of five residential levels of type IIIA over one type IA residential level over a commercial ground level and two subterranean type IA garage levels. 123 residential units. Total of 16 units with thirteen (13) units to be reserved for Extremely Low Income Households. Restaurant (A2, 968SF) at Level1 with OCC load of 65.
Permit Issued
Issued on 10/13/2020
Issuing Office
Metro
Current Status
CofO Issued on 5/24/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/26/2019 APPLICANT
Assigned to Plan Check Engineer 5/16/2019 LARRY LEE
Corrections Issued 5/30/2019 SUEN LIEU
Quality Review Completed 5/30/2019 CHARLES CHANG
Building Plans Picked Up 6/3/2019 APPLICANT
Plan Check Approved 2/25/2020 LARRY LEE
Issued 10/13/2020 APPLICANT
TCO Issued (Expire Date: 03-03-2024) 9/5/2023 TED RIES
CofO in Progress 4/11/2024 EDWIN GREGORYONA
CofO in Progress 4/19/2024 EDWIN GREGORYONA
CofO Issued 5/24/2024 ERNESTO CORRAL
Permit Finaled 5/24/2024 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 7/1/2019 ELENA LOPEZ
Highway dedication Cleared 7/1/2019 ELENA LOPEZ
Permit Cleared 7/1/2019 ELENA LOPEZ
Abandoned oil well Cleared 7/2/2019 JEREMY CARTER
Abandoned oil well approval Cleared 7/2/2019 JEREMY CARTER
Hydrant and Access approval Cleared 7/2/2019 JEREMY CARTER
Internal circulation Cleared 7/2/2019 MOHAMMAD HASAN
Eng Process Fee Ord 176,300 Cleared 7/18/2019 ELENA LOPEZ
Low Impact Development Cleared 9/13/2019 JORGE MEJIA LEMUS
Building over 3-story or 36-ft Cleared 9/18/2019 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 9/18/2019 CALOSHA APPROVED
Roof/Waste drainage to street Cleared 9/19/2019 THOMAS LANG
Sewer availability Cleared 9/19/2019 THOMAS LANG
Encroachment in public way Cleared 9/20/2019 ELAINE LEI
Trees in Parkway Cleared 10/10/2019 JOHN KIM
DAS Clearance Cleared 10/17/2019 ELIZABETH TOMS
Green Code Cleared 10/18/2019 DONALD CRICHLOW
Bicycle Parking Cleared 10/24/2019 ELAINE LEI
DCP conditions approval Cleared 12/3/2019 NICHOLAS KAWAZOE
Density Bonus 12.22.A.31 Cleared 12/3/2019 NICHOLAS KAWAZOE
Stormwater Pollution Mitigatn Cleared 12/10/2019 JORGE MEJIA LEMUS
Miscellaneous Cleared 12/16/2019 SARAHI ORTEGA
Miscellaneous Cleared 12/16/2019 SARAHI ORTEGA
Miscellaneous Cleared 12/16/2019 SARAHI ORTEGA
Miscellaneous Cleared 12/16/2019 SARAHI ORTEGA
Opn space landscape/Water mgmt Cleared 12/16/2019 SARAHI ORTEGA
Site Plan review Cleared 12/16/2019 SARAHI ORTEGA
ZA Case Cleared 12/16/2019 SARAHI ORTEGA
Fire Marshall Fire Life Safety Cleared 12/19/2019 WILLIAM JOHNS
Work Adjacent to Public Way Cleared 1/17/2020 BOK GOH
Food Service Establishment Cleared 1/22/2020 KENNETH BROWNE
Methane Ordinance Cleared 2/13/2020 WILLIAM JOHNS

Contact Information

Contractor Westport Construction Inc; Lic. No.: 712732-B 125 W MAPLE AVE      MONROVIA, CA 91016
Engineer , ; Lic. No.: C88261       ,
Engineer , ; Lic. No.: S5421       ,

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 10/21/2020 Partial Inspection LARRY ARNICK
Footing/Foundation/Slab 1/6/2021 Partial Approval LARRY ARNICK
METHANE-Barrier 1/6/2021 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 1/6/2021 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 1/20/2021 Not Ready for Inspection LARRY ARNICK
METHANE-Barrier 1/20/2021 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 1/20/2021 Not Ready for Inspection LARRY ARNICK
Deputy Methane Barrier 1/22/2021 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 1/25/2021 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 2/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/17/2021 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 2/17/2021 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 2/17/2021 Partial Approval EDWIN GREGORYONA
METHANE-Subgrade 2/17/2021 Order to Comply Issued EDWIN GREGORYONA
Deputy Reinf. Concrete 2/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 2/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 2/23/2021 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 2/23/2021 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 2/23/2021 Partial Approval EDWIN GREGORYONA
METHANE-Subgrade 2/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 2/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/2/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 3/2/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 3/3/2021 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 3/3/2021 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 3/3/2021 Partial Inspection EDWIN GREGORYONA
METHANE-Subgrade 3/3/2021 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 3/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 3/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 3/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 3/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 3/11/2021 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 3/11/2021 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Barrier 3/11/2021 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Subgrade 3/11/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Shotcrete 3/12/2021 Partial Approval EDWIN GREGORYONA
Pre-Inspection 3/13/2021 Approved EDWIN GREGORYONA
Deputy Shotcrete 3/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 3/16/2021 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 3/16/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 3/16/2021 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Barrier 3/16/2021 Approved EDWIN GREGORYONA
METHANE-Rough 3/16/2021 Approved EDWIN GREGORYONA
METHANE-Subgrade 3/16/2021 Approved EDWIN GREGORYONA
Reinforced Concrete Frame 3/16/2021 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 3/16/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Shotcrete 3/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 3/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 3/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 3/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 3/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 3/23/2021 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 3/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 3/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 3/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 3/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 3/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 3/31/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 3/31/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 4/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 4/6/2021 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 4/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 4/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 4/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 4/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 5/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 5/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 5/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 5/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/11/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 5/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/2/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/2/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/4/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 6/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 6/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 6/8/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 6/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 6/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/10/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 6/10/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 6/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 6/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 6/15/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 6/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 6/16/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 6/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 6/17/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 6/17/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Shotcrete 6/17/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 6/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 6/18/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 6/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 6/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 6/22/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 6/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 6/23/2021 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 6/28/2021 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 6/29/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Masonry 6/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/6/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/7/2021 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 7/8/2021 Conditional Approval TIMOTHY BUXTON
Excavation/Setback/Form/Re-Bar 7/9/2021 Partial Inspection JONATHAN QUACH
Deputy Reinf. Concrete 7/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/27/2021 Conditional Approval TIMOTHY BUXTON
Deputy Reinf. Concrete 7/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/30/2021 Conditional Approval TIMOTHY BUXTON
Deputy Reinf. Concrete 8/2/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/10/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 8/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 8/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 8/17/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 8/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/19/2021 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 8/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 8/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 8/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 8/27/2021 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 8/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 8/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/31/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 8/31/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 8/31/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 9/1/2021 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 9/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/2/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 9/2/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 9/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 9/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 9/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 9/8/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 9/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 9/9/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 9/9/2021 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 9/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 9/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 9/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 9/15/2021 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 9/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 9/16/2021 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 9/17/2021 Partial Approval JONATHAN QUACH
Masonry Wall/Backfill 9/20/2021 Not Ready for Inspection JONATHAN QUACH
Deputy Reinf. Masonry 9/21/2021 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 9/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 9/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 9/23/2021 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 9/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/22/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/29/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 10/29/2021 Corrections Issued EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 10/30/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/5/2021 Conditional Approval TED RIES
Deputy Shotcrete 11/5/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 11/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 11/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 11/9/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 11/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 11/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 11/12/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 11/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 11/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 11/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/23/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/29/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/30/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 1/4/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/5/2022 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 1/5/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/6/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/14/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 1/19/2022 Partial Approval EDWIN GREGORYONA
Green Building Rough 1/19/2022 Not Ready for Inspection EDWIN GREGORYONA
Insulation 1/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/20/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 1/20/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/21/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 1/21/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 1/24/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 1/26/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/27/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/28/2022 Partial Approval EDWIN GREGORYONA
Green Building Rough 1/31/2022 Not Ready for Inspection EDWIN GREGORYONA
Structural Steel Frame 1/31/2022 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 1/31/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Fireproofing 2/3/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 2/7/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 2/11/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/11/2022 Partial Approval EDWIN GREGORYONA
Green Building Rough 2/11/2022 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 2/11/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 2/14/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 2/14/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 2/14/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/15/2022 Partial Approval EDWIN GREGORYONA
Green Building Rough 2/15/2022 Not Ready for Inspection EDWIN GREGORYONA
Pre-Inspection 2/15/2022 Approved EDWIN GREGORYONA
Verify Sprinkler Sign Off 2/15/2022 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 2/17/2022 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 2/17/2022 Not Ready for Inspection EDWIN GREGORYONA
Wood Frame 2/17/2022 Partial Inspection EDWIN GREGORYONA
Deputy Wood Construction 2/18/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/22/2022 Partial Approval EDWIN GREGORYONA
Green Building Rough 2/22/2022 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 2/22/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Wood Construction 2/23/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 2/24/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/24/2022 Partial Approval EDWIN GREGORYONA
Green Building Rough 2/24/2022 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 2/24/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/28/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 2/28/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/28/2022 Partial Approval EDWIN GREGORYONA
Green Building Rough 2/28/2022 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 2/28/2022 Not Ready for Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/1/2022 Partial Inspection EDWIN GREGORYONA
Deputy Wood Construction 3/2/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/3/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/3/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/4/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/8/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 3/8/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/9/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/10/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 3/14/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/14/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/16/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 3/16/2022 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 3/16/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/16/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/17/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 3/17/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/17/2022 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 3/18/2022 Partial Approval EDWIN GREGORYONA
Green Building Rough 3/18/2022 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 3/21/2022 Partial Inspection EDWIN GREGORYONA
Wood Frame 3/21/2022 Partial Inspection EDWIN GREGORYONA
Deputy Wood Construction 3/22/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 3/25/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/25/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 3/29/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/29/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 3/31/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/31/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 4/4/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/4/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 4/5/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 4/6/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 4/6/2022 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 4/6/2022 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/6/2022 Not Ready for Inspection EDWIN GREGORYONA
Wood Frame 4/6/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/7/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/8/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 4/8/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 4/8/2022 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/8/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/11/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/11/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/11/2022 Partial Inspection EDWIN GREGORYONA
Deputy Fireproofing 4/12/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/13/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/14/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/15/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/15/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 4/20/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/20/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 4/22/2022 Partial Approval EDWIN GREGORYONA
Wood Frame 4/22/2022 Partial Inspection EDWIN GREGORYONA
Deputy Wood Construction 4/25/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/25/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 4/26/2022 Conditional Approval DAVID BURKHEAD
Drywall Nailing 4/26/2022 Partial Approval RUSSELL BONVOULOIR
Green Building Rough 4/26/2022 Partial Approval RUSSELL BONVOULOIR
Insulation 4/27/2022 Conditional Approval DARRYL ARNOLD
Deputy Wood Construction 4/28/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/28/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 4/29/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/29/2022 Partial Inspection EDWIN GREGORYONA
Deputy Wood Construction 5/3/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 5/3/2022 Partial Approval EDWIN GREGORYONA
Insulation 5/3/2022 Partial Inspection EDWIN GREGORYONA
Deputy Wood Construction 5/5/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 5/5/2022 Partial Approval EDWIN GREGORYONA
Insulation 5/5/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 5/9/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 5/9/2022 Not Ready for Inspection EDWIN GREGORYONA
Insulation 5/9/2022 Not Ready for Inspection EDWIN GREGORYONA
Special/Order Compliance 5/9/2022 Approved EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/10/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 5/10/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 5/11/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 5/12/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/13/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 5/13/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/16/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 5/16/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 5/16/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 5/19/2022 Partial Approval EDWIN GREGORYONA
Green Building Rough 5/19/2022 Partial Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 5/19/2022 Approved EDWIN GREGORYONA
Wood Frame 5/19/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Wood Construction 5/20/2022 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 5/20/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 5/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 5/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 5/25/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/25/2022 Partial Approval EDWIN GREGORYONA
Green Building Rough 5/25/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Wood Construction 5/31/2022 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 6/1/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 6/6/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 6/6/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Wood Construction 6/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 6/9/2022 Partial Approval EDWIN GREGORYONA
Green Building Rough 6/9/2022 Not Ready for Inspection EDWIN GREGORYONA
Wood Frame 6/9/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Wood Construction 6/13/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 6/13/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Wood Construction 6/15/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 6/15/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 6/15/2022 Partial Inspection EDWIN GREGORYONA
Green Building Rough 6/15/2022 Approved EDWIN GREGORYONA
Deputy Wood Construction 6/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 6/17/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 6/17/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 6/21/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 6/22/2022 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 6/23/2022 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 6/23/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 6/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 6/28/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 6/28/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 7/1/2022 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 7/1/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 7/6/2022 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 7/6/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Wood Construction 7/11/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 7/12/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 7/13/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 7/18/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 7/19/2022 Conditional Approval WINSTON DUNNING
Drywall Nailing 7/21/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 7/22/2022 Conditional Approval WINSTON DUNNING
Drywall Nailing 7/25/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 7/27/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 7/29/2022 Conditional Approval WINSTON DUNNING
Deputy Wood Construction 8/2/2022 Conditional Approval WINSTON DUNNING
Deputy Wood Construction 8/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 8/4/2022 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 8/4/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 8/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 8/8/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 8/8/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 8/9/2022 Conditional Approval WINSTON DUNNING
Deputy Wood Construction 8/10/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 8/10/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 8/11/2022 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 8/12/2022 Conditional Approval ERNESTO CORRAL
Drywall Nailing 8/12/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 8/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 8/17/2022 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 8/18/2022 Conditional Approval ERNESTO CORRAL
Drywall Nailing 8/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 8/22/2022 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 8/22/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 8/26/2022 Conditional Approval WINSTON DUNNING
Wood Frame 8/29/2022 Partial Inspection EDWIN GREGORYONA
Deputy Wood Construction 8/30/2022 Conditional Approval WINSTON DUNNING
Deputy Wood Construction 9/1/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 9/1/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 9/2/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 9/9/2022 Conditional Approval MICHAEL ROSENBERG
Insulation 9/12/2022 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 9/12/2022 Not Ready for Inspection EDWIN GREGORYONA
Wood Frame 9/12/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 9/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 9/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 9/16/2022 Conditional Approval MICHAEL ROSENBERG
Drywall Nailing 9/19/2022 Partial Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 9/19/2022 Partial Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 9/19/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 9/26/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/3/2022 Conditional Approval MICHAEL ROSENBERG
Drywall Nailing 10/7/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 10/19/2022 Partial Approval EDWIN GREGORYONA
Wood Frame 10/19/2022 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 10/24/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 10/28/2022 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 10/28/2022 Partial Approval EDWIN GREGORYONA
Insulation 11/2/2022 Partial Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 11/2/2022 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 11/2/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/4/2022 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 11/4/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 11/7/2022 Conditional Approval MICHAEL ROSENBERG
Light Gage Steel Frame 11/8/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/16/2022 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 11/16/2022 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 11/18/2022 Not Ready for Inspection EDWIN GREGORYONA
Insulation 11/22/2022 Partial Inspection EDWIN GREGORYONA
Drywall Nailing 11/30/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 12/2/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 12/14/2022 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 12/20/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 1/3/2023 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/6/2023 Conditional Approval MICHAEL ROSENBERG
Drywall Nailing 1/11/2023 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 1/13/2023 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 1/17/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 1/24/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 1/30/2023 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 2/2/2023 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 2/7/2023 Partial Inspection EDWIN GREGORYONA
Drywall Nailing 2/14/2023 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 2/22/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Shotcrete 2/23/2023 Conditional Approval MICHAEL ROSENBERG
Drywall Nailing 2/24/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/28/2023 Partial Approval GREGORY POMISH
Deputy Shotcrete 3/6/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/6/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 3/10/2023 Conditional Approval MICHAEL ROSENBERG
Drywall Nailing 3/14/2023 Partial Inspection EDWIN GREGORYONA
Drywall Nailing 3/20/2023 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 3/28/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 4/4/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 4/14/2023 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 4/14/2023 Approved EDWIN GREGORYONA
Masonry Wall/Backfill 4/18/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/5/2023 Approved EDWIN GREGORYONA
Special/Order Compliance 6/23/2023 Not Ready for Inspection GREGORY POMISH
Masonry Wall/Backfill 6/26/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 6/27/2023 Conditional Approval MICHAEL ROSENBERG
Special/Order Compliance 7/5/2023 Approved EDWIN GREGORYONA
Drywall Nailing 8/25/2023 Partial Approval EDWIN GREGORYONA
Final 8/25/2023 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 8/25/2023 Approved EDWIN GREGORYONA
Green Building Final 8/25/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 8/25/2023 Approved EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 8/25/2023 SGSOV Approved EDWIN GREGORYONA
Smoke Detectors 8/25/2023 Approved EDWIN GREGORYONA
Structural Steel Frame 8/25/2023 Approved EDWIN GREGORYONA
Wood Frame 8/25/2023 Approved EDWIN GREGORYONA
Drywall Nailing 8/30/2023 Approved EDWIN GREGORYONA
Final 8/30/2023 Partial Inspection EDWIN GREGORYONA
Green Building Final 8/30/2023 Partial Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 8/30/2023 Approved EDWIN GREGORYONA
Special/Order Compliance 9/1/2023 Approved EDWIN GREGORYONA
Final 1/10/2024 OK to Issue CofO EDWIN GREGORYONA
Green Building Final 1/10/2024 Approved EDWIN GREGORYONA
Special/Order Compliance 2/7/2024 Approved EDWIN GREGORYONA